About this file

This federal contract opportunity solicitation seeks proposals for a construction project to create an elevator tower and stairwell within Building 23 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project number is 657-19-128JB and has an estimated cost between $2 million to $5 million. The North American Industry Classification System code is 238220 for commercial and institutional building construction. The project completion period is estimated at 383 calendar days after notice to proceed. Proposals are due on or around January 22, 2021 and award will be made using best value tradeoff source selection with the lowest price technically acceptable proposal. The successful contractor must perform a minimum of 15% general construction labor. Registration in the System for Award Management and Vendor Information Pages databases is required. Only one pre-solicitation site visit will be scheduled. Questions shall be submitted by email with the subject line referencing the project number and name.

View the file

Other files

File Type Posted
36C25521R0027.docx DOCX document
657-19-128JB Specifications Volume I.pdf PDF
04Drawings Structural.pdf PDF
09Drawings Electrical.pdf PDF
07Drawings Plumbing.pdf PDF
10Drawings Technology.pdf PDF
03Drawings Civil_Part3.pdf PDF
02Drawings Hazardous Materials.pdf PDF
06Drawings Fire Protection.pdf PDF
05Drawings Architectural.pdf PDF
01Drawings General.pdf PDF
657-19-128JB Specifications Volume II.pdf PDF
03Drawings Civil_Part1.pdf PDF
03Drawings Civil_Part2.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MA

MV

CO

EV

VE

AI

FOV

FOR

FOS

FP

LPG

NPW

NO

O

N

G

MPG

G

MPG

CA

V

VBG

VBF

AV

AW

AW

ST

OST

GW

GW

S

W

ID

SPD

T

T

140°

S

W

ST

RS

RL

CWR

CWS

CHWR

CHWS

HWR

HWS

PD

CD

ACD

D

CD

LPC

LPS

MPC

MPS

HPC

HPS

S

SCW

WS

RD

H

T

H

T

FSD

SD

FD

FD

T

H

VD

MD

BD

RD

RDB

HPSR

HPWS

RV

CAP

LC

M

AV

FLOOR MOUNTED FLUSH VALVE

WATER

CLOSET

WALL MOUNTED FLUSH VALVE

WATER

CLOSET

26-P 3

PLUMBING PIPING SYMBOLS

ANNOTATION

XX-1

xx

X100

X100

GENERAL PLUMBING SYMBOLS

DENTAL

MEDICAL GASES

STORM

FUEL

EXISTING PIPING

WATER

WASTE

VALVE SYMBOLS

ETR

HVAC PIPING SYMBOLS

GENERAL DUCT SYMBOLS

GENERAL PLUMBING EQUIPMENT

SHOWER HEADS

JANITORS SINK

DRINKING FOUNTAIN & TYPE

SHOWER

BATHTUB

TANK TYPE WATER CLOSET

COUNTER TOP LAVATORY & TYPE

WALL MOUNTED LAVATORY & TYPE

URINAL

SINK & TYPE

JANITORS SINK - CORNER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

IS LOCATED.

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

LA

LV

OA

IA

TWR

TWS

FILTERED COLD WATERFCW

FUEL OIL DISCHARGEFOD

ANCHOR

CONNECTION - SIDE

ECCENTRIC REDUCER

CONNECTION - BOTTOM, 45° OR 90°

CONNECTION - TOP, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

RISE OR DROP IN PIPE

STRAINER

FLOAT & THERMOSTATIC TRAP SET W/

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

FLOOR DRAIN (FD), SIZE & TYPE

ROOF DRAIN (RD), SIZE & TYPE

FLOOR SINK (FS), SIZE & TYPE

NATURAL GAS BELOW GRADE (G)

SUMP OR SEWAGE PUMP DISCHARGE (SPD)

CONDENSATE DRAIN (CD)

INDIRECT DRAIN (ID)

NATURAL GAS (G)

NITROUS OXIDE (NO)

LIQUIFIED PETROLEUM GAS (LPG)

FIRE PROTECTION (FP)

WATER SERVICE (WS)

COMPRESSED AIR (CA)

NITROGEN (N)

MEDICAL AIR (MA)

OXYGEN (O)

DOMESTIC HOT WATER RECIRC.

SOIL PIPING - ABOVE FLOOR (S)

SOIL PIPING - BELOW FLOOR (S)

STORM DRAIN - ABOVE FLOOR (ST)

STORM DRAIN - BELOW FLOOR (ST)

ACID WASTE - ABOVE FLOOR (AW)

ACID WASTE - BELOW FLOOR (AW)

DOMESTIC COLD WATER

DOMESTIC HOT WATER

140° DOMESTIC HOT WATER (140°)

WASTE PIPING - ABOVE FLOOR (W)

WASTE PIPING - BELOW FLOOR (W)

GREASE WASTE - ABOVE FLOOR (GW)

GREASE WASTE - BELOW FLOOR (GW)

SOFTENED COLD WATER (SCW)

ACID VENT (AV)

VENT PIPING (V)

HOSE BIBB (HB)

NONFREEZE WALL HYDRANT (NW)

WALL CLEANOUT (WCO)

FLOOR CLEANOUT (FCO)

EXTERIOR CLEANOUT (ECO)

THERMOSTATIC MIXING VALVE

BACKFLOW PREVENTER

OVERFLOW STORM DRAIN - ABOVE FLOOR (OST)

NON POTABLE WATER (NPW)

FUEL OIL SUPPLY (FOS)

FUEL OIL RETURN (FOR)

FUEL OIL VENT (FOV)

AUXILIARY CONDENSATE DRAIN (ACD)

VENT BELOW GRADE (VBG)

VENT BELOW FLOOR (VBF)

CARBON DIOXIDE (CO)

MEDICAL VACUUM (MV)

EVACUATION (EV)

MEDICAL VACUUM EXHAUST (VE)

MEDICAL AIR INTAKE (AI)

TRAP PRIMER LINE (T)

WATER METER

MEDIUM PRESSURE NATURAL GAS (MPG)

MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)

ELBOW DOWN WITH SHUT-OFF VALVE

TEE DOWN WITH SHUT-OFF VALVE (SOV)

TEE UP WITH SHUT-OFF VALVE (SOV)

RECIRCULATION PUMP

DIRECTION OF FLOW

EXISTING PIPING TO REMAIN

EXISTING PIPING TO BE REMOVED

FLANGE CONNECTION

CLEANOUT

ELBOW DOWN

ELBOW UP

TEE DOWN

ELBOW UP WITH SHUT-OFF VALVE (SOV)

TEE UP

UNION

THERMOMETER

PRESSURE GAUGE

PRESSURE REDUCING VALVE

REDUCER

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

MECHANICAL OR FIRE SPRINKLER PLAN NOTE CALL OUT

PLUMBING PLAN NOTE CALL OUT

ELECTRICAL OR FIRE ALARM PLAN NOTE CALL OUT

TECHNOLOGY PLAN NOTE CALL OUT

PLUMBING EQUIPMENT DESIGNATION

MECHANICAL EQUIPMENT DESIGNATION TAG

OWNER FURNISHED, CONTRACTOR INSTALLED

EQUIPMENT DESIGNATION

NEW WORK TO EXISTING WORK CONNECTION POINT

DETAIL NUMBER

SHEET NUMBER

LIMIT OF DEMOLITION

TRAP PRIMER LINE - BELOW SLAB (T)

CO

DOUBLE EXTERIOR CLEANOUT (ECO)

CLEANOUTS

DRAINS AND TRAPS

EQUIPMENT

PIPE FITTINGS AND ACCESSORIES

SHEET NUMBER

SECTION NUMBER

MEDICAL GAS OUTLET (TYPE)

EXISTING TO REMAIN

DIVISION 23 PIPE FITTINGS AND ACCESSORIES

DRAIN (D)

CONDENSATE DRAIN (CD)

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

BUILDING NO. WHERE EQUIP. IS LOCATED

10x8AUTOMATIC BALANCING CONTROL VALVE

WYE STRAINER (WITH BALL VALVE

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

QUICK-COUPLE HOSE CONNECTOR

WYE STRAINER WITH VALVED DRAIN ANDWATER LEVEL CONTROLLER

FLOW METER

& HOSE CONNECTION)

EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED

EXISTING DUCTWORK OR EQUIPMENT TO REMAIN

BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH

BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL

RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN

FITTING AND MANUAL VOLUME DAMPER

SUPPLY AIR DUCT UP

RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP

LINEAR SLOT DIFFUSER

ELBOW WITH TURNING VANES

INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG)

VOLUME CONTROL DAMPER

NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER/ REGISTER

MOTORIZED DAMPER

VOLUME DAMPER

THERMOSTAT

FIRE DAMPER

FIRE SMOKE DAMPER

SMOKE DAMPER

24x24 CEG-1 800 CFM

SIZE, TYPE, CFM OF EXHAUST GRILLE

MANUAL VOLUME DAMPER

SQUARE TO ROUND TRANSITION

RISER DESIGNATION

HUMIDISTAT

EQUIPMENT WITH FLEXIBLE DUCT CONNECTION

10" CSD-1 300 CFM

BACKDRAFT DAMPER

SUPPLY AIR DUCT DOWN

DUCT MOUNTED SMOKE DETECTOR

(SD=SUPPLY/RD=RETURN)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER

DUCT WITH SOUND LINING

DAMPERS: (BD, FD, FSD, MD, SD, VD)

TRAP PRIMER WITH DISTRIBUTION UNIT

TRAP PRIMER

P-TRAP

GAS COCK

HEATING HOT WATER RETURN (HWR)

HEATING HOT WATER SUPPLY (HWS)

REFRIGERANT DISCHARGE BYPASS (RDB)

REFRIGERANT SUCTION (RS)

CHILLED WATER RETURN (CHWR)

CONDENSER WATER SUPPLY (CWS)

CONDENSER WATER RETURN (CWR)

REFRIGERANT DISCHARGE (HOT GAS) (RD)

HEAT PUMP WATER RETURN (HPWR)

HEAT PUMP WATER SUPPLY (HPWS)

REFRIGERANT LIQUID (RL)

CHILLED WATER SUPPLY (CHWS)

HIGH PRESSURE STEAM CONDENSATE (HPC)

HIGH PRESSURE STEAM SUPPLY (HPS)

MEDIUM PRESSURE STEAM CONDENSATE (MPC)

MEDIUM PRESSURE STEAM SUPPLY (MPS)

LOW PRESSURE STEAM CONDENSATE (LPC)

LOW PRESSURE STEAM SUPPLY (LPS)

CONDENSATE PUMP DISCHARGE (PD)

EXPANSION JOINT

F & T TRAP

TRIPLE DUTY VALVE WITH PRESSURE PORTS

BALANCING VALVE WITH PRESSURE PORTS

SOLENOID VALVE

STRAINER WITH BLOWOFF

REFRIGERANT VENT (RV)

EJ

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM RELIEF VALVE

PRESSURE / VACUUM SWITCH

LIMIT OF DEMOLITION

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

BACK DRAFT DAMPER

BDD

SOLAR WATER RETURN

SOLAR WATER SUPPLY

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLY

MAKE-UP WATER

CHILLED GLYCOL-WATER RETURN

CHILLED GLYCOL-WATER SUPPLY

GHS

GHR

SWS

SWR

GCR

GCS

MW

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURNGRR

GRS

VACUUM CONDENSATE RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

FWPS

FWPD

FEEDWATER SAMPLE (DEAERATOR)

BOILER WATER SAMPLE

CONTINUOUS BLOWDOWN

CF

FWS

BWS

CBD

BO

CHEMICAL FEED

BOILER BLOWOFF

TUBE CLEANER WATER SUPPLYTC

OFL OVERFLOW

REFRIGERANT SIGHT GLASS

QUICK-COUPLE HOSE CONNECTOR

TEMPERATURE SENSOR

HUMIDITY SENSOR

DUCT W/DAMPERS

DIFFUSERS,GRILLES, FLEX CONNECTIONS

FITTINGS & TRANSITIONS

SOFTENED WATERSW

BRINE & SOFT WATER

REFRIGERANT

PLANT PIPING

STEAM

EXISTING TO REMAIN

ABBREVIATIONS

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

T

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

S

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

O

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J

J INTENTIALLY LEFT BLANK

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

M

M METER, SI UNIT

M/s METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

H

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

D

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

C

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION 1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION 2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING

TOWER

CWS CONDENSER WATER SUPPLY (FROM COOLING

TOWER)

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

A

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACDTP AUTOMATIC CONTROL DMPR, TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

Y

YR YEAR

W

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

U

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

FSD COMBINATION FIRE / SMOKE DAMPER

FD FLOOR DRAIN

I th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MG-001

MECHANICAL LEGEND

RLC

65 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

jet Text Box

DN

STEAM UNIT HEATER

LOW PRES.

STEAM

(ETR)

LOW PRES.

COND. (ETR)

COND. (ETR)

HIGH PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

STEAM

(ETR)

HIGH PRES.

STEAM (ETR)

MED PRES.

STEAM (ETR)

COND. (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

COND. (ETR)

HIGH PRES.

STEAM (ETR)

LOW PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

MED PRES.

STEAM (ETR)

HIGH PRES.

STEAM (ETR)

COND. (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

COND.

HIGH PRES.

STEAM

COND.

LOW PRES.

STEAM

LOW PRES.

STEAM

LOW PRES.

COND.

LOW PRES.

COND.

LOW PRES.

STEAM

LOW PRES.

COND. FFA

STEAM UNIT HEATER

1" HWR (ETR)

1" HWS (ETR)

EXISTING

CORRIDOR

EXISTING

BUILDING 23

1 2 3 4 5 6 7 8 9 10 113.4

A

B

C

B.5

BREAK RM. / STORAGE

G23

CARPENTER SHOP

G26

CARPENTER SHOP OFFICE/ KEY PICK-UP

G25

LOCKER, MALE

G15

TOILET / SHOWER

G16

STORAGE

G14

STAIRWELL NO. 1

CORRIDOR

H001

TOILET, MEN

G12

STORAGE

G13

LOCKER, MALE

G11

CARPENTER STORAGE

G10

CHARGING STATION

G07

STORAGE

G08

LOCK SHOP

G09

KEY SHOP

G09A

BREAK RM.

G04

STORAGE

G05

OFFICE

G01A

ELEC RM.

G01

MECH. RM.

G02

ELEC RM.

G03

CORRIDOR

H002

BATTERY STORAGE

G13C

TRASH RM.

G13B

WASH RM.

G13A

STAIRWELL NO. 2

S2

MECH. RM.

G17

CORRIDOR

H000

ELEVATOR

CLOSET

H002A

Room

97G th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:0

A

M

23-MD-101

MECHANICAL PIPING DEMOLITION PLAN

- FLOOR 00

RLC

66 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/8" = 1'-0"1

MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

5. THE DEMOLITION DRAWINGS ARE DEEMED SCHEMATIC. CONTRACTOR

RESPONSIBLE FOR FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR

TO SUBMISSION OF PROPOSAL.

MECHANICAL PLAN NOTES:

1. REMOVE STEAM AND CONDENSATE PIPING AND ALL ASSOCIATED

ACCESSORIES BACK TO DEMARCATION POINT SHOWN.

N jet

F D

EDGE OF

FLOOR ABOVE

LOBBY

ELEVATOR

EQUIPMENT

FT

ACU

ACU

UTILITY

AC

UH

L

6"ø CD-1

6"ø CD-1

8"x8" SA

8"x10" RA

22"x22" RG-1

8"ø OA

12"x8" OA

EXISTING

CORRIDOR

EXISTING

BUILDING 23

1 2 3 4 5 6 7 8

9 10 113.4

A

B

C

B.5

6.3 7.8 8.5 9.3 9.7 9.8 9.9

U

V

W

Y

Z

6.1

X

BREAK RM. / STORAGE

G23

CARPENTER SHOP

G26

CARPENTER SHOP OFFICE/ KEY PICK-UP

G25

LOCKER, MALE

G15

TOILET / SHOWER

G16

STORAGE

G14

STAIRWELL NO. 1

CORRIDOR

H001

TOILET, MEN

G12

STORAGE

G13

LOCKER, MALE

G11

CARPENTER STORAGE

G10

CHARGING STATION

G07

STORAGE

G08

LOCK SHOP

G09

KEY SHOP

G09A

BREAK RM.

G04

STORAGE

G05

OFFICE

G01A

ELEC RM.

G01

MECH. RM.

G02

ELEC RM.

G03

CORRIDOR

H002

BATTERY STORAGE

G13C

TRASH RM.

G13B

WASH RM.

G13A

STAIRWELL NO. 2

S2

MECH. RM.

G17

CORRIDOR

H000

ELEVATOR

CLOSET

H002A

Room

97G

T7

T6

T5

T4

T3

T2

TA TB

T1

RHP

RHP

RHP

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MH-101

MECHANICAL HVAC PLAN - FLOOR 00

RLC

67 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/8" = 1'-0"1

MECHANICAL HVAC PLAN - FLOOR 00

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

MECHANICAL PLAN NOTES:

1. PROVIDE FIRE DAMPER WHERE DUCT PENETRATES CEILING. SEE DETAIL

4/23-MJ-501 FOR RELATED INFORMATION.

N jet

F D

MEZZANINE

ELEVATOR

ELECTRICAL

ACU

ACU

ACU

AC

EF

10"ø CD-2

10"ø CD-2

22"x22" RG-1

"ø

O A

22"x22" RG-1

8"ø CD-1

8"ø CD-1

8"ø CD-1

12"ø RA

"ø S

A

8"ø OA

12"x8" OA

14"ø OA

10"ø OA

EXISTING

BUILDING 23

1 2 3 4 5 6 7 8

9 10 113.4

A

B

C

B.5

6.3 7.8 8.5 9.3 9.7 9.8 9.9

U

V

W

Y

Z

6.1

X

CONFERENCE RM.

PROSTHETICS RESTORATION

PROSTHETICS RESTORATION OFFICE

PROSTHETICS RESTORATION LAB

LAB DUSTER

115A

OI&T

115B

CORRIDOR

C119

MAIL

STAFF LOUNGE

HAC

TOILET

CORRIDOR

C128

ORTH LAB SUPPLIES

ORTH LAB SUPPLIES

AMPUTEE CLINIC

WHEELCHAIR ASSEMBLY

WHEELCHAIR REPAIR

OFFICE

EXAM 1

CORRIDOR

C118

CORRIDOR

C102

EXAM 2

FIT 2

FIT 1

OFFICE

CLEAN SUPPLY

ORTH LAB/OFFICE

SEWING STORAGE

TOILET, STAFF

CAD CAM

CAST RM.

LAB WORK

CORRIDOR

C110

LAB FUME/STORAGE

OVEN

114A

ALCOVE

122A

DME SUPPLY / DISTRIBUTION

PROSTHETICS SERVICE CHECK-IN

TOILET

RECEPTION

PURCHASING AGENTS

PROGRAM SUPPORT ASSISTANT

OFFICE

OFFICE

CORRIDOR

CORRIDOR

C102A

STAIRWELL NO. 1

S1

CORRIDOR

C102B

ELEVATOR

E-1

WORK

129A

WORK

129B

OFFICE

97D

OFFICE

97A

HALLWAY

96A

OFFICE

97B

OFFICE

97E

OFFICE

97C

OFFICE

97F

OFFICE

114B

12"ø SA th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MH-111

MECHANICAL HVAC PLAN - FLOOR 01

RLC

68 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/8" = 1'-0"1

MECHANICAL HVAC PLAN - FLOOR 01

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

MECHANICAL PLAN NOTES:

1. PROVIDE FIRE DAMPER WHERE DUCT PENETRATES FLOOR. SEE DETAIL

4/23-MJ-501 FOR RELATED INFORMATION.

N jet

CU

CU

CU

CU

CU

HD

3" VTR

P-808

EXISTING BUILDING 23 ROOF

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MH-121

MECHANICAL HVAC PLAN - ROOF

RLC

69 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/4" = 1'-0"1

MECHANICAL PLAN - ROOF

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

N jet

LOBBY

ELEVATOR

EQUIPMENT

EDGE OF

FLOOR ABOVE

FT

ACU

ACU

1" HWR (ETR)

1" HWS (ETR)

3/4" HWS

3/4" HWR

3/4" HWS

/4

H

W S

/4

H

W R

/4

H

W S

/4

H

W R

/4

H

W R

/4

H

W S

L

UH

AC

LOW PRES.

STEAM

(ETR)

LOW PRES.

COND. (ETR)

COND. (ETR)

HIGH PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

STEAM

(ETR)

HIGH PRES.

STEAM (ETR)

MED PRES.

STEAM (ETR)

COND. (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

COND. (ETR)

HIGH PRES.

STEAM (ETR)

LOW PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

MED PRES.

STEAM (ETR)

HIGH PRES.

STEAM (ETR)

LOW PRES.

COND. (ETR)

LOW PRES.

COND.

LOW PRES.

STEAM

LOW PRES.

STEAM

LOW PRES.

COND.

LOW PRES.

COND. FFA

T

ACU-2

T

ACU-4

EXISTING

CORRIDOR

EXISTING

BUILDING 23

1 2 3 4 5 6 7 8

9 10 113.4

A

B

C

B.5

6.3 7.8 8.5 9.3 9.7 9.8 9.9

U

V

W

Y

Z

6.1

X

BREAK RM. / STORAGE

G23

CARPENTER SHOP

G26

CARPENTER SHOP OFFICE/ KEY PICK-UP

G25

LOCKER, MALE

G15

TOILET / SHOWER

G16

STORAGE

G14

STAIRWELL NO. 1

CORRIDOR

H001

TOILET, MEN

G12

STORAGE

G13

LOCKER, MALE

G11

CARPENTER STORAGE

G10

CHARGING STATION

G07

STORAGE

G08

LOCK SHOP

G09

KEY SHOP

G09A

BREAK RM.

G04

STORAGE

G05

OFFICE

G01A

ELEC RM.

G01

MECH. RM.

G02

ELEC RM.

G03

CORRIDOR

H002

BATTERY STORAGE

G13C

TRASH RM.

G13B

WASH RM.

G13A

STAIRWELL NO. 2

S2

MECH. RM.

G17

CORRIDOR

H000

ELEVATOR

CLOSET

H002A

Room

97G

T7

T6

T5

T4

T3

T2

TA TB

T1

RHP

RHP

RHP

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MP-101

MECHANICAL PIPING PLAN - FLOOR 00

RLC

70 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/8" = 1'-0"1

MECHANICAL PIPING PLAN - FLOOR 00

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

MECHANICAL PLAN NOTES:

1. CONTRACTOR TO PROVIDE REFRIGERANT LINES FROM CONDENSING

UNITS ON THE ROOF TO THEIR RESPECTIVE DX TERMINAL UNIT.

2. PROVIDE NEW HWR/S LINES FROM 12' BASEBOARD HEATER. CONNECT

TO EXISTING SYSTEM. CONTRACTOR TO VERIFY LOCATION OF EXISTING

HWS/R LINES.

3. PROVIDE NEW STEAM AND CONDENSATE LINES AT DEMARCATION POINT

SHOWN. CONTRACTOR TO FIELD VERIFY EXACT LINE SIZES PRIOR TO

CONSTRUCTION.

N jet

MEZZANINE

ELEVATOR

ELECTRICAL

ACU

ACU

ACU

3 1

/4

H

W S

3/4" HWS

3/4" HWS

EF

AC

T

ACU-5

EXISTING

BUILDING 23

1 2 3 4 5 6 7 8

9 10 113.4

A

B

C

B.5

6.3 7.8 8.5 9.3 9.7 9.8 9.9

U

V

W

Y

Z

6.1

X

CONFERENCE RM.

PROSTHETICS RESTORATION

PROSTHETICS RESTORATION OFFICE

PROSTHETICS RESTORATION LAB

LAB DUSTER

115A

OI&T

115B

CORRIDOR

C119

MAIL

STAFF LOUNGE

HAC

TOILET

CORRIDOR

C128

ORTH LAB SUPPLIES

ORTH LAB SUPPLIES

AMPUTEE CLINIC

WHEELCHAIR ASSEMBLY

WHEELCHAIR REPAIR

OFFICE

EXAM 1

CORRIDOR

C118

CORRIDOR

C102

EXAM 2

FIT 2

FIT 1

OFFICE

CLEAN SUPPLY

ORTH LAB/OFFICE

SEWING STORAGE

TOILET, STAFF

CAD CAM

CAST RM.

LAB WORK

CORRIDOR

C110

LAB FUME/STORAGE

OVEN

114A

ALCOVE

122A

DME SUPPLY / DISTRIBUTION

PROSTHETICS SERVICE CHECK-IN

TOILET

RECEPTION

PURCHASING AGENTS

PROGRAM SUPPORT ASSISTANT

OFFICE

OFFICE

CORRIDOR

CORRIDOR

C102A

STAIRWELL NO. 1

S1

CORRIDOR

C102B

ELEVATOR

E-1

WORK

129A

WORK

129B

OFFICE

97D

OFFICE

97A

HALLWAY

96A

OFFICE

97B

OFFICE

97E

OFFICE

97C

OFFICE

97F

OFFICE

114B th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MP-111

MECHANICAL PIPING PLAN - FLOOR 01

RLC

71 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

1/8" = 1'-0"1

MECHANICAL PIPING PLAN - FLOOR 01

GENERAL NOTES:

1. THE AREA OF WORK SHOWN IS ASSOCIATED WITH AN OPERATING

FACILITY THAT MUST REMAIN IN SERVICE.

2. SEE SHEET 23-GI001 FOR ADDITIONAL INFORMATION REGARDING

SCHEDULE AND PHASING REQUIREMENTS. SCHEDULE WORK TO

MINIMIZE DISRUPTION OF SERVICES.

3. COORDINATE WORK SCHEDULE WITH THE CONTRACTING OFFICER’S

REPRESENTATIVE (COR) BEFORE THE START OF WORK.

4. COORDINATE MECHANICAL WORK WITH OTHER TRADES AND

CONTRACTORS. VERIFY ALL EXISTING CONDITIONS BEFORE THE START

OF WORK.

MECHANICAL PLAN NOTES:

1. CONTRACTOR TO PROVIDE REFRIGERANT LINES FROM CONDENSING

UNITS ON THE ROOF TO THEIR RESPECTIVE DX TERMINAL UNIT.

N jet

"4"

GAS IN

LIQUID

OUT

COORDINATE MOUNTING

RAILS WITH ROOF ASSEMBLY.

NOTE:

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND FAN

ROOM FLOORS SHALL BE PROVIDED WITH A 3" [75mm] HIGH CONCRETE CURB AROUND

OPENING FOR DUCT.

SEAL HOLE WITH FIREPROOFING

MATERIAL AFTER DUCT

INSTALLATION

2"x2"x1/4" [50x50x6mm] ANGLE

INSTALL ON BOTH LONG

DIMENSION SIDES OF DUCT.

DUCT RISER - SEE FLOOR PLANS

FOR DETAILS

SEAL HOLE WITH FIREPROOFING

MATERIAL AFTER DUCT

INSTALLATION

FLOOR

EXTEND ANGLE 3" [75mm]

BEYOND DUCT

DUCT RISER - SEE FLOOR PLANS

FOR SIZES SHEET METAL SCREWS 4" [100mm]

ON CENTER

1 1/2"x1 1/2"x1/8" [40x40x3mm] ANGLE

INSTALL ON BOTH LONG DIMENSION

SIDES OF DUCT. FOR DUCTS OVER 60"

[1500mm] USE 2"x2"x1/8" [50x50x3mm]

ANGLE.

HOLE IN STRUCTURAL FLOOR

DUCT RISER

0.5 INCH WG [125Pa] TO 2 INCHES WG [500Pa] DUCT RISER SUPPORT

ARRANGE RISER SO REINFORCER

TRANSVERSE JOINT IS AT RISER

SUPPORT POINT

FLOOR

2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT

HOLE IN STRUCTURAL FLOOR

DUCT RISER

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

W

FROM STRUCTURE

SAME AS DIFFUSER

INLET: 5'-0" MAX

FLEXIBLE DUCT SIZE

LENGTH.

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

FOR CHANGE OF

DIRECTION GREATER

USE RIGID ELBOWS

THAN 45°

[300mm]

SEE SPECIFICATIONS FOR CLAMPS

AND SEALANT (TYP.)

THERMAL INSULATION

SEE SPECIFICATIONS

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

NOTE:

1. THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED

FOR THE DEDICATED AHU SERVING THE SURGICAL SUITE. ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED

CONNECTION ON FAN

SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX.

INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON

12" [300mm] CENTERS

RIVET ON 4"

[100mm] CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION

OF BOLT 1 1/2" [40mm]

POCKET SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX.

INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL TAUT

FLANGED

CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL

AS SPECIFIED

1 1/2"1/2"1/2"

OPTION "A"

OPTION "B"

ROOF DECK

ABS CURB CAB

EPDM RUBBER CAP

INSULATION

1" CLEAR OPENING AROUND PIPE TO

ALLOW FOR PIPE MOVEMENT

INSULATED ROOF CURB

WITH 26 GA. GALVANIZED

COUNTER FLASHING

ACRYLIC COATED ABS

RIB REINFORCED

PLASTIC CURB COVER

EPDM PROTECTIVE

RUBBER CAP

STAINLESS

STEEL CLAMP

SINGLE OR MULTIPLE

PIPE PENETRATIONS

PIPE PENETRATION(S) PER

PLAN

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPECIFICATION

DAMPER BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND

ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

NOTE:

1. INSTALLING CONTRACTOR SHALL VERIFY WITH EQUIPMENT MANUFACTURER PIPE

SIZES AND MAXIMUM RUN LENGTHS TO ENSURE PROPER OPERATION.

2. CONTRACTOR TO INSTALL OIL TRAPS IN REFRIGERANT LINE BEFORE EVAPORATOR

COIL AND NEAR CONDENSING UNIT TO HELP PREVENT OIL BUILD-UP IN COILS.

ACU - INDOOR UNIT

CU - OUTDOOR UNIT

3/8" RL / 5/8" RG

A P

P R

O X

[2 m m

ACCESS

PANEL

NOTE 5

PERIMETER ANGLE, NOTE 3 (NOTE

FASTENED TO PARTITION)

TYPICAL DUCT

INSULATION

FIRE BARRIER

PARTITION OR CHASE

NOTE 6

SLEEVE, NOTE 2

DAMPER COLLAR

EXTENSION INTEGRAL

PART OF SLEEVE

DAMPER,

NOTE 1

DUCT

CONNECTION

NOTE 4

SLEEVE, NOTE 2

A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S SIMILAR. FOLLOW

DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR

SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR

FLOOR AND NOT OUTSIDE THE PENETRATION.

GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER

FRAME AND TO PERIMETER ANGLES.

PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO

PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.

BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.

ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.

PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH

ROCK WOOL FIRESTOP FIBER.

ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND

MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB

AROUND OPENING FOR DUCT.

NOTE:

1.

2.

3.

4.

5.

6.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:4

:1

A

M

23-MJ-501

MECHANICAL DETAILS

RLC

72 101

JRM

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

01/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

NOT TO SCALE7

CONDENSING UNIT MOUNTING RAIL DETAIL

NOT TO SCALE5

DUCT RISER SUPPORTS

NOT TO SCALE9

EXHAUST OR RETURN BRANCH DUCTWORK

NOT TO SCALE3

FLEXIBLE AIR DUCT CONNECTOR

NOT TO SCALE1

FLEXIBLE DUCT CONNECTIONS

NOT TO SCALE6

PIPE ROOF PENETRATION CURB

NOT TO SCALE2

VOLUME DAMPER

NOT TO SCALE8

CONDENSING UNIT PIPING DIAGRAM

NOT TO SCALE4

SECTION THRU FIRE DAMPER INSTALLATION

jet jet

23-MG-001 - MECHANICAL LEGEND
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-MJ-501 - MECHANICAL DETAILS
Sheets
23-MD-101 - MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MG-001 - MECHANICAL LEGEND
23-MH-101 - MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 - MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 - MECHANICAL HVAC PLAN - ROOF
23-MJ-501 - MECHANICAL DETAILS
23-MP-101 - MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 - MECHANICAL PIPING PLAN - FLOOR 01
23-M-601 - MECHANICAL SCHEDULES I
23-M-701 - MECHANICAL CONTROLS I
23-M-702 - MECHANICAL CONTROLS II

File details come from the government source that posted it. Updated .