02Drawings Hazardous Materials.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25521R0027
About this file
This is a solicitation for a construction project to create an elevator tower and stairwell within Building 23 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project cost is estimated between $2,000,000 to $5,000,000 and will have a duration of 383 calendar days. The North American Industry Classification System code is 238220 and the small business size standard is $39.5 million. The work includes all labor, materials, equipment, supervision and site preparation required by the drawings and specifications. Pursuant to applicable laws, this is a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be posted on January 22, 2021 to beta.SAM.gov and proposals are due in accordance with the instructions in the solicitation package. The Department of Veterans Affairs Veterans Health Administration is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25521R0027.docx | DOCX document | |
| 657-19-128JB Specifications Volume I.pdf | ||
| 04Drawings Structural.pdf | ||
| 09Drawings Electrical.pdf | ||
| 07Drawings Plumbing.pdf | ||
| 10Drawings Technology.pdf | ||
| 03Drawings Civil_Part3.pdf | ||
| 08Drawings Mechanical.pdf | ||
| 06Drawings Fire Protection.pdf | ||
| 05Drawings Architectural.pdf | ||
| 01Drawings General.pdf | ||
| 657-19-128JB Specifications Volume II.pdf | ||
| 03Drawings Civil_Part1.pdf | ||
| 03Drawings Civil_Part2.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
L1 A1
L1 A1
L1 A1 L1 A1
L1 A1
L1
A1
L1 A1
A4
A4
A2
C2C2C1
C2
L2 A3
C4C3
L1
A1
HARD BARRIER
PROVIDED BY GC
C1
A5
HARD BARRIER
PROVIDED BY GC
REMEDIATION PLAN - PHASE 1 KEYNOTES
A1
A2
A4
A5
L1
L2
REMOVE WINDOW SYSTEMS WITH HIDDEN ASBESTOS CAULKS USING
ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.11 - (8 EACH)
REMOVE ASBESTOS INSULATION ON PIPE AND FITTINGS USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.13 - 35 LFT, 10
FITTINGS
REMOVE NON-ASBESTOS PLASTER CHASE AND THEN REMOVE ASBESTOS
PIPE INSULATION USING GLOVEBAG ABATEMENT METHODS AS REQUIRED
BY SECTION 02.82.13.13 - 30 SF AND 18 LF
REMOVE NON-ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS
MASTIC USING ABATEMENT METHODS AS REQUIRED BY SECTION
02.82.13.19 - 470 SF
REMOVE ASBESTOS FIRE DOORS AND ASSOCIATED LBP FRAMING USING
ABATEMENT METHODS AS REQUIRED IN SECTIONS 02.82.11 AND 02.83.13 -
1 EACH
REMOVE LBP WINDOW ASSEMBLY USING ABATMENT METHODS AS
REQUIRED BY SECTION 02.83.13.13 - 7 UNITS
REMOVE DOOR FRAME WITH LEAD PAINT - 1 UNIT
REMOVE LBP FROM PLASTER CELING USING CHEMICAL STRIPPER AND
ABATEMENT METHODS AS REQUIRED IN SECTION 02.83.13.13 - 10
LOCATIONS AS COORDINATED WITH GENERAL CONTRACTOR ON NIGHTS
AND WEEKENDS
NEGATIVE PRESSURE ENCLOSURE (NPE BOUNDARY, ALL PENETRATIONS
ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL
LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.
ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY
CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH
CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,
FLOOR, AND PIPING TO BE REMOVED AS INDICATED WITHIN NPE
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN
REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN
WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE
DISCHARGED THROUGH NEARBY WINDOW UNITS.
3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE
CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL
DECONTAMINATION PURPOSES.
2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR
POLY AND USED FOR WASTE DECON PURPOSED. ACCOMMODATE SIZE OF
DEMO COMPONENTS - CONSTRUCT ACCORDINGLY
L3
A3
C1
C2
C3
C4
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-101
REMEDIATION PLAN - FLOOR 00 - PHASE
BHR
3 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 00 - PHASE 1
L1
A1
L1
A1
L1 A1
A2
L2
A3
C4C3
A5
L3
L4
A4
A1 A3 L1 L2HARD BARRIER
PROVIDED BY GC
C1 C2
L1
A1 L1
A1
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.
REMEDIATION PLAN - PHASE 2 KEYNOTES
A1
A2
A4
A5
L1
L2
REMOVE WINDOW SYSTEMS WITH HIDDEN ASBESTOS CAULKS USING
ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.11 - (5 EACH)
REMOVE NON-ASBESTOS PLASTER CHASE AND THEN REMOVE ASBESTOS
PIPE INSULATION USING GLOVEBAG ABATEMENT METHODS AS REQUIRED
BY SECTION 02.82.13.13 - 4 LF, 6 FITTINGS
REMOVE ASBESTOS FIRE DOORS AND ASSOCIATED LBP FRAMING USING
ABATEMENT METHODS AS REQUIRED IN SECTIONS 02.82.11 AND
02.83.33.13 - 3 DOORS AND 2 FRAMES
REMOVE NON-ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS
FLOOR TILE AND MASTIC USING ABATEMENT METHODS AS REQUIRED BY
SECTION 02.82.13.19 - 400 SF
REMOVE ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS MASTIC
USING ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.19 - 70
SF
REMOVE LBP WINDOW ASSEMBLY USING ABATEMENT METHODS AS
REQUIRED BY SECTION 02.83.13.13 - 5 UNITS
REMOVE DOOR FRAME WITH LEAD PAINT - 2 UNITS
REMOVE LOWER NON-ASBESTOS PLASTER CEILING WITH LEAD-BASED
PAINT USING ABATEMENT METHOD AS REQUIRED IN SECTION 02.83.13.13 -
400 SF
SCRAPE AND STABILIZE LEAD PAINT FROM UPPER CONCRETE CEILING
USING ABATEMENT METHOD AS REQUIRED IN SECTION 02.83.13.13 - 400 SF
NEGATIVE PRESSURE ENCLOSURE (NPE BOUNDARY, ALL PENETRATIONS
ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL
LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.
ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY
CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH
CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,
FLOOR, AND PIPING TO BE REMOVED AS INDICATED WITHIN NPE
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN
REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN
WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE
DISCHARGED THROUGH NEARBY WINDOW UNITS.
3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE
CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL
DECONTAMINATION PURPOSES.
2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR
POLY AND USED FOR WASTE DECONTAMINATION PURPOSES.
ACCOMMODATE SIZE OF DEMO COMPONENTS - CONSTRUCT
ACCORDINGLY
L3
A3
C1
C2
C3
C4
L4 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-102
REMEDIATION PLAN - FLOOR 01 - PHASE
BHR
4 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 01 - PHASE 2
C2
A2 C2
C2
C1
A1
C1
C4C3
C1
C2
A2
A3
A1
A3
C2
C4C3
A1
REMEDIATION PLAN - PHASE 3 KEYNOTES
A1
A2
C1
C2
C3
REMOVE NON-ASBESTOS EIFS LAYER AND UNDERLYING ASBESTOS AND
LEAD CONTAINING LAYER ABATEMENT METHODS AS REQUIRED BY
SECTION 02.82.11 (NOTE: HIGH PRESSURE WATER BLASTING IS
PROHIBITED) - 1800 SF
REMOVE NON ASBESTOS EIFS SIDING WITH CLEAN CUT AND THEN
UNDERLYING ASBESTOS AND LEAD CONTAINING STUCCO LAYER TO ALLOW
FOR JUNCTION/INTERFACE BETWEEN NEW CONSTRUCTION AND OLD
USING ABATEMENT METHODS AS REQUIRED IN SECTION 02.82.11 (NOTE:
HIGH PRESSURE WATER BLASTING IS PROHIBITED). SPECIFIC LOCATIONS
TO BE DETERMINED IN COORDINATION WITH GENERAL CONTRACTOR. - 50
SF
REMOVE NON-ASBESTOS EIFS SIDING WITH CLEAN CUT AND THEN
UNDERLYING ASBESTOS AND LEAD CONTAINING STUCCO LAYER TO ALLOW
FOR INFILL AT REMOVED DOOR AT BUILDING 23 USING ABATEMENT
METHODS AS REQUIRED BY SECTION 02.82.11 (NOTE: HIGH PRESSURE
WATER BLASTING IS PROHIBITED). SPECIFIC LOCATIONS TO BE
DETERMINED IN COORDINATION WITH GENERAL CONTRACTOR. - 20 SF
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS
ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL
LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.
ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THE SYSTEM
CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH
CLEARANCE. ALL CEILING (TILES; MAINTAIN GRID IN PLACE), WALL, FLOOR,
AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN
REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN
WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER).
3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE
CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL
DECONTAMINATION PURPOSES.
2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR
POLY AND USED FOR WASTE DECONTAMINATION PURPOSES.
ACCOMMODATE SIZE OF DEMO COMPONENTS - CONSTRUCT
ACCORDINGLY
C4
A3
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-103
REMEDIATION PLAN - PHASE 3
BHR
5 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 00 - PHASE 3
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 01 - PHASE 3
SCAFFOLDING
C3 C2 C1
A2A1
SCAFFOLDING
A2
A3
A1
C4
A2
C3
C5
C3
C5 C2
C6
C7
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.
REMEDIATION PLAN - PHASE 4 KEYNOTES
A1
A2
C1
C2
C3
REMOVE NON-ASBESTOS BALLAST AND ASBESTOS ROOF CAPPING AND
FLASHING USING ABATEMENT METHODS AS REQUIRED IN SECTION
02.82.13.21 - 200 SF
REMOVE ASBESTOS ROOF CAULKING IN EXPANSION JOINTS WHERE
PRESENT USING ABATEMENT METHODS AS REQUIRED IN SECTION
02.82.13.21 - 50 SF
REMOVE NON-ASBESTOS MEMBRANE AND ASBESTOS ROOF CAPPING AND
FLASHING USING ABATEMENT METHODS AS REQUIRED IN SECTION
02.82.13.21 - 500 SF
ALL PENETRATIONS, DOORS, WINDOWS, AND OTHER OPENINGS WITHIN
100 FT OF THE OUTDOOR REGULATED AREA TO BE SEALED WITH 2
LAYERS OF 6 MIL FR POLY SHEETING. ALL WINDOWS TO BE SEALED ON
THE INSIDE WITH 6 MIL FR POLY SHEETING.
ALL ASBESTOS WASTE TO BE HOUSED INSIDE LOCKABLE, WATER TIGHT
CONTAINER PLACED WITHIN REGULATED AREA.
REGULATED AREA TO BE SECURED BY FENCES OR OTHER ST LOUIS
COUNTY DEPARTMENT APPROVED MEANS (RED ASBESTOS TAPE MAY BE
ALLOWED FOR BY COUNTY). NO INDIVIDUALS OTHER THAN THOSE
ENGAGED IN THE PROJECT MAY PASS WITHIN 20 FT OF WORK AREA.
APPROPRIATE SIGNAGE MUST BE POSTED.
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS
ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL
LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.
ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE OF THEY
CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH
CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,
FLOOR, AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.
HEPA FILTERED NAGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN
REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN
WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER)
3 STAGE WET DECONTAMINATION STATION (W/CFM) TO BE CONSTRUCTED
OF 6 MIL POLY AND USED FOR PERSONAL DECONTAMINATION PURPOSES.
2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR
POLY AND USED FOR WASTE DECON PURPOSES. ACCOMMODATE SIZE OF
DEMO COMPONENTS AND CONSTRUCT ACCORDINGLY.
A3
C4
C5
C6
C7 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-104
REMEDIATION PLAN - PHASE 4
BHR
6 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 00 - PHASE 4
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 01 - PHASE 4
A2
A3
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.
REMEDIATION PLAN - PHASE 5 KEYNOTES
A1
A2
REMOVE ASBESTOS EXTERIOR WATERPROOFING LAYER WHERE
PRESENT USING GLOVEBAG ABATEMENT METHODS AS REQUIRED IN
SECTION 02.82.13.13 - 8 SF
REMOVE ASBESTOS EXTERIOR EXPANSION BOARD WHERE PRESENT
USING GLOVEBAG ABATEMENT METHODS AS REQUIRED IN SECTION
02.82.13.13 - 16 SF
HAND EXCAVATE AND REMOVE EXPOSED 8" METAL WATER MAIN W/
ASBESTOS BLACK TAR USING ABATEMENT METHODS AS REQUIRED BY
SECTION 02.82.13.13. REMOVE ACM TAR ON REMAINING PIPE TO ALLOW
FOR NEW COUPLING AND TAP. BULK EXCAVATION TO BE PERFORMED BY
OTHERS - 50 FT OF ACM WATER MAIN (8") & 3 FT² OF BLACK TAR
A3 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-105
REMEDIATION PLAN - FLOOR 00 - PHASE
BHR
7 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 00 - PHASE 5
C1 C2
A2
C1
C2
A1
A2
L1
A1
L1
A3
L1 A2
C4C3C4C3
C4C3
L1
C1 C2
C1
C2
GENERAL REMEDIATION NOTES
1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS
REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL
CONTRACTOR AND APPROVED BY COR.
PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR
PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR
PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO
UNDER EIFS
PHASE 4: ROOF ABATEMENT
PHASE 5: GROUND LEVEL FOUNDATION
PHASE 6: BLDG 23 INTERIOR
2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY
LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1
NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE
MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED
WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.
3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/
GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND
WEEKENDS.
REMEDIATION PLAN - PHASE 6 KEYNOTES
A1
A2
L1
C1
C2
C3
REMOVE ASBESTOS INSULATION ON PIPE AND FITTINGS USING GLOVEBAG
ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.13- 36 LFT, 7
FITTINGS
PROTECT OTHER ASBESTOS PIPE INSULATION AND HANGERS PRESENT
THROUGHOUT, AS NECESSARY
REMOVE NON-ASBESTOS EFIS LAYER AND UNDERLYING ASBESTOS AND
LEAD CONTAINING LAYER USING ABATEMENT METHODS AS REQUIRED IN
SECTION 02.82.11 (NOTE: HIGH PRESSURE WATER BLASTING IS
PROHIBITED) - 2 SF
REMOVE LBP FROM PLASTER CEILINGS OR WALLS USING CHEMICAL
STRIPPER AND ABATEMENT METHODS AS REQUIRED IN SECTION
02.83.13.13 - 10 LOCATIONS AS COORDINATED WITH GENERAL
CONTRACTOR ON NIGHTS AND WEEKENDS.
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS
ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL
LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.
ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY
CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH
CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID PLACE), WALL,
FLOOR, AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN
REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN
WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE
DISCHARGED THROUGH NEARBY WINDOW UNITS.
3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE
CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL
DECONTAMINATION PURPOSES.
2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR
POLY AND USED FOR WASTE DECON PURPOSES. ACCOMMODATE SIZE OF
DEMO COMPONENTS - CONSTRUCT ACCORDINGLY.
C4
A3 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
BUILDING 23
AREA OF
WORK
N
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-HA-106
REMEDIATION PLAN - FLOOR 00 - PHASE
BHR
8 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
N
1/8" = 1'-0"
REMEDIATION PLAN - FLOOR 00 - PHASE 6
| Sheets |
| 23-GI-001 - COVER SHEET |
| 23-GI-002 - GENERAL INFORMATION |
| 23-HA-101 - REMEDIATION PLAN - FLOOR 00 - PHASE 1 |
| 23-HA-102 - REMEDIATION PLAN - FLOOR 01 - PHASE 2 |
| 23-HA-103 - REMEDIATION PLAN - PHASE 3 |
| 23-HA-104 - REMEDIATION PLAN - PHASE 4 |
| 23-HA-105 - REMEDIATION PLAN - FLOOR 00 - PHASE 5 |
| 23-HA-106 - REMEDIATION PLAN - FLOOR 00 - PHASE 6 |
| 23-AS-101 - ARCHITECTURAL SITE PLAN |
| 23-AL-101 - LIFE SAFETY PLAN - FLOOR 00 |
| 23-AL-111 - LIFE SAFETY PLAN - FLOOR 01 |
| 23-AD-101 - DEMOLITION PLAN - FLOOR 00 |
| 23-AD-111 - DEMOLITION PLAN - FLOOR 01 |
| 23-AE-001 - PARTITION TYPES |
| 23-AE-101 - FLOOR PLAN - FLOOR 00 |
| 23-AE-111 - FLOOR PLAN - FLOOR 01 |
| 23-AE-121 - ROOF PLAN |
| 23-AE-201 - BUILDING ELEVATIONS |
| 23-AE-202 - BUILDING ELEVATIONS |
| 23-AE-301 - BUILDING SECTIONS |
| 23-AE-401 - WALL SECTIONS |
| 23-AE-411 - VERTICAL CIRCULATION |
| 23-AE-412 - VERTICAL CIRCULATION |
| 23-AE-413 - TEMPORARY CORRIDOR |
| 23-AE-501 - BUILDING DETAILS |
| 23-AE-601 - INTERIOR ELEVATIONS |
| 23-AC-101 - REFLECTED CEILING PLAN - FLOOR 00 |
| 23-AC-111 - REFLECTED CEILING PLAN - FLOOR 01 |
| 23-AF-101 - FINISH FLOOR PLANS |
| 23-AP-601 - DOOR & WINDOW SCHEDULES |
File details come from the government source that posted it. Updated .