1-Attachment D EMC WWTF 30% CMGC Addendum 1 Set.pdf
PDF 28 MB Posted
- Solicitation number
- EMC-FY26-05
- Issued by
- Utah County, Utah
About this file
This file is a 30% Construction Management at-Risk (CMGC) Addendum 1 Set for the Eagle Mountain Wastewater Treatment Facility (WWTF) Expansion project, prepared by Advanced Engineering and Environmental Services, LLC for Eagle Mountain City, Utah. The preliminary design submittal, dated November 2025 with project number 13139-2023-002, encompasses comprehensive construction drawings for the expansion of the existing wastewater treatment facility. The deliverables include detailed site plans, civil drafting conventions, structural and mechanical systems documentation, process flow diagrams, and electrical infrastructure plans. The drawing set comprises over 100 individual sheets organized by facility designator, including general notes, site work details, electrical buildings, headworks, oxidation ditch upgrades, biological nutrient removal systems, membrane treatment buildings, solids buildings, and chemical feed facilities. General notes emphasize contractor responsibilities for site coordination, utility location and protection, material handling, pipe installation standards, and adherence to construction specifications including OSHA compliance for trench excavations, minimum four-foot cover depths, water main pressure testing requirements, and compaction standards.
The project specifications reference 2018 International Building Code standards, ACI concrete requirements, ASTM material standards, and various industry guidelines for steel, masonry, and wood construction. Key material specifications include f'c 4000 PSI concrete for foundations and elevated slabs, ASTM A706 Grade 60 reinforcing steel with specified lap splice lengths, cold-formed metal framing, structural steel per AISC standards, and treated wood materials where applicable. Construction notes detail concrete formwork requirements, reinforcement placement tolerances, foundation bearing capacities per geotechnical recommendations, masonry construction standards, and structural steel welding procedures. The contractor assumes responsibility for design and construction safety of all formwork, verification of existing site conditions, coordination of temporary utilities and existing structures, proper material handling to prevent damage, and one-year warranty on installation quality following final acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Attachment C.pdf | ||
| 3-Attachment B.pdf | ||
| 4-Attachment A.pdf | ||
| 5-MFS RFP 2025 EMWWTF MFS Equipment Procurement 2512 03.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pl ott ed : B y:
S tev e S eib er t D ate : M on da y, No ve mb er 3, Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
0- Ge ne ra l\P lan
S he ets \C
OV
ER
.dw g
EAGLE MOUNTAIN WWTF EXPANSION
PREPARED FOR:
EAGLE MOUNTAIN CITY
AE2S PROJECT NO:
ENGINEERING TEAM:
Ad va nc ed
En g i nee r i ng and
PRELIM
IN
ARY
Env i ronmental Services, LLC
NOT FOR
CONSTRUCTIO
N
LOCATION:
EAGLE MOUNTAIN CITY, UTAH
ALT. PROJECT NO:
N/A
CIVIL ENGINEER
30% DESIGN SUBMITTAL
13139-2023-002
DATE:
NOVEMBER 2025
Advanced Engineering and Environmental Services, LLC
Advanced Engineering and Environmental Services, LLC
STRUCTURAL ENGINEER
AJC Architects
ARCHITECT
Advanced Engineering and Environmental Services, LLC
PROCESS ENGINEER
Advanced Engineering and Environmental Services, LLC
MECHANICAL ENGINEER
Advanced Engineering and Environmental Services, LLC
ELECTRICAL ENGINEER
Advanced Engineering and Environmental Services, LLC
I&C ENGINEER
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w w .a e2 s.
co m
CMGC ADDENDUM 1 SET
FACILITY DESIGNATOR SHEET NUMBER SHEET TITLE
GENERAL (GEN)
GEN G001 COVER SHEET
GEN G002 INDEX OF DRAWINGS
GEN G003 LOCATION MAP
GEN C001 CIVIL DRAFTING CONVENTIONS
GEN C002 CIVIL SYMBOLS & ABBREVIATIONS
GEN C003 CIVIL CONSTRUCTION NOTES
GEN S001 GENERAL NOTES
GEN S002 GENERAL NOTES
GEN S003 DESIGN TABLES
GEN S004 INSPECTION TABLES
GEN P001 PROCESS SYMBOLS AND ABBREVIATIONS
GEN P002 PROCESS SCHEMATIC LEGEND
GEN P003 PROCESS FLOW DIAGRAM - MEMBRANE BIOREACTOR
GEN P004 PROCESS FLOW DIAGRAM - OXIDATION DITCH
GEN P005 PROCESS FLOW DIAGRAM - SOLIDS HANDLING
GEN P006 PROCESS HYDRAULIC PROFILE - OXIDATION DITCH
GEN P007 PROCESS HYDRAULIC PROFILE - MEMBRANE BIOREACTOR
GEN P008 PROCESS BASIS OF DESIGN - FLOWS AND LOADS
GEN P009 PROCESS BASIS OF DESIGN - EQUIPMENT - MBR EXPANSION
GEN P010 PROCESS BASIS OF DESIGN - EQUIPMENT - MBR EXPANSION
GEN P011 PROCESS BASIS OF DESIGN - EQUIPMENT - OXIDATION DITCH
GEN M001 MECHANICAL SYMBOLS AND ABBREVIATIONS - HVAC
GEN M002 MECHANICAL SYMBOLS AND ABBREVIATIONS - PLUMBING
GEN E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
GEN E002 OVERALL CAMPUS NETWORK DIAGRAM
GEN E003 OXIDATION DITCH NETWORK DIAGRAM
GEN E004 HAZARDOUS AREA CLASSIFICATION SCHEDULE
GEN IC001 P&ID SYMBOLS AND ABBREVIATIONS
GEN IC002 P&ID SYMBOLS AND LEGEND
GEN IC003 P&ID TAGGING ABBREVIATIONS
SITE WORK (SW)
SW C101 SITE PLAN - OVERALL
SW C102 SITE PLAN - EXISTING TRAIN
SW C103 SITE PLAN - MBR TRAIN
SW C104 OXIDATION DITCH (OXD) UPGRADES SITE PLAN
SW E001 SITE PLAN - ELECTRICAL CONDUIT LAYOUT
ELECTRICAL BUILDING (EB1)
EB1 E601 EXISTING EB1-SWBD1 ONE-LINE DIAGRAM
EB1 E602 EXISTING EB1-MCC1 ONE-LINE DIAGRAM
EB1 E603 EXISTING EB1-MCC1 ONE-LINE DIAGRAM
EB1 E604 EXISTING EB1-MCC1 ONE-LINE DIAGRAM
EB1 E605 EXISTING EB1-MCC1 ONE-LINE DIAGRAM
ELECTRICAL BUILDING (EB2)
EB2 E601 EB2-MVSWG1 ONE-LINE DIAGRAM
EB2 E602 EB2-MVSWG1 ONE-LINE DIAGRAM
EB2 E603 EB2-MVSWG1 ONE-LINE DIAGRAM
EB2 E604 EB2-MVSWG1 ONE-LINE DIAGRAM
EB2 E605 EB2-MVSWG1 ELEVATION
EB2 E606 EB2-MVSWG1 INSTRUMENTATION
EB2 E607 WEST AND EAST LOOP ONE-LINE DIAGRAMS
INFLUENT PUMP STATION (IPS)
IPS IC101 P&ID - WET WELL No. 1 IPS IC102 P&ID - VALVE VAULT No. 1 IPS IC103 P&ID - WET WELL No. 2 IPS IC104 P&ID - VALVE VAULT No. 2
HEADWORKS 1 (HW1)
HW1 E601 DP-HW ONE-LINE DIAGRAM
HW1 E602 DP-HW ONE-LINE DIAGRAM
HW1 E603 DP-HW ONE-LINE DIAGRAM
OXIDATION DITCH (OXD)
OXD P101 SUBGRADE LEVEL - OVERALL PLAN
OXD P102 MAIN LEVEL - OVERALL PLAN
OXD P301 SECTIONS
OXD P901 ISO VIEW
OXD IC101 P&ID - OXIDATION DITCH
OXD IC102 P&ID - OXIDATION DITCH
OXIDATION DITCH SWING ZONE (OSW)
OSW IC101 P&ID - VALVE VAULT
OSW IC102 P&ID - OXIDATION DITCH SWING ZONE
HEADWORKS 2 (HW2)
HW2 P101 CONCEPT - MAIN LEVEL - OVERALL PLAN
HW2 P102 CONCEPT - UPPER LEVEL - OVERALL PLAN
HW2 P301 CONCEPT - SECTION
HW2 IC101 P&ID - COARSE SCREEN No. 1 HW2 IC102 P&ID - COARSE SCREEN No. 2 HW2 IC103 P&ID - COARSE SCREEN No. 3 HW2 IC104 P&ID - COARSE SCREEN No. 4 (FUTURE)
HW2 IC105 P&ID - GRIT REMOVAL
HW2 IC106 P&ID - GRIT PUMP Nos. 1-2 HW2 IC107 P&ID - GRIT PUMP Nos. 3-4 HW2 IC108 P&ID - FINE SCREEN No. 1 HW2 IC109 P&ID - FINE SCREEN No. 2 HW2 IC110 P&ID - FINE SCREEN No. 3 HW2 IC111 P&ID - FINE SCREEN No. 4 HW2 IC112 P&ID - FINE SCREEN No. 5
HW2 IC113 P&ID - FINE SCREEN EFFLUENT
HW2 IC114 P&ID - ODOR CONTROL
HW2 IC115 P&ID - CONVEYORS
BIOLOGICAL NUTRIENT REMOVAL (BNR)
BNR S101 FOUNDATION PLAN - OVERALL
BNR S102 FOUNDATION PLAN - NORTH
BNR S103 FOUNDATION PLAN - SOUTH
BNR S104 WEIR LEVEL PLAN - OVERALL
BNR S105 WEIR LEVEL PLAN - NORTH
BNR S106 WEIR LEVEL PLAN - SOUTH
BNR S107 MAIN LEVEL PLAN - OVERALL
BNR S108 MAIN LEVEL PLAN - NORTH
BNR S109 MAIN LEVEL PLAN - SOUTH
BNR S110 ROOF FRAMING PLAN - OVERALL
BNR S111 ROOF FRAMING PLAN - NORTH
BNR S112 ROOF FRAMING PLAN - SOUTH
BNR S301 SECTIONS
BNR S302 SECTIONS
BNR S303 SECTIONS
BNR S304 SECTIONS
BNR S901 ISOMETRIC
BNR IC101 P&ID - PROCESS BLOWERS No. 1 AND No. 2 BNR IC102 P&ID - PROCESS BLOWERS No. 3 AND No. 4
BNR IC103 P&ID - PROCESS BLOWERS HEADER
BNR IC104 P&ID - BNR INFLUENT DISTRIBUTION BOX
BNR IC105 P&ID - RAS DISTRIBUTION BOX
BNR IC106 P&ID - BNR BASIN No. 1 BNR IC107 P&ID - BNR BASIN No. 1 BNR IC108 P&ID - BNR BASIN No. 1
BNR IC109 P&ID - BNR EFFLUENT CHANNEL
BNR IC110 P&ID - BNR AIR COMPRESSOR SYSTEM
BNR IC111 P&ID - ODOR CONTROL
MEMBRANE TREATMENT BUILDING (MTB)
MTB P101 VEOLIA CONCEPT - SUBGRADE LEVEL - OVERALL PLAN
MTB P102 MEMCOR CONCEPT - SUBGRADE LEVEL - OVERALL PLAN
MTB P103 VEOLIA CONCEPT - MAIN LEVEL - OVERALL PLAN
MTB P104 MEMCOR CONCEPT - MAIN LEVEL - OVERALL PLAN
MTB P105 VEOLIA CONCEPT - UPPER LEVEL - OVERALL PLAN
MTB P106 MEMCOR CONCEPT - UPPER LEVEL - OVERALL PLAN
MTB P301 VEOLIA CONCEPT - SECTION
MTB P302 MEMCOR CONCEPT - SECTION
MTB IC101 P&ID - MEMBRANE BLOWER No. 1
MTB IC102 P&ID - BLOWER DISCHARGE HEADER
MTB IC103 P&ID - MFS INFLUENT DISTRIBUTION CHANNEL
MTB IC104 P&ID - MEMBRANE TANK No. 1
MTB IC105 P&ID - MTB RAS CHANNEL
MTB IC106 P&ID - PERMEATE PUMP Nos. 1-4
MTB IC107 P&ID - PLANT WATER TANK
MTB IC108 P&ID - UV VESSEL No. 1 MTB IC109 P&ID - NONPOTABLE PLANT WATER PUMP Nos. 1-4
MTB IC110 P&ID - HYDROPNEAUMATIC TANK
MTB IC111 P&ID - RAS PUMP Nos. 1-4
MTB IC112 P&ID - RAS PUMP HEADER
MTB IC113 P&ID - WAS PUMPS
MTB IC114 P&ID - MEMBRANE THICKENING TANK No. 1 MTB IC115 P&ID - MEMBRANE THICKENING TANK No. 2 MTB IC116 P&ID - MEMBRANE THICKENING PUMP Nos. 1-2 MTB IC117 P&ID - TWAS PUMP Nos. 1-2
MTB IC118 P&ID - MEMBRANE THICKENING BLOWER
MTB IC119 P&ID - CITRIC ACID STORAGE TANK Nos. 1-2 MTB IC120 P&ID - CITRIC ACID CHEMICAL METERING PUMP SKID No. 1 MTB IC121 P&ID - SODIUM HYPOCHLORITE STORAGE TANK Nos. 1-2 MTB IC122 P&ID - SODIUM HYPOCHLORITE CHEMICAL METERING PUMP SKID No. 1 MTB IC123 P&ID - SODIUM HYPOCHLORITE CHEMICAL METERING PUMP SKID No. 2
MTB IC124 P&ID - MEMBRANE AIR COMPRESSOR SYSTEM
SLUDGE STORAGE TANKS (SST)
SST IC101 P&ID - SLUDGE STORAGE TANK Nos. 1-2
SOLIDS BUILDING 2 (SB2)
SB2 P101 P&ID - CONCEPT - SUBGRADE LEVEL - OVERALL PLAN
SB2 P102 P&ID - MAIN LEVEL - OVERALL PLAN
SB2 P103 P&ID - UPPER LEVEL - OVERALL PLAN
SB2 P301 P&ID - CONCEPT - SECTION
SB2 IC101 P&ID - SLUDGE STORAGE BLOWER Nos. 1-2
SB2 IC102 P&ID - SLUDGE STORAGE BLOWER DISTRIBUTION PIPING
SB2 IC103 P&ID - SLUDGE TRANSFER PUMP Nos. 1-3
SB2 IC104 P&ID - SLUDGE TRANSFER PUMP DISTRIBUTION PIPING
SB2 IC105 P&ID - DEWATERING UNIT AND VOLUTE PRESS Nos. 1-2 SB2 IC106 P&ID - SLUDGE CONVEYOR Nos. 1-3
SB2 IC107 P&ID - PRESSSATE STORAGE TANK
SB2 IC108 P&ID - POLYMER BLENDING UNIT No. 1 SB2 IC109 P&ID - POLYMER BLENDING UNIT No. 2
SB2 IC110 P&ID - ODOR CONTROL
DRAIN LIFT STATION (DLS)
DLS IC101 P&ID - DRAIN LIFT STATION
CHEMICAL FEED BUILDING (CFB)
CFB IC101 P&ID - COAGULANT STORAGE TANK No. 1 CFB IC102 P&ID - COAGULANT CHEMICAL METERING SKID No. 1 CFB IC103 P&ID - CARBON STORAGE TANK Nos. 1-2 CFB IC104 P&ID - CARBON CHEMICAL METERING SKID No. 1 CFB IC105 P&ID - MAGNESIUM HYDROXIDE TANK No. 1 CFB IC106 P&ID - MAGNESIUM HYDROXIDE CHEMICAL METERING SKID No.1
STANDARD DETAILS (SD)
SD S701 STANDARD STRUCTURAL DETAILS
SD S702 STANDARD STRUCTURAL DETAILS
SD S703 STANDARD STRUCTURAL DETAILS
FACILITY DESIGNATOR SHEET NUMBER SHEET TITLE
Fil e:
\\a e2 s.c om
\na su ni\ pr oje cts
\E \E ag le
Mo un tai n\1
-2
3-
2\C
AD
D wg s\0 0-
Ge ne ra l\P lan S he ets
\In de x o f D ra wi ng s.d wg Pl ott ed
: B y:
St ev e S eib er t
Da te:
M on da y, No ve mb er
3, Fil e:
\\a e2 s.c om \na su ni\ pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
0- Ge ne ra l\P lan
S he ets \In de x o f D ra wi ng s.d wg
PR
OJ
EC
T
TI
TL
E:
PROJECT NO:
DATE:
ALT. PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
SY
M
DA
TE
AP
PR
ST
AT
US
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w
.a e2 s.
co m
Ad va nc ed
En g i neer i ng and
PRELIM
IN
ARY
Env i ronmental Services, LLC
NOT FOR
CONSTRUCTIO
N
EA
G
LE
M
O U
N
TA
IN
W
W
TF
E
XP
A N
SI
O
N
INDEX OF DRAWINGS
EAGLE MOUNTAIN CITY
EAGLE MOUNTAIN CITY, UTAH
13139-2023-002
N/A
NOVEMBER 2025 GEN G002
SAS
JC
KCW
PR
EL
IM
IN
A R
Y
G003
PROJECT LOCATION MAP
G003
PROJECT VICINITY MAP
UTAH COUNTY
G003
PROJECT AERIAL MAP
UTAH COUNTY
STATE OF UTAH
Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
0- Ge ne ra l\P lan
S he ets \Lo ca tio n a nd
In de x.d wg
Pl ott ed : B y:
S tev e S eib er t D ate : M on da y, No ve mb er 3, Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
0- Ge ne ra l\P lan
S he ets \Lo ca tio n a nd
In de x.d wg
PR
OJ
EC
T
TI
TL
E:
PROJECT NO:
DATE:
ALT. PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
SY
M
DA
TE
AP
PR
ST
AT
US
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w w .a e2 s.
co m
Ad va nc ed
En g i nee r i ng and
PRELIM
IN
ARY
Env i ronmental Services, LLC
NOT FOR
CONSTRUCTIO
N
EA
G
LE
M
O U
N
TA
IN
W
W
TF
E
XP
A N
SI
O
N
LOCATION MAP
EAGLE MOUNTAIN CITY
EAGLE MOUNTAIN CITY, UTAH
13139-2023-002
N/A
NOVEMBER 2025 GEN G003
SAS
JC
KCW
PR
EL
IM
IN
A R
Y
PROJECT LOCATION
PROJECT LOCATION
N M
A G
N O
LI
A
R D
N P
O N
Y
EX
PR
ES
S
PK
W
X
XX
PLAN DRAWING TITLE
50' 0 50' 100'
SECTION A-A
X
XX
X
XX
AA
H T R O N
CONSTR ACTUAL
REF:
X
XX
C10, C12, C14
DETAIL TITLE
SCALE: NONE
X
XX
SECTION TITLE
50' 0 50' 100'
SHEET WHERE DETAIL IS CALLED
FROM (EVERY OCCURRENCE)
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
AREA OF DETAIL
SHEET WHERE DRAWN
DETAIL NUMBER
GRAPHIC SCALE
SHEET WHERE DRAWN
DETAIL NUMBER
GRAPHIC SCALE
DRAWING SUB-TITLE
SECTION CUT WITHIN
SAME DETAIL DRAWING
ACTUAL NORTH
REFERENCE NORTH (ORIENTED
TO SITE OR STRUCTURE)
100'-0"±
FLOOR
100'-0"±
FLOOR
108'-0"
WALL
108'-0"
FLOOR
EQUIP
EXISTING ELEVATION IN SECTION VIEW
(CONTRACTOR TO VERIFY)
EXISTING ELEVATION IN PLAN VIEW
(CONTRACTOR TO VERIFY)
DESIGN ELEVATION IN SECTION VIEW
DESIGN ELEVATION IN PLAN VIEW
BREAKLINE
DIRECTION OF FLOW
CONSTRUCTION NOTES
DEMOLITION NOTES
EQUIPMENT SCHEDULE ITEMS
EXISTING NOTES
PIPING SCHEDULE ITEMS
& - AND
∠ - ANGLE
@ - AT
℄ - CENTERLINE
° - DEGREES
Δ - DELTA
Ø - DIAMETER
o - SQUARE
± - PLUS / MINUS
ABS - ACRYLONITRILE-BUTADIENE-STYRENE
ACI - AMERICAN CONCRETE INSTITUTE
ACP - ASBESTOS CEMENT PIPE
ADD'L - ADDITIONAL
ADDM. - ADDENDUM
ADJ. - ADJUSTABLE
AGGR. - AGGREGATE
ALT. - ALTERNATE
APPR. - APPROACH
APPROX. - APPROXIMATE
APPURT. - APPURTENANCE
ARCH. - ARCHITECT or ARCHITECTURAL
AR MH - AIR RELEASE MANHOLE
ARV - AIR RELEASE VALVE
ASSY. - ASSEMBLY
ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS
AVE - AVENUE
AVV - AIR / VACUUM VALVE
BFV - BUTTERFLY VALVE
BITUM. - BITUMINOUS
BL - BUILDING LINE
BLDG. - BUILDING
BLK. - BLOCK
B.O. - BY OTHERS
BP - BEGINNING OF PROJECT
BRG. - BEARING
BSMT. - BASEMENT
BVC - BEGIN VERTICAL CURVE
C-C - CENTER TO CENTER
C&G - CURB AND GUTTER
CB - CATCH BASIN
CDF - CONTROLLED DENSITY FILL
CF - CUBIC FEET
CI - CAST IRON
CIP - CAST IRON PIPE
C.I.P. - CAST IN PLACE
CJ - CONSTRUCTION JOINT
CL - CENTERLINE
CMP - CORRUGATED METAL PIPE
CO - CLEANOUT
CONC. - CONCRETE
CONSTR. - CONSTRUCTION
CONT. - CONTINUOUS
CNTRL. - CONTROL
CSP - CORRUGATED STEEL PIPE
CSV - CURB STOP VALVE
CTR - CENTER
CU - COPPER
CY - CUBIC YARD
DEPR. - DEPRESSION
DTL - DETAIL
DI or D.I. - DUCTILE IRON
DIA. - DIAMETER
DIM. - DIMENSION
DIP - DUCTILE IRON PIPE
DIST. - DISTANCE
DR - DRIVE
DRWY - DRIVEWAY
DWG. - DRAWING
E. - EAST
E-W - EAST TO WEST
EA. - EACH
E.F. - EACH FACE
EJ - EXPANSION JOINT
ELEC. - ELECTRICAL
ELEV. - ELEVATION
EP - END OF PROJECT
EQ. - EQUAL
EVC - END VERTICAL CURVE
E.W. - EACH WAY
EXIST. - EXISTING
EXP. - EXPANSION
FDN. - FOUNDATION
FIN. - FINISH
FL - FLOW LINE OR FLANGE
FLR. - FLOOR
FM - FORCE MAIN
FRP - FIBERGLASS REINFORCED PLASTIC
FT. - FOOT
G&S - GROOVE AND SHOULDER
GA. - GAGE
GALV. - GALVANIZED
GR. - GRADE
GRD. - GROUND
GV - GATE VALVE
H - HATCH
HDD - HORIZONTAL DIRECTIONAL DRILLING
HDPE - HIGH DENSITY POLYETHYLENE
HORZ. - HORIZONTAL
HR. - HANDRAIL
HT. - HEIGHT
HYD - HYDRANT
I.D. - INSIDE DIAMETER
I.E. - INVERT ELEVATION
IN. - INCH
INSUL - INSULATION
INV. - INVERT
JT. - JOINT
K - RATE OF CURVATURE
L - LENGTH OF CURVE
LB - POUND
LCCP - LINED CONCRETE CYLINDER PIPE
LF - LINEAR FEET
LVC - LENGTH OF VERTICAL CURVE
LVL - LEVEL
MAX. - MAXIMUM
MECH - MECHANICAL
MFG. - MANUFACTURER
MH - MANHOLE
MJ or M.J. - MECHANICAL JOINT
MIN. - MINIMUM
MNDOT - MINNESOTA DEPARTMENT OF TRANSPORTATION
MTDOT - MONTANA DEPARTMENT OF TRANSPORTATION
MTR. - METER
N. - NORTH
N-S - NORTH TO SOUTH
NA - NOT APPLICABLE
NDDOT - NORTH DAKOTA DEPARTMENT OF TRANSPORTATION
NPT - NIPPLE
NTS - NOT TO SCALE
O.C. - ON CENTER
O.D. - OUTSIDE DIAMETER
OH. - OVERHEAD
OPNG. - OPENING
OSHA - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PC - POINT OF CURVATURE
PC - PRECAST
P.C.C. - PORTLAND CEMENT CONCRETE
PE - POLYETHYLENE
PE or P.E. - PLAIN END
PEP - POLYETHYLENE PIPE
PI - POINT OF INTERSECTION
PO - PUSH ON
POLY
PRV - PRESSURE REDUCING VALVE
PSI - POUNDS PER SQUARE INCH
PT - POINT OF TANGENCY
PLV - PLUG VALVE
PVC - POLYVINYL CHLORIDE
PVI - POINT OF VERTICAL INTERSECTION
R or RAD - RADIUS
R. - RISER
RCCP - REINFORCED CONCRETE CYLINDER PIPE
RCP - REINFORCED CONCRETE PIPE
RDL - ROOF DRAIN LINE
RES - RESERVOIR
REQ'D. - REQUIRED
REQ'MTS. - REQUIREMENTS
RJ - RESTRAINED JOINT
S. - SOUTH
S-N - SOUTH TO NORTH
SAN - SANITARY
SCH. - SCHEDULE
SD - STORM DRAIN
SECT. - SECTION
SF - SQUARE FEET
SIM. - SIMILAR
SS - SANITARY SEWER
SSSL - SANITARY SEWER SERVICE LEAD
ST - STREET
STA - STATION
STD. - STANDARD
STL. - STEEL
STN. STL. - STAINLESS STEEL
STR. - STRUCTURAL
STRUCT - STRUCTURAL
SUP. - SUPPORT
SWPP - STORM WATER POLLUTION PROTECTION
SY - SQUARE YARD
TEMP. - TEMPORARY
THK. - THICK
TOC - TOP OF CASTING
T.O.P. - TOP OF PIPE
TOS - TOP OF STEEL
TYP. - TYPICAL
UON - UNLESS OTHERWISE NOTED
USACE - U.S. ARMY CORPS OF ENGINEERS
VCP - VITRIFIED CLAY PIPE
VERT. - VERTICAL
W. - WEST
W-E - WEST TO EAST
W/ - WITH
W/O - WITHOUT
WM - WATERMAIN
WRF - WATER RECLAMATION FACILITY
WSL - WATER SERVICE LEAD
WTF - WATER TREATMENT FACILITY
WTP - WATER TREATMENT PLANT
WWF - WELDED WIRE FABRIC
WWTP - WASTE WATER TREATMENT PLANT
GENERAL NOTES
1. THE INFORMATION DEPICTED WITHIN THESE DRAWINGS IS
COMPILED FROM LEGACY DRAWINGS AND FIELD SURVEYS
FROM PREVIOUS PROJECTS, SITE VISITS, CONSTRUCTION
OBSERVATION TIES AND PHOTOGRAPHS, AND THE
MEMORIES OF CITY STAFF AND CONSTRUCTION
OBSERVERS.
2. THE LOCATIONS OF KNOWN UNDERGROUND UTILITIES
ARE SHOWN ON THE CONSTRUCTION DRAWINGS IN AN
APPROXIMATE WAY ONLY. ADDITIONAL ACTIVE AND
INACTIVE UTILITIES MAY BE PRESENT.
3. COORDINATE ALL ON-SITE STAGING WITH OWNER TO
AVOID CONFLICTS WITH EXISTING UTILITIES.
4. MAINTAIN OWNER ACCESS TO SITE AT ALL TIMES.
CIVIL DRAWING SYMBOLS
DRAWING, SECTION AND DETAIL CONVENTIONS
CIVIL ABBREVIATIONS
SHEET SERIES SERIES DESCRIPTION
000 SYMBOLS LEGEND, DRAFTING CONVENTIONS, NOTES, ETC.
100 PLAN VIEWS AND COMBINATION PLAN & PROFILE VIEW (HORIZONTAL VIEWS)
200 ELEVATIONS AND PROFILES (VERTICAL VIEWS)
300 SECTIONS (SECTION VIEWS, WALL SECTIONS)
400 LARGE SCALE VIEWS (SCALED UP REPRODUCTIONS OF PLANS, ELEVATIONS OR SECTIONS NOT IN DETAILS
500 DETAILS (PROJECT SPECIFIC DETAILS)
600 SCHEDULES AND DIAGRAMS
700 STANDARD DETAILS
800 USER DEFINED
SHEET NUMBERING
Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
1- Ci vil \P lan S he ets
\C _S ym bo ls_ Ab br ev iat ion s.d wg
Pl ott ed : B y:
S tev e S eib er t D ate : M on da y, No ve mb er 3, Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
1- Ci vil \P lan S he ets
\C _S ym bo ls_ Ab br ev iat ion s.d wg
PR
OJ
EC
T
TI
TL
E:
PROJECT NO:
DATE:
ALT. PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
SY
M
DA
TE
AP
PR
ST
AT
US
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w w .a e2 s.
co m
Ad va nc ed
En g i nee r i ng and
PRELIM
IN
ARY
Env i ronmental Services, LLC
NOT FOR
CONSTRUCTIO
N
EA
G
LE
M
O U
N
TA
IN
W
W
TF
E
XP
A N
SI
O
N
CIVIL DRAFTING CONVENTIONS
EAGLE MOUNTAIN CITY
EAGLE MOUNTAIN CITY, UTAH
13139-2023-002
N/A
NOVEMBER 2025 GEN C001
EL
RS
RS
PR
EL
IM
IN
A
WATER
DESCRIPTION EXISTING NEW
PIPE
WATER MAIN
WATER SERVICE
STRUCTURES
MANHOLE
METER MANHOLE
ARV MANHOLE
WELL
MONITORING WELL
PRV MANHOLE
WATER HANDHOLE
VAULT
VALVES
CURBSTOP
GATE
BUTTERFLY
PLUG
CHECK
BALL
HYDRANTS
FIRE
ARV
BLOW OFF
FITTINGS
11.25° BEND
22.50° BEND
30° BEND
45° BEND
60° BEND
90° BEND
WYE (R)
WYE (L)
CAP
COUPLING
CROSS
PLUG
REDUCER
TEE
SADDLE TAP
W W
M M
WW WW
MW MW
W W
W W
W
SANITARY
DESCRIPTION EXISTING NEW
PIPE
SANITARY MAIN
SANITARY SERVICE
STRUCTURES
MANHOLE
CLEAN OUT
METER MANHOLE
SEPTIC TANK
VAULT
LIFTSTATION
VALVES
GATE
BUTTERFLY
PLUG
FITTINGS
WYE (R)
WYE (L)
PLUG
CAP
S S
CO CO
M M
ST ST
S S
L L
SS
STORM
DESCRIPTION EXISTING NEW
PIPE
STORM MAIN
STORM LEAD
STRUCTURES
MANHOLE
AREA INLET
BEEHIVE INLET
CURB INLET
DOUBLE CURB INLET
OUTFALL
D D
SD
ELECTRICAL
DESCRIPTION EXISTING NEW
LINES
ELECTRIC
OVERHEAD
UNDERGROUND
STRUCTURES
MANHOLE
HANDHOLE
UTILITY POLE
GUY ANCHOR
LIGHT POST
PUSH TO WALK POST
STREET LIGHT
SIGNAL
SIGNAL WITH ARM
E E
E E
P P
E E
OHE
UGE
OHE
UGE
COMMUNICATIONS
DESCRIPTION EXISTING NEW
LINES
COMMUNICATIONS
FIBER OPTIC
TELEPHONE
CABLE TV
CLOSED CIRCUIT TV
STRUCTURES
MANHOLE
TELEPHONE MANHOLE
TELEPHONE PEDESTAL
TELEPHONE FIBER OPTIC
PEDESTAL
TELEVISION PEDESTAL
UNKNOWN PEDESTAL
C C
T T
T T
FO FO
TV TV
U U
C
FO
T
CATV
CCTV
SITE
DESCRIPTION EXISTING NEW
VEGETATION
CONIFEROUS TREE
(LARGE)
CONIFEROUS TREE
(SMALL)
DECIDUOUS TREE
(LARGE)
DECIDUOUS TREE
(SMALL)
SHRUB
STUMP
TREE LINE
SIGNAGE
STREET SIGN
MILE POST
SITE
BUILDING
CURB
CONCRETE
FENCES
BARBED WIRE
CHAIN LINK
WOOD
VINYL
WOVEN WIRE
GUARD RAIL
SILT
SUPER SILT
GATE POST
TOPOLOGY
CONTOURS
MP MP
GP
GAS
DESCRIPTION EXISTING NEW
LINES
NATURAL GAS
STRUCTURES
MANHOLE
METER
VALVES
GATE VALVE
G G
G G
G
SF
SSF
SF
SSF
DEMOLITION
DESCRIPTION EXISTING NEW
LINES
FEATURES TO BE
REMOVED
FEATURES TO BE
ABANDONED
REMOVE CURB & GUTTER
STRUCTURES
REMOVE TREE OR SHRUB
AREA
ITEMS TO BE REMOVED
Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
1- Ci vil \P lan S he ets
\C _S ym bo ls_ Ab br ev iat ion s.d wg
Pl ott ed : B y:
S tev e S eib er t D ate : M on da y, No ve mb er 3, Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
1- Ci vil \P lan S he ets
\C _S ym bo ls_ Ab br ev iat ion s.d wg
PR
OJ
EC
T
TI
TL
E:
PROJECT NO:
DATE:
ALT. PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
SY
M
DA
TE
AP
PR
ST
AT
US
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w w .a e2 s.
co m
Ad va nc ed
En g i nee r i ng and
PRELIM
IN
ARY
Env i ronmental Services, LLC
NOT FOR
CONSTRUCTIO
N
EA
G
LE
M
O U
N
TA
IN
W
W
TF
E
XP
A N
SI
O
N
CIVIL SYMBOLS & ABBREVIATIONS
EAGLE MOUNTAIN CITY
EAGLE MOUNTAIN CITY, UTAH
13139-2023-002
N/A
NOVEMBER 2025 GEN C002
EL
RS
RS
PR
EL
IM
IN
A R
Y
900900
G
GENERAL NOTES
1. THIS LEGEND SHEET IS FOR VISUAL REFERENCE OF THE
SYMBOLS AND LINETYPES USED ON THIS PROJECT.
SOME OF THE SYMBOLS AND LINETYPES MAY NOT BE
USED BY THIS PARTICULAR PROJECT.
Fil e:
\\A E2
S.
co m\ Na su ni\
Pr oje cts \E
\E ag le Mo un tai n\1
-2
3-
2\C
AD
D wg s\0
1- Ci vil \P lan S he ets
\C _G en _N ote s.d wg Pl ott ed
: B y:
S tev e S eib er t
D ate
: M on da y, No ve mb er
3, Fil e:
\\A
E2 S.
co m\
Na su ni\ Pr oje cts
\E \E ag le
Mo un tai n\1
-2
3-
2\C
AD
D wg s\0 1-
Ci vil
\P lan
S he ets \C
_G en
_N ote s.d wg
PR
OJ
EC
T
TI
TL
E:
PROJECT NO:
DATE:
ALT. PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
SY
M
DA
TE
AP
PR
ST
AT
US
Certification of Individual Project Design Disciplines Are Included On Their Individual Drawings, Respectively
A dv an ce d En gi ne er in g an d En vi ro nm en ta l S er vi ce s, L
LC
w w w .a e2 s.
co m
RE
VI
SI
ON
S
EA
G
LE
M
O U
N
TA
IN
W
W
TF
E
XP
A N
SI
O
N
CIVIL CONSTRUCTION NOTES
EAGLE MOUNTAIN CITY
EAGLE MOUNTAIN CITY, UTAH
13139-2023-002
N/A
NOVEMBER 2025 GEN C003
EL
RS
RS
PR
EL
IM
IN
A R
Y
GENERAL NOTES
1. CONTRACTOR SHALL ADHERE TO CLIENT CONSTRUCTION SPECIFICATIONS, UNLESS
NOTED OTHERWISE. CONTRACTOR SHOULD NOTE THAT ADDITIONAL CONSTRUCTION
NOTES AND SPECIFICATIONS ARE INCLUDED ON INDIVIDUAL DRAWINGS.
2. THIS PLAN SET HAS A LIST OF GENERAL ABBREVIATIONS AND SYMBOLS AND MATERIALS
LEGENDS LISTED ON IT. SOME SYMBOLS, MATERIALS, AND ABBREVIATIONS MAY NOT BE
UTILIZED ON THIS SPECIFIC PROJECT.
3. ALL CONTOURS, ELEVATIONS, AND COORDINATES FOR THE PROJECT ARE BASED ON
NAD83 STATE PLANE COORDINATE SYSTEM, UTAH CENTRAL ZONE, US FOOT, AND NAVD88.
4. CONTRACTOR SHALL PROVIDE A ONE (1) WEEK NOTICE TO ENGINEER, OWNER, AND
PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING OSHA STANDARDS FOR TRENCH
EXCAVATIONS.
6. DEPTH OF COVER SHALL BE A MINIMUM OF 4 FEET 0 INCHES MEASURED FROM THE
FINISHED GRADE GROUND SURFACE TO THE TOP OF THE PIPE UNLESS OTHERWISE
SHOWN ON THE PLANS. PIPES SHALL BE LOWERED, AS REQUIRED, TO AVOID CONFLICTS
WITH EXISTING UTILITIES AND TO MAINTAIN SPECIFIED AND REQUIRED SEPARATIONS.
7. GATE VALVE AND CURB STOP BOXES, IF ANY, SHALL BE SET AS SHOWN IN THE
CONSTRUCTION DETAILS, AS APPLICABLE.
8. EXCESS EXCAVATED MATERIAL INCLUDING PIPE, STUMPS, ROOTS, SOIL MATERIALS,
ASPHALT AND CONCRETE PAVEMENT, SIDEWALK, CURB AND GUTTER, AND ANY OTHER
ITEMS THE CITY DOES NOT WISH TO SALVAGE SHALL BECOME CONTRACTOR'S PROPERTY
AND SHALL BE REMOVED FROM THE SITE AND DISPOSED OF PROPERLY, INCIDENTAL TO
THE CONTRACT.
9. CONTRACTOR SHALL BE REQUIRED TO CLEAN STREETS AND SIDEWALKS AND REPAIR ALL
DAMAGE TO THE CONDITION THEY WERE IN PRIOR TO THE START OF CONSTRUCTION. ALL
REPAIRS AND CLEANING WILL BE COMPLETED BEFORE PAYMENT FOR ASSOCIATED BID
ITEMS WILL BE MADE.
10. ALL BOLTS AND ANCHOR BOLTS INSTALLED THROUGHOUT THE PROJECT SHALL BE
STAINLESS STEEL, UNLESS OTHERWISE NOTED IN THE DRAWINGS AND SPECIFICATIONS.
11. CONTRACTOR TO PROVIDE AND MAINTAIN ADEQUATE DEWATERING EQUIPMENT TO
REMOVE AND DISPOSE OF ANY SURFACE AND GROUNDWATER ENTERING THE TRENCH.
12. THE CONTRACTOR SHALL PROVIDE MARKER TAPE IN ALL TRENCHS AND TRACER WIRE ON
ALL PVC POTABLE WATER PIPE.
13. THE AERIAL PHOTOGRAPHY SHOWN ON THE CONSTRUCTION PLAN SHEETS MAY NOT
REFLECT CURRENT CONDITIONS. THEREFORE, ACTUAL FIELD CONDITIONS MAY VARY
FROM THOSE DISPLAYED IN THE CONSTRUCTION PLANS.
14. ITEMS NOT INCLUDED IN THE BID FORM AS A PAY ITEM BUT INCLUDED ELSEWHERE IN THE
PLANS SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER AND SHALL BE CONSIDERED INCIDENTAL ITEMS.
15. DEFLECTIONS FROM A STRAIGHT LINE OR GRADE ARE TO BE MADE WITH FITTINGS,
DEFLECTED JOINTS, SHORTER PIPE SECTIONS, OR A COMBINATION OF THESE METHODS
TO CONFORM TO THE ALIGNMENT AND PROFILE INDICATED ON THE DRAWINGS AND
SPECIFIED. DEFLECTED JOINTS ARE NOT TO EXCEED THE VALUES SPECIFIED FOR THE
PIPE JOINT. CONTRACTOR TO SUBMIT METHOD TO MEASURE DEFLECTION OF PIPE JOINTS.
16. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION BY THE CONTRACTOR IN ACCORDANCE WITH THESE SPECIFICATIONS AND
DRAWINGS.
17. CONTRACTOR SHALL MAINTAIN EXISTING DRAINAGE.
18. CONTRACTOR SHALL INCORPORATE PROPER EROSION CONTROL MEASURES.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEFICIENCIES WITH THE
INSTALLATION OF ALL THE PIPELINES AND ALL APPURTENANCES INSTALLED ON THE
PROJECT FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY
OWNER.
20. CONTRACTOR SHALL FOLLOW THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD) STANDARDS AND GUIDES FOR TRAFFIC CONTROL FOR STREET AND HIGHWAY
CONSTRUCTION.
21. CONTRACTOR SHALL LIMIT ALL WORK TO WITHIN THE CONSTRUCTION LIMITS AND SHALL
NOT IMPEDE TRAFFIC ON ROADWAYS.
22. CONTRACTOR SHALL MAINTAIN INGRESS/EGRESS ACCESS TO INDIVIDUAL PROPERTY
OWNERS AT ALL TIMES. CONTRACTOR SHALL COORDINATE DETOURS AND ANY
TEMPORARY CLOSURES WITH EACH PROPERTY OWNER. CONTRACTOR SHALL KEEP
DURATION OF ALL CLOSURES AND DETOURS TO A MINIMUM.
23. CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS A MINIMUM OF 24 HOURS PRIOR TO
ANY WATER SERVICE DISRUPTIONS. SERVICE DISRUPTIONS SHALL BE KEPT TO A MINIMUM.
24. THE CONTRACTOR SHALL UTILIZE HAND TAMPERS AND PNEUMATIC TAMPERS TO OBTAIN
THE REQUIRED COMPACTION OF THE PIPE BED AND THE BACKFILL, AS SPECIFIED.
25. THE CONTRACTOR SHALL PROVIDE ALL APPROPRIATE HOISTING EQUIPMENT TO HANDLE
THE PIPE WHILE UNLOADING AND PLACING IT IN ITS FINAL POSITION WITHOUT DAMAGE TO
THE PIPE. PIPE, FITTINGS, VALVES, AND OTHER ACCESSORIES SHALL, UNLESS OTHERWISE
DIRECTED, BE UNLOADED AT THE POINT OF DELIVERY, HAULED TO AND DISTRIBUTED AT
THE SITE OF THE PROJECT BY THE CONTRACTOR. MATERIALS SHALL AT ALL TIMES BE
HANDLED WITH CARE TO AVOID DAMAGE. UNDER NO CIRCUMSTANCES SHALL ANY
MATERIALS BE DROPPED. PIPE HANDLED ON SKIDWAYS MUST NOT BE SKIDDED OR
ROLLED AGAINST PIPE ALREADY ON THE GROUND. IN DISTRIBUTING THE MATERIALS AT
THE SITE OF WORK EACH PIECE SHALL BE UNLOADED OPPOSITE OR NEAR THE PLACE
WHERE IT IS TO BE LAID IN THE TRENCH. MATERIALS SHALL BE HANDLED IN SUCH A
MANNER THAT NO DAMAGE TO THE PIPE WILL RESULT.
26. PVC AND POLYETHYLENE PIPE SHALL BE STORED COVERED OUT OF DIRECT SUNLIGHT.
27. SANITARY SEWER/WATER MAIN CROSSINGS: ALL SANITARY SEWER/WATER MAIN
CROSSINGS SHALL BE INSTALLED WITH A MINIMUM OF 18" VERTICAL SEPARATION
BETWEEN PIPE OUTSIDE WALLS. ALL WATER MAIN SHALL BE INSTALLED ABOVE SANITARY
SEWER WHEN POSSIBLE. WATER MAINS INSTALLED ABOVE AND WITHIN 5 FEET OF A
SANITARY SEWER MAIN, AND ALL WATER MAINS INSTALLED BELOW A SANITARY SEWER
MAIN SHALL HAVE A FULL 20-FOOT LENGTH OF WATER MAIN PIPE CENTERED ON THE
SANITARY SEWER MAIN. WHEN WATER MAINS ARE INSTALLED BENEATH AN EXISTING
SEWER MAIN THE SEWER MAIN SHALL BE REPLACED BY A FULL 20-FOOT LENGTH OF
SEWER MAIN PIPE CENTERED OVER THE WATER MAIN UNLESS OTHERWISE DIRECTED BY
THE ENGINEER. THIS PROCEDURE SHALL ALSO BE FOLLOWED FOR INSTALLATIONS OF
SANITARY SEWER PIPE.
28. SANITARY SEWER AND/OR WATER PIPELINE THAT IS TO BE PLACED PARALLEL TO EACH
OTHER SHALL HAVE A MINIMUM HORIZONTAL SEPARATION OF 10 FEET.
29. CUTTING PIPE: CUTTING SHALL COMPLY WITH PIPE MANUFACTURER'S
RECOMMENDATIONS. CUTS SHALL BE SMOOTH, STRAIGHT, AND AT RIGHT ANGLES TO PIPE
AXIS. SHARP CORNERS SHALL BE REMOVED AND THE PIPE BEVELED TO MANUFACTURER'S
RECOMMENDATION.
30. DUCTILE IRON PROTECTION: ALL DUCTILE IRON FITTINGS AND APPURTENANCES SHALL BE
WRAPPED IN AN 8-MIL POLYETHYLENE SHEETING IN ACCORDANCE WITH AWWA C105.
31. CONTRACTOR SHALL INSTALL ALL PIPE WITH PIPE BEDDING AS INDICATED IN THE DETAILS, UNLESS OTHERWISE NOTED IN THE DRAWINGS AND SPECIFICATIONS.
32. RESTRAINING REQUIREMENTS: ALL VALVES, TEES, CROSSES, AND BENDS SHALL BE
CONNECTED TO THE WATER MAIN WITH AN APPROVED JOINT RESTRAINT. COSTS OF ALL
RESTRAINTS SHALL BE INCIDENTAL TO THE FITTINGS.
33. THE MINIMUM RESTRAINED LENGTHS REQUIRED FOR 8-INCH WATER MAIN PIPE AND
FITTINGS SHALL BE AS SHOWN IN THE TABLE BELOW AND AS INDICATED ON THE
DRAWINGS.
34. POTABLE WATER MAIN TEST: NEWLY LAID WATER MAIN SHALL BE HYDROSTATICALLY
PRESSURE TESTED AT 150 PEI FOR TWO (2) HOURS. LEAKAGE SHALL NOT EXCEED THE
ALLOWANCES LISTED BELOW:
NOMINAL PIPE SIZE (INCHES) ALLOWABLE LEAKAGE AT TEST
PRESSURE (150PSI*)
8.0 0.66 GALLONS PER 1,000 FEET
* PRESSURE SHALL BE MAINTAINED AT PLUS OR MINUS (±) 5% OF SPECIFIED TEST
PRESSURE FOR DURATION OF TEST.
35. AFTER THE CONTRACTOR HAS COMPLETED THE INSTALLATION OF THE UTILITIES AND ANY
CLEANUP ITEMS, CONTRACTOR SHALL MAKE A WRITTEN REQUEST TO THE ENGINEER FOR
A FINAL INSPECTION. UPON RECEIPT OF THIS REQUEST, THE ENGINEER WILL SET A DATE
AND TIME FOR THE FINAL INSPECTION. DURING THE FINAL INSPECTION, GATE VALVES WILL
BE CHECKED TO SEE IF THEY ARE ACCESSIBLE AND OPERABLE. ANY DEFICIENCIES FOUND
WILL PROMPTLY BE CORRECTED BEFORE FINAL PAYMENT WILL BE MADE. THE FINAL
INSPECTION REQUEST FORM IS ATTACHED AS PART OF THE SPECIFICATIONS.
UTILITY NOTES
1. THE APPROXIMATE LOCATION OF KNOWN EXISTING UNDERGROUND UTILITY LINES ARE
SHOWN ON THE PLANS. OTHER UNKNOWN UTILITIES MAY EXIST. CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL EXISTING UTILITIES
BEFORE COMMENCING WORK AND SHALL BE RESPONSIBLE FOR PROTECTING ALL
UTILITIES OR REPAIRING ANY DAMAGE WHICH OCCURS BECAUSE OF THE CONTRACTOR'S
FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. NOT ALL
OVERHEAD UTILITIES, PERMANENT OR TEMPORARY, ARE SHOWN ON THE PLANS.
2. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, ELEVATION, SIZE, AND MATERIAL
OF THE EXISTING UNDERGROUND PIPING AT THE POINTS OF CONNECTION. APPROVED
TRANSITIONS SHALL BE USED TO MAKE ALL CONNECTIONS. PRECISE LOCATION AND
ARRANGEMENT OF CONNECTIONS OF NEW PIPELINES WITH EXISTING PIPELINES ARE TO BE
FIELD VERIFIED. PROVIDE FITTINGS, ADAPTERS, SOLID SLEEVE CLOSURES, HARNESSED
MECHANICAL COUPLINGS, AND ROTATE FITTINGS, AND DEFLECT JOINTS AS REQUIRED TO
MAKE CONNECTIONS. PROVIDE TEMPORARY PLUG WITH FACTORY OUTLET SIZED AS
REQUIRED FOR CONTRACTOR'S TESTING AND DISINFECTION WORK BEFORE MAKING
CONNECTION. ANY DIFFERENT FITTINGS NECESSARY TO MAKE ALL CONNECTIONS SHALL
BE INCIDENTAL.
3. THE PROTECTION, TEMPORARY SUPPORT, ADJUSTMENT, OR REQUIRED RELOCATION OF
ANY UTILITIES AND STRUCTURES (UNDERGROUND, SURFACE, OR OVERHEAD) IS TO BE
COORDINATED WITH THE CONTRACTOR AND THE OWNER OF EACH UTILITY BEFORE
CONSTRUCTION/INSTALLATION IS STARTED.
4. EARTHWORK ACTIVITIES ARE NOT ALLOWED OUTSIDE CONSTRUCTION LIMITS OR R.O.W.
UNLESS APPROVED BY THE ENGINEER.
5. TRENCH BOX TECHNIQUES SHALL BE UTILIZED TO LIMIT WIDTHS OF OPEN-CUT TRENCHES.
6. WHERE EXISTING UTILITY WIRES (TELEPHONE, ELECTRIC, FIBER OPTIC) ARE LOCATED
ADJACENT TO OR ABOVE THE PROPOSED WORK, CONTRACTOR SHALL TEMPORARILY
SUPPORT EXISTING WIRES AND INSTALL PIPING UNDER EXISTING WIRES. ANY DECISION
TO HAVE THE EXISTING UTILITIES RELOCATE WIRES WILL BE AT THE CONTRACTOR'S
EXPENSE. CONTRACTOR SHALL HAVE THE UTILITY COMPANY PROVIDE AN ON-SITE
REPRESENTATIVE TO INSPECT THE EXCAVATION AND TEMPORARY SUPPORT OF THE
EXISTING UTILITY WIRES TO ENSURE THEY CONCUR WITH THE METHOD USED FOR
TEMPORARY SUPPORT. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETION OF WORK
AS INDICATED AND MEETING ALL UTILITY REQUIREMENTS TO ENSURE A FINAL
INSTALLATION THAT BENEFITS BOTH THE CITY AND THE UTILITY COMPANY.
7. UNKNOWN UTILITIES ARE ANTICIPATED TO EXIST WITHIN THE PROJECT AREA AND ARE NOT
SHOWN ON THE PLANS. CONTRACTOR SHALL LOCATE ALL UTILITIES AND COMPLETE ALL
PROJECT WORK WHILE PROTECTING UTILITIES. PROTECTION OF UTILITIES SHALL BE
INCIDENTAL TO THE PROJECT.
8. SHOULD GROUND WATER BE ENCOUNTERED DURING EXCAVATION, THE GENERAL
CONTRACTOR SHALL MAKE PROVISIONS TO DE-WATER EXCAVATION AS NECESSARY TO
MAINTAIN SAFE WORKING CONDITIONS. DE-WATERING WATER SHALL BE DISPOSED OF IN
A MANNER THAT DOES NOT IMPACT ADJACENT PROPERTIES.
COORDINATION NOTES
1. CONTRACTOR SHALL COORDINATE SUPPORT OF UTILITY CROSSINGS AND/OR EXISTING
UTILITY RELOCATIONS WITH UTILITY COMPANY, TRAFFIC CONTROL ISSUES WITH THE
OWNER, AND MOBILITY ISSUES WITH OTHER CONSTRUCTION SITES IN THE AREA.
2. CONTRACTOR SHALL COORDINATE THE OPERATION OF EXISTING PIPELINES, VALVES, AND
HYDRANTS WITH CITY PERSONNEL. GREAT CARE MUST BE USED IN OPERATING VALVES
AND HYDRANTS ON THE EXISTING WATER SYSTEM. ANY MAIN BREAKS CAUSED BY
CONTRACTOR WILL BE CORRECTED AND PAID FOR BY CONTRACTOR.
3. CONTRACTOR SHALL PRESSURE TEST PIPELINE AND REPAIR ANY LEAKS. CONTRACTOR
MUST PROVIDE ENGINEER 48 HOURS NOTICE PRIOR TO TESTING.
PROTECTION NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, STORE, AND REPLACE ANY
EXISTING TRAFFIC SIGNS AFFECTED BY CONSTRUCTION ACTIVITY. ANY SIGNS DAMAGED
OR LOST AS A RESULT OF THE PROJECT WILL BE REPLACED BY THE CONTRACTOR AND
THE COST FOR REPLACEMENT SHALL BE DEDUCTED FROM THE CONTRACTOR'S FINAL
PAYMENT.
2. MISCELLANEOUS ITEMS SUCH AS AND NOT LIMITED TO, MAILBOXES, STREET LIGHTS,
TRAFFIC LIGHTS, SIGNS, FENCES, POLES, TREES, ETC. SHALL BE PROTECTED OR REMOVED
AND REINSTALLED BY THE CONTRACTOR INCIDENTAL TO THE CONTRACT.
3. PROTECTION OR REMOVAL OF TREES, SHRUBS, AND LANDSCAPING IS TO BE IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SHALL BE COORDINATED WITH THE
ENGINEER AND THE PROPERTY OWNER.
4. CONTRACTOR MUST RE-ESTABLISH ANY DISTURBED PROPERTY PINS OR CONTROL POINTS
WITH SERVICES OF REGISTERED LAND SURVEYOR (RLS) REGISTERED IN NORTH DAKOTA.
CONTRACTOR MUST SUBMIT CERTIFICATE OF SURVEY FOR EACH PROPERTY WITH
RE-ESTABLISHED PROPERTY PINS. THE COST FOR RLS SERVICES SHALL BE INCIDENTAL.
5. ANY EXISTING STRUCTURES DISTURBED BY CONSTRUCTION, INCLUDING CURB AND
GUTTER, CONCRETE AND BITUMINOUS ROADS AND SIDEWALKS, FENCING, RETAINING
WALLS, ETC., ARE TO BE RESTORED TO THEIR ORIGINAL LOCATION AND CONDITION.
8-INCH WATER MAIN LENGTH EACH SIDE OF
FITTING
VALVE/DEADEND 70'
90° BEND 70'
TEE (BRANCH) 110'
PR
ELI
M
IN
AR
Y
Ad va nc ed
En g i nee r i ng a nd
Env i ronmentalServices,LLC
N O T F
O R
C O N S
TR
U C
TIO
N
S T
A T
U S
P R
O
JE
C T
T
IT
L E
PROJECT NO:
DATE:
ALT PROJECT NO:
SHEET DESIGNATOR: SHEET NO:
CLIENT:
SHEET TITLE:
PREPARED BY:
CHECKED BY:
APPROVED BY:
A d v a n c e d
E n g in e e ri n g a n d E n v ir o n m e n ta l S e rv ic e s L
C w
.a e s .c o m
Certification of Individual Project Design Disciplines Are
Included On Their Individual Drawings, Respectively
P R
E
LI
M
IN
A R
Y
A u to d e s k D o c s /1
-2
-0
E a g le
M o u n ta in W
W T
P E x p a n s io n /E
M W
W T
P G
E N
-S D
S v .r v t
/2
/2
:0 :4
P
M
JAP
KDE
HES
S001
GENERAL NOTES
EAGLE MOUNTAIN, UTAH
EAGLE MOUNTAIN CITY
E A
G L
E M
O U
N T
A
IN
W W
T F
E X
P A
N S
IO
N
P13139-2023-002
SEPTEMBER 2025 GEN
CAST-IN-PLACE CONCRETE - SPEC 03 30 00
1. A CONCRETE MIX DESIGN FOR EACH UNIQUE COMBINATION OF STRENGTH,
APPLICATION, COARSE AGGREGATE GRADATION, AND WATER CEMENT RATIO
SPECIFIED SHALL BE PREPARED BY THE SUPPLIER OR AN INDEPENDENT TESTING
LABORATORY AND BE SUBMITTED FOR REVIEW PRIOR TO CASTING ANY CONCRETE.
2. UNLESS NOTED OTHERWISE, MAXIMUM AGGREGATE SIZE SHALL BE 1 INCH,
MAXIMUM WATER: CEMENT RATIO OF 0.5, AIR CONTENT NOT TO EXCEED 3%
ENTRAPPED AT TROWEL FINISHED SLABS, AND AT APPLICATIONS EXPOSED TO
FREEZE/THAW CYCLES PROVIDE 6% AIR ENTRAINMENT.
3. ALL FORMWORK SHALL BE DESIGNED, ERECTED, SUPPORTED, BRACED AND
MAINTAINED ACCORDING TO ACI 347, “RECOMMENDED STANDARD PRACTICE FOR
CONCRETE FORMWORK”.
4. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN,
CONSTRUCTION, AND SAFETY OF ALL FORMWORK.
5. ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 3/4" WHERE NOT
SPECIFICALLY SHOWN ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS.
6. UNLESS OTHERWISE NOTED, TOLERANCES FOR CONCRETE FORMWORK SHALL
CONFORM TO ACI STANDARD 117, “STANDARD TOLERANCES FOR CONCRETE
CONSTRUCTION AND MATERIALS”. TOLERANCES IN PLACING REINFORCEMENT
SHALL BE:
A. +/- 3/8 INCH FOR MEMBERS WITH DEPTH </= 10 INCHES
B. +/- 1/2 INCH FOR MEMBERS WITH DEPTH > 10 INCHES
7. DO NOT USE ADMIXTURES CONTAINING CALCIUM CHLORIDE.
8. ALL WATER TO ACHIEVE CONCRETE BATCHING MUST BE ADDED DURING THE
BATCH AT THE PLANT. THE ADDITION OF WATER TO THE A BATCH ON SITE WILL
NOT BE PERMITTED.
9. CONCRETE CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF ACI 301
“STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE” AND ACI 318 “BUILDING
CODE REQUIREMENTS FOR REINFORCED CONCRETE.” CONFORM TO THE
REQUIREMENTS OF ACI 305 “HOT WEATHER CONCRETING” OR ACI 306 “COLD
WEATHER CONCRETING” WHEN WEATHER CONDITIONS DICTATE.
10. OPENINGS IN CONCRETE SHALL BE REINFORCED AS NOTED IN THE STANDARD
DETAILS.
11. SEE STANDARD DETAILS FOR CORNER BAR REINFORCING AT WALL CORNERS.
12. PROVIDE DOWELS TO SUPPORTING MEMBER WITH BARS SIZED AND SPACED TO
MATCH TYPICAL VERTICAL REINFORCING. DOWELS SHALL HAVE STANDARD HOOKS
EMBEDDED INTO SUPPORTING CONCRETE WITH LAP SPLICE TO VERTICAL
REINFORCING, UNLESS NOTED OTHERWISE.
13. ALL FOOTINGS, PIERS, AND FOUNDATIONS SHALL BE CENTERED, UNLESS
OTHERWISE NOTED.
14. SLABS ON GRADE SHALL BEAR ON EITHER COMPETENT NATIVE SOIL OR
COMPACTED STRUCTURAL FILL DEPENDENT ON SITE CONDITIONS AND
RECOMMENDATIONS WITHIN THE GEOTECHNICAL REPORT.
15. A 6 INCH GRANULAR BASE SHALL BE PROVIDED BETWEEN THE SLAB ON GRADE AND
SUBGRADE. A 10 MIL VAPOR BARRIER SHALL BE PROVIDED AT ALL INTERIOR SLABS
ON GRADE.
16. SEE STANDARD DETAILS FOR SLAB ON GRADE CONSTRUCTION AND CONTRACTION
JOINTS. CONTRACTION JOINTS SHALL BE CUT WITHIN 24 HOURS OF CONCRETE
PLACEMENT, SPACED NOT MORE THAN 3 TIMES THE SLAB THICKNESS IN FEET, AND
WITH AN ASPECT RATIO NOT EXCEEDING 1.5.
17. SEE STANDARD DETAILS FOR LAYOUT REQUIREMENTS OF ELECTRICAL CONDUIT
PLACED IN CONCRETE SLABS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATION AND ASSURANCE THAT CONDUIT MEETS REQUIREMENTS OF
DETAILS.
18. ALL EMBEDDED ELEMENTS, INCLUDING BUT NOT LIMITED TO REINFORCING
DOWELS, WATERSTOPS, EMBEDMENT PLATES, AND ANCHOR BOLTS, MUST BE HELD
RIGIDLY AND ACCURATELY IN PLACE, AND PROTECTED AGAINST DISPLACEMENT
BEFORE AND DURING PLACEMENT OF CONCRETE. WET SETTING OF EMBEDDED
ELEMENTS WILL NOT BE PERMITTED.
REINFORCING STEEL - SPEC 03 20 00
1. LAP SPLICES OF DEFORMED BARS SHALL BE CLASS B, SEE REINFORCING SPLICE
AND DEVELOPMENT TABLE FOR LENGTHS, UNLESS OTHERWISE NOTED.
2. REINFORCING STEEL SHALL NOT BE WELDED.
3. WELDED REINFORCING SHALL BE ASTM A706 MATERIAL WITH WELDING COMPLETED
IN ACCORDANCE WITH AWS D1.4.
4. LAP ALL WWR (WELDED WIRE REINFORCING) A MINIMUM DISTANCE OF ONE CROSS
WIRE SPACING PLUS 2 INCHES.
5. ALL REINFORCING STEEL SHALL BE SUPPORTED ON STANDARD ACCESSORIES,
HELD RIGIDLY AND ACCURATELY IN PLACE, AND PROTECTED AGAINST
DISPLACEMENT BEFORE AND DURING PLACEMENT OF CONCRETE. SUPPORTING
ACCESSORY LEGS THAT REST ON CONCRETE SURFACES THAT WILL BE EXPOSED IN
THE FINISHED STRUCTURE SHALL BE FABRICATED OF STAINLESS STEEL.
6. DOWELS AND OTHER MISCELLANEOUS STEEL EMBEDDED ITEMS SHALL BE
LOCATED AND HELD IN SPECIFIED POSITION PRIOR TO PLACEMENT OF CONCRETE
AND SHALL NOT BE PUSHED INTO CONCRETE FOLLOWING CONCRETE POUR.
7. PROVIDE 200' OF #5 REBAR & #6 IN 20' LENGTHS TO BE USED AS DIRECTED BY THE
ENGINEER.
FOUNDATIONS
1. FOUNDATION SYSTEMS ARE DESIGNED PER THE PROJECT GEOTECHNICAL REPORT
(XXXXXX, PROJECT NUMBER XXXXXX) AND FOLLOW THE RECOMMENDATIONS
SPECIFIED THEREIN.
2. FOOTINGS HAVE BEEN DESIGNED FOR THE ALLOWABLE SOIL BEARING PRESSURE
INDICATED WITHIN THE DESIGN CRITERIA AND LOADS TABLE AND SHALL BE FIELD
VERIFIED, WHEN ASSUMED VALUES ARE NOTED, WITH THE PROJECT
GEOTECHNICAL ENGINEER.
3. PROJECT GEOTECHNICAL ENGINEER SHALL INSPECT ALL SUBGRADES AND
PREPARED SOIL BEARING SURFACES PRIOR TO PLACEMENT OF FOUNDATIONS.
4. FOUNDATIONS, WHERE PRESENT, SHALL BEAR ON EITHER COMPETENT NATIVE
SOIL OR COMPACTED STRUCTURAL FILL.
5. RETAINING WALLS HAVE BEEN DESIGNED FOR THE LISTED LATERAL EARTH
PRESSURE AND SURCHARGE, ASSUMING A WELL GRADED AND DRAINED
CONDITION.
6. PLACE ALL BACKFILL ACCORDING TO PROJECT SPECIFICATIONS. BRACE ALL WALLS
AS REQUIRED PRIOR TO AND DURING THE PLACEMENT OF BACKFILL AND UNTIL
SUPPORT FOR THE WALLS ARE IN PLACE.
7. STRUCTURAL ENGINEER FILL SHALL BE USED AS SPECIFIED MEETING THE
FOLLOWING REQUIREMENTS:
A. P200 < 12% B. P40 < 25%
C. SOIL CLASSIFICATIONS SP, SW, GP, OR DUAL SYMBOL CLASSIFICATIONS WITH
NON-PLASTIC FINE MATERIALS
D. SUBMIT ASTM D2487 SOIL CLASSIFICATION TEST DATA FOR APPROVAL OF
EACH PROPOSED MATERIAL
8. COMPACT ALL BACKFILL UNDER FOOTINGS TO THE FOLLOWING REQUIREMENTS:
A. MINIMUM COMPACTION TO 98% OF ASTM D698
B. SOIL WATER CONTENT OF -4% TO 0% OF ASTM D698 OPTIMUM WATER
CONTENT
9. BACKFILL ALONG FOUNDATION WALLS, AND WITHIN THE BUILDING AREA
FOUNDATION WALLS, MEETING THE FOLLOWING REQUIREMENTS:
A. MINIMUM COMPACTION OF 95% OF ASTM D698
B. SOIL WATER CONTENT OF -4% TO 0% FOR GRANULAR NON-COHESIVE SOILS
AND -3% TO +3% FOR COHESIVE SOILS
C. BACKFILL WITH SALVAGED EXISTING SOILS OR IMPORTED SOILS FREE OF
ORGANIC MATTER, FROZEN SOIL, OR DEBRIS AND WITH A LIQUID LIMIT BELOW
D. STRUCTURAL ENGINEER FILL MAY BE USED PER CONTRACTOR OPTION
10. PROTECT ALL FOUNDATIONS FROM THE ACTION OF WATER AND FREEZING.
11. CONTRACTOR SHALL SUBMIT AN EXCAVATION PLAN, INCLUDING DESIGN
CALCULATIONS, PREPARED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
STATE IN WHICH THE PROJECT IS LOCATED.
12. SEE PRE-ENGINEERED METAL BUILDING NOTES FOR ADDITIONAL FOUNDATION
REQUIREMENTS AND COORDINATION.
MASONRY - SPEC 04 20 00
1. MASONRY CONSTRUCTION SHALL CONFORM TO TMS 402/602 BUILDING CODE
REQUIREMENTS AND SPECIFICATIONS FOR MASONRY STRUCTURES” AND COMPLY
WITH ALL RECOMMENDATIONS AND STANDARDS ESTABLISHED BY THE NATIONAL
CONCRETE MASONRY ASSOCIATION AND THE BRICK INSTITUTE OF AMERICA.
2. CONCRETE BLOCK ARE TO BE PER ASTM C90, GRADE N, TYPE 1 (MOISTURE-
CONTROLLED), NORMAL WEIGHT. MORTAR SHALL BE ASTM C270, TYPE N (USE TYPE
S BELOW GRADE). GROUT FILL SHALL BE PER ASTM C476 (COURSE GROUT) WITH
MAXIMUM 3/8” AGGREGATE AND MINIMUM 28-DAY COMPRESSIVE STRENGTH OF
3,000 PSI.
3. MASONRY CORES CONTAINING REINFORCING OR ANCHOR BOLTS/RODS SHALL BE
FILLED SOLID WITH GROUT. MASONRY BELOW GRADE SHALL HAVE CORES FILLED
SOLID WITH GROUT. MAXIMUM LIFT HEIGHT EQUALS 5’-4”. MECHANICALLY VIBRATE
GROUT IN VERTICAL SPACES IMMEDIATELY AFTER PLACEMENT.
4. PROVIDE A (2) #5 VERTICAL BARS FULL HEIGHT AT ALL MASONRY JAMBS, CORNERS
AND WALL ENDS, UNLESS OTHERWISE NOTED.
5. VERTICAL REINFORCING SHALL BE DOWELED TO THE FOUNDATION.
6. BOND BEAMS SHALL BE REINFORCED WITH (2) #4 CONTINUOUS, UNLESS
OTHERWISE NOTED. PROVIDE BENT CORNER BARS TO MATCH AND LAP BOND BEAM
REINFORCING AT ALL CORNERS AND INTERSECTIONS.
7. LAP SPLICE STEEL REINFORCING BARS 48 DIAMETERS AT SPLICES, UNLESS NOTED
OTHERWISE ON DRAWINGS.
8. LAP SPLICE REINFORCING PER THE FOLLOWING, UNLESS NOTED OTHERWISE:
#3 x 1’-8”, #4 x 2’-0“, #5 x 2’-8”, #6 x 4’-0”, AND #7 x 5’-0”.
9. PROVIDE GALVANIZED WIRE, LADDER TYPE, HORIZONTAL JOINT REINFORCING AT
16” o/c, MAXIMUM, AND AS INDICATED ON ARCHITECTURAL DRAWINGS. HORIZONTAL
JOINT REINFORCING SHALL BE DISCONTINUOUS AT CONTROL JOINTS.
10. REINFORCED MASONRY LINTELS SHALL BE SPECIALLY FORMED U-SHAPED LINTEL
OR LOW WEB LINTEL UNITS WITH REINFORCING BARS, OR PRECAST UNITS
DESIGNED FOR THE WEIGHT OF MASONRY ABOVE AND OTHER APPLIED LOADS.
11. REINFORCED MASONRY LINTELS SHALL BE INSTALLED OVER ALL OPENINGS,
UNLESS NOTED OTHERWISE. DO NOT SPLICE REINFORCING BARS WITHIN LINTELS
AND MAINTAIN BEARING DEPTH EQUAL TO LINTEL DEPTH, MINIMUM, ON EACH SIDE.
UNLESS OTHERWISE NOTED, THE MINIMUM REINFORCEMENT FOR LINTELS SHALL
BE AS FOLLOWS: OPENINGS UP TO 42 INCHES WIDE PROVIDE (2) #5 AT BOTTOM OF 8
INCH DEEP LINTEL, OPENINGS 42 TO 78 INCHES WIDE PROVIDE (2) #5 AT BOTTOM OF
16 INCH DEEP LINTEL, AND FOR OPENINGS OVER 78 INCHES WIDE REINFORCE PER
DRAWINGS.
12. WALL CONTROL JOINTS SHALL BE PROVIDED IN ALL CONCRETE MASONRY
CONSTRUCTION AT LOCATIONS INDICATED ON ARCHITECTURAL DRAWINGS OR AS
REFERENCED BY TO THE NMCA. CONTROL JOINTS SHALL NOT BE PLACED OVER
OPENINGS, WITHIN THE SPAN OF THE LINTEL, OR WITHIN THE WIDTH OF THE JAMB.
13. MASONRY WALLS SHALL BE BRACED BY OTHER INTERSECTING WALLS, OR BY
ANCHORAGE/BRACING TO THE STRUCTURE ABOVE.
STEEL JOIST - SPEC 05 21 00
1. STEEL JOISTS TO BE FABRICATED AND ERECTED IN ACCORDANCE WITH SJI
SPECIFICATIONS AND OSHA REGULATIONS FOR THE LOADING INDICATED. ERECTION
STABILITY BRACING SHALL BE DESIGNED AND SUPPLIED BY THE FABRICATOR.
2. JOISTS FRAMING INTO OR ON TOP OF COLUMNS SHALL BE FIELD BOLTED TO THE
COLUMNS AND THE BOTTOM CHORDS EXTENDED TO SHOP INSTALLED STABILIZER
PLATES ON THE COLUMNS PER FABRICATOR REQUIREMENTS. DO NOT WELD BOTTOM
CHORD TO STABILIZER PLATES UNLESS NOTED OTHERWISE.
3. FABRICATOR SHALL PROVIDE HORIZONTAL OR DIAGONAL TYPE BRIDGING AND
ANCHORAGE FOR ALL JOISTS AS REQUIRED BY SJI SPECIFICATION, BRIDGING IS
SCHEMATICALLY INDICATED ON THE DRAWINGS.
4. REFER TO STANDARD DETAILS FOR SUPPLEMENTAL FRAMING AT JOIST SUPPORTING
CONCENTRATED LOADS.
5. JOIST SEATS SHALL HAVE THE CAPACITY TO RESIST A LATERAL LOAD APPLIED TO
THE TOP CHORD, PERPENDICULAR TO THE SPAN (ROLLOVER). PROVIDE A MINIMUM
ROLLOVER FORCE OF 2,000 POUNDS FOR SEATS UP TO 3.5 INCHES DEEP AND 1,200
POUNDS FOR SEATS OVER 3.5 INCHES DEEP.
STRUCTURAL STEEL - SPEC 05 12 00
1. STRUCTURAL STEEL, INCLUDING ANCHOR RODS/BOLTS AND BASE PLATES, SHALL
NOT BE FIELD MODIFIED WITHOUT APPROVAL OF THE ENGINEER OF RECORD.
2. FRAMING CONNECTIONS NOT DETAILED, OR CONNECTIONS THAT ARE MODIFIED
FROM THOSE DETAILED, SHALL BE DESIGNED BY THE FABRICATOR FOR THE END
REACTION SHOWN ON THE PLAN (## K). FABRICATOR MAY SELECT AISC SIMPLE
SHEAR CONNECTION THAT MEETS DESIGN REQUIREMENTS AND ERECTOR
PREFERENCE. IF NO REACTION IS PROVIDED, DESIGN FOR ½ THE BEAM MAXIMUM
UNIFORM LOAD PER AISC MANUAL FOR STEEL CONSTRUCTION.
3. MEMBERS NOTED AS ‘CONTINUOUS’ SHALL BE FULLY WELDED AT ALL BUTT SPLICES
OR CONNECTIONS SHALL BE DETAILED TO PROVIDE CONTINUITY.
4. BEAM AND COLUMNS SHALL BE ERECTED TRUE AND PLUMB, PROVIDE TEMPORARY
BRACING.
5. BEARING PLATES FOR STEEL BEAMS AND COLUMNS SHALL BE DRY PACKED WITH
GROUT AS SPECIFIED OR REQUIRED.
6. NO FIELD WELDS ARE TO BE MADE UNTIL THE MEMBERS ARE PROPERLY ALIGNED.
FIELD WELDS ARE TO BE MADE BY COMPETENT WELDERS USING PROPER
ELECTRODES AND AMPERAGE.
7. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH AWS D1.1 BY
CERTIFIED WELDERS WITH CURRENT EXPERIENCE IN TYPE OF WELD SHOWN ON
THE DRAWINGS.
8. DO NOT PAINT STEEL TO BE FIREPROOFED, FIELD WELDED, EMBEDDED IN
CONCRETE, OR SPECIALLY PREPARED.
9. SHOP PRIME ALL STRUCTURAL STEEL WITH FABRICATOR’S STANDARD COLOR,
UNLESS NOTED OTHERWISE, PER AISC 360 SECTION M3 AND AISC 303 SECTION 6.5.
PRIMER SHALL BE COMPATIBLE WITH TOP COAT AND FINISH, FIELD TOUCH-UP AS
NECESSARY. COORDINATE TOP COAT AND FINISH WITH ARCHITECTURAL
DRAWINGS, UNLESS OTHERWISE NOTED.
10. LIFE SAFETY COMPONENTS AND LIFTING DEVICES (I.E. GUARD RAILS, STAIRS,
MONORAIL, ETC) SHALL RECEIVE A SAFETY YELLOW TOP COAT.
11. NUMBER ADJACENT TO BEAM SECTION, (##), INDICATES TOTAL NUMBER OF ¾”X4”
LONG HEADED STUDS TO BE EQUALLY SPACED ALONG THE LENGTH OF THE BEAM.
MULTIPLE NUMBERS ADJACENT TO GIRDER SECTION, (##,##,##), INDICATES NUMBER
STUDS TO BE EQUALLY SPACED ALONG SEGMENTS OF THE GIRDER. STUDS ARE TO
BE AUTOMATICALLY WELDED TO THE BEAMS THROUGH THE FLOOR DECK.
12. TOP FLANGES OF BEAMS AND GIRDERS MUST BE FREE OF PAINT, WATER, DIRT,
RUST AND ANY OTHER MATERIALS WHICH INTERFERE WITH THE WELDING
OPERATION OF HEADED STUDS.
13. COLUMN CAP PLATES SHALL BE 3/4 INCH THICK, UNLESS OTHERWISE NOTED.
14. LINTELS IN MASONRY WALLS SHALL HAVE A BEARING OF 1" PER FOOT OF SPAN
EACH END, 6" MINIMUM. LINTEL ANGLES WHICH HAVE NOT BEEN SHOWN
OTHERWISE TO BE AS FOLLOWS FOR EACH 4" OF WALL THICKNESS:
SPANS TO 4"-0" - 3 1/2" x 3 1/2" ANGLE 4'-0" to 6'-0" - 4" x 3 1/2" x 1/4" ANGLE 6'-0" to 8'-0" - 5" x 3 1/2" x 5/16" ANGLE
STEEL DECK - SPEC 05 31 00
1. ROOF DECK SHALL BE PLACED SO AS TO COVER AT LEAST TWO SPANS. SINGLE SPAN
CONDITIONS SHALL NOT BE USED.
2. STEEL DECK SHALL BE GALVANIZED WITH A PROTECTIVE ZINC COATING CONFORMING
TO ASTM A924, DESIGNATION G90.
3. GENERAL CONTRACTOR SHALL VERIFY AND COORDINATE THE SIZE AND LOCATION OF
ALL OPENINGS. OPENINGS LARGER THAN 12”, AND AS DETAILED, SHALL HAVE A STEEL
WELDED ANGLE FRAME, PER STANDARD DETAILS, SUPPORTING ALL EDGES.
4. METAL DECK TO BE MANUFACTURED AND ERECTED IN ACCORDANCE WITH SDI
SPECIFICATIONS.
5. STEEL DECKING SHALL BE FASTENED TO SUPPORTING MEMBERS WITH THE
FOLLOWING PATTERNS AND REQUIRED SIDELAPS PER SPAN:
ROOF DECK:
5/8” DIA PUDDLE WELDS IN A 36/4 PATTERN, (1) #10 TEK SCREW SIDELAP FLOOR
DECK:
5/8” DIA PUDDLE WELDS IN A 36/4 PATTERN, (1) WELD SIDELAP
GENERAL REQUIREMENTS
1. DESIGN AND CONSTRUCTION OF THIS PROJECT IS PER THE 2018 "INTERNATIONAL
BUILDING CODE (IBC)" WITH THE INCLUSION OF LOCAL AMENDMENTS
2. REFER TO PROCESS, ARCHITECTURAL, CIVIL, MECHANICAL, ELECTRICAL, AND
PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO: DIMENSIONS,
ELEVATIONS, SLOPES, DOOR AND WINDOW OPENINGS, NON-BEARING WALLS,
STAIRS, FINISHES, DRAINS, WATERPROOFING, RAILINGS, MECHANICAL UNIT
LOCATIONS, INSERTS, EMBEDDED ITEMS, ANCHORAGES, AND OTHER NON-
STRUCTURAL ITEMS
3. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR: COORDINATING DETAILS,
ACCURACY OF THE WORK, VERIFICATION OF ALL QUANTITIES AND DIMENSIONS,
SELECTING FABRICATION PROCESSES, MEANS AND METHODS OF CONSTRUCTION,
AND FOR PERFORMING THE WORK IN A SAFE AND SECURE MANNER
4. STRENGTH AND STABILITY OF THE STRUCTURE DURING CONSTRUCTION SHALL BE
THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PROVIDE TEMPORARY
SHORING, BRACING AND OTHER ELEMENTS REQUIRED TO MAINTAIN STABILITY
UNTIL THE STRUCTURE IS COMPLETE
5. DISCREPANCIES WITHIN THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO
THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK
6. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS,
AND CONDITIONS AT THE SITE, INCLUDING FOUNDATIONS. CONFLICTS BETWEEN
THE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.
7. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED OR OTHERWISE REDUCED
IN STRENGTH UNLESS APPROVED BY THE ENGINEER OF RECORD.
8. CONSTRUCTION OBSERVATION BY THE STRUCTURAL ENGINEER IS FOR GENERAL
CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS. GENERAL CONTRACTOR
SHALL BE RESPONSIBLE FOR PERFORMING ALL WORK IN COMPLIANCE WITH THE
CONTRACT DOCUMENTS.
9. PROTECT EXISTING CONSTRUCTION FROM DAMAGE DURING CONSTRUCTION OF
NEW ADDITIONS. MAKE NO CUTS OR ALTERATIONS TO EXISTING CONSTRUCTION,
OTHER THAN THOSE SHOWN ON THE DRAWINGS, WITHOUT THE APPROVAL OF THE
ARCHITECT/ENGINEER. PATCHING SHALL MATCH THAT OF WORK PREVIOUSLY
COMPLETED.
10. GENERAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND PRODUCT DATA TO
ENGINEER OF RECORD FOR REVIEW OF GENERAL CONFORMANCE WITH CONTRACT
DOCUMENTS. ALL SUBMITTALS SHALL BE REVIEWED AND STAMPED BY THE
GENERAL CONTRACTOR PRIOR TO SUBMISSION. SUBMITTALS ARE REQUIRED FOR:
STEEL FRAMING AND DETAILS, JOIST DETAILS FOR FABRICATION AND ERECTION,
CONCRETE MIX DESIGNS, REINFORCING STEEL, FORMWORK AND RESHORING,
METAL BUILDINGS, COLD FORMED STEEL FRAMING, PREFABRICATED METAL
STAIRS, AND WOOD I-JOISTS AND TRUSSES.
11. SPECIAL INSPECTIONS SHALL BE PROVIDED BY AN INDEPENDENT TESTING AND
INSPECTION AGENCY PER CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE
AND AS NOTED WITHIN THE CONTRACT DOCUMENTS. REPORTS DOCUMENTING THE
RESULTS OF THE TESTING AND INSPECTIONS SHALL BE SUBMITTED FOR REVIEW
AND RECORD.
S Y
M D
A T
E D
E S
C R
IP
T
IO
N
A P
P
M
IN
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .