08Drawings Mechanical.pdf
PDF 9 MB Posted
- Solicitation number
- 36C25521R0027
About this file
This federal contract opportunity solicitation seeks proposals for a construction project to create an elevator tower and stairwell within Building 23 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project number is 657-19-128JB and has an estimated cost between $2 million to $5 million. The North American Industry Classification System code is 238220 for commercial and institutional building construction. The project completion period is estimated at 383 calendar days after notice to proceed. Proposals are due on or around January 22, 2021 and award will be made using best value tradeoff source selection with the lowest price technically acceptable proposal. The successful contractor must perform a minimum of 15% general construction labor. Registration in the System for Award Management and Vendor Information Pages databases is required. Only one pre-solicitation site visit will be scheduled. Questions shall be submitted by email with the subject line referencing the project number and name.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MA
MV
CO
EV
VE
AI
FOV
FOR
FOS
FP
LPG
NPW
NO
O
N
G
MPG
G
MPG
CA
V
VBG
VBF
AV
AW
AW
ST
OST
GW
GW
S
W
ID
SPD
T
T
140°
S
W
ST
RS
RL
CWR
CWS
CHWR
CHWS
HWR
HWS
PD
CD
ACD
D
CD
LPC
LPS
MPC
MPS
HPC
HPS
S
SCW
WS
RD
H
T
H
T
FSD
SD
FD
FD
T
H
VD
MD
BD
RD
RDB
HPSR
HPWS
RV
CAP
LC
M
AV
FLOOR MOUNTED FLUSH VALVE
WATER
CLOSET
WALL MOUNTED FLUSH VALVE
WATER
CLOSET
26-P 3
PLUMBING PIPING SYMBOLS
ANNOTATION
XX-1
xx
X100
X100
GENERAL PLUMBING SYMBOLS
DENTAL
MEDICAL GASES
STORM
FUEL
EXISTING PIPING
WATER
WASTE
VALVE SYMBOLS
ETR
HVAC PIPING SYMBOLS
GENERAL DUCT SYMBOLS
GENERAL PLUMBING EQUIPMENT
SHOWER HEADS
JANITORS SINK
DRINKING FOUNTAIN & TYPE
SHOWER
BATHTUB
TANK TYPE WATER CLOSET
COUNTER TOP LAVATORY & TYPE
WALL MOUNTED LAVATORY & TYPE
URINAL
SINK & TYPE
JANITORS SINK - CORNER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
IS LOCATED.
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
LA
LV
OA
IA
TWR
TWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
ANCHOR
CONNECTION - SIDE
ECCENTRIC REDUCER
CONNECTION - BOTTOM, 45° OR 90°
CONNECTION - TOP, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
STRAINER
FLOAT & THERMOSTATIC TRAP SET W/
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FLOOR DRAIN (FD), SIZE & TYPE
ROOF DRAIN (RD), SIZE & TYPE
FLOOR SINK (FS), SIZE & TYPE
NATURAL GAS BELOW GRADE (G)
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
CONDENSATE DRAIN (CD)
INDIRECT DRAIN (ID)
NATURAL GAS (G)
NITROUS OXIDE (NO)
LIQUIFIED PETROLEUM GAS (LPG)
FIRE PROTECTION (FP)
WATER SERVICE (WS)
COMPRESSED AIR (CA)
NITROGEN (N)
MEDICAL AIR (MA)
OXYGEN (O)
DOMESTIC HOT WATER RECIRC.
SOIL PIPING - ABOVE FLOOR (S)
SOIL PIPING - BELOW FLOOR (S)
STORM DRAIN - ABOVE FLOOR (ST)
STORM DRAIN - BELOW FLOOR (ST)
ACID WASTE - ABOVE FLOOR (AW)
ACID WASTE - BELOW FLOOR (AW)
DOMESTIC COLD WATER
DOMESTIC HOT WATER
140° DOMESTIC HOT WATER (140°)
WASTE PIPING - ABOVE FLOOR (W)
WASTE PIPING - BELOW FLOOR (W)
GREASE WASTE - ABOVE FLOOR (GW)
GREASE WASTE - BELOW FLOOR (GW)
SOFTENED COLD WATER (SCW)
ACID VENT (AV)
VENT PIPING (V)
HOSE BIBB (HB)
NONFREEZE WALL HYDRANT (NW)
WALL CLEANOUT (WCO)
FLOOR CLEANOUT (FCO)
EXTERIOR CLEANOUT (ECO)
THERMOSTATIC MIXING VALVE
BACKFLOW PREVENTER
OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)
NON POTABLE WATER (NPW)
FUEL OIL SUPPLY (FOS)
FUEL OIL RETURN (FOR)
FUEL OIL VENT (FOV)
AUXILIARY CONDENSATE DRAIN (ACD)
VENT BELOW GRADE (VBG)
VENT BELOW FLOOR (VBF)
CARBON DIOXIDE (CO)
MEDICAL VACUUM (MV)
EVACUATION (EV)
MEDICAL VACUUM EXHAUST (VE)
MEDICAL AIR INTAKE (AI)
TRAP PRIMER LINE (T)
WATER METER
MEDIUM PRESSURE NATURAL GAS (MPG)
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ELBOW DOWN WITH SHUT-OFF VALVE
TEE DOWN WITH SHUT-OFF VALVE (SOV)
TEE UP WITH SHUT-OFF VALVE (SOV)
RECIRCULATION PUMP
DIRECTION OF FLOW
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
FLANGE CONNECTION
CLEANOUT
ELBOW DOWN
ELBOW UP
TEE DOWN
ELBOW UP WITH SHUT-OFF VALVE (SOV)
TEE UP
UNION
THERMOMETER
PRESSURE GAUGE
PRESSURE REDUCING VALVE
REDUCER
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT
PLUMBING PLAN NOTE CALL OUT
ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT
TECHNOLOGY PLAN NOTE CALL OUT
PLUMBING EQUIPMENT DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION TAG
OWNER FURNISHED, CONTRACTOR INSTALLED
EQUIPMENT DESIGNATION
NEW WORK TO EXISTING WORK CONNECTION POINT
DETAIL NUMBER
SHEET NUMBER
LIMIT OF DEMOLITION
TRAP PRIMER LINE - BELOW SLAB (T)
CO
DOUBLE EXTERIOR CLEANOUT (ECO)
CLEANOUTS
DRAINS AND TRAPS
EQUIPMENT
PIPE FITTINGS AND ACCESSORIES
SHEET NUMBER
SECTION NUMBER
MEDICAL GAS OUTLET (TYPE)
EXISTING TO REMAIN
DIVISION 23 PIPE FITTINGS AND ACCESSORIES
DRAIN (D)
CONDENSATE DRAIN (CD)
26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
BUILDING NO. WHERE EQUIP. IS LOCATED
10x8AUTOMATIC BALANCING CONTROL VALVE
WYE STRAINER (WITH BALL VALVE
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
QUICK-COUPLE HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER
FLOW METER
& HOSE CONNECTION)
EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED
EXISTING DUCTWORK OR EQUIPMENT TO REMAIN
BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH
BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL
RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN
FITTING AND MANUAL VOLUME DAMPER
SUPPLY AIR DUCT UP
RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP
LINEAR SLOT DIFFUSER
ELBOW WITH TURNING VANES
INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)
VOLUME CONTROL DAMPER
NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER
MOTORIZED DAMPER
VOLUME DAMPER
THERMOSTAT
FIRE DAMPER
FIRE SMOKE DAMPER
SMOKE DAMPER
24x24 CEG-1 800 CFM
SIZE, TYPE, CFM OF EXHAUST GRILLE
MANUAL VOLUME DAMPER
SQUARE TO ROUND TRANSITION
RISER DESIGNATION
HUMIDISTAT
EQUIPMENT WITH FLEXIBLE DUCT CONNECTION
10" CSD-1 300 CFM
BACKDRAFT DAMPER
SUPPLY AIR DUCT DOWN
DUCT MOUNTED SMOKE DETECTOR
(SD=SUPPLY/RD=RETURN)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
LOUVER
DUCT WITH SOUND LINING
DAMPERS: (BD, FD, FSD, MD, SD, VD)
TRAP PRIMER WITH DISTRIBUTION UNIT
TRAP PRIMER
P-TRAP
GAS COCK
HEATING HOT WATER RETURN (HWR)
HEATING HOT WATER SUPPLY (HWS)
REFRIGERANT DISCHARGE BYPASS (RDB)
REFRIGERANT SUCTION (RS)
CHILLED WATER RETURN (CHWR)
CONDENSER WATER SUPPLY (CWS)
CONDENSER WATER RETURN (CWR)
REFRIGERANT DISCHARGE (HOT GAS) (RD)
HEAT PUMP WATER RETURN (HPWR)
HEAT PUMP WATER SUPPLY (HPWS)
REFRIGERANT LIQUID (RL)
CHILLED WATER SUPPLY (CHWS)
HIGH PRESSURE STEAM CONDENSATE (HPC)
HIGH PRESSURE STEAM SUPPLY (HPS)
MEDIUM PRESSURE STEAM CONDENSATE (MPC)
MEDIUM PRESSURE STEAM SUPPLY (MPS)
LOW PRESSURE STEAM CONDENSATE (LPC)
LOW PRESSURE STEAM SUPPLY (LPS)
CONDENSATE PUMP DISCHARGE (PD)
EXPANSION JOINT
F & T TRAP
TRIPLE DUTY VALVE WITH PRESSURE PORTS
BALANCING VALVE WITH PRESSURE PORTS
SOLENOID VALVE
STRAINER WITH BLOWOFF
REFRIGERANT VENT (RV)
EJ
PRESSURE AND TEMPERATURE TEST PLUG
VACUUM RELIEF VALVE
PRESSURE / VACUUM SWITCH
LIMIT OF DEMOLITION
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
BACK DRAFT DAMPER
BDD
SOLAR WATER RETURN
SOLAR WATER SUPPLY
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLY
MAKE-UP WATER
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
GHS
GHR
SWS
SWR
GCR
GCS
MW
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURNGRR
GRS
VACUUM CONDENSATE RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
FWPS
FWPD
FEEDWATER SAMPLE (DEAERATOR)
BOILER WATER SAMPLE
CONTINUOUS BLOWDOWN
CF
FWS
BWS
CBD
BO
CHEMICAL FEED
BOILER BLOWOFF
TUBE CLEANER WATER SUPPLYTC
OFL OVERFLOW
REFRIGERANT SIGHT GLASS
QUICK-COUPLE HOSE CONNECTOR
TEMPERATURE SENSOR
HUMIDITY SENSOR
DUCT W/DAMPERS
DIFFUSERS,GRILLES, FLEX CONNECTIONS
FITTINGS & TRANSITIONS
SOFTENED WATERSW
BRINE & SOFT WATER
REFRIGERANT
PLANT PIPING
STEAM
EXISTING TO REMAIN
ABBREVIATIONS
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
T
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
S
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
M
M METER, SI UNIT
M/s METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
H
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
C
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING
TOWER
CWS CONDENSER WATER SUPPLY (FROM COOLING
TOWER)
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
A
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
Y
YR YEAR
W
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
U
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
FSD COMBINATION FIRE / SMOKE DAMPER
FD FLOOR DRAIN
I th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MG-001
MECHANICAL LEGEND
RLC
65 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
jet Text Box
DN
STEAM UNIT HEATER
LOW PRES.
STEAM
(ETR)
LOW PRES.
COND. (ETR)
COND. (ETR)
HIGH PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
STEAM
(ETR)
HIGH PRES.
STEAM (ETR)
MED PRES.
STEAM (ETR)
COND. (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
COND. (ETR)
HIGH PRES.
STEAM (ETR)
LOW PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
MED PRES.
STEAM (ETR)
HIGH PRES.
STEAM (ETR)
COND. (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
COND.
HIGH PRES.
STEAM
COND.
LOW PRES.
STEAM
LOW PRES.
STEAM
LOW PRES.
COND.
LOW PRES.
COND.
LOW PRES.
STEAM
LOW PRES.
COND. FFA
STEAM UNIT HEATER
1" HWR (ETR)
1" HWS (ETR)
EXISTING
CORRIDOR
EXISTING
BUILDING 23
1 2 3 4 5 6 7 8 9 10 113.4
A
B
C
B.5
BREAK RM. / STORAGE
G23
CARPENTER SHOP
G26
CARPENTER SHOP OFFICE/ KEY PICK-UP
G25
LOCKER, MALE
G15
TOILET / SHOWER
G16
STORAGE
G14
STAIRWELL NO. 1
CORRIDOR
H001
TOILET, MEN
G12
STORAGE
G13
LOCKER, MALE
G11
CARPENTER STORAGE
G10
CHARGING STATION
G07
STORAGE
G08
LOCK SHOP
G09
KEY SHOP
G09A
BREAK RM.
G04
STORAGE
G05
OFFICE
G01A
ELEC RM.
G01
MECH. RM.
G02
ELEC RM.
G03
CORRIDOR
H002
BATTERY STORAGE
G13C
TRASH RM.
G13B
WASH RM.
G13A
STAIRWELL NO. 2
S2
MECH. RM.
G17
CORRIDOR
H000
ELEVATOR
CLOSET
H002A
Room
97G th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:0
A
M
23-MD-101
MECHANICAL PIPING DEMOLITION PLAN
- FLOOR 00
RLC
66 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/8" = 1'-0"1
MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
5. THE DEMOLITION DRAWINGS ARE DEEMED SCHEMATIC. CONTRACTOR
RESPONSIBLE FOR FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR
TO SUBMISSION OF PROPOSAL.
MECHANICAL PLAN NOTES:
1. REMOVE STEAM AND CONDENSATE PIPING AND ALL ASSOCIATED
ACCESSORIES BACK TO DEMARCATION POINT SHOWN.
N jet
F D
EDGE OF
FLOOR ABOVE
LOBBY
ELEVATOR
EQUIPMENT
FT
ACU
ACU
UTILITY
AC
UH
L
6"ø CD-1
6"ø CD-1
8"x8" SA
8"x10" RA
22"x22" RG-1
8"ø OA
12"x8" OA
EXISTING
CORRIDOR
EXISTING
BUILDING 23
1 2 3 4 5 6 7 8
9 10 113.4
A
B
C
B.5
6.3 7.8 8.5 9.3 9.7 9.8 9.9
U
V
W
Y
Z
6.1
X
BREAK RM. / STORAGE
G23
CARPENTER SHOP
G26
CARPENTER SHOP OFFICE/ KEY PICK-UP
G25
LOCKER, MALE
G15
TOILET / SHOWER
G16
STORAGE
G14
STAIRWELL NO. 1
CORRIDOR
H001
TOILET, MEN
G12
STORAGE
G13
LOCKER, MALE
G11
CARPENTER STORAGE
G10
CHARGING STATION
G07
STORAGE
G08
LOCK SHOP
G09
KEY SHOP
G09A
BREAK RM.
G04
STORAGE
G05
OFFICE
G01A
ELEC RM.
G01
MECH. RM.
G02
ELEC RM.
G03
CORRIDOR
H002
BATTERY STORAGE
G13C
TRASH RM.
G13B
WASH RM.
G13A
STAIRWELL NO. 2
S2
MECH. RM.
G17
CORRIDOR
H000
ELEVATOR
CLOSET
H002A
Room
97G
T7
T6
T5
T4
T3
T2
TA TB
T1
RHP
RHP
RHP
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MH-101
MECHANICAL HVAC PLAN - FLOOR 00
RLC
67 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/8" = 1'-0"1
MECHANICAL HVAC PLAN - FLOOR 00
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
MECHANICAL PLAN NOTES:
1. PROVIDE FIRE DAMPER WHERE DUCT PENETRATES CEILING. SEE DETAIL
4/23-MJ-501 FOR RELATED INFORMATION.
N jet
F D
MEZZANINE
ELEVATOR
ELECTRICAL
ACU
ACU
ACU
AC
EF
10"ø CD-2
10"ø CD-2
22"x22" RG-1
"ø
O A
22"x22" RG-1
8"ø CD-1
8"ø CD-1
8"ø CD-1
12"ø RA
"ø S
A
8"ø OA
12"x8" OA
14"ø OA
10"ø OA
EXISTING
BUILDING 23
1 2 3 4 5 6 7 8
9 10 113.4
A
B
C
B.5
6.3 7.8 8.5 9.3 9.7 9.8 9.9
U
V
W
Y
Z
6.1
X
CONFERENCE RM.
PROSTHETICS RESTORATION
PROSTHETICS RESTORATION OFFICE
PROSTHETICS RESTORATION LAB
LAB DUSTER
115A
OI&T
115B
CORRIDOR
C119
STAFF LOUNGE
HAC
TOILET
CORRIDOR
C128
ORTH LAB SUPPLIES
ORTH LAB SUPPLIES
AMPUTEE CLINIC
WHEELCHAIR ASSEMBLY
WHEELCHAIR REPAIR
OFFICE
EXAM 1
CORRIDOR
C118
CORRIDOR
C102
EXAM 2
FIT 2
FIT 1
OFFICE
CLEAN SUPPLY
ORTH LAB/OFFICE
SEWING STORAGE
TOILET, STAFF
CAD CAM
CAST RM.
LAB WORK
CORRIDOR
C110
LAB FUME/STORAGE
OVEN
114A
ALCOVE
122A
DME SUPPLY / DISTRIBUTION
PROSTHETICS SERVICE CHECK-IN
TOILET
RECEPTION
PURCHASING AGENTS
PROGRAM SUPPORT ASSISTANT
OFFICE
OFFICE
CORRIDOR
CORRIDOR
C102A
STAIRWELL NO. 1
S1
CORRIDOR
C102B
ELEVATOR
E-1
WORK
129A
WORK
129B
OFFICE
97D
OFFICE
97A
HALLWAY
96A
OFFICE
97B
OFFICE
97E
OFFICE
97C
OFFICE
97F
OFFICE
114B
12"ø SA th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MH-111
MECHANICAL HVAC PLAN - FLOOR 01
RLC
68 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/8" = 1'-0"1
MECHANICAL HVAC PLAN - FLOOR 01
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
MECHANICAL PLAN NOTES:
1. PROVIDE FIRE DAMPER WHERE DUCT PENETRATES FLOOR. SEE DETAIL
4/23-MJ-501 FOR RELATED INFORMATION.
N jet
CU
CU
CU
CU
CU
HD
3" VTR
P-808
EXISTING BUILDING 23 ROOF
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MH-121
MECHANICAL HVAC PLAN - ROOF
RLC
69 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/4" = 1'-0"1
MECHANICAL PLAN - ROOF
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
N jet
LOBBY
ELEVATOR
EQUIPMENT
EDGE OF
FLOOR ABOVE
FT
ACU
ACU
1" HWR (ETR)
1" HWS (ETR)
3/4" HWS
3/4" HWR
3/4" HWS
/4
H
W S
/4
H
W R
/4
H
W S
/4
H
W R
/4
H
W R
/4
H
W S
L
UH
AC
LOW PRES.
STEAM
(ETR)
LOW PRES.
COND. (ETR)
COND. (ETR)
HIGH PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
STEAM
(ETR)
HIGH PRES.
STEAM (ETR)
MED PRES.
STEAM (ETR)
COND. (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
COND. (ETR)
HIGH PRES.
STEAM (ETR)
LOW PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
MED PRES.
STEAM (ETR)
HIGH PRES.
STEAM (ETR)
LOW PRES.
COND. (ETR)
LOW PRES.
COND.
LOW PRES.
STEAM
LOW PRES.
STEAM
LOW PRES.
COND.
LOW PRES.
COND. FFA
T
ACU-2
T
ACU-4
EXISTING
CORRIDOR
EXISTING
BUILDING 23
1 2 3 4 5 6 7 8
9 10 113.4
A
B
C
B.5
6.3 7.8 8.5 9.3 9.7 9.8 9.9
U
V
W
Y
Z
6.1
X
BREAK RM. / STORAGE
G23
CARPENTER SHOP
G26
CARPENTER SHOP OFFICE/ KEY PICK-UP
G25
LOCKER, MALE
G15
TOILET / SHOWER
G16
STORAGE
G14
STAIRWELL NO. 1
CORRIDOR
H001
TOILET, MEN
G12
STORAGE
G13
LOCKER, MALE
G11
CARPENTER STORAGE
G10
CHARGING STATION
G07
STORAGE
G08
LOCK SHOP
G09
KEY SHOP
G09A
BREAK RM.
G04
STORAGE
G05
OFFICE
G01A
ELEC RM.
G01
MECH. RM.
G02
ELEC RM.
G03
CORRIDOR
H002
BATTERY STORAGE
G13C
TRASH RM.
G13B
WASH RM.
G13A
STAIRWELL NO. 2
S2
MECH. RM.
G17
CORRIDOR
H000
ELEVATOR
CLOSET
H002A
Room
97G
T7
T6
T5
T4
T3
T2
TA TB
T1
RHP
RHP
RHP
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MP-101
MECHANICAL PIPING PLAN - FLOOR 00
RLC
70 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/8" = 1'-0"1
MECHANICAL PIPING PLAN - FLOOR 00
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
MECHANICAL PLAN NOTES:
1. CONTRACTOR TO PROVIDE REFRIGERANT LINES FROM CONDENSING
UNITS ON THE ROOF TO THEIR RESPECTIVE DX TERMINAL UNIT.
2. PROVIDE NEW HWR/S LINES FROM 12' BASEBOARD HEATER. CONNECT
TO EXISTING SYSTEM. CONTRACTOR TO VERIFY LOCATION OF EXISTING
HWS/R LINES.
3. PROVIDE NEW STEAM AND CONDENSATE LINES AT DEMARCATION POINT
SHOWN. CONTRACTOR TO FIELD VERIFY EXACT LINE SIZES PRIOR TO
CONSTRUCTION.
N jet
MEZZANINE
ELEVATOR
ELECTRICAL
ACU
ACU
ACU
3 1
/4
H
W S
3/4" HWS
3/4" HWS
EF
AC
T
ACU-5
EXISTING
BUILDING 23
1 2 3 4 5 6 7 8
9 10 113.4
A
B
C
B.5
6.3 7.8 8.5 9.3 9.7 9.8 9.9
U
V
W
Y
Z
6.1
X
CONFERENCE RM.
PROSTHETICS RESTORATION
PROSTHETICS RESTORATION OFFICE
PROSTHETICS RESTORATION LAB
LAB DUSTER
115A
OI&T
115B
CORRIDOR
C119
STAFF LOUNGE
HAC
TOILET
CORRIDOR
C128
ORTH LAB SUPPLIES
ORTH LAB SUPPLIES
AMPUTEE CLINIC
WHEELCHAIR ASSEMBLY
WHEELCHAIR REPAIR
OFFICE
EXAM 1
CORRIDOR
C118
CORRIDOR
C102
EXAM 2
FIT 2
FIT 1
OFFICE
CLEAN SUPPLY
ORTH LAB/OFFICE
SEWING STORAGE
TOILET, STAFF
CAD CAM
CAST RM.
LAB WORK
CORRIDOR
C110
LAB FUME/STORAGE
OVEN
114A
ALCOVE
122A
DME SUPPLY / DISTRIBUTION
PROSTHETICS SERVICE CHECK-IN
TOILET
RECEPTION
PURCHASING AGENTS
PROGRAM SUPPORT ASSISTANT
OFFICE
OFFICE
CORRIDOR
CORRIDOR
C102A
STAIRWELL NO. 1
S1
CORRIDOR
C102B
ELEVATOR
E-1
WORK
129A
WORK
129B
OFFICE
97D
OFFICE
97A
HALLWAY
96A
OFFICE
97B
OFFICE
97E
OFFICE
97C
OFFICE
97F
OFFICE
114B th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MP-111
MECHANICAL PIPING PLAN - FLOOR 01
RLC
71 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
1/8" = 1'-0"1
MECHANICAL PIPING PLAN - FLOOR 01
GENERAL NOTES:
1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING
FACILITY THAT MUST REMAIN IN SERVICE.
2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING
SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO
MINIMIZE DISRUPTION OF SERVICES.
3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S
REPRESENTATIVE (COR) BEFORE THE START OF WORK.
4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND
CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START
OF WORK.
MECHANICAL PLAN NOTES:
1. CONTRACTOR TO PROVIDE REFRIGERANT LINES FROM CONDENSING
UNITS ON THE ROOF TO THEIR RESPECTIVE DX TERMINAL UNIT.
N jet
"4"
GAS IN
LIQUID
OUT
COORDINATE MOUNTING
RAILS WITH ROOF ASSEMBLY.
NOTE:
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND FAN
ROOM FLOORS SHALL BE PROVIDED WITH A 3" [75mm] HIGH CONCRETE CURB AROUND
OPENING FOR DUCT.
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT
INSTALLATION
2"x2"x1/4" [50x50x6mm] ANGLE
INSTALL ON BOTH LONG
DIMENSION SIDES OF DUCT.
DUCT RISER - SEE FLOOR PLANS
FOR DETAILS
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT
INSTALLATION
FLOOR
EXTEND ANGLE 3" [75mm]
BEYOND DUCT
DUCT RISER - SEE FLOOR PLANS
FOR SIZES SHEET METAL SCREWS 4" [100mm]
ON CENTER
1 1/2"x1 1/2"x1/8" [40x40x3mm] ANGLE
INSTALL ON BOTH LONG DIMENSION
SIDES OF DUCT. FOR DUCTS OVER 60"
[1500mm] USE 2"x2"x1/8" [50x50x3mm]
ANGLE.
HOLE IN STRUCTURAL FLOOR
DUCT RISER
0.5 INCH WG [125Pa] TO 2 INCHES WG [500Pa] DUCT RISER SUPPORT
ARRANGE RISER SO REINFORCER
TRANSVERSE JOINT IS AT RISER
SUPPORT POINT
FLOOR
2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT
HOLE IN STRUCTURAL FLOOR
DUCT RISER
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm]
MIN.
BRANCH DUCT
VD
W
FROM STRUCTURE
SAME AS DIFFUSER
INLET: 5'-0" MAX
FLEXIBLE DUCT SIZE
LENGTH.
12"
CEILING
SUPPORT SADDLE
VOLUME DAMPER W/
LOCKING QUADSADDLE
SHEET METAL
CONICAL OUTLET
BRANCH DUCT
FOR CHANGE OF
DIRECTION GREATER
USE RIGID ELBOWS
THAN 45°
[300mm]
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
THERMAL INSULATION
SEE SPECIFICATIONS
TYPICAL
DIFFUSER OR
REGISTER IN
LAY-IN CLG.
NOTE:
1. THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED
FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE. ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED
CONNECTION ON FAN
SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX.
INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON
12" [300mm] CENTERS
RIVET ON 4"
[100mm] CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION
OF BOLT 1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX.
INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL TAUT
FLANGED
CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
1 1/2"1/2"1/2"
OPTION "A"
OPTION "B"
ROOF DECK
ABS CURB CAB
EPDM RUBBER CAP
INSULATION
1" CLEAR OPENING AROUND PIPE TO
ALLOW FOR PIPE MOVEMENT
INSULATED ROOF CURB
WITH 26 GA. GALVANIZED
COUNTER FLASHING
ACRYLIC COATED ABS
RIB REINFORCED
PLASTIC CURB COVER
EPDM PROTECTIVE
RUBBER CAP
STAINLESS
STEEL CLAMP
SINGLE OR MULTIPLE
PIPE PENETRATIONS
PIPE PENETRATION(S) PER
PLAN
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE
ALL AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND
ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
NOTE:
1. INSTALLING CONTRACTOR SHALL VERIFY WITH EQUIPMENT MANUFACTURER PIPE
SIZES AND MAXIMUM RUN LENGTHS TO ENSURE PROPER OPERATION.
2. CONTRACTOR TO INSTALL OIL TRAPS IN REFRIGERANT LINE BEFORE EVAPORATOR
COIL AND NEAR CONDENSING UNIT TO HELP PREVENT OIL BUILD-UP IN COILS.
ACU - INDOOR UNIT
CU - OUTDOOR UNIT
3/8" RL / 5/8" RG
A P
P R
O X
[2 m m
ACCESS
PANEL
NOTE 5
PERIMETER ANGLE, NOTE 3 (NOTE
FASTENED TO PARTITION)
TYPICAL DUCT
INSULATION
FIRE BARRIER
PARTITION OR CHASE
NOTE 6
SLEEVE, NOTE 2
DAMPER COLLAR
EXTENSION INTEGRAL
PART OF SLEEVE
DAMPER,
NOTE 1
DUCT
CONNECTION
NOTE 4
SLEEVE, NOTE 2
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR. FOLLOW
DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR
SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR
FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER
FRAME AND TO PERIMETER ANGLES.
PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO
PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH
ROCK WOOL FIRESTOP FIBER.
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND
MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB
AROUND OPENING FOR DUCT.
NOTE:
1.
2.
3.
4.
5.
6.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:4
:1
A
M
23-MJ-501
MECHANICAL DETAILS
RLC
72 101
JRM
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
01/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
NOT TO SCALE7
CONDENSING UNIT MOUNTING RAIL DETAIL
NOT TO SCALE5
DUCT RISER SUPPORTS
NOT TO SCALE9
EXHAUST OR RETURN BRANCH DUCTWORK
NOT TO SCALE3
FLEXIBLE AIR DUCT CONNECTOR
NOT TO SCALE1
FLEXIBLE DUCT CONNECTIONS
NOT TO SCALE6
PIPE ROOF PENETRATION CURB
NOT TO SCALE2
VOLUME DAMPER
NOT TO SCALE8
CONDENSING UNIT PIPING DIAGRAM
NOT TO SCALE4
SECTION THRU FIRE DAMPER INSTALLATION
jet jet
| 23-MG-001 - MECHANICAL LEGEND |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-MJ-501 - MECHANICAL DETAILS |
| Sheets |
| 23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00 |
| 23-MG-001 - MECHANICAL LEGEND |
| 23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00 |
| 23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01 |
| 23-MH-121 - MECHANICAL HVAC PLAN - ROOF |
| 23-MJ-501 - MECHANICAL DETAILS |
| 23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00 |
| 23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01 |
| 23-M-601 - MECHANICAL SCHEDULES I |
| 23-M-701 - MECHANICAL CONTROLS I |
| 23-M-702 - MECHANICAL CONTROLS II |
File details come from the government source that posted it. Updated .