This is a Statement of Work (SOW) for the U.S. Department of Agriculture Forest Service regarding the reconstruction of the Brush Creek Work Center in Berry Creek, California, following destruction by the North Complex Fire in August 2020. The project scope includes decommissioning existing Plumas National Forest facilities and constructing a new work center with utility infrastructure, with several items designated as optional line items. The work location is 12815 Oro Quincy Highway, Berry Creek, CA 95916 (Latitude/Longitude: 39.691407, -121.340275), and the period of performance is 650 calendar days commencing after issuance of the Notice to Proceed, which shall be issued within 10 days of contract award.
The contractor is responsible for furnishing all personnel, equipment, tools, materials, security, supervision, and related services to complete demolition and new construction per the stamped 100% IFC drawing package and specification package. Key contractor responsibilities include: procuring third-party testing and special inspections; designing and obtaining permits for Storm Water Pollution Prevention Plan (SWPPP) compliance; submitting PG&E permanent power renovation applications; obtaining Butte County permits for septic system demolition and installation; installing a minimum 4'W x 8'L project sign; documenting construction with professional photography; conducting surveys as needed; and managing all construction debris disposal off National Forest Land. Work hours are limited to Monday–Friday, 0600–1900 on non-holiday weekdays unless COR-approved. The contractor must provide an onsite superintendent and project manager within five business days of award and submit key deliverables including a proposed schedule, project plan, Schedule of Values, project submittals, warranties, operation manuals, and weekly status reports. An organized site visit is scheduled for Wednesday, February 18, 2026, at 1300 hours, led by Facilities Engineer Justine Zeni (justine.zeni@usda.gov). The government will provide existing utilities (spring water for non-concrete uses and a 200A power pedestal), AutoCAD drawing files, construction administration support through its contracted A&E firm, and access to a Box folder for file sharing.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project
General Information
1.0 Scope of Work
2.0 Background
3.0 Location
4.0 Estimated Start Date / Period of Performance
5.0 Drawings and Specifications
6.0 Restrictions on Work
6.0 Camping and Housing
7.0 Required Submittals
Contractor Requirements
8.0 Technical Requirements / Tasks
9.0 Government Furnished
10.0 Deliverables / Schedule
11.0 Travel
12.0 Contractor’s Key Personnel
13.0 Security Requirements
14.0 Data Rights
15.0 Site Visit
Project Brush Creek Work Center Construction
General Information
1.0 Scope of Work
The goal of this project is to decommission specified existing Plumas National Forest facilities at the Brush Creek Work Center and construct a new work center including utility infrastructure. Several scope items are included as option line items.
2.0 Background
The North Complex Fire began with a series of lightning strikes in August of 2020. On September 8, 2020 the fire spotted across the Middle Fork of the Feather River, entered Butte County and traveled 30 miles in a single day. The communities of Berry Creek and Brush Creek were immediately evacuated. The North Complex Fire burned through the Brush Creek Work Center (BCWC) destroying all but three structures. The Fire rendered the BCWC facility uninhabitable for employees and operations until burned structure debris and contaminated soil were removed. Phase 1 debris clean-up was completed in February 2021. Phase 2 debris and soil removal was completed in December 2021. Burned and hazardous tree removal throughout the compound site was completed in the summer of 2022. A&E was completed for the demolition and new development of the site in 2025.
3.0 Location
o 12815 Oro Quincy Highway, Berry Creek, CA 95916 o Lat/Long: 39.691407, -121.340275
4.0 Estimated Start Date / Period of Performance
o The work shall commence after the Notice to Proceed (NTP) is issued. The NTP shall be issued within 10 days of the award.
o The period of performance is 650 Calendar days.
5.0 Drawings and Specifications
Reference Solicitation Attachments:
• Brush Creek Work Center 100% Stamped IFC Drawing Package
• Brush Creek Work Center 100% IFC Specification Package
6.0 Restrictions on Work
• Work hours are limited to non-holiday weekdays, Monday – Friday, 0600 – 1900, unless approved by COR at no cost to the Government.
• In accordance with the fire plan, in Section J.
• When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
• For sites requiring archaeology monitoring, contractor must notify COR at least 24 hours prior to any ground disturbing activities and no ground disturbing activities may occur without a Forest Service archaeologist on site.
• When the Contracting Officer or designated representative determines that work must stop due to the presence of archaeological artifacts.
• Contractor is responsible for the security of their tools and equipment at all times, reference Spec section 01 50
• Contractor is responsible for all demolition activities and material as described in Spec section 02 41 00.
• All trash and loose materials shall be secured by the contractor daily, reference Spec section 01 50 00
• All construction debris remains the property of the Contractor and shall be properly disposed of off National Forest Land, reference Spec section 01 50 00 and 02 41 00.
• The contractor will be able to utilize the Forest Service Roads; however, the Contractor will be responsible for any damage to the roads due to construction activities. The contractor is also responsible for completing any activities required for access to the spring area such as access road maintenance and brush clearing.
6.0 Camping and Housing
Camping within the construction limits may be permitted only with COR and District Ranger approval. Please provide request for camping in project bid proposal. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
7.0 Required Submittals
Reference individual specification sections in attachment for submittal requirements.
Contractor Requirements
8.0 Technical Requirements / Tasks
The contractor shall furnish all personnel, equipment, tools, materials, security, supervision, and other items and services necessary to demolish the existing buildings/infrastructure and construct a complete, new work center.
• All work shall be completed per stamped drawing set and specification requirements unless otherwise noted.
• Contractor is responsible for procuring any required 3rd party testing and special inspections from qualified personnel. Refence specification package Attachment B – Schedule of special inspections and Spec section 01 40 00.
• The Contractor is responsible for designing, obtaining required permits and installing best management practices to be in compliance with the Storm Water Pollution Prevention Plan (SWPPP) according to Spec section 01 57 23. Contractor is responsible for completing and uploading all required documentation to the CSWRCB SMARTS system for SWPPP permit tracking and certification by Government.
• Contractor is responsible for submitting the PG&E permanent power renovation application and any associated fees.
• Contractor is required to obtain all permits required from Butte County for demolition of septic system (reference spec section 02 41 00) and installation of new septic system (reference spec section 02 41 00).
• Contractor is required to procure and install a project sign at project entrance prior to mobilization on site. Sign shall be a minimum of 4’Wx8’L. Verbiage and colors to be coordinated with Government COR. Reference Spec Section 01 50 00.
• Contractor is required to document construction with professional photos including preconstruction photos, concealed work photos, and final completion photos in accordance with specification 01 32 33.
• This contract does not include supplying and installing FFE. FFE includes desks, chairs, tables, shelving, lockers, window blinds, refrigerators, microwaves, ice machines, printers, washers and dryers.
• Contractor is responsible for any surveys, including boundary surveys completed by a registered professional surveyor, needed to complete the project scope.
• Liquidated damages are included in this contract.
• The Contractor is responsible for protection of their work, and purchase of Builder’s Risk Insurance is a decision to be made by the contractor.
9.0 Government Furnished
• Existing utilities for contractor’s use – reference Spec section 01 50 00 o Water: Existing spring water is acidic and not permitted to be used for concrete mixing, but can be used for general construction purposes such as dust abatement. Contractor is permitted to use the existing water source and system, but is responsible for any items required to make the existing system operational and any maintenance required during use.
o Power: One 200A power pedestal is located on the site and can be used for general construction needs.
Contractor will be responsible for opening a PG&E account to cover any associated costs with this meter. Any additional temporary power required is the responsibility of the contractor.
• Government will provide AutoCad drawing files of design documents as needed after contract award in coordination with the Government Contracted A&E Firm.
• The Government Contracted A&E firm will complete construction administration activities such as attending contractor coordination meetings, reviewing submittals and answering RFIs.
• Contractor’s will have access to a Government provided Box folder for sharing of large files and other project needs.
10.0 Deliverables / Schedule
Tasks and Associated Deliverables: Timely submission of deliverables is essential to successful completion this project.
Schedules for deliverables are specified in Table 1 and project specifications.
Table 1: Key Deliverables
Item No. Deliverable Objective Due
1 Proposed Schedule Demonstrate project timeline to Government At time of bid submission
2 Proposed Project Plan Define the responsibilities of contractor personnel, timeline, milestones of contract objectives and proposed approach to the project
At time of bid submission
3 Project Schedule of Values (SOV)
Document pricing in an organized way with a sufficient level of detail for Government to review proposal and effectively administer the contract.
At time of bid submission
3 Project Submittals Demonstrate understanding of products and systems throughout the project
As required per Specifications for procurement and construction timelines.
4 Warranties and Maintenance/Operation Manuals
Document required paperwork to the Government No later than five (5) business days after substantial completion
5 Weekly Status Report Report documenting tasks & issues weekly. Must include photos
Weekly, every Monday for work completed the previous week, by 1200 PST until the contract expires
11.0 Travel
Contractor is responsible for any travel costs related to this project scope.
12.0 Contractor’s Key Personnel
The Contractor shall provide an onsite contract representative (superintendent) who will oversee the performance of the work specified in this contract in the field no later than five (5) business days after contract award. Designate in writing to CO, the name of the contract representative and an alternate who shall have the authority to act for the Contractor on all contract matters relating to onsite daily operation of this contract. The CO/COR shall be notified at least 10 working days in advance of any subsequent personnel changes. Replacement personnel shall have the same level or better experience as the person being replaced.
The contractor shall provide a Project Manager representative who will oversee all administrative actions for the performance of work no later than five (5) business days after contract award. Designate in writing to CO, the name of the contract representative and an alternate who shall have the authority to act for the Contractor on all contract matters relating to administrative operations of this contract. The CO/COR shall be notified at least 10 working days in advance of any subsequent personnel changes. Replacement personnel shall have the same level or better experience as the person being replaced.
13.0 Security Requirements
No Additional security requirements required for this contract.
14.0 Data Rights
All drawings, plans, and specifications prepared for construction are property of the United States Government. Copying, dissemination, or distribution of these drawings, plans, or specifications to unauthorized persons is prohibited.
15.0 Site Visit
Organized Site Visit Details:
• Date / Time: Wednesday February 18, 2026 @ 1300
• Address / bldg. #: 12815 Oro Quincy, Hwy, Berry Creek, CA 95916.
Figure 1: Site Visit Location
FS personnel leading Site Visit Contact Info
• Title: Facilities Engineer
• Name: Justine Zeni
• Email: justine.zeni@usda.gov mailto:justine.zeni@usda.gov
File details come from the government source that posted it. Updated .