This is a site layout diagram for the Utah Communications Authority (UCA) Geyser Peak Tower Construction and Equipment Shelter Installation project located near Geyser Peak in Sevier County, Utah on USFS land (GPS coordinates 38.511960, -111.460180). The technical drawing depicts a detailed floor plan with multiple pages showing the spatial arrangement of equipment, mechanical systems, and structural components for the facility. The layout includes specifications for HVAC systems (both internal and external), electrical conduit routing, grounding systems, solar components, LP sensor conduits, bus bar configurations, and rack positioning. Key measurements and dimensional annotations are provided throughout the design, with references to Andrew part numbers (PN 252138) and various equipment designations including a P25 rack, MW P25 R1 unit, and Geyser 4-21-26 components. The drawing indicates multiple ducting sections, check size notations, and a 60-foot overall dimension across the primary structure. Materials for this project are to be picked up at the UCA Warehouse and UDOT Road Shed near Fish Lake (GPS coordinates 38.473200, -111.832516). Questions regarding the solicitation are due by May 19, 2026 at noon MT, with submissions required by May 22, 2026 at 10:00 AM MT via the U3P system.
The site layout document provides no information regarding pricing terms, set-asides, funding sources, or contract award amounts. The diagram serves as a technical reference for contractors to understand the facility configuration and equipment placement requirements for the tower construction and shelter installation project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'-11"
5'-0"
P25
Rack8
A
F F
1'-6" 1'-6"
8"
Andrew
PN 252138
Andrew
PN 252138
20" Bus
Bar
LP Line
Conduit To Grounding System
Solar Conduits LP Sensor Conduit Conduit To Grounding System
4'-0"
'8
A
F F
'2
A
F F
1'-8"
Geyser 4-21-26
3'-2"
180° South Sector # 2
DUCTING
C h e c k s iz e
C h e c k s iz e
18'-4 1/2"
MW P25
R1
'8
In t.
H
V A
C
E x te rn a l H
V A
C
In t.
H
V A
C
E x te rn a l H
V A
C
2'-0"
4'-0"
5'-0"
5'-5"
21'-6"
1'-8"7
6'-2" 5'-5"
6'-2" 5'-5"
0 deg.
19'-0"
0 deg.
19'-0"
60'-0"
10'-10"
7'-4"
10'-10"
5'-5"
21'-6"
17'-1" 17'-1"