01Drawings General.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25521R0027
About this file
This federal contract opportunity notice solicits proposals for a construction project to create an elevator tower and stairwell within Building 23 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project number is 657-19-128JB and has an estimated cost range between $2 million to $5 million. It is a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 238220 with a small business size standard of $39.5 million. The completion period is estimated at 383 calendar days from notice to proceed. Proposals are due on or around January 22, 2021 and must be submitted electronically through beta.Sam.gov. The successful offeror will be selected using the Best Value Lowest Price Technically Acceptable process and must self-perform at least 15% of the general construction labor. Attendance at a pre-solicitation site visit is encouraged for responsible sources. Questions should be emailed by the stated deadline to the contracting officer's representatives.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BW
W
BWW
CO
NC
. W
AL
K
W A
LK
WALK
AREA PLAN
N
PROJECT SITE
BLDG 23
1 CLINICS - ADMIN - DIAG - RESEARCH
1CC CONNECTING CORRIDORS
2 EDUCATION
3 DOMICILIARY
3T DOMICILIARY OFFICES (MODULAR BLDG)
18 ADMINISTRATION
23 PROSTHETICS - M&O SHOPS
24 AUDITORIUM - CANTEEN - LIBRARY
25 NATIONAL CANTEEN SERVICE (OUTLEASED)
32 FLAGPOLE
35 STORAGE
44 CONCRETE PLATFORM
45 CONCRETE PLATFORM
51 INPATIENT PSYCHIATRIC
51T NEURO PSYCHIATRIC (MODULAR BLDG)
52 LONG TERM SCI - DOM
53 NURSING HOME
53T MEDICAL REHAB (MODULAR BLDG)
54 REHAB BUILDING (UNDER CONSTRUCTION)
55 CLINIC BUILDING (UNDER CONSTRUCTION)
56 TENANT BUILDING
57 ENGINEERING - WAREHOUSE (UNDER CONSTRUCTION)
58 MENTAL HEALTH CLINIC
59 FISCHER HOUSE
60 MAIN KITCHEN
60T FOOD - NUTRITION - DIETETICS
75 ENERGY PLANT - GENERATOR BLDG & SUBSTATION
81 BUS STOP
83 EMERGENCY GENERATOR
84 EMERGENCY GENERATOR
86 EMERGENCY GENERATOR
87 EMERGENCY GENERATOR
89 SECURITY STATION
93 HAZARDOUS WASTE STORAGE
BUILDING KEY
CAMPUS MAP
N
53T
51T
55 23
60T
3T
K O
C H
R O
A D
NEW SOUTH GATE ENTRANCE
JEFFERSON BARRACKS DRIVE
G R
A V
E S
S T
R E
E T
CIRCLE DRIVE
EAST
G A T E E
N T R
A N
C E
OLD
S O
U T H
PROJECT SITE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
JEFFERSON BARRACKS
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:4
A
M
23-GI-001
COVER SHEET
BHR
1 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER
& STAIRWELL, BUILDING 23
VA PROJECT NUMBER: 657-19-128JB
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
SHEET LIST
NUMBER SEQUENCE NAME
01 - GENERAL
23-GI-001 1 COVER SHEET
23-GI-002 2 GENERAL INFORMATION
02 - HAZARDOUS MATERIALS
23-HA-101 3 REMEDIATION PLAN - FLOOR 00 - PHASE 1
23-HA-102 4 REMEDIATION PLAN - FLOOR 01 - PHASE 2
23-HA-103 5 REMEDIATION PLAN - PHASE 3
23-HA-104 6 REMEDIATION PLAN - PHASE 4
23-HA-105 7 REMEDIATION PLAN - FLOOR 00 - PHASE 5
23-HA-106 8 REMEDIATION PLAN - FLOOR 00 - PHASE 6
03 - CIVIL
23-CS-100 9 TOPOGRAPHIC SURVEY
23-CD-101 10 DEMOLITION PLAN
23-CI-101 11 SITE LAYOUT AND PAVING PLAN
23-CG-101 12 GRADING AND EROSION CONTROL PLAN
23-CU-101 13 UTILITY PLAN
23-CU-102 14 UTILITY PROFILES
23-CU-103 15 UTILITY PROFILES
23-CU-104 16 SITE DISTURBANCE PLAN
23-CJ-501 17 CIVIL DETAILS
23-CJ-502 18 CIVIL DETAILS
04 - STRUCTURAL
23-SG-001 19 STRUCTURAL GENERAL NOTES
23-SG-002 20 SNOW DRIFT PLAN, SYMBOLS, AND ABBREVIATIONS
23-SD-101 21 STRUCTURAL DEMOLITION AND PHASING PLAN
23-SD-102 22 BUILDING SECTIONS
23-SB-101 23 FOUNDATION PLAN - FLOOR 00
23-SF-101 24 FRAMING PLAN - FLOOR 01
23-SF-102 25 FLOOR 01 STAIR AND RAMP DIMENSION PLAN
23-SF-103 26 FRAMING PLAN - ROOF
23-SB-501 27 CONCRETE DETAILS
23-SB-502 28 CONCRETE DETAILS
23-SB-503 29 CONCRETE DETAILS
23-SF-501 30 MASONRY DETAILS
23-SF-502 31 STEEL FRAMING DETAILS
23-SF-503 32 STEEL FRAMING DETAILS
05 - ARCHITECTURAL
23-AS-101 33 ARCHITECTURAL SITE PLAN
23-AL-101 34 LIFE SAFETY PLAN - FLOOR 00
23-AL-111 35 LIFE SAFETY PLAN - FLOOR 01
23-AD-101 36 DEMOLITION PLAN - FLOOR 00
23-AD-111 37 DEMOLITION PLAN - FLOOR 01
23-AE-001 38 PARTITION TYPES
23-AE-101 39 FLOOR PLAN - FLOOR 00
23-AE-111 40 FLOOR PLAN - FLOOR 01
23-AE-121 41 ROOF PLAN
23-AE-201 42 BUILDING ELEVATIONS
23-AE-202 43 BUILDING ELEVATIONS
23-AE-301 44 BUILDING SECTIONS
23-AE-401 45 WALL SECTIONS
23-AE-411 46 VERTICAL CIRCULATION
23-AE-412 47 VERTICAL CIRCULATION
23-AE-413 48 TEMPORARY CORRIDOR
23-AE-501 49 BUILDING DETAILS
23-AE-601 50 INTERIOR ELEVATIONS
23-AC-101 51 REFLECTED CEILING PLAN - FLOOR 00
23-AC-111 52 REFLECTED CEILING PLAN - FLOOR 01
23-AF-101 53 FINISH FLOOR PLANS
23-AP-601 54 DOOR & WINDOW SCHEDULES
06 - FIRE PROTECTION
23-FG-001 55 FIRE PROTECTION LEGEND
23-FX-101 56 FIRE PROTECTION PLAN - FLOOR 00
23-FX-111 57 FIRE PROTECTION PLAN - FLOOR 01
07 - PLUMBING
23-PG-001 58 PLUMBING LEGEND
23-PL-101 59 PLUMBING WASTE PLAN - FLOOR 00
23-PL-111 60 PLUMBING WASTE PLAN - FLOOR 01
23-PP-101 61 PLUMBING SUPPLY PLAN - FLOOR 00
23-PP-111 62 PLUMBING SUPPLY PLAN - FLOOR 01
23-PP-121 63 PLUMBING PLAN - ROOF
23-PJ-501 64 PLUMBING DETAILS
23-PJ-502 65 PLUMBING DETAILS
23-PJ-601 66 PLUMBING SCHEDULES
08 - MECHANICAL
23-MG-001 67 MECHANICAL LEGEND
23-MD-101 68 MECHANICAL PIPING DEMOLITION PLAN - FLOOR 00
23-MH-101 69 MECHANICAL HVAC PLAN - FLOOR 00
23-MH-111 70 MECHANICAL HVAC PLAN - FLOOR 01
23-MH-121 71 MECHANICAL HVAC PLAN - ROOF
23-MP-101 72 MECHANICAL PIPING PLAN - FLOOR 00
23-MP-111 73 MECHANICAL PIPING PLAN - FLOOR 01
23-MJ-501 74 MECHANICAL DETAILS
23-MJ-601 75 MECHANICAL SCHEDULES
23-MK-701 76 MECHANICAL CONTROLS
23-MK-702 77 MECHANICAL CONTROLS
09 - ELECTRICAL
23-EG-000 78 ELECTRICAL LEGEND
23-ED-101 79 ELECTRICAL LIGHTING DEMOLITION PLAN - FLOOR 00
23-ED-102 80 ELECTRICAL POWER DEMOLITION PLAN - FLOOR 00
23-ED-111 81 ELECTRICAL LIGHTING DEOMOLITION PLAN - FLOOR 01
23-ED-112 82 ELECTRICAL POWER DEMOLITION PLAN - FLOOR 01
23-EL-101 83 ELECTRICAL LIGHTING FLOOR PLAN - FLOOR 00
23-EL-111 84 ELECTRICAL LIGHTING FLOOR PLAN - FLOOR 01
23-EP-101 85 ELECTRICAL POWER FLOOR PLAN - FLOOR 00
23-EP-111 86 ELECTRICAL POWER FLOOR PLAN - FLOOR 01
23-EJ-101 87 ELECTRICAL EQUIPMENT FLOOR PLAN - FLOOR 00
23-EJ-111 88 ELECTRICAL EQUIPMENT FLOOR PLAN - FLOOR 01
23-EJ-121 89 ELECTRICAL EQUIPMENT FLOOR PLAN - ROOF
23-EK-501 90 ELECTRICAL DETAILS
23-EK-601 91 ELECTRICAL ONE-LINE DIAGRAM AND LIGHT FIXTURE SCHEDULE
23-EK-602 92 ELECTRICAL SCHEDULES
10 - TECHNOLOGY
00-TG-000 93 TECHNOLOGY LEGEND
00-TS-101 94 TECHNOLOGY SITE PLAN
00-TJ-501 95 TECHNOLOGY DETAILS
00-TJ-502 96 TECHNOLOGY SCHEDULES
23-TD-101 97 TECHNOLOGY DEMOLITION PLAN - FLOOR 00
23-TD-102 98 TECHNOLOGY DEMOLITION PLAN - FLOOR 01
23-TY-101 99 TECHNOLOGY FLOOR PLAN - FLOOR 00
23-TY-102 100 TECHNOLOGY FLOOR PLAN - FLOOR 01
23-TJ-501 101 TECHNOLOGY DETAILS AND SCHEDULES
TOTAL SHEETS: 101
GENERAL NOTES SYMBOLS LEGEND
ARCHITECTURAL ABBREVIATIONS
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT & USE OF VOLUNTARY ST&ARDS, OFFICE OF MANAGEMENT & BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY ST&ARDS, BOTH DOMESTIC & INTERNATIONAL, WHENEVER FEASIBLE, & TO PARTICIPATE IN VOLUNTARY ST&ARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES & ST&ARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY & THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS & MASTER SPECIFICATIONS SPECIFY OTHER CODES & ST&ARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD ST&ARD APPLICATION GUIDE, & OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 & NFPA 900
• OCCUPATIONAL, SAFETY & HEALTH ADMINISTRATION (OSHA) ST&ARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• SAFETY CODE FOR ELEVATORS & ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER & PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY ST&ARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE & COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD & RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION ST&ARDS FOR NEW FEDERAL, COMMERCIAL & MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS & NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 & 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE & SUSTAINABLE BUILDINGS: MEMOR&UM OF UNDERST&ING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, & TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION & SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE ST&ARD 62.1- 2004.
• SAFETY ST&ARD FOR REFRIGERATION SYSTEMS – ASHRAE ST&ARD 15 – 2007.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) & THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH & SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS & GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY & FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT & VENTILATION, & ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 & DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 & DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES & ST&ARDS & VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS & VA ADOPTED NATIONALLY RECOGNIZED CODES & ST&ARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY
SYSTEM WIDE.
CODES, ST&ARDS, & EXECUTIVE ORDERSENERGY REQUIREMENTS
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM ALL ITEMS
REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK TO CONFIRM THE ACCURACY OF THE DRAWINGS, & REPORT ANY DISCREPANCIES TO THE ARCHITECT.
DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS & EXISTING STRUCTURAL
CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN &
FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES & WARNING SIGNS TO DIVERT & WARN PASSERS-BY OF THE CONSTRUCTION
WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING
FACILITIES.
5. ALL TRASH & DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES & CONDITIONS TO REMAIN IN PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH & REPAIR ANY DAMAGE TO ADJACENT
FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT PARTICULATE
MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE
LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR & SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER DISCIPLINES TO INSTALL COMPLETE & OPERATIONAL SYSTEMS. DRAWINGS, AS A WHOLE, REPRESENT A COMPLETE SET & DEPICT REQUIREMENTS FOR COMPLETE & OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS
MAY NOT DEPICT COMPLETE & ACCURATE INFORMATION TO COORDINATE COMPLETE &
OPERATIONAL SYSTEMS, BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER
INDIVIDUAL DRAWINGS. CONTRACTOR & SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER
SHEETS & SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT
WORK REQUIRED TO ACHIEVE A COMPLETE & OPERATIONAL GOAL. LACK OF COORDINATION &
REVIEW OF DRAWINGS & SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE &
OPERATIONAL SYSTEMS, BEING OBVIOUS & TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS & SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO THE
GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COR, IN WRITING, 21 DAYS IN ADVANCE OF PROPOSED INTERRUPTION AND 48 HOUR NOTICE FOR “HOT” WORK
PERMIT. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF
SUCH INTERRUPTION.
12. CONTRACTOR WILL BE ADVISED (IN WRITING) OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY MEDICAL CENTER MAY OCCUR AT
OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS.
13. IN CASE OF A CONTRACT CONSTRUCTION EMERGENCY, SERVICE WILL BE INTERRUPTED ON
APPROVAL OF COR. SUCH APPROVAL WILL BE CONFIRMED IN WRITING AS SOON AS PRACTICAL.
14. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS & MAY NOT
BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL
CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING & APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE &/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY OCCUR AT
TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE
ON WEEKENDS OR LATE HOURS & MAY NOT BE AN ADDITIONAL COST TO THE GOVERNMENT.
COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL OPERATION OF THE FACILITY
WITH THE COR WHEN SUBMITTING THE CONSTRUCTION SCHEDULE OR UPDATES TO THE
CONSTRUCTION SCHEDULE.
15. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE
CONSTRUCTION DOCUMENTS.
ROOM NAME, NUMBER &
SQUARE FEET
STRUCTURAL GRID
KEYNOTE
WALL OR PARTITION TYPE
PLAN NORTH ARROW WITH TRUE NORTH
ELEVATION INDICATOR,
INTERIOR/EXTERIOR
BUILDING SECTION
INDICATOR
ELEVATION INDICATOR
BREAK LINE
DIMENSION LINE
CENTER LINE
MATCH LINE
N
A
SPOT ELEVATION
DETAIL INDICATOR
1 / A101
SIM
Room name
150 SF
A101
SIM
A101
SIM
WINDOW TYPE
DOOR CLEARANCES
MATERIALS LEGEND
FIXTURE MOUNTING HEIGHTS & CLEARANCES
ASHRAE 90.1 - 2016 EDITION
BUILDING LOCATION: ST. LOUIS, MO
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING & COOLING AS DEPICTED IN
THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL
DRAWINGS SHALL BE THE MAXIMUM & MINIMUM VALUES FOR THE ASSOCIATED
TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
OPAQUE THERMAL ENVELOPE REQUIREMENTS (TABLE 5.5-4):
ROOFS REQUIRED
INSULATION: R-30 c.i.
METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls
ATTIC & OTHER: R-49
WALLS, ABOVE GRADE
MASS: R-9.5 c.i.
METAL BUILDING: R-0 + R-15.8 c.i.
STEEL-FRAMED: R-13 + R-7.5 c.i.
WOOD-FRAMED & OTHER: R-13 + R-3.8 c.i. or R-20
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i.
FLOORS
MASS: R-14.6 c.i.
STEEL-FRAMED: R-30
WOOD-FRAMED & OTHER R-30
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 FOR 24 in.
HEATED SLABS: R-20 for 24 in.
OPAQUE DOORS
SWINGING: U-0.370
NONSWINGING: U-0.310
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION
U-FACTOR
-NON-METAL FRAMING (ALL): 0.31
-METAL FRAMING, FIXED: 0.38
-METAL FRAMING, OPERABLE: 0.46
-METAL FRAMING ENTRANCE DOOR: 0.68
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ACT (SP) ACOUSTICAL CEILING TILE (WITH SPRAYED PLASTIC
FINISH)
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ADC AUTOMATIC DOOR CLOSER
ADH ADHESIVE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
ABG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
ALUM ALUMINUM
AR AS REQUIRED
ASB ASBESTOS
AWT ACOUSTICAL WALL TREATMENT
BAT BATTEN
BEV BEVEL
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BTWN BETWEEN
CAC CEILING ATTENUATION CLASS
CB CORNER BEAD
CBB CEMENTITIOUS BACKER BOARD
CCTV CLOSED CIRCUIT TELEVISION
C / C CONTRACTOR FURNISHED / CONTRACTOR INSTALLED
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CONT CONTINUE OR CONTINUOUS
COR CONTRACTING OFFICER'S REPRESENTATIVE
CR CARD READER
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
ELEC ELECTRIC
EA EACH
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTINGUISHER
ETR EXISTING TO REMAIN
F FEMALE
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF&E FURNITURE, FIXTURE, & EQUIPMENT
FT FEET OR FOOT
FP FIRE PROTECTION OR FIREPROOF
FR FIRE RATING, FIRE RESISTANCE, OR FRAME
FT FEET OR FOOT
FURR FURRING
FV FIELD VERIFY
GA GAGE
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GD GUARD
GL GLASS
GT GROUT
GWB GYPSUM WALLBOARD
HDR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HEAT-STRENGTHENED (GLASS)
OR HIGH STRENGTH
HT HEIGHT
S SEALED CONCRETE
SCHED SCHEDULE
SF SQUARE FOOT (FEET)
SIM SIMILAR
SPEC SPECIFICATION
SQ IN SQUARE INCH
SQ YD SQUARE YARD
STRUCT STRUCTURAL
STC SOUND TRANSMISSION CLASS
STD ST&ARD
STOR STORAGE
T&G TONGUE & GROOVE
THRU THROUGH
TO TOP OF
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOS TOP OF STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
VAR VARIES
V / C VA PROVIDED / CONTRACTOR INSTALLED
V / V VA PROVIDED / VA INSTALLED
W/ WITH
W/O WITHOUT
WC WALL COVERING OR WATER CLOSET
WD WOOD
WDW WINDOW
WR WASTE RECEPTACLE
X BRACE CROSS BRACE
IN INCH OR INCHES
KPL KICKPLATE
LAV LAVATORY
LF LINEAR FEET (FOOT)
LVR LOUVER
LF LINEAR FEET (FOOT)
MAX MAXIMUM
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MANUF MANUFACTURER
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
OC ON CENTER
OPP OPPOSITE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
QUAL QUALITY
R RADIUS OR RISER
RCP REFLECTED CEILING PLAN
RECPT RECEPTACLE
REF REFERENCE
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
X'-X"
1 1/4"
A101
SIM
1i
A
Name Elevation
18" MIN.60
M
IN
FRONT
APPROACH,
PULL SIDE
36" MIN.
M
IN
HINGE
APPROACH,
PULL SIDE
HINGE
APPROACH,
PULL SIDE
*12" MIN.
M
IN
FRONT
APPROACH,
PUSH SIDE
M
IN
HINGE
APPROACH,
PUSH SIDE
22" MIN. 24" MIN.*4
8"
M
IN
LATCH
APPROACH,
PULL SIDE
24" MIN.*4
2"
M
IN
LATCH
APPROACH,
PUSH SIDE
*IF BOTH CLOSER & LATCH ARE PROVIDED
*54" MIN. IF CLOSER IS
PROVIDED
*48" IF CLOSER IS PROVIDED*IF BOTH CLOSER & LATCH ARE PROVIDED
**48" MIN. IF BOTH CLOSER & LATCH PROVIDED
FRONT
APPROACH,
PUSH SIDE
M
IN
42" MIN.
M
IN
CONCRETE/ PRECAST CONCRETE
SOIL
S&, EIFS FINISH COAT, OR CEMENT
PLASTER
BRICK
CMU
STONE
FIBERGLASS SEMI RIGID
INSULATION
FIBERGLASS BATT
INSULATION
MINERAL WOOL SEMI RIGID INSULATION
EXP&ED POLYSTYRENE RIGID
INSULATION
EXTRUDED POLYSTYRENE RIGID
INSULATION
POLYISOCYANURATE RIGID INSULATION
GYPSUM
BOARD
EXTERIOR GYPSUM SHEATHING
EXTERIOR CEMENT
BOARD
COATED GLASS MAT WATER RESISTANT
GYP BD
PLYWOOD
COVER BOARD
SPRAY-APPLIED CLOSED CELL
INSULATION
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN1. GENERAL CONTRACTOR TO PROVIDE
METAL SUPPORT BLOCKING FOR ALL
WALL MOUNTED ACCESSORIES,
FIXTURES, & EQUIPMENT. SUPPORT
BRACKETS TO BE PLACED AT ALL
OPEN COUNTERTOPS - 18"-24" ON
CENTER.
2. SPECIFIED MAXIMUMS ARE MEASURED
FROM AFTER FINISHED FLOOR TO THE
OPERABLE PART OF THE FIXTURE.
3. FIXTURES SHOWN ARE
REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO
SPECIFICATIONS FOR FIXTURE TYPES
USED IN THIS PROJECT.
4. FIXTURES MAY OVERLAP WAINSCOT.
WHERE APPLICABLE, BACKING TO BE
PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH
SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWERTURNING RADIUS BARIATRIC
TURNING
RADIUS
DRINKING
FOUNTAIN
PAPER
TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
M
A X
WASTE
RECEPTACLE
LAVATORY
WITH
MIRROR ON
CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" O
F R
E F
L E C
T
IV
E S
U R
F A
C E
3' -4
M
A X
. T O
B O
T T
O M
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
M
A X
4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH
APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-4"- 1'-6"
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
MIN
1'-0"
3'-6" MIN MAX
1'-0"
4'-6" MIN
1' -5
1' -7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
3' -0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
5'-0" 6'-0"
FINISHED FLOOR
3' -6
M
A X
FIRE
EXTINGUISHER
CABINET
WEIGHT > 40 LBS
5' -0
M
A X
FIRE
EXTINGUISHER
CABINET
WEIGHT < 40 LBS
4' -0
M
A X
4' -0
M
A X
TOILET
SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR
SPACE AT WATER
CLOSET
5'-6"
6' -0
CLEAR FLOOR
SPACE AT ADA
DRINKING FOUNTAIN
2'-6"
4' -0
2'-6"
4' -0
CLEAR FLOOR
SPACE AT ADA
LAVATORY
3' -0
6"
HANDRAILS &
BUMPERGUARDS
4"
6"
MIN
2'-0"
6" MAX
7" - 9"
3"
1' -6
11" MIN
17" - 25"
39"- 41"
1"
M
IN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Brad Petrovic, Project Manager Gary Drikow, Chief of Design and Construction Kevin Knight, Contracting Officer
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MO ARCH REG. NO. 2012034754, EXP. 12/31/2020
MO ENGR REG. NO. 2014031351, EXP. 12/31/2020
STRUCTURAL /
CIVIL ENGINEER
IMEG CORP.
15 SUNNEN DR., SUITE 104
ST. LOUIS, MO 63143
(314) 645-1132
MECHANICAL / ELECTRICAL /
PLUMBING / TECHNICAL ENGINEER
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(405) 842-6100
ELEVATOR CONSULTANT
KENNETH H. LEMP ELEVATOR
CONSULTANT, INC.
211 3RD STREET
VALLEY PARK, MO 63088
(636) 861-2722
ENVIRONMENTAL
ENGINEER
RIVER FRONT SAFETY & HEALTH, LC
1139 OLIVE STREET, SUITE 300
ST. LOUIS, MO 63101
(314) 436-9192
F U
L L
Y S
P R
IN
K
L E
R E
D
/2
/2
:2
:5
A
M
23-GI-002
GENERAL INFORMATION
BHR
2 101
AM/JP
BID DOCUMENTS
CREATE ELEVATOR TOWER &
STAIRWELL, BUILDING 23
1/22/2021
657-19-128JB
JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
| Sheets |
| 23-GI-001 - COVER SHEET |
| 23-GI-002 - GENERAL INFORMATION |
| 23-HA-101 - REMEDIATION PLAN - FLOOR 00 - PHASE 1 |
| 23-HA-102 - REMEDIATION PLAN - FLOOR 01 - PHASE 2 |
| 23-HA-103 - REMEDIATION PLAN - PHASE 3 |
| 23-HA-104 - REMEDIATION PLAN - PHASE 4 |
| 23-HA-105 - REMEDIATION PLAN - FLOOR 00 - PHASE 5 |
| 23-HA-106 - REMEDIATION PLAN - FLOOR 00 - PHASE 6 |
| 23-AS-101 - ARCHITECTURAL SITE PLAN |
| 23-AL-101 - LIFE SAFETY PLAN - FLOOR 00 |
| 23-AL-111 - LIFE SAFETY PLAN - FLOOR 01 |
| 23-AD-101 - DEMOLITION PLAN - FLOOR 00 |
| 23-AD-111 - DEMOLITION PLAN - FLOOR 01 |
| 23-AE-001 - PARTITION TYPES |
| 23-AE-101 - FLOOR PLAN - FLOOR 00 |
| 23-AE-111 - FLOOR PLAN - FLOOR 01 |
| 23-AE-121 - ROOF PLAN |
| 23-AE-201 - BUILDING ELEVATIONS |
| 23-AE-202 - BUILDING ELEVATIONS |
| 23-AE-301 - BUILDING SECTIONS |
| 23-AE-401 - WALL SECTIONS |
| 23-AE-411 - VERTICAL CIRCULATION |
| 23-AE-412 - VERTICAL CIRCULATION |
| 23-AE-413 - TEMPORARY CORRIDOR |
| 23-AE-501 - BUILDING DETAILS |
| 23-AE-601 - INTERIOR ELEVATIONS |
| 23-AC-101 - REFLECTED CEILING PLAN - FLOOR 00 |
| 23-AC-111 - REFLECTED CEILING PLAN - FLOOR 01 |
| 23-AF-101 - FINISH FLOOR PLANS |
| 23-AP-601 - DOOR & WINDOW SCHEDULES |
File details come from the government source that posted it. Updated .