013300_Attch1_TAFBF3000.pdf

PDF 234 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is AF IMT 3000, a Material Approval Submittal form used by the U.S. Air Force to manage the submission and approval of materials, equipment, and supplies for federal contracts.

The form serves as a standardized submission vehicle for contractors to present Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates, and Material Samples to the Government for approval in accordance with contract provisions. Contractors must prepare submissions in four copies, signed and provided to the contracting officer with appropriate attachments. Each submission is assigned a consecutive submission number by contract and includes fields for the contract number, project number, and identification of items as new or resubmittal entries. Materials must be clearly tabbed or identified, with attachments numbered to correspond with item numbers on the form. The document requires contractor certification that all materials comply with contract specifications. Government evaluation occurs through a structured approval process involving the Base Civil Engineering Project Manager and the Air Force Contracting Officer's Representative, who may recommend approval, disapproval, or require resubmittal within a specified timeframe. The form defines "material" broadly as articles, supplies, raw materials, equipment, parts, components, and end items incorporated into contract work. Submissions are valid only when signed by the contracting officer. The form carries OMB approval number 9000-0062 and an estimated public reporting burden of 20 minutes per response.

View the file

Other files

File Type Posted
WWYK250063 - Site Visit Sign In Sheet.jpg JPG image
Site Visit Meet Up Location.png PNG image
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
23 08 00.pdf PDF
21 13 13.pdf PDF
23 07 00.pdf PDF
23 36 00.00 40.pdf PDF
23 05 48.00 40.pdf PDF
10 14 00.10.pdf PDF
08 81 00.pdf PDF
28 31 76.pdf PDF
06 41 16.00 10.pdf PDF
01 42 00.pdf PDF
01 33 16.00 10.pdf PDF
HAZMAT Reporting at Tinker AFB FEB 2025.pdf PDF
afi91-202_afmcsup.pdf PDF
tinkerafb_HWMP.pdf PDF
TAFB_SOP_outages_v2.pdf PDF
007200_Attch14_Information for New Boilers.pdf PDF
017800_Attch1_DD1354.pdf PDF
007200_Attch7a_AF3952.pdf PDF
image.png PNG image
image (1).png PNG image
Room finish schedule.xlsx XLSX spreadsheet
ELECTRICAL PANEL SCHEDULE U18L.xlsx XLSX spreadsheet
z400i.pdf_safe.pdf PDF
overall plan 04.15.2021.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
05 05 23.16.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
tinkerafb_INRMP.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Form Approved OMB No 9000-062 Expires May 31, 2005

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

TO: (Contracting Officer’s Representative) FROM: (Contractor) DATE (YYYYMMDD)

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

New RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

DATE (YYYYMMDD) [Contractor] TYPE OR PRINT NAME AND GRADE Signature

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Project Manager)

For Evaluation and Action

DATE (YYYYMMDD) [Base Civil Engineering CM/Inspector] TYPE OR PRINT NAME Signature

TO: (AF Contracting Officer’s Representative)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE (YYYYMMDD) [Base Civil Engineering Project Mgr] TYPE OR PRINT NAME Signature

APPROVED DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

TO: (Contractor)

DATE (YYYYMMDD) [Contracting Officer’s Representative] TYPE OR PRINT NAME Signature

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

FROM Contractor:
DATE YYYYMMDD:
CONTRACT NUMBER:
PROJECT NUMBER:
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN:
TO Contractor:
Group1: Choice1
ITEM 1:
ITEM 2:
ITEM 3:
ITEM 4:
ITEM 5:
ITEM 6:
APPROVED 1:
SEE REVERSE 1:
INITIAL 1:
Spec Sect/Par #/Dwg 2:
Spec Sect/Par #/Dwg 1:
Spec Sect/Par #/Dwg 3:
Spec Sect/Par #/Dwg 4:
Spec Sect/Par #/Dwg 5:
Spec Sect/Par #/Dwg 6:
APPROVED 2:
APPROVED 3:
APPROVED 4:
APPROVED 5:
DISAPPROVED 1:
DISAPPROVED 2:
DISAPPROVED 3:
DISAPPROVED 4:
DISAPPROVED 5:
DISAPPROVED 6:
SEE REVERSE 2:
SEE REVERSE 3:
SEE REVERSE 4:
SEE REVERSE 5:
SEE REVERSE 6:
APPROVED 6:
INITIAL 2:
INITIAL 3:
INITIAL 4:
INITIAL 5:
INITIAL 6:
DESCRIPTION OF MATERIAL 1:
DESCRIPTION OF MATERIAL 2:
DESCRIPTION OF MATERIAL 3:
DESCRIPTION OF MATERIAL 4:
DESCRIPTION OF MATERIAL 5:
DESCRIPTION OF MATERIAL 6:
KTR DATE:
INSP DATE:
PM DATE:
COR DATE:
Group3: Choice2
TO COR:
KTR Name:
INSP Name:
PM Name:
COR Name:
To PM:
Back Pg Remarks:
To COR:
SN #:
Previous SN #:
Group2: Choice3