02Drawings Hazardous Materials.pdf

PDF 1 MB Posted

Attached to
Z2DA--Create Elevator Tower & Stairwell, 657-19-128JB, Building 23 (VA-20-00082588)
Solicitation number
36C25521R0027
Issued by

About this file

This is a solicitation for a construction project to create an elevator tower and stairwell within Building 23 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project cost is estimated between $2,000,000 to $5,000,000 and will have a duration of 383 calendar days. The North American Industry Classification System code is 238220 and the small business size standard is $39.5 million. The work includes all labor, materials, equipment, supervision and site preparation required by the drawings and specifications. Pursuant to applicable laws, this is a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be posted on January 22, 2021 to beta.SAM.gov and proposals are due in accordance with the instructions in the solicitation package. The Department of Veterans Affairs Veterans Health Administration is the contracting agency.

View the file

Other files

File Type Posted
36C25521R0027.docx DOCX document
657-19-128JB Specifications Volume I.pdf PDF
04Drawings Structural.pdf PDF
09Drawings Electrical.pdf PDF
07Drawings Plumbing.pdf PDF
10Drawings Technology.pdf PDF
03Drawings Civil_Part3.pdf PDF
08Drawings Mechanical.pdf PDF
06Drawings Fire Protection.pdf PDF
05Drawings Architectural.pdf PDF
01Drawings General.pdf PDF
657-19-128JB Specifications Volume II.pdf PDF
03Drawings Civil_Part1.pdf PDF
03Drawings Civil_Part2.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

L1 A1

L1 A1

L1 A1 L1 A1

L1 A1

L1

A1

L1 A1

A4

A4

A2

C2C2C1

C2

L2 A3

C4C3

L1

A1

HARD BARRIER

PROVIDED BY GC

C1

A5

HARD BARRIER

PROVIDED BY GC

REMEDIATION PLAN - PHASE 1 KEYNOTES

A1

A2

A4

A5

L1

L2

REMOVE WINDOW SYSTEMS WITH HIDDEN ASBESTOS CAULKS USING

ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.11 - (8 EACH)

REMOVE ASBESTOS INSULATION ON PIPE AND FITTINGS USING GLOVEBAG

ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.13 - 35 LFT, 10

FITTINGS

REMOVE NON-ASBESTOS PLASTER CHASE AND THEN REMOVE ASBESTOS

PIPE INSULATION USING GLOVEBAG ABATEMENT METHODS AS REQUIRED

BY SECTION 02.82.13.13 - 30 SF AND 18 LF

REMOVE NON-ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS

MASTIC USING ABATEMENT METHODS AS REQUIRED BY SECTION

02.82.13.19 - 470 SF

REMOVE ASBESTOS FIRE DOORS AND ASSOCIATED LBP FRAMING USING

ABATEMENT METHODS AS REQUIRED IN SECTIONS 02.82.11 AND 02.83.13 -

1 EACH

REMOVE LBP WINDOW ASSEMBLY USING ABATMENT METHODS AS

REQUIRED BY SECTION 02.83.13.13 - 7 UNITS

REMOVE DOOR FRAME WITH LEAD PAINT - 1 UNIT

REMOVE LBP FROM PLASTER CELING USING CHEMICAL STRIPPER AND

ABATEMENT METHODS AS REQUIRED IN SECTION 02.83.13.13 - 10

LOCATIONS AS COORDINATED WITH GENERAL CONTRACTOR ON NIGHTS

AND WEEKENDS

NEGATIVE PRESSURE ENCLOSURE (NPE BOUNDARY, ALL PENETRATIONS

ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL

LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.

ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY

CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH

CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,

FLOOR, AND PIPING TO BE REMOVED AS INDICATED WITHIN NPE

HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN

REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN

WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH

ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE

DISCHARGED THROUGH NEARBY WINDOW UNITS.

3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE

CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL

DECONTAMINATION PURPOSES.

2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR

POLY AND USED FOR WASTE DECON PURPOSED. ACCOMMODATE SIZE OF

DEMO COMPONENTS - CONSTRUCT ACCORDINGLY

L3

A3

C1

C2

C3

C4

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-101

REMEDIATION PLAN - FLOOR 00 - PHASE

BHR

3 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 00 - PHASE 1

L1

A1

L1

A1

L1 A1

A2

L2

A3

C4C3

A5

L3

L4

A4

A1 A3 L1 L2HARD BARRIER

PROVIDED BY GC

C1 C2

L1

A1 L1

A1

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.

REMEDIATION PLAN - PHASE 2 KEYNOTES

A1

A2

A4

A5

L1

L2

REMOVE WINDOW SYSTEMS WITH HIDDEN ASBESTOS CAULKS USING

ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.11 - (5 EACH)

REMOVE NON-ASBESTOS PLASTER CHASE AND THEN REMOVE ASBESTOS

PIPE INSULATION USING GLOVEBAG ABATEMENT METHODS AS REQUIRED

BY SECTION 02.82.13.13 - 4 LF, 6 FITTINGS

REMOVE ASBESTOS FIRE DOORS AND ASSOCIATED LBP FRAMING USING

ABATEMENT METHODS AS REQUIRED IN SECTIONS 02.82.11 AND

02.83.33.13 - 3 DOORS AND 2 FRAMES

REMOVE NON-ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS

FLOOR TILE AND MASTIC USING ABATEMENT METHODS AS REQUIRED BY

SECTION 02.82.13.19 - 400 SF

REMOVE ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS MASTIC

USING ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.19 - 70

SF

REMOVE LBP WINDOW ASSEMBLY USING ABATEMENT METHODS AS

REQUIRED BY SECTION 02.83.13.13 - 5 UNITS

REMOVE DOOR FRAME WITH LEAD PAINT - 2 UNITS

REMOVE LOWER NON-ASBESTOS PLASTER CEILING WITH LEAD-BASED

PAINT USING ABATEMENT METHOD AS REQUIRED IN SECTION 02.83.13.13 -

400 SF

SCRAPE AND STABILIZE LEAD PAINT FROM UPPER CONCRETE CEILING

USING ABATEMENT METHOD AS REQUIRED IN SECTION 02.83.13.13 - 400 SF

NEGATIVE PRESSURE ENCLOSURE (NPE BOUNDARY, ALL PENETRATIONS

ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL

LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.

ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY

CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH

CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,

FLOOR, AND PIPING TO BE REMOVED AS INDICATED WITHIN NPE

HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN

REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN

WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH

ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE

DISCHARGED THROUGH NEARBY WINDOW UNITS.

3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE

CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL

DECONTAMINATION PURPOSES.

2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR

POLY AND USED FOR WASTE DECONTAMINATION PURPOSES.

ACCOMMODATE SIZE OF DEMO COMPONENTS - CONSTRUCT

ACCORDINGLY

L3

A3

C1

C2

C3

C4

L4 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-102

REMEDIATION PLAN - FLOOR 01 - PHASE

BHR

4 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 01 - PHASE 2

C2

A2 C2

C2

C1

A1

C1

C4C3

C1

C2

A2

A3

A1

A3

C2

C4C3

A1

REMEDIATION PLAN - PHASE 3 KEYNOTES

A1

A2

C1

C2

C3

REMOVE NON-ASBESTOS EIFS LAYER AND UNDERLYING ASBESTOS AND

LEAD CONTAINING LAYER ABATEMENT METHODS AS REQUIRED BY

SECTION 02.82.11 (NOTE: HIGH PRESSURE WATER BLASTING IS

PROHIBITED) - 1800 SF

REMOVE NON ASBESTOS EIFS SIDING WITH CLEAN CUT AND THEN

UNDERLYING ASBESTOS AND LEAD CONTAINING STUCCO LAYER TO ALLOW

FOR JUNCTION/INTERFACE BETWEEN NEW CONSTRUCTION AND OLD

USING ABATEMENT METHODS AS REQUIRED IN SECTION 02.82.11 (NOTE:

HIGH PRESSURE WATER BLASTING IS PROHIBITED). SPECIFIC LOCATIONS

TO BE DETERMINED IN COORDINATION WITH GENERAL CONTRACTOR. - 50

SF

REMOVE NON-ASBESTOS EIFS SIDING WITH CLEAN CUT AND THEN

UNDERLYING ASBESTOS AND LEAD CONTAINING STUCCO LAYER TO ALLOW

FOR INFILL AT REMOVED DOOR AT BUILDING 23 USING ABATEMENT

METHODS AS REQUIRED BY SECTION 02.82.11 (NOTE: HIGH PRESSURE

WATER BLASTING IS PROHIBITED). SPECIFIC LOCATIONS TO BE

DETERMINED IN COORDINATION WITH GENERAL CONTRACTOR. - 20 SF

NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS

ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL

LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.

ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THE SYSTEM

CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH

CLEARANCE. ALL CEILING (TILES; MAINTAIN GRID IN PLACE), WALL, FLOOR,

AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.

HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN

REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN

WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH

ELECTRONIC RECORDING MANOMETER).

3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE

CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL

DECONTAMINATION PURPOSES.

2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR

POLY AND USED FOR WASTE DECONTAMINATION PURPOSES.

ACCOMMODATE SIZE OF DEMO COMPONENTS - CONSTRUCT

ACCORDINGLY

C4

A3

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-103

REMEDIATION PLAN - PHASE 3

BHR

5 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 00 - PHASE 3

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 01 - PHASE 3

SCAFFOLDING

C3 C2 C1

A2A1

SCAFFOLDING

A2

A3

A1

C4

A2

C3

C5

C3

C5 C2

C6

C7

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.

REMEDIATION PLAN - PHASE 4 KEYNOTES

A1

A2

C1

C2

C3

REMOVE NON-ASBESTOS BALLAST AND ASBESTOS ROOF CAPPING AND

FLASHING USING ABATEMENT METHODS AS REQUIRED IN SECTION

02.82.13.21 - 200 SF

REMOVE ASBESTOS ROOF CAULKING IN EXPANSION JOINTS WHERE

PRESENT USING ABATEMENT METHODS AS REQUIRED IN SECTION

02.82.13.21 - 50 SF

REMOVE NON-ASBESTOS MEMBRANE AND ASBESTOS ROOF CAPPING AND

FLASHING USING ABATEMENT METHODS AS REQUIRED IN SECTION

02.82.13.21 - 500 SF

ALL PENETRATIONS, DOORS, WINDOWS, AND OTHER OPENINGS WITHIN

100 FT OF THE OUTDOOR REGULATED AREA TO BE SEALED WITH 2

LAYERS OF 6 MIL FR POLY SHEETING. ALL WINDOWS TO BE SEALED ON

THE INSIDE WITH 6 MIL FR POLY SHEETING.

ALL ASBESTOS WASTE TO BE HOUSED INSIDE LOCKABLE, WATER TIGHT

CONTAINER PLACED WITHIN REGULATED AREA.

REGULATED AREA TO BE SECURED BY FENCES OR OTHER ST LOUIS

COUNTY DEPARTMENT APPROVED MEANS (RED ASBESTOS TAPE MAY BE

ALLOWED FOR BY COUNTY). NO INDIVIDUALS OTHER THAN THOSE

ENGAGED IN THE PROJECT MAY PASS WITHIN 20 FT OF WORK AREA.

APPROPRIATE SIGNAGE MUST BE POSTED.

NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS

ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL

LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.

ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE OF THEY

CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH

CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID IN PLACE), WALL,

FLOOR, AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.

HEPA FILTERED NAGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN

REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN

WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH

ELECTRONIC RECORDING MANOMETER)

3 STAGE WET DECONTAMINATION STATION (W/CFM) TO BE CONSTRUCTED

OF 6 MIL POLY AND USED FOR PERSONAL DECONTAMINATION PURPOSES.

2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR

POLY AND USED FOR WASTE DECON PURPOSES. ACCOMMODATE SIZE OF

DEMO COMPONENTS AND CONSTRUCT ACCORDINGLY.

A3

C4

C5

C6

C7 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-104

REMEDIATION PLAN - PHASE 4

BHR

6 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 00 - PHASE 4

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 01 - PHASE 4

A2

A3

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.

REMEDIATION PLAN - PHASE 5 KEYNOTES

A1

A2

REMOVE ASBESTOS EXTERIOR WATERPROOFING LAYER WHERE

PRESENT USING GLOVEBAG ABATEMENT METHODS AS REQUIRED IN

SECTION 02.82.13.13 - 8 SF

REMOVE ASBESTOS EXTERIOR EXPANSION BOARD WHERE PRESENT

USING GLOVEBAG ABATEMENT METHODS AS REQUIRED IN SECTION

02.82.13.13 - 16 SF

HAND EXCAVATE AND REMOVE EXPOSED 8" METAL WATER MAIN W/

ASBESTOS BLACK TAR USING ABATEMENT METHODS AS REQUIRED BY

SECTION 02.82.13.13. REMOVE ACM TAR ON REMAINING PIPE TO ALLOW

FOR NEW COUPLING AND TAP. BULK EXCAVATION TO BE PERFORMED BY

OTHERS - 50 FT OF ACM WATER MAIN (8") & 3 FT² OF BLACK TAR

A3 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-105

REMEDIATION PLAN - FLOOR 00 - PHASE

BHR

7 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 00 - PHASE 5

C1 C2

A2

C1

C2

A1

A2

L1

A1

L1

A3

L1 A2

C4C3C4C3

C4C3

L1

C1 C2

C1

C2

GENERAL REMEDIATION NOTES

1. WORK TO BE DONE IN PHASES AS NEEDED TO FACILITATE PROJECT NEEDS

REGARDING SCHEDULING AND ACCESS, AS DETERMINED BY GENERAL

CONTRACTOR AND APPROVED BY COR.

PHASE 1: INTERIOR ABATMENT OF GROUND FLOOR

PHASE 2: INTERIOR ABATMENT OF 1ST FLOOR

PHASE 3: EXTERIOR REMOVAL OF ASBESTOS AND LEAD CONTAINING STUCCO

UNDER EIFS

PHASE 4: ROOF ABATEMENT

PHASE 5: GROUND LEVEL FOUNDATION

PHASE 6: BLDG 23 INTERIOR

2. ALL ABATEMENT WORK NOTED ABOVE TO BE PERFORMED BY

LICENSED/TRAINED/ PROTECTED ABATMENET WORKERS WITHIN A CLASS 1

NEGATIVE PRESSURE ENCLOSURE. FULL CONTAINMENT SYSTEM TO BE

MAINTAINED AS A REGULATED AREA THROUGH COMPLETION OF SCHEDULED

WORK AND FINAL CLEARANCE BY VPIH FOR RE-OCCUPANCY BY OTHERS.

3. COORDINATE EXACT LOCATIONS OF LEAD AND ASBESTOS ABATEMENT W/

GENERAL CONTRACTOR. WORK TO BE PERFORMED ON NIGHTS AND

WEEKENDS.

REMEDIATION PLAN - PHASE 6 KEYNOTES

A1

A2

L1

C1

C2

C3

REMOVE ASBESTOS INSULATION ON PIPE AND FITTINGS USING GLOVEBAG

ABATEMENT METHODS AS REQUIRED BY SECTION 02.82.13.13- 36 LFT, 7

FITTINGS

PROTECT OTHER ASBESTOS PIPE INSULATION AND HANGERS PRESENT

THROUGHOUT, AS NECESSARY

REMOVE NON-ASBESTOS EFIS LAYER AND UNDERLYING ASBESTOS AND

LEAD CONTAINING LAYER USING ABATEMENT METHODS AS REQUIRED IN

SECTION 02.82.11 (NOTE: HIGH PRESSURE WATER BLASTING IS

PROHIBITED) - 2 SF

REMOVE LBP FROM PLASTER CEILINGS OR WALLS USING CHEMICAL

STRIPPER AND ABATEMENT METHODS AS REQUIRED IN SECTION

02.83.13.13 - 10 LOCATIONS AS COORDINATED WITH GENERAL

CONTRACTOR ON NIGHTS AND WEEKENDS.

NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY. ALL PENETRATIONS

ARE TO BE SEALED OR OTHERWISE ISOLATED FROM NPE WITH 6 MIL

LAYER OF FIRE RETARDANT (FR) POLY SHEETING AS A CRITICAL BARRIER.

ACTIVE HVAC COMPONENTS MUST BE ISOLATED FROM NPE IF THEY

CANNOT BE SHUT DOWN. NPE MUST BE MAINTAINED THROUGH

CLEARANCE. ALL CEILING (TILES ONLY; MAINTAIN GRID PLACE), WALL,

FLOOR, AND PIPING FINISHES TO BE REMOVED AS INDICATED WITHIN NPE.

HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM) TO MAINTAIN

REGULATED AREA UNDER NEGATIVE PRESSURE DIFFERENTIAL OF 0.02 IN

WG DURING REGULATED ACTIVITIES (VERIFY/DOCUMENT WITH

ELECTRONIC RECORDING MANOMETER). EXHAUST AIR TO BE

DISCHARGED THROUGH NEARBY WINDOW UNITS.

3 STAGE WET DECONTAMINATION STATION (W/ SHOWER) TO BE

CONSTRUCTED OF 6 MIL POLY AND USED FOR PERSONAL

DECONTAMINATION PURPOSES.

2 STAGE WASTE LOAD OUT CHAMBER TO BE CONSTRUCTED OF 6 MIL FR

POLY AND USED FOR WASTE DECON PURPOSES. ACCOMMODATE SIZE OF

DEMO COMPONENTS - CONSTRUCT ACCORDINGLY.

C4

A3 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

MO ARCH REG. NO. 2012034754, EXP. 12/31/2020

MO ENGR REG. NO. 2014031351, EXP. 12/31/2020

STRUCTURAL /

CIVIL ENGINEER

IMEG CORP.

15 SUNNEN DR., SUITE 104

ST. LOUIS, MO 63143

(314) 645-1132

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

SPUR DESIGN

11020 KING STREET, SUITE 350

OVERLAND PARK, KS 66210

(405) 842-6100

ELEVATOR CONSULTANT

KENNETH H. LEMP ELEVATOR

CONSULTANT, INC.

211 3RD STREET

VALLEY PARK, MO 63088

(636) 861-2722

ENVIRONMENTAL

ENGINEER

RIVER FRONT SAFETY & HEALTH, LC

1139 OLIVE STREET, SUITE 300

ST. LOUIS, MO 63101

(314) 436-9192

BUILDING 23

AREA OF

WORK

N

F U

L L

Y S

P R

IN

K

L E

R E

D

/2

/2

:2

:5

A

M

23-HA-106

REMEDIATION PLAN - FLOOR 00 - PHASE

BHR

8 101

AM/JP

BID DOCUMENTS

CREATE ELEVATOR TOWER &

STAIRWELL, BUILDING 23

1/22/2021

657-19-128JB

JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

N

1/8" = 1'-0"

REMEDIATION PLAN - FLOOR 00 - PHASE 6

Sheets
23-GI-001 - COVER SHEET
23-GI-002 - GENERAL INFORMATION
23-HA-101 - REMEDIATION PLAN - FLOOR 00 - PHASE 1
23-HA-102 - REMEDIATION PLAN - FLOOR 01 - PHASE 2
23-HA-103 - REMEDIATION PLAN - PHASE 3
23-HA-104 - REMEDIATION PLAN - PHASE 4
23-HA-105 - REMEDIATION PLAN - FLOOR 00 - PHASE 5
23-HA-106 - REMEDIATION PLAN - FLOOR 00 - PHASE 6
23-AS-101 - ARCHITECTURAL SITE PLAN
23-AL-101 - LIFE SAFETY PLAN - FLOOR 00
23-AL-111 - LIFE SAFETY PLAN - FLOOR 01
23-AD-101 - DEMOLITION PLAN - FLOOR 00
23-AD-111 - DEMOLITION PLAN - FLOOR 01
23-AE-001 - PARTITION TYPES
23-AE-101 - FLOOR PLAN - FLOOR 00
23-AE-111 - FLOOR PLAN - FLOOR 01
23-AE-121 - ROOF PLAN
23-AE-201 - BUILDING ELEVATIONS
23-AE-202 - BUILDING ELEVATIONS
23-AE-301 - BUILDING SECTIONS
23-AE-401 - WALL SECTIONS
23-AE-411 - VERTICAL CIRCULATION
23-AE-412 - VERTICAL CIRCULATION
23-AE-413 - TEMPORARY CORRIDOR
23-AE-501 - BUILDING DETAILS
23-AE-601 - INTERIOR ELEVATIONS
23-AC-101 - REFLECTED CEILING PLAN - FLOOR 00
23-AC-111 - REFLECTED CEILING PLAN - FLOOR 01
23-AF-101 - FINISH FLOOR PLANS
23-AP-601 - DOOR & WINDOW SCHEDULES

File details come from the government source that posted it. Updated .