SUPPLIES OR SERVICES AND PRICE REVISED 5-8-09.pdf

PDF 22 KB Posted

Attached to
Recovery - Construction of New Norton Sound Regional Hospital in Nome, Alaska
Solicitation number
09-102-SOL-00003
Issued by

About this file

Price Schedule revised 5-8-09

View the file

Other files

File Type Posted
Amendment_9_12-102-SOL-00003_nin-rml.pdf PDF
Amendment_9_Attachment_1Highway_mt120001_6.22.12.pdf PDF
Pano from SE Corner - 30 June 08.jpg JPG image
Amendment No. 000007.pdf PDF
South Edge Looking East - 30 June 08.jpg JPG image
Main Pad Looking West —
Main Pad Looking North - 30 June 08.jpg JPG image
South Edge Looking West - 30 June 08.jpg JPG image
NEC-NSHC IP Scope of Work —
05.29.2009_Compiled Answers.pdf PDF
Looking West Along ByPass Rd —
Amendment No. 000006 SF30.pdf PDF
Amendment No. 000005 SF30.pdf PDF
Amendment No. 000004 SF30.pdf PDF
Amendment No. 000003 SF30.pdf PDF
Pre-Proposal Final Agenda.pdf PDF
Pre-Proposal Conference 4-22-09 Transcript.pdf PDF
Sign-in Sheet Pre-Proposal Conference 4-22-09.pdf PDF
Nome Pre-Proposal Meeting-Vinikoor.ppt PPT presentation
NSRH Final Presentation-Geisert.ppt PPT presentation
H-8 Progress and Final Photographs.pdf PDF
AK1_dvb 04-17-2009.txt TXT text file
Amendment No. 000002 SF30.pdf PDF
Amendment No. 1.pdf PDF
AK1_dvb 04-03-2009.txt TXT text file
sf24_f.pdf PDF
sf25_f.pdf PDF
SampleSubcontractingPlan.doc DOC document
Sol 09-102-SOL-0003.pdf PDF
Sf25a.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction of the New Norton Sound Regional Hospital Solicitation #09-102-SOL-00003 Nome, Alaska April 3, 2009

REVISED 5-8-09

Section B - SUPPLIES OR SERVICES AND PRICE/COSTS

B-1 PRICE SCHEDULE

Item Description Qty Unit Unit Price

Total

00001

Base Item: All materials, labor, tools and equipment necessary for construction of the New Norton Sound Regional Hospital and deliver a complete, fully functional facility as described herein and in the attachments, except those elements of work listed separately as Unit Price Items1and 2, Allowance No. 1, and Alternate Items Nos.1- 3, and 5-6.

1 JOB

00002

Unit Price 1: Hydraulic Cement Underlayment as required for leveling of concrete floors or providing for transition between floor finish materials of differing thickness.

25,000 SF $______ $_________

00003

Unit Price 2: Select Embankment Fill as needed to achieve final pad and ramp elevations as described on Civil Drawings.

3,800 CY $______ $_________

00004

ADD Alternate No. 1: Provide pre-patinated copper sheet composite exterior wall panels (Section 074243, 2.4, C) in lieu of kynar-coated aluminum composite wall panels (Section 074243, 2.4, B). Penthouse Metal Wall Panels are unaffected.

1 JOB $_________

00005

ADD Alternate No. 2: Provide automatic fire sprinkler system in Crawlspace. Delete smoke detectors in crawlspace. Provide stair access to crawlspace at stair #2 as shown on Drawings. (Base Item 00001 has an access hatch in lieu of stair access).

1 JOB $_________

00006 ADD Alternate No. 3: Provide triple glazing at all windows/curtainwalls. Refer to Specification sections 084113, 084413, and 088000.

1 JOB $_________

00007 Allowance No. 1: Purchase and deliver commercial grade of distilled fuel oil and fill (3) 12,000-gallon empty fuel tanks (assume 2,000 gallons left from testing equipment).

34,000 $8.75/ gal

$297,500.00

00008

ADD Alternate No. 5: Provide Resinous Matrix Terrazzo Flooring as called out on the Room Finish Schedule and specified in Section 096623. Base Item 00001 assumes Resilient Terrazzo Tile as specified in section 096560.

1 JOB $_________

B-1

Construction of the New Norton Sound Regional Hospital Solicitation #09-102-SOL-00003 Nome, Alaska April 3, 2009

REVISED 5-8-09

B-2

00009

ADD Alternate No. 6: Provide two (2) flat loop cooling systems outside the south line of the building as indicated on drawings (A-104) and specified in section 316465 Flat Loop Evaporators. (Note that the flat loop evaporators under level 0 and entry deck are in Base Item 00001).

1 JOB $_________

Section B - SUPPLIES OR SERVICES AND PRICE/COSTS