1-STH GEK Showers RFB FINAL 8.24.26.docx
DOCX document 114 KB Posted
- Attached to
- Shelter for the Homeless- GEK Shower Resurfacing
- Solicitation number
- NS27-101
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This Request for Bids (RFB) is issued by Shelter the Homeless, a nonprofit organization in Salt Lake City, Utah, for shower resurfacing improvements at the Geraldine E. King Women's Resource Center. The project involves resurfacing 25 existing shower stalls (six measuring approximately 5 ft. × 12 ft. and nineteen measuring approximately 5 ft. × 7 ft.) with Sherwin-Williams Deco Quartz resin in Blue Slate and three coats of clear epoxy coating to create durable, sanitary surfaces suitable for high-volume use. The contractor must verify all field measurements and provide all labor, materials, equipment, and supplies necessary for completion. Work is scheduled to begin around September 28, 2026, with a completion deadline of October 31, 2026, and must be performed Monday through Friday between 7:00 a.m. and 6:00 p.m. A mandatory pre-bid meeting is required on September 2, 2026, at 1:00 PM at the project location. Bids are due September 15, 2026, at 5:00 PM through the U3P portal, with bid opening scheduled for September 17, 2026, and estimated contractor selection by September 21, 2026.
This federally funded project is supported by Community Development Block Grant (CDBG) Program Year 2025 funding and is subject to Davis-Bacon prevailing wage requirements. The contract will be awarded to the lowest responsive and responsible bidder. All contractors and subcontractors must obtain a Unique Entity Identifier (UEI) and maintain full registration in SAM.gov, comply with applicable federal, state, and local requirements, and submit weekly certified payroll documentation. Contractors must carry insurance meeting minimum organizational requirements and obtain appropriate licensing. Any project changes must be approved in writing prior to implementation. Questions must be submitted through the U3P portal by September 8, 2026, at 5:00 PM, with responses posted September 11, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-STH GEK Showers RFB Amend1 9.2.26.docx | DOCX document | |
| 4-Shelter the Homeless GEK Wage Determination-Building 8-21-2026.pdf | ||
| 3-STH GEK Floor Plans 2.pdf | ||
| 6-NS27-101 Shelter for the Homeless- GEK Shower Resurfacing QA.pdf | ||
| 2-PY25 Pre-Bid Oriention Compliance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Bids (RFB)
1. Project Information Project Name: GEK Showers Grantee/Agency: Shelter the Homeless Agency Address: 242 W Paramount Ave, Salt Lake City, Utah Project Location: 131 E 700 S, Salt Lake City, Utah Funding Source: Community Development Block Grant (CDBG), Program Year 2025
2. Project Overview Shelter the Homeless is a nonprofit organization that serves the community by serving individuals experiencing homelessness and working with partners to develop safe facilities and expand solutions to prevent and end homelessness in Utah.
This project includes building improvements to create cleanable, non-porous surfaces to the showers that support effective sanitation, improved indoor air quality, and return the facility to the level of quality required for safe and reliable building operations at the Geraldine E. King Women’s Resource Center. The goal of the project is to ensure the space is accessible, safe, and usable for all community members, including people with disabilities and mobility limitations.
Submissions will be accepted through the U3P portal until September 15, 2026 at 5:00 PM.
3. Scope of Work The intent of this project is to resurface the existing shower walls with Sherwin-Williams Deco Quartz resin (Blue Slate) and apply three coats of clear epoxy to create a durable, sanitary finish capable of withstanding long-term, high-volume use.
The project includes:
· Six (6) showers measuring approximately 5 ft. × 12 ft.
· Nineteen (19) showers measuring approximately 5 ft. × 7 ft.
The existing surface is painted cinderblock. The selected contractor will be responsible for verifying all field measurements and furnishing all labor, materials, equipment, and supplies necessary to complete the work, including the specified Deco Quartz resin and clear epoxy coating system.
The contractor shall isolate, secure, and maintain the construction area for the duration of the project. While the shower area is under construction, shelter residents will continue to use the restroom stalls and sinks located in the south portion of the restroom. The north portion, which contains the showers, shall remain a secured work zone accessible only to authorized personnel.
Work shall be performed Monday through Friday between 7:00 a.m. and 6:00 p.m. Parking is available on the west side of the facility.
G. Schedule Expectations The project should begin around September 28, 2026, with a completion date no later than October 31, 2026.
4. Mandatory Pre-Bid Meeting Attendance at the pre-bid meeting is required for contractors intending to submit a bid.
Pre-Bid Meeting Details:
· Date: Wednesday, September 2, 2026
· Time: 1:00PM
· Location: Geraldine E. King Resource Center, 131 East 700 South, Salt Lake City
5. Schedule of Events
| Event |
| Date & Time |
| RFB Posted |
| August 25 |
| Mandatory Pre-Bid Meeting |
| September 2 |
| Deadline for Questions |
| September 8 at 5:00 PM |
| Responses to Questions Posted |
| September 11 |
| Event |
| Date & Time |
| Bid Due Date |
| September 15 at 5:00 PM |
| Bid Opening |
| September 17 |
| Estimated Contractor Selection |
| September 21 |
6. Questions and Addenda All questions should be submitted in writing through the U3P portal.
7. Contractor Requirements Licensing and Experience The contractor and all subcontractors must comply with applicable federal, state, and local requirements, including Davis-Bacon prevailing-wage requirements and weekly certified payroll submission.
Unique Entity Identifier (UEI) All contractors and subcontractors must have a UEI registered in SAM.gov in addition to full SAM.gov registration.
8. Federal Requirements – Davis-Bacon and CDBG (Summary for Contractors – Reviewed in Detail Later) This is a federally funded project and subject to Davis-Bacon prevailing wage requirements. Contractors will receive detailed guidance during the pre-bid meeting and the required pre-construction compliance orientation.
9. Insurance Requirements Contractors must carry insurance meeting minimum requirements. Grantees should verify insurance requirements align with their organizational policies.
10. Change Orders Any changes must be approved in writing before work proceeds. Clear scope definitions help reduce the need for change orders.
11. Bid Evaluation and Selection Contracts will be awarded to the lowest responsive and responsible bidder. Grantees should document their review and selection process for their records.
12. Attachments Include all documents needed for bidders to understand the project fully:
· Scope of Work
· Plans and Drawings
· Wage Determination
· Pre-Bid Davis Bacon Compliance Packet
· Required Bid Forms
13. Closing Thank you for your interest in this project. We look forward to receiving bids.
image1.jpeg
File details come from the government source that posted it. Updated .