1-ATTACHMENT B - GEYSER SITE LAYOUT.pdf

PDF 621 KB Posted

Attached to
GJ26-149 UCA Geyser Peak Tower Construction and Equipment Shelter Installation
Solicitation number
GJ26-149
Issued by
Tooele County, Utah

About this file

This is a site layout diagram for the Utah Communications Authority (UCA) Geyser Peak Tower Construction and Equipment Shelter Installation project located near Geyser Peak in Sevier County, Utah on USFS land (GPS coordinates 38.511960, -111.460180). The technical drawing depicts a detailed floor plan with multiple pages showing the spatial arrangement of equipment, mechanical systems, and structural components for the facility. The layout includes specifications for HVAC systems (both internal and external), electrical conduit routing, grounding systems, solar components, LP sensor conduits, bus bar configurations, and rack positioning. Key measurements and dimensional annotations are provided throughout the design, with references to Andrew part numbers (PN 252138) and various equipment designations including a P25 rack, MW P25 R1 unit, and Geyser 4-21-26 components. The drawing indicates multiple ducting sections, check size notations, and a 60-foot overall dimension across the primary structure. Materials for this project are to be picked up at the UCA Warehouse and UDOT Road Shed near Fish Lake (GPS coordinates 38.473200, -111.832516). Questions regarding the solicitation are due by May 19, 2026 at noon MT, with submissions required by May 22, 2026 at 10:00 AM MT via the U3P system.

The site layout document provides no information regarding pricing terms, set-asides, funding sources, or contract award amounts. The diagram serves as a technical reference for contractors to understand the facility configuration and equipment placement requirements for the tower construction and shelter installation project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2'-11"

5'-0"

P25

Rack8

A

F F

1'-6" 1'-6"

8"

Andrew

PN 252138

Andrew

PN 252138

20" Bus

Bar

LP Line

Conduit To Grounding System

Solar Conduits LP Sensor Conduit Conduit To Grounding System

4'-0"

'8

A

F F

'2

A

F F

1'-8"

Geyser 4-21-26

3'-2"

180° South Sector # 2

DUCTING

C h e c k s iz e

C h e c k s iz e

18'-4 1/2"

MW P25

R1

'8

In t.

H

V A

C

E x te rn a l H

V A

C

In t.

H

V A

C

E x te rn a l H

V A

C

2'-0"

4'-0"

5'-0"

5'-5"

21'-6"

1'-8"7

6'-2" 5'-5"

6'-2" 5'-5"

0 deg.

19'-0"

0 deg.

19'-0"

60'-0"

10'-10"

7'-4"

10'-10"

5'-5"

21'-6"

17'-1" 17'-1"

7'-4"

Geyser Draft 2, 3-26-26.vsdx
Page-1
Page-2
Page-3
Page-4
Page-5
Page-6

File details come from the government source that posted it. Updated .