SUPPLIES OR SERVICES AND PRICE REVISED 5-8-09.pdf
PDF 22 KB Posted
- Solicitation number
- 09-102-SOL-00003
About this file
Price Schedule revised 5-8-09
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction of the New Norton Sound Regional Hospital Solicitation #09-102-SOL-00003 Nome, Alaska April 3, 2009
REVISED 5-8-09
Section B - SUPPLIES OR SERVICES AND PRICE/COSTS
B-1 PRICE SCHEDULE
Item Description Qty Unit Unit Price
Total
00001
Base Item: All materials, labor, tools and equipment necessary for construction of the New Norton Sound Regional Hospital and deliver a complete, fully functional facility as described herein and in the attachments, except those elements of work listed separately as Unit Price Items1and 2, Allowance No. 1, and Alternate Items Nos.1- 3, and 5-6.
1 JOB
00002
Unit Price 1: Hydraulic Cement Underlayment as required for leveling of concrete floors or providing for transition between floor finish materials of differing thickness.
25,000 SF $______ $_________
00003
Unit Price 2: Select Embankment Fill as needed to achieve final pad and ramp elevations as described on Civil Drawings.
3,800 CY $______ $_________
00004
ADD Alternate No. 1: Provide pre-patinated copper sheet composite exterior wall panels (Section 074243, 2.4, C) in lieu of kynar-coated aluminum composite wall panels (Section 074243, 2.4, B). Penthouse Metal Wall Panels are unaffected.
1 JOB $_________
00005
ADD Alternate No. 2: Provide automatic fire sprinkler system in Crawlspace. Delete smoke detectors in crawlspace. Provide stair access to crawlspace at stair #2 as shown on Drawings. (Base Item 00001 has an access hatch in lieu of stair access).
1 JOB $_________
00006 ADD Alternate No. 3: Provide triple glazing at all windows/curtainwalls. Refer to Specification sections 084113, 084413, and 088000.
1 JOB $_________
00007 Allowance No. 1: Purchase and deliver commercial grade of distilled fuel oil and fill (3) 12,000-gallon empty fuel tanks (assume 2,000 gallons left from testing equipment).
34,000 $8.75/ gal
$297,500.00
00008
ADD Alternate No. 5: Provide Resinous Matrix Terrazzo Flooring as called out on the Room Finish Schedule and specified in Section 096623. Base Item 00001 assumes Resilient Terrazzo Tile as specified in section 096560.
1 JOB $_________
B-1
Construction of the New Norton Sound Regional Hospital Solicitation #09-102-SOL-00003 Nome, Alaska April 3, 2009
REVISED 5-8-09
B-2
00009
ADD Alternate No. 6: Provide two (2) flat loop cooling systems outside the south line of the building as indicated on drawings (A-104) and specified in section 316465 Flat Loop Evaporators. (Note that the flat loop evaporators under level 0 and entry deck are in Base Item 00001).
1 JOB $_________
| Section B - SUPPLIES OR SERVICES AND PRICE/COSTS |
| B-1 PRICE SCHEDULE |
File details come from the government source that posted it. Updated .