This Contract Data Requirements List (CDRL) and related solicitation require an incumbent contractor to submit a Phase-Out Plan for transitioning services and knowledge to a new contractor at the end of the contract period.
The CDRL provides instructions for contractors to include in their Phase-Out Plan, such as processes, documentation, personnel responsibilities and schedules, and risks and mitigation strategies. Contractors must submit an initial draft plan within their proposal and a revised draft no later than 60 days before contract end. The related solicitation from the Federal Aviation Administration seeks proposals for aviation safety training and currency/proficiency services at Fort Worth Alliance Airport. Responses are due from small businesses by the date specified. The contractor will provide management, instructor pilots, administrative support, and training platforms including aircraft to support flight program training for inspectors and flight test personnel.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6973GH-20-R-00069 Amendment 0003.pdf | ||
| 03_PWS 5Yr BE - Admin LH 20200629.pdf | ||
| 13_QUESTIONS AND ANSWERS.pdf | ||
| 02_PWS 5Yr 141 Cert 20200629 CHANGES HIGHLIGHTED.pdf | ||
| 6973GH-20-R-00069 Amendment 0002.pdf | ||
| 02_PWS 5Yr 141 Cert 20200629.pdf | ||
| 12_Expanded 141 Hr Chart Final.pdf | ||
| 03_PWS 5Yr BE - Admin LH 20200629 CHANGES HIGHLIGHTED.pdf | ||
| 6973GH-20-R-00069-0001.pdf | ||
| 11_Past Performance Questionaire 6973GH-20-R-00069.doc | DOC document | |
| 08_Monthly CDRL spdsht example.xlsx | XLSX spreadsheet | |
| 07_CDRL 4 141 Cert.pdf | ||
| 04_CDRL 1 Monthly Report Form.pdf | ||
| 6973GH-20-R-00069.pdf | ||
| 03_PWS 5Yr BE - Admin LH 20200430.pdf | ||
| 02_PWS 5Yr 141 Cert 20200430.pdf | ||
| 09_TRAVEL AUTHORIZATION FORM.xlsx | XLSX spreadsheet | |
| 01_Attachment 1 - Schedule B Table.doc | DOC document | |
| 05_CDRL 2 Mtg Min Report.pdf | ||
| 10_Wage Determination 2015-5232v15_20191223.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
CLIN 0003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
A003 Phase-Out Plan Form
4. Authority 5. Contact Reference 6. Requiring Office
AJF-4
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A As needed
12. Date of First
Submission At proposal
13. Date of Subsequent
Submission See Blk 14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
1. Block 13. A revised Draft Phase Out Plan 60 calendar days prior to the end of the contract or as notified by the CO.
2. Block 12 & 13:
See page 2 for the mimimum items the contractor must provide as part of the Phase-Out Plan.
AJF-4200
AAQ-732
16. Total
G. Prepared By: H. Date I. Approved By J. Date
Kadi Barrett 10/2/19
17. Price Group 18. Estimated Total Price
CDRL 3 Phase-Out Plan Page 2
The contractor must identify how it will coordinate with the incoming contractor and Government personnel to transfer knowledge and accomplish at a minimum, the following in accordance with a 30-calendar day phase-out period:
a. Project, Technical and Operational processes
b. Government resources needed as well as Contractor Points of contact
c. Location and listing of all current technical, operational and project management documentation
d. Status of ongoing technical and operational initiatives
e. Appropriate contractor to contractor coordination to ensure a seamless transition
f. Transition of Key and Non-Key Personnel responsibilities, to include the identification of schedules and milestones
g. Identify actions required of the Government
h. Establish and maintain effective communication with the incoming
Contractor/Government personnel for the period of the 30 day transition via weekly status meetings
i. Incumbent's commitment and plan to use current personnel to enable institutional knowledge transfer to include how it proposes, and the schedule for, ramping down both
Key and Non-Key personnel throughout the 30-calendar day transition-out period
j. Identification of Transition Risks and associated mitigation strategies to ensure continuity of operations
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated
ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required
DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions
OTIME One time (does not include draft submissions QRTLY Quarterly
R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes
Code Definition Code Definition
ASGEN As generated ASREQ As required
DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period
“N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract
EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used. 18. Estimated Total Price. Not used.