Amendment_9_12-102-SOL-00003_nin-rml.pdf
PDF 28 KB Posted
- Solicitation number
- 09-102-SOL-00003
About this file
Amendment 9 - adds updated wage determination with attach. 1
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Nine (9) 06-27-2012
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Indian Health Service – DES 2201 6th Ave, Room 937 Seattle, WA 98121
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
12-102-SOL-00003 rml site imprvmnt
9B. DATED (SEE ITEM 11)
05-11-2012
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers__ is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Attachment 1 to this Amendment 9 is the replacement Highway Wage Determination for the now oudated Attachment 1B to the solicitation in Section J.
See next page, page 2, for statement about PPQ (past performance questionaire) deadline that shall coorespond to the closing date and time of the solicitation as amendmended and one question and answer.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
Paul J. Reed (Signature of person authorized to sign) (Signature of Contracting Officer)
Amendment 9
12-102-SOL-00003
Also note the closing date for this soliciation is not changed with this Amendment No. 9 but remains per Amendment 8 at July 6th, 2012 2:00pm local time.
Offerors should advise potential references for PPQ submissions that the original closing date of June 25th on the PPQ form is no longer valid and PPQ’s may be submitted per the instructions up to the latest amended closing date of this soliciation that your PPQ references may not be aware of. It is the Offerors responsibility to assure that their PPQ references understand this.
Q. Would it be possible to pick a color for the concrete- or tell everyone to allow “$X” for it in the bid and adjust the contract after a selection is made?
A. Specification Section 02529 - Concrete Sidewalks, Driveways, Approaches, Curb Turn Fillets, Valley Gutters and Miscellaneous New Concrete Construction - Paragraph 2.7 A which clearly states the Contractor shall submit final color chart from the “Standard Group” color listed as a mid-range cost/yd (designated with symbol $$).
Offerors can assume a high or low cost at their risk.
(end of Amendment 9)
File details come from the government source that posted it. Updated .