01 Drawings.pdf

PDF 15 MB Posted

Attached to
Z2DA--Renovate Halls, Walls, Ceilings
Solicitation number
36C24624B0005
Issued by

About this file

This document provides details for a federal contract solicitation to renovate halls, walls, and ceilings at the Durham VA Medical Center. Solicitation number 36C24624B0005 seeks proposals for a project with a construction magnitude between $2 million and $5 million that is 100% set aside for a service-disabled veteran owned small business. The North American Industry Classification code for this requirement is 236220, with a size standard of $45 million. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation includes statements of work, specifications, and drawings for reference.

View the file

Other files

File Type Posted
S07 Bid Abstract - 36C24624B0005.pdf PDF
36C24624B0005 0021.docx DOCX document
36C24624B0005 0020.docx DOCX document
36C24624B0005 0019.docx DOCX document
36C24624B0005 0017 04032025.pdf PDF
36C24624B0005 0018.docx DOCX document
36C24624B0005 0016.docx DOCX document
36C24624B0005 0015.docx DOCX document
028333.14 ACM and LP Report.pdf PDF
36C24624B0005 0014.docx DOCX document
36C24624B0005 0013.docx DOCX document
36C24624B0005 0012.docx DOCX document
36C24624B0005 0011.docx DOCX document
36C24624B0005 0010.docx DOCX document
36C24624B0005 0009.docx DOCX document
36C24624B0005 0008.docx DOCX document
36C24624B0005 Amendment 0007 RFI regarding dates.pdf PDF
36C24624B0005 0007.docx DOCX document
RFI 10282024.pdf PDF
36C24624B0005 Amendment 0007 RFI regarding dates.pdf PDF
36C24624B0005 Amendment 0003 RFI regarding taxes (1).pdf PDF
36C24624B0005 0004 Solicitation Amendment Answer Questions.pdf PDF
36C24624B0005 0006.docx DOCX document
36C24624B0005 Solicitation Amendment 9.27.24.pdf PDF
36C24624B0005 0002.docx DOCX document
36C24624B0005_1.docx DOCX document
Project Specs.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA MEDICAL CENTER -

DURHAM CAMPUS LOCATION

BUILDING 1

VA MEDICAL CENTER -

DURHAM CAMPUS LOCATION

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

0 4 8 16

WING MATCH LINE

NORTH

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CG CORNER GUARD

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

ER EPOXY RESIN

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GCT GLAZED CERAMIC TILE

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

LVT LUXURY VINYL TILE

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PV PLASTER VENEER

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

V VINYL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WP WALL PROTECTION

WT WEIGHT

CL

DEMOLITION KEYNOTE

WALL TYPE

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

-1

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT

PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO

PROCEEDING WITH NEW CONSTRUCTION.

3. THE VA WILL DESIGNATE WHAT ITEMS ON THE WALL (HAND SANITIZER DISPENSERS, LITERATURE SLOTS, BULLETIN BOARD DISPLAY CASES, EQUIPMENT, ETC.) IS TO BE STORED BY THE CONTRACTOR AND REINSTALLED

AT THE END OF EACH PHASE. UNMARKED ITEMS ARE TO BE DISPOSED OF.

4. THE VA WILL IDENTIFY WHAT ARTWORK IS TO BE RETAINED AND TURNED OVER TO THE VA. ALL REMAINING

ARTWORK IS TO BE DISPOSED OF. THE VA WILL REINSTALL ARTWORK TURNED OVER.

5. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS INDICATED

OTHERWISE.

6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

7. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION OF THE PROJECT. OPPORTUNITY FOR INSPECTION WAS PROVIDED DURING THE BID PERIOD.

SPACE IS PUBLIC ACCESS.

8. REFER TO THE ELECTRICAL AND MECHANICAL DRAWINGS FOR FURTHER INFORMATION REGARDING REMOVAL

AND RE-INSTALLATION OF ELECTRICAL AND MECHANICAL FIXTURES.

9. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

10. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE

NOT IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER AND COR.

11. REMOVE EXISTING CORNER GUARDS TO ALLOW NEW CORNER GUARDS INSTALLATION. EMPLOY TOOLS WITH

HEPA FILTER WHEN WORKING ON EXISTING CT WALL

DEMOLITION NOTES

GENERAL NOTES

3. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

4. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WORK OF ALL TRADES PRIOR TO STARTING

CONSTRUCTION.

6. THE CONTRACTOR INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR CONSTRUCTING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL

NECESSARY PERMITS.

7. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

8. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: CONTRACTOR TO PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND

CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

9. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING OR FINISHED FACE OF EXISTING WALL SURFACE.

10. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES, PUBLISHED STANDARDS, AND

ACCEPTABLE CONSTRUCTION STANDARDS.

11. ALL CONSTRUCTION WORK SHALL FOLLOW PHASING SCHEDULE ON SHEET A-001 SHEET NOTE "A".

12. NO NEW FIXTURES ADDED TO PROJECT.

13. THERE IS NO GUARANTEE THAT THERE WILL BE SPACE ON SITE OR IN THE HOSPITAL FOR ANY MATERIAL STORAGE. THE CONTRACTOR IS RESPONSIBLE FOR ACCUMULATING MATERIAL AS RECOMMENDED BY THE

MANUFACTURER.

14. AT THE BEGINNING OF EACH PHASE, THE CONTRACTOR WILL REMOVE ALL SIGNAGE, EXCLUDING EMERGENCY EGRESS SIGNAGE, UNO. SIGNAGE SHALL BE TURNED OVER TO THE VA. CONTRACTOR WILL INSTALL TEMPORARY PRINTED SIGNAGE THAT CONTAINS THE SAME INFORMATION AS THE REMOVED SIGNS. THE VA

WILL EITHER RETURN THE SIGNAGE OR PROVIDE NEW SIGNAGE FOR CONTRACTOR INSTALL.

15. THE VA WILL DESIGNATE WHAT ITEMS ON THE WALL (HAND SANITIZER DISPENSERS, LITERATURE SLOTS, BULLETIN BOARD, DISPLAY CASES, EQUIPMENT, ETC.) IS TO BE STORED BY THE CONTRACTOR AND REINSTALLED AT THE END OF EACH PHASE. ITEMS SHOULD BE STORED IN A MANOR TO NOT CAUSE DAMAGE.

UNMARKED ITEMS NEED TO BE CONFIRMED BY THE VA TO SEE IF THEY CAN BE DISPOSED.

16. THE VA WILL IDENTIFY WHAT ARTWORK IS TO BE RETAINED AND STORED BY VA INTERIORS. ALL REMAINING

ARTWORK IS TO BE DISPOSED OF. THE VA WILL REINSTALL ARTWORK TURNED OVER.

17. WHEN REPAIRING WALLS OR CEILINGS, MATCH EXISTING CONDITION THAT EXISTS THROUGHOUT THAT AREA, UNO.

18. PROVIDE TRANSITION STRIPS TO MATCH EXISTING BETWEEN VARIED TYPES OF FLOORS AT TRANSITIONS AT

DOORS. COORDINATE SCHEDULE FOR ACCESSING THESE DOORS FOR EACH PHASE WITH VA COR.

19. THE VA RESERVES THE RIGHT TO ADJUST THE PHASING LIMITS AND WORK HOURS AS NECESSARY FOR THE

BENEFIT OF THE OPERATION OF THE HOSPITAL.

20. ALTHOUGH EGRESS IN THE CONSTRUCTION PHASES IS RESTRICTED DURING CONSTRUCTION HOURS, EMERGENCY EGRESS IN CORRIDORS MUST BE MAINTAINED WHEN POSSIBLE. WHEN EMERGENCY EGRESS CANNOT BE PROVIDED, THE CONTRACTOR SHALL DEVELOP AN INTERIM LIFE SAFETY PLAN, WITH ALL APPLICABLE TEMPORARY SIGNAGE, TO BE APPROVED BY THE VA SAFETY DEPARTMENT, SIGNAGE BY

CONTRACTOR.

21. AT THE END OF EACH WORK PERIOD, THE CONTRACTOR SHALL RETURN THE WORK AREA BACK TO THE VA

FOR FULL USE. SEE SHEET A-001 SHEET NOTE A FOR CONSTRUCTION HOURS.

22. DRILLING INTO EXISTING LEAD CONTAINING YELLOW GLAZED TILE: ACTIVITIES WILL BE PERFORMED IN ICRA APPLICABLE PLASTIC TENT/ ENCLOSURE USING AN IMPACT DRILL WITH INTEGRAL HEPA FILTERED VACUUM.

23. WITH ANY DRYWALL OF SKIM COATING, SANDING, PERFORM WITH ELECTRIC SANDING MACHINE WITH A BUILT-

IN HEPA FILTER VACUUM.

24. ALL NEW FLOORING TO BE EXTENDED TO THE UNDERSIDE OF EXISTING DOOR UNLESS CONDITION VARIES.

25. ALL WALL MOUNTED ITEMS SHALL BE REMOVED. ITEMS TO BE KEPT WILL BE REMOVED AND STORED BY THE CONTRACTOR AND KEPT IN A MANNER NOT TO CAUSE DAMAGE. ITEMS TO BE KEPT WILL BE IDENTIFIED BY VA

STAFF. CONTRACTOR TO DISPOSE OF ITEMS NOT TO BE KEPT.

26. EXISTING SPRINKLER HEADS SHALL BE COVERED WITH FILTER MATERIAL PRIOR TO STARTING CONSTRUCTION WORK EACH DAY IN EACH PHASE. REMOVE COVER AT THE END OF CONSTRUCTION EACH DAY IN EACH PHASE.

27. CONTRACTOR SHALL EXAMINE WALL RECEIVING NEW PAINT, IF HOLES, CRACKS OR DAMAGED WALL SURFACE

ARE FOUND, REPAIR, PATCH, CLEAN AND PAINT.

28. IF NEWLY EXPOSED WALL IS FOUND TO BE DAMAGED WITH HOLES, CRACKS AND/OR WATER DAMAGE, DRYWALL IS TO BE REPLACED.

29. PROVISION FOR FACILITY FIRE WATCH SEE FIRE PROTECTION SHEET FX-001.

1. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT

THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

2. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ARCHITECT AND/OR ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

Engineers Architects

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/2

/2

:3

:3

A

M

G-001

COVER SHEET

1 1KC AC, DGC

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

RENOVATE GROUND FLOOR BUILDING 1

HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

VA PROJECT #: 558-18-260

DRAWING LIST

NO. SHEET NAME DWG OF DWG

GENERAL

G-001 COVER SHEET 1 1

HAZARDOUS

HA-01 HAZARDOUS ABATEMENT 1 1

ARCHITECTURAL

A-001 GROUND FLOOR COMPOSITE PHASING AND ICRA PLANS, FINISH SCHEDULE 1 13

A-002 INFECTION CONTROL RISK ASSESSMENT (ICRA) 2 13

A-003 ARCHITECTURAL SITE PLAN 3 13

A-101 GROUND FLOOR PLAN - C AND D WING CORRIDORS 4 13

A-102 GROUND FLOOR PLAN - A, B, AND E WING CORRIDORS 5 13

A-103 GROUND FLOOR PLAN - F WING CORRIDORS 6 13

A-111 GROUND FLOOR RELFECTED CEILING PLAN - C AND D WING CORRIDORS 7 13

A-112 GROUND FLOOR REFLECTED CEILING PLAN - A, B, AND E WING CORRIDORS 8 13

A-113 GROUND FLOOR REFLECTED CEILING PLAN - F WING CORRIDORS 9 13

A-201 INTERIOR ELEVATIONS 10 13

A-202 INTERIOR ELEVATIONS 11 13

A-203 INTERIOR ELEVATIONS 12 13

A-501 DETAILS 13 13

FIRE PROTECTION

FX001 FIRE PROTECTION GENERAL INFORMATION 1 1

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 1

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 2

E-501 ELECTRICAL DETAILS 2 2

TECHNOLOGY

LV001 LOW VOLTAGE GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 1

GENERAL SYMBOL LEGEND

ABBREVIATIONS

ARCHITECTURAL SYMBOL LEGEND

E

B

DocuSign Envelope ID: 6F1AD2EF-A1FB-43C0-A0A9-6CF6A0CB313F

1/27/2021

F

TO CRAWL

SPACE

UPDN

UP

DN

UP

TO CRAWL

SPACE

TO CRAWL SPACE

RAMP

RAMP

F

F

S SS

S

SS

A-102

D WING CORRIDORS

PHASE 1 (A & B)

C WING CORRIDORS

PHASE 2 (A, B, C, D, E, F, & G)B WING CORRIDORS

PHASE 3

A WING CORRIDORS

PHASE 4 (A & B)

E WING

CORRIDORS

PHASE 5

F WING CORRIDORS

(EAST SIDE)

PHASE 6

PREP

AREA

DG017

COOLER

DG021

FREEZER

DG015

STAIR-4

DG018

ELECTRICA

L CLOSET

DG016

FIRE

PROTECTION

FREEZER

DG014

COOK-CHILL UNITS

DG013

STORAGE

DG008

STORAGE

DG001

CORRIDOR D

STAIR - 5

WOMENS

DG002

MENS SHOWER

DG004

STORAGE

DG006

MECH

CG015

AIR HANDLING UNIT - 6

KITCHEN

CG020

COOLER

CG018

COOLER

CG016

OFFICE

CG014

OFFICE

CG014

C O

R R

ID

O

R C

G

OFFICE

CG010

STORAGE KITCHEN

CG013

F.H.C.

CG009F OFFICE

CG009B

NUTRITION

FOOD

CG009A OFFICE

CG009C

D

CG009B

OFFICE

CG009

OFFICE

CG009

MENS TOILET

CG007

GREEN

ELEVATOR

P5

GREEN

ELEVATOR

P6

GREEN

ELEVATOR

P7

LINEN

CHUTE

TRASH RM

CG003

FEMALE

TOILET

AG001P3

P2

P1

S4

S5

DUMB WAITER

CPR EQUIP

CG008

DUMB WAITER

DUMB WAITER

HOUSE

KEEPING

BG003

STAIR 1

MORGUE

ELEVATOR

CORRIDOR

BG001

SHAFT

MECH RM

BG001A

HOUSE

KEEPING

EG001

VENDING RM

BG000

CANTEEN

STORAGE

BG002

CORRIDORCORRIDOR

ELECTRONIC

SHOP

BG004

STORAGE

BIO-MED

BG005BIO-MED

ADMIN OFFICE

BG007

GAS

GAS

STORAGE

BIO-MED CLINICAL EQUIP UNIT

BG009

CORRIDORSTORAGE

BG009A

OFFICE

BG015

STORAGE

BG010

BG012

WAREHOUSE

BG013

STORAGE

BG017

STAIR 3

FREEZER

BG016

STORAGE

BG014

STORAGE

OFFICE

BG006

MAIL PROCESSING AREA

BG008

CONFERENCE

RM

BG008A

REPRODUCTION

AREA

BG008B

CORRIDOR

CAFETERIA

AG002A

CAFETERIA

AG002

CORRIDOR

CORRIDOR

CANTEEN STORAGE

AG005

FREEZER

FREEZERCANTEEN

STORAGE

AG009

OFFICE

AG008

CANTEEN

OFFICE

AG011

CANTEEN

OFFICE

AG012

MECH

AG012

AG009A

RETAIL STORE

AG015

CANTEEN STORAGE

AG007

STORAGE

AG005A

RETAIL STORE

AG015A

TELEPHONE

AG017

ISO OFFICE

FG154

IRM OFFICE

FG155

IRM OFFICE

FG156A

FG156

ELECTRICAL

CLOSET

FG157

TOILET

FG160A

FG159

RECORDS RM

FG160

WORK RM IRM

FG163

COMP AND PEN

FG163A

KITCHEN

AG010

STORAGE

CANTEEN

FG151

OFFICE

FG149

CANTEEN DINING

AG000A

ISO OFFICE

FG148

OFFICE

FG147A

DECEDENT

AFFAIRS

FG147

AFGE

FG146

AFGE

FG146A

OFFICE,

PRIVACY

FG145

CANTEEN DINING

CANTEEN DINING

CANTEEN DINING

OFFICE

EG002

EG003A EG003B

OFFICE

EG003

OFFICE

EG005A

OFFICE

EG005

ELECTRICAL

CLOSET

EG007A

OFFICE

EG004

OFFICE

EG006 CORRIDOR OFFICE

EG007

OFFICE

EG009

OFFICE

EG008

ELECTRICAL

CLOSET

EG010

OFFICE

EG011

STORAGE

EG013

LAB

EG012

EG012A

ELEVATOR

EG015

STORAGE

EG018A

STORAGE

EG018

LAB

EGO17A

RESEARCH

EG017

CORRIDOR

EG014

ELECTRICAL RM

FG1000

WAITING

FG234

FG1001

STAIR - 12

NEW EXIT

PASSAGEWAY

FG400B

BIO-MED

FG137

STAIR-10

CORRIDOR

GENERAL

STORAGE

FG144A

OFFICE,

NURSING UNION

FG143

ISO OFFICE

FG142

OFFICE

FG137A

CORRIDOR

TELECOM

FG158

SERVER RM

FG104

STORAGE

FG141

TELECOM

FG104A

PC LAB

FG140

COMPUTER RM

FG106

OFFICE

FG139 OFFICE

FG108

STORAGE

FG138

HOUSE

KEEPING

FG15

ELEVATOR

LOBBY

FG12

BROWN

ELEVATOR

P10

BROWN

ELEVATOR

P11

MENS

LOCKER

FG14

MENS

TOILET

FG14A

CORRIDOR

OFFICE

IRMS

FG15A

FG16A

WOMENS

TOILET

FG16

OFFICE

FG103

OFFICE

FG105

IRM OFFICE

FG105D

IRM OFFICE

FG105C

IRM

OFFICE

FG105BIRM OFFICE

FG105A

MENTAL

HEALTH

OFFICE

FG122

OFFICE

FG123

GROUP MEETING

FG124

RELEASE OF INFO

FG107C

COPY RM

FG107B

RELEASE OF

INFO

FG107A

OFFICE OF

RELEASE OF INFO

FG107

HOUSE

KEEPING

FG109

COPY

RM

FG111

OFFICE

FG113

OFFICE

FG114

UTILITY

RM

FG116

TOILET

GF119

TOILET

FG118

CORRIDOR

FG133B

OFFICE

FG125

OFFICE

FG125B

OFFICE

FG125C

FIRE PROTECTION

CONFERENCE RM

FG126

OFFICE

DIRECTOR

MHC

FG130

OFFICE

FG130

OFFICE

FG132

OFFICE

FG134

OFFICE

SOCIAL

WORKER

FG135

OFFICE

FG136

WAITING RM

FG133B

RECEPTION

FG133A

OFFICE

FG112

OFFICE

FG115

OFFICE

FG117

RESIDENT

PSYCH.

OFFICE

FG120

WOMENS

HEALTH

CLINIC

FG121

RECEPTION

FG133

OFFICE

FG131

EXAM RM-2

FG129

EXAM RM-1

FG127

CONFERENCE

RM

FG235

OFFICE

FG236

OFFICE

FG239

OFFICE

FG241

OFFICE

FG243

OFFICE

FG245

CIRC.

FG500C

STORAGE

FG236

GROUP

THERAPY

FG237

OFFICE

FG240

OFFICE

FG242

OFFICE

FG236

CORRIDOR

FG400D

WAITING

FG344

RECEPTION

FG343

LOCKER ROOM

FG343A

EXAMS

FG342

PROCEDURE 7

FG302PROCEDURE 6

FG304

PROCEDURE 5

FG306

PROCEDURE 4

FG308

SUPPLIES

FG310

NOURISH

FG331

PROCEDURE 3

FG313

PROCEDURE 2

FG315

PROCEDURE 1

FG320

SCOPES SOIL

FG319

SCOPES CLEAN

FG318

SOIL

FG317

CLEAN

FG316 TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERICAL

FG309

CHIEF

FG307

PHYSICIAN

FG305

CIRC

FG300B

ELEC CLOSET

FG300CL

PHYSICIAN

FG303

P.A.

FG301

CIRC.

FG300A

NEW EXIT PASSAGEWAY

FG400C

GAS

FG189

OFFICE

FG172

STAFF

LOCKERS

FG403

HSK

FG219

EXAM

FG217

WAITING

FG164

RECEPTION

FG171

DRSG RM

FG174

DRSG RM

FG173

CORRIDOR

FG175

TOILET

FG169

TOILET

FG167

SEDATION

FG168

STORAGE

FG170

CONTROL

FG184

MRI EXAM

FG184A

MRI EXAM

FG184B

EQUIP

FG184C

HOUSE

KEEPING

FG178

WORK

RM

FG179

SOILED

UTL

FG180

STORAGE

FG181

DRSG

FG182C DRSG

FG182D

CORRIDOR

FG184

STORAGE

FG182

ELEC.

CLOSET

FG183

BREAK

FG182A

STORAGE

FG182B

CORRIDOR

FG176

TELECOM

FG187

WAITING

FG185

TOILET

FG185A

EQUIP

G185C

CONTROL

RM

G185B

DRSG RM

G186A

DRSG

RM

FG186

EXAM RM

G185A ELEC. RM

FG405

DATA RM

FG404

OFFICE

FG212

CONFERENCE

FG211

WAITING

FG166

PRESCREEN

FG165

OFFICE

FG210

EXAM

FG209

EXAM

FG207

EXAM

FG205

EXAM

FG203

PHOTO

FG202

RECEPTION

FG201

CIRCULATION

FG200A

PROCEDURES

FG214

WAITING

FG216

C

IR

C U

L A

T

IO

N F G

B

LASER

FG213

LASER

FG215

CLEAN

UTL

FG21B

SOILED

UTL

FG218A

STAFF

TOILET

FG220

CLEAN

SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

CIRCULATION

FG200C

EXAM

FG224

EXAM

FG226

EXAM

FG228

C

IR

C U

L A

T

IO

N F G

D

EXAM

FG208

EXAM

FG206

EXAM

FG204

EXAM

FG230

EXAM

FG223

EXAM

FG225

EXAM

FG227

EXAM

FG229

OFFICE

FG231

FIELD

FG232

PRETEST/FIT

FG233

PUBLIC TOILETS (W)

FG401

PUBLIC TOILETS (M)

FG402

EXPANSION JOINT

COVER PLATE

EJ COVER

EXPANSION JOINT

COVER PLATE

STORAGE

DG011

HEM/ONC

DG009

OFFICE

DG007 DG005B

OFFICE

ESCORT

DG005

OFFICE

ESCORT

DG005A

EXPANSION JOINT

COVER PLATE

EXPANSION JOINT

COVER PLATE

MECHANICAL

FG345

HSK

FG321

EQUIP

FG322

TOILET

FG323

RECOVERY

FG324

RECOVERY

FG325

RECOVERY

FG326

RECOVERY

FG327

RECOVERY

FG328

RECOVERY

FG329

RECOVERY

FG330

NURSE STATION

FG332

TOILET

FG333

HOLDING

FG334

HOLDING

FG335

HOLDING

FG336

HOLDING

FG337

HOLDING

FG338

TOILET

FG339

RESIDENTS

FG340

EXAMS

FG341

OFFICE

FG246

OFFICE

FG248

OFFICE

FG250

OFFICE

FG247

OFFICE

FG249

A-102

A-101

A-101

A-102

A-103

A-111

A-111

A-112

A-113

A-112

A-112

ADD HANDRAIL

AND BUMPER TO

MATCH EXISTING

PHASE 1A

PHASE 1B

PHASE 2A

PHASE 2B

A-102

1 2 3

2B

2A

1 2

2 1

11 32

PHASE 6

PHASE 6

PHASE 6

PHASE 2C

PHASE 2F

PHASE 2G

PHASE 2E

2 1

3 1

PHASE 5

PHASE 3 1 2 3

PHASE 4B

2 PHASE 4A1 2 3

PHASE 4A

2B

PHASE 2D

S

S

S

S

S S

S

S S

S

S

S S S

S

S

S S

S

S S

S S

S

S S

S SS

S

S S S S

S S

S S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S S

S S

S

S

S

SS

S

S S

S

S S

S

S

SS

S

S

S

S

S

SSS

SS

S

S

S S

S

S

S S S

S

S SS

S

S S S S

S

S S

S S

S

S

S S S

SS S

S

S S S S S S S

S

S

S

S

S

S S

S

S S

S

S S

S S

S S S S

S S

S

S

S

A WING CORRIDORS

B WING CORRIDORS

C WING CORRIDORS

D WING CORRIDORS

E WING CORRIDORS

F WING CORRIDORS

Engineers Architects

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1 /2

:4

:2

P M

HA-01

GROUND FLOOR COMPOSITE PHASING

AND ICRA PLANS

RH AS 1 1

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

AREA HATCH LEGEND

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B C D E F

0 4 8 16

NORTH

Note: The following items are lead-containing com-ponents: Yellow glazed block walls (located throughout hallways) and white plaster walls (Wings A and B).

ASBESTOS ABATEMENT NOTES

1. ASBESTOS-CONTAINING MATERIALS

(ACMS) SHALL BE REMOVED AND

DISPOSED OF PROPERLY BY AN

ASBESTOS ABATEMENT CONTRACTOR

UTILIZING SUPERVISORS AND

WORKERS ACCREDITED BY THE

HEALTH HAZARDS CONTROL UNIT OF

THE NORTH CAROLINA DEPARTMENT

OF HEALTH AND HUMAN SERVICES.

THESE DRAWINGS ARE ACCOMPANIED

BY TECHNICAL SPECIFICATIONS FOR

THE REMOVAL AND DISPOSAL OF

ACMS. REFER TO SPECIFICATION

SECTION 028211 FOR ASBESTOS

ABATEMENT SCOPE OF WORK.

2. FLOOR PLANS ARE NOT TO SCALE.

3. FOR APPROXIMATE QUANTITIES OF

ACMS, PLEASE REFER TO

SPECIFICATION SECTION 028211.

4. ABATEMENT CONTRACTOR SHALL

VERIFY QUANTITIES AND LOCATIONS

OF ACM PRIOR TO START OF

ABATEMENT.

LEGEND

Asbestos-containing floor tile and/or mastic

Russell Harrings, CIH Certificate No. 11853 CP Signed 1-27-2021

JSherwood Stamp

F

TO CRAWL

SPACE

UPDN

UP

DN

UP

TO CRAWL

SPACE

TO CRAWL SPACE

RAMP

RAMP

F

F

S SS

S

SS

A-102

D WING CORRIDORS

PHASE 1 (A & B)

C WING CORRIDORS

PHASE 2 (A, B, C, D, E, F, & G)B WING CORRIDORS

PHASE 3

A WING CORRIDORS

PHASE 4 (A & B)

E WING

CORRIDORS

PHASE 5

F WING CORRIDORS

(EAST SIDE)

PHASE 6

PREP

AREA

DG017

COOLER

DG021

FREEZER

DG015

STAIR-4

DG018

ELECTRICA

L CLOSET

DG016

FIRE

PROTECTION

FREEZER

DG014

COOK-CHILL UNITS

DG013

STORAGE

DG008

STORAGE

DG001

CORRIDOR D

STAIR - 5

WOMENS

DG002

MENS SHOWER

DG004

STORAGE

DG006

MECH

CG015

AIR HANDLING UNIT - 6

KITCHEN

CG020

COOLER

CG018

COOLER

CG016

OFFICE

CG014

OFFICE

CG014

C O

R R

ID

O

R C

G

OFFICE

CG010

STORAGE KITCHEN

CG013

F.H.C.

CG009F OFFICE

CG009B

NUTRITION

FOOD

CG009A OFFICE

CG009C

D

CG009B

OFFICE

CG009

OFFICE

CG009

MENS TOILET

CG007

GREEN

ELEVATOR

P5

GREEN

ELEVATOR

P6

GREEN

ELEVATOR

P7

LINEN

CHUTE

TRASH RM

CG003

FEMALE

TOILET

AG001P3

P2

P1

S4

S5

DUMB WAITER

CPR EQUIP

CG008

DUMB

WAITER

DUMB

WAITER

HOUSE

KEEPING

BG003 STAIR 1

MORGUE

ELEVATOR

CORRIDOR

BG001

SHAFT

MECH RM

BG001A

HOUSE

KEEPING

EG001

VENDING RM

BG000

CANTEEN

STORAGE

BG002

CORRIDORCORRIDOR

ELECTRONIC

SHOP

BG004

STORAGE

BIO-MED

BG005BIO-MED

ADMIN OFFICE

BG007

GAS

GAS

STORAGE

BIO-MED CLINICAL EQUIP UNIT

BG009

CORRIDORSTORAGE

BG009A

OFFICE

BG015

STORAGE

BG010

BG012

WAREHOUSE

BG013

STORAGE

BG017

STAIR 3

FREEZER

BG016

STORAGE

BG014

STORAGE

OFFICE

BG006

MAIL PROCESSING AREA

BG008

CONFERENCE

RM

BG008A

REPRODUCTION

AREA

BG008B

CORRIDOR

CAFETERIA

AG002A

CAFETERIA

AG002

CORRIDOR

CORRIDOR

CANTEEN STORAGE

AG005

FREEZER

FREEZERCANTEEN

STORAGE

AG009

OFFICE

AG008

CANTEEN

OFFICE

AG011

CANTEEN

OFFICE

AG012

MECH

AG012

AG009A

RETAIL STORE

AG015

CANTEEN STORAGE

AG007

STORAGE

AG005A

RETAIL STORE

AG015A

TELEPHONE

AG017

ISO OFFICE

FG154

IRM OFFICE

FG155

IRM OFFICE

FG156A

FG156

ELECTRICAL

CLOSET

FG157

TOILET

FG160A

FG159

RECORDS RM

FG160

WORK RM IRM

FG163

COMP AND PEN

FG163A

KITCHEN

AG010

STORAGE

CANTEEN

FG151

OFFICE

FG149

CANTEEN DINING

AG000A

ISO OFFICE

FG148

OFFICE

FG147A

DECEDENT

AFFAIRS

FG147

AFGE

FG146

AFGE

FG146A

OFFICE,

PRIVACY

FG145

CANTEEN DINING

CANTEEN DINING

CANTEEN DINING

OFFICE

EG002

EG003A EG003B

OFFICE

EG003

OFFICE

EG005A

OFFICE

EG005

ELECTRICAL

CLOSET

EG007A

OFFICE

EG004

OFFICE

EG006 CORRIDOR OFFICE

EG007

OFFICE

EG009

OFFICE

EG008

ELECTRICAL

CLOSET

EG010

OFFICE

EG011

STORAGE

EG013

LAB

EG012

EG012A

ELEVATOR

EG015

STORAGE

EG018A

STORAGE

EG018

LAB

EGO17A

RESEARCH

EG017

CORRIDOR

EG014

ELECTRICAL RM

FG1000

WAITING

FG234

FG1001

STAIR - 12

NEW EXIT

PASSAGEWAY

FG400B

BIO-MED

FG137

STAIR-10

CORRIDOR

GENERAL

STORAGE

FG144A

OFFICE,

NURSING UNION

FG143

ISO OFFICE

FG142

OFFICE

FG137A

CORRIDOR

TELECOM

FG158

SERVER RM

FG104

STORAGE

FG141

TELECOM

FG104A

PC LAB

FG140

COMPUTER RM

FG106

OFFICE

FG139 OFFICE

FG108

STORAGE

FG138

HOUSE

KEEPING

FG15

ELEVATOR

LOBBY

FG12

BROWN

ELEVATOR

P10

BROWN

ELEVATOR

P11

MENS

LOCKER

FG14

MENS

TOILET

FG14A

CORRIDOR

OFFICE

IRMS

FG15A

FG16A

WOMENS

TOILET

FG16

OFFICE

FG103

OFFICE

FG105

IRM OFFICE

FG105D

IRM OFFICE

FG105C

IRM

OFFICE

FG105BIRM OFFICE

FG105A

MENTAL

HEALTH

OFFICE

FG122

OFFICE

FG123

GROUP MEETING

FG124

RELEASE OF INFO

FG107C

COPY RM

FG107B

RELEASE OF

INFO

FG107A

OFFICE OF

RELEASE OF INFO

FG107

HOUSE

KEEPING

FG109

COPY

RM

FG111

OFFICE

FG113

OFFICE

FG114

UTILITY

RM

FG116

TOILET

GF119

TOILET

FG118

CORRIDOR

FG133B

OFFICE

FG125

OFFICE

FG125B

OFFICE

FG125C

FIRE PROTECTION

CONFERENCE RM

FG126

OFFICE

DIRECTOR

MHC

FG130

OFFICE

FG130

OFFICE

FG132

OFFICE

FG134

OFFICE

SOCIAL

WORKER

FG135

OFFICE

FG136

WAITING RM

FG133B

RECEPTION

FG133A

OFFICE

FG112

OFFICE

FG115

OFFICE

FG117

RESIDENT

PSYCH.

OFFICE

FG120

WOMENS

HEALTH

CLINIC

FG121

RECEPTION

FG133

OFFICE

FG131

EXAM RM-2

FG129

EXAM RM-1

FG127

CONFERENCE

RM

FG235

OFFICE

FG236

OFFICE

FG239

OFFICE

FG241

OFFICE

FG243

OFFICE

FG245

CIRC.

FG500C

STORAGE

FG236

GROUP

THERAPY

FG237

OFFICE

FG240

OFFICE

FG242

OFFICE

FG236

CORRIDOR

FG400D

WAITING

FG344

RECEPTION

FG343

LOCKER ROOM

FG343A

EXAMS

FG342

PROCEDURE 7

FG302PROCEDURE 6

FG304

PROCEDURE 5

FG306

PROCEDURE 4

FG308

SUPPLIES

FG310

NOURISH

FG331

PROCEDURE 3

FG313

PROCEDURE 2

FG315

PROCEDURE 1

FG320

SCOPES SOIL

FG319

SCOPES CLEAN

FG318

SOIL

FG317

CLEAN

FG316 TOILET

FG314

STORAGE

FG312

ASSIST

FG311

CLERICAL

FG309

CHIEF

FG307

PHYSICIAN

FG305

CIRC

FG300B

ELEC CLOSET

FG300CL

PHYSICIAN

FG303

P.A.

FG301

CIRC.

FG300A

NEW EXIT PASSAGEWAY

FG400C

GAS

FG189

OFFICE

FG172

STAFF

LOCKERS

FG403

HSK

FG219

EXAM

FG217

WAITING

FG164

RECEPTION

FG171

DRSG RM

FG174

DRSG RM

FG173

CORRIDOR

FG175

TOILET

FG169

TOILET

FG167

SEDATION

FG168

STORAGE

FG170

CONTROL

FG184

MRI EXAM

FG184A

MRI EXAM

FG184B

EQUIP

FG184C

HOUSE

KEEPING

FG178

WORK

RM

FG179

SOILED

UTL

FG180

STORAGE

FG181

DRSG

FG182C DRSG

FG182D

CORRIDOR

FG184

STORAGE

FG182

ELEC.

CLOSET

FG183

BREAK

FG182A

STORAGE

FG182B

CORRIDOR

FG176

TELECOM

FG187

WAITING

FG185

TOILET

FG185A

EQUIP

G185C

CONTROL

RM

G185B

DRSG RM

G186A

DRSG

RM

FG186

EXAM RM

G185A ELEC. RM

FG405

DATA RM

FG404

OFFICE

FG212

CONFERENCE

FG211

WAITING

FG166

PRESCREEN

FG165

OFFICE

FG210

EXAM

FG209

EXAM

FG207

EXAM

FG205

EXAM

FG203

PHOTO

FG202

RECEPTION

FG201

CIRCULATION

FG200A

PROCEDURES

FG214

WAITING

FG216

C

IR

C U

L A

T

IO

N F

G B

LASER

FG213

LASER

FG215

CLEAN

UTL

FG21B

SOILED

UTL

FG218A

STAFF

TOILET

FG220

CLEAN

SUPPLIES

FG221

WAITING

FG222A

WAITING

FG222B

CIRCULATION

FG200C

EXAM

FG224

EXAM

FG226

EXAM

FG228

C

IR

C U

L A

T

IO

N F

G D

EXAM

FG208

EXAM

FG206

EXAM

FG204

EXAM

FG230

EXAM

FG223

EXAM

FG225

EXAM

FG227

EXAM

FG229

OFFICE

FG231

FIELD

FG232

PRETEST/FIT

FG233

PUBLIC TOILETS (W)

FG401

PUBLIC TOILETS (M)

FG402

EXPANSION JOINT

COVER PLATE

EJ COVER

EXPANSION JOINT

COVER PLATE

STORAGE

DG011

HEM/ONC

DG009

OFFICE

DG007 DG005B

OFFICE

ESCORT

DG005

OFFICE

ESCORT

DG005A

EXPANSION JOINT

COVER PLATE

EXPANSION JOINT

COVER PLATE

MECHANICAL

FG345

HSK

FG321

EQUIP

FG322

TOILET

FG323

RECOVERY

FG324

RECOVERY

FG325

RECOVERY

FG326

RECOVERY

FG327

RECOVERY

FG328

RECOVERY

FG329

RECOVERY

FG330

NURSE STATION

FG332

TOILET

FG333

HOLDING

FG334

HOLDING

FG335

HOLDING

FG336

HOLDING

FG337

HOLDING

FG338

TOILET

FG339

RESIDENTS

FG340

EXAMS

FG341

OFFICE

FG246

OFFICE

FG248

OFFICE

FG250

OFFICE

FG247

OFFICE

FG249

A-102

A-101

A-101

A-102

A-103

A-111

A-111

A-112

A-113

A-112

A-112

ADD HANDRAIL

AND BUMPER TO

MATCH EXISTING

PHASE 1A

PHASE 1B

PHASE 2A

PHASE 2B

A-102

1 2 3

2B

2A

2 1

11 32

PHASE 6

PHASE 6

PHASE 6

PHASE 2C

PHASE 2F

PHASE 2G

PHASE 2E

2 1

PHASE 5

PHASE 3 1 2 3

PHASE 4B

2 PHASE 4A1 2 3

PHASE 4A

2 1

2B

PHASE 2D

S

S

S

S

S S

S

S S

S

S

S S S

S

S

S S

S

S S

S S

S

S S

S SS

S

S S S S

S S

S S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S S

S S

S

S

S

SS

S

S S

S

S S

S

S

SS

S

S

S

S

S

SSS

SS

S

S

S S

S

S

S S S

S

S SS

S

S S S S

S

S S

S S

S

S

S S S

SS S

S

S S S S S S S

S

S

S

S

S

S S

S

S S

S

S S

S S

S S S S

S S

S

S

S

FOR ABATEMENT IN STAIR-5 CORRIDOR

SEE KEYNOTE 5

F O

R A

B A

T E

M E

N T

I N

A W

IN

G

S E

E K

E Y

N O

T E

FOR ABATEMENT IN B WING

SEE KEYNOTE 5

A WING CORRIDORS

B WING CORRIDORS

C WING CORRIDORS

D WING CORRIDORS

E WING CORRIDORS

F WING CORRIDORS

FINISH SCHEDULE

FINISH TYPE: MANUFACTURER: DESCRIPTION: REMARKS:

PAINT: SHERWIN WILLIAMS MEDICAL IVORY # SW 7558

TRIM PAINT: ROPPE FAWN #140 BASECOLOR MATCH SEMIGLOSS FINISH

ACCENT PAINT: PPG PONYTAIL PPG1086-4

ACCENT PAINT: PPG

ACCENT PAINT: PPG

ACCENT BLUE WALL

ACCENT GREEN WALL

RB1: ROPPE #140 FAWN - 6" RUBBER COVE BASE 6" RUBBER BASE

LVT-1:

LVT-2:

LVT-3:

LVT-4:

LVT-5:

LVT-6:

UPO QUARTZ TILE

UPO QUARTZ TILE

UPO QUARTZ TILE

UPO QUARTZ TILE

UPO QUARTZ TILE

UPO QUARTZ TILE

BEIGE MOSAIC #8323

DARK GREY MOSAIC #8319

BEIGE #8223 (LINEAR PATTERN)

ACCENT TILE - BLUE #8355

ACCENT TILE - GREEN #8366

ACCENT TILE - BROWN #8324

CEILING: ARMSTRONG ULTIMA, SQUARE LAY-IN TILES: WHITE GRID: PURE WHITE

QT1: QUARRY TILE DAL TILE GRAY FLASHED - 0Q48 ARID FLASH SQUARE 6"X6"

QT2: BASE QUARRY TILE DAL TILE GRAY FLASHED - 0Q48 ARID FLASH INTEGRAL COVE BASE TILE

GROUT: LATICRETE

WP1: INPRO CORPORATION OATMEAL WALL PROTECTION - WISP #5E012 .060" THICK

WP2: INPRO CORPORATION BEECHNUT WALL PROTECTION - BEECHNUT #0539 .060" THICK, HANDRAILS TO BE BEECHNUT AS WELL

WP TRIM 1:

WP CG 1: STAINLESS STEEL CORNER GUARD 4" WINGS

WP WG 1: INPRO CORPORATION 700 SERIES WALL GUARD - OATMEAL #0239 ALL TO HAVE CONTINUOUS ALUMINUM RETAINER

WP WG 2: INPRO CORPORATION NU TREE WALL GUARD - WEATHERED WOOD #05 1" X 5.5", (2) UPPER AND LOWER

WP HR 1: INPRO CORPORATION 800 SERIES HANDRAIL - OATMEAL #0239

LOCATION TO BE DECIDED BY VA INTERIORS

LOCATION TO BE DECIDED BY VA INTERIORS

INPRO CORPORATION SILVER SLIM STYLE TOP CAP FOR ALL WP

ACCENT PAINT: PPG DRY FOG #3142 HEAVY CREAM E-WING, SEE 3/A-112

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:2

:5

A

M

A-001

GROUND FLOOR COMPOSITE PHASING

AND ICRA PLANS, FINISH SCHEDULE

1 13KC NPM, DGC

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

SCALE: 1" = 20'-0"

GROUND FLOOR COMPOSITE PHASING AND ICRA PLANS

AREA HATCH LEGEND

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B C D E F

A. CONSTRUCTION HOURS AS THE FOLLOWING:

PHASE 1A (DIETARY DEPT.)

7:00 PM TO 5:00 AM MON - SUN

PHASE 1B (EMS HOUSEKEEPING)

7:00 PM TO 5:00 AM MON - SUN

PHASE 2 A - G (DIETARY DEPT.)

7:00 PM TO 5:00 AM MON - SUN

PHASE 3 (WAREHOUSE DEPT.)

6:00 PM TO 5:00 AM MON - FRI

6:00 PM (FRI) TO 5:00 AM (MON) WEEKEND

PHASE 4 (CANTEEN DEPT.)

6:00 PM TO 5:00 AM MON - FRI

6:00 PM (FRI) TO 9:00 AM (SAT) WEEKEND

1:30 PM (SAT) TO 9:00 AM (SUN)WEEKEND

1:30 PM (SUN) TO 5:00 AM (MON) WEEKEND

PHASE 5 (ADMINISTRATIVE)

6:00 PM TO 5:00 AM MON - FRI

6:00 PM (FRI) TO 5:00 AM (MON) WEEKEND

PHASE 6 (ADMINISTRATIVE)

6:00 PM TO 5:00 AM MON - FRI

6:00 PM (FRI) TO 5:00 AM (MON) WEEKEND

B. COMPLY WITH ICRA LEVEL CLASS III REQUIREMENT.

PROVIDE TEMPORARY PROTECTIVE PLASTIC

BARRIER W/ ZIPPER ENTRY TO THE UNDERSIDE OF

CEILING. WHEN ABOVE THE CEILING, THE PLASTIC

BARRIER SHALL BE INSTALL FROM TOP OF CEILING

TO UNDERSIDE OF FLOOR SLAB ABOVE AND LEAVE

ON AT ALL TIMES. SEE KEY NOTES FOR DIFFERENT

PHASES.

C. PROVIDE STICKY MAT AT EVERY DOOR ALONG THE

CORRIDOR AND CONSTRUCTION ENTRY POINTS AT

THE END OF CORRIDORS IN EACH PHASE.

D. UNFINISHED FLOOR SHALL BE SWEPT CLEAN, KEPT

SAFE AND AVOID TRIP HAZARD AFTER

CONSTRUCTION WORK EACH DAY IN EACH PHASE.

E. TRANSITION STRIP SHALL BE USED BETWEEN

UNFINISHED AND FINISHED OR EXISTING FLOORING

IN EACH PHASE.

F. NO CONSTRUCTION WORK IS ALLOWED DURING

FACILITY OPERATION HOURS ON THE GROUND

FLOOR. REFER TO PHASING, ICRA PLANS AND

SHEET NOTE A. FOR SPECIFIC HOURS OF

OPERATION.

G. PROCEEDING FROM ONE CONSTRUCTION PHASE

TO THE NEXT SHALL BE APPROVED AND SIGNED

OFF BY THE VA COR.

H. CEILING CAN BE LEFT OFF DURING FACILITY

OPERATION HOURS. ALL REMAINING OVERHEAD

ELEMENTS SHALL BE PROPERLY SECURED.

I. CONTRACTOR AND VA COR TO COORDINATE

ALTERNATE EGRESS ROUTE IN EACH PHASE.

0 4 8 16

NORTH

1 TEMPORARY PROTECTIVE PLASTIC BARRIER W/

ZIPPER ENTRY. ALSO SEE SHEET NOTE B.

2 PROVIDE CONSTRUCTION SIGNAGE WITH

CONSTRUCTION HOURS INDICATED FOR EACH

PHASE.

2A CONSTRUCTION SIGNAGE INSIDE ELEVATOR

CARS: INDICATE GROUND FLOOR ACCESS IS

NOT AVAILABLE DURING CONSTRUCTION

HOURS.

2B INSTALL TEMPORARY CONSTRUCTION SIGNAGE

STAIR TO INDICATE NO ACCESS THROUGH

CORRIDOR DURING THIS PHASE OF

CONSTRUCTION. COORDINATE WITH VA COR

ABOUT SECURING EGRESS DOOR.

3 SEE SHEET NOTE C FOR STICKY MAT

REQUIREMENTS.

4 SEAL AROUND DOOR COMPLETELY. INSTALL

YELLOW CROSS TAPES AND CONSTRUCTION

SIGN STATING "TEAR OFF TAPES EMERGENCY

EXIT ONLY."

5 HAZARDOUS MATERIALS SEE SPECIFICATION

SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND

MASTIC ABATEMENT. VETERAN'S

ADMINISTRATION REPORT "ASBESTOS 2018

9-13-18.BLDG 1.". SEE SHEET HA-01

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR

BUILDING 1 HALLS AND WALLS

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

Engineers Architects

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:5

A

M

A-002

INFECTION CONTROL RISK

ASSESSMENT (ICRA)

2 13KC NPM, DGC

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

SCALE: 12" = 1'-0"

ILSM TEMPORARY BARRIER TAG

SCALE: 6" = 1'-0"

ILSM SIGNAGE

W M

WM

CONCRETE WALL

BRICK

WALL

C O N C R E T E

W A L L

R A

IL

R O A D

T

IE

W A L L

BRICK WALL

BLOCK

WALL

C O N C R E T E

W A

LL

R A

IL

R O A D

T

IE

W A L L

CONCRETE

WALL

B R

IC

K W A

LL

BRICK WALL

C O N C R E T E

W A L L

B R

IC

K

W A L L

GUARD

RAIL

3.5'CHAIN LINK FENCE

'M E T A L

F E N C E

6'CHAIN LINK

FENCE

6'CHAIN LINK FENCE

6'CHAIN LINK FENCE

CHAIN LINK FENCE

'C H A

IN

L

IN

K

W O O D E N

F E N C E

'C H A

IN

L

IN

K

F E N C E

6'CHAIN LINK FENCE

4'WOODEN

FENCE

CHAIN LINK FENCE

'C H A

IN

L

IN

K

F E N C E

7'CHAIN LINK

FENCE

6'CHAIN LINK FENCEERWIN ROAD

F U

L T

O N

S T

R E

E T

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

CONSTRUCTION PARKING

AND STAGING AREAS

GENERAL CONTRACTOR

TO REVIEW WITH VA COR

BEFORE START OF

CONSTRUCTION.

Engineers Architects

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:0

A

M

A-003

ARCHITECTURAL SITE PLAN

3 13KC NPM, DGC

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B C D E F

SCALE: 1" = 40'-0"

ARCHITECTURAL SITE PLAN 0 4020 80

NORTH

UP

DN

S

S

S

S S

S S

S S

S S S

S S

S

S S S

S

S S

S S

S S

S S

S

S S

S

S

S

S

SS S

S SS

S SS

S S

S

S

S S

S

S

S

S

S

S

S

SS

SS

S

S SS

S SS

S S

S

S SS

S

S

S SS

F

SS

S S

S

A-2013 4

A-201

A-2017 8

A-2019 10

A-20111 12

A-202

STORAGE

DG006

MECH

CG015

COOLER

CG018

COOLER

CG016

OFFICE

CG014

OFFICE

CG014

FIRE

PROTECTION

CORRIDOR

CG004

OFFICE

CG010

STORAGE KITCHEN

CG013

F.H.C.

CG009F

NUTRITION

FOOD

CG009A

OFFICE

CG009

OFFICE

CG009

MENS TOILET

CG007

GREEN

ELEVATOR

P5

GREEN

ELEVATOR

P6

GREEN

ELEVATOR

P7

FIRE

PROTECTION

LINEN

CHUTE

TRASH RM

CG003

FEMALE

TOILET

AG003

FEMALE

TOILET

AG001

P3

P2

P1

S4

S5

DUMB

WAITER

CPR EQUIP

CG008

STAIR 1

CORRIDOR

BG001

SHAFT

FIRE

PROTECTION

MECH RM

BG001A

CORRIDOR

CORRIDOR

A-2013 4

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-KITCHEN HALL

INTEGRAL BASE QUARRY TILE

ACT

EXISTING FULL HEIGHT YELLOW

LEAD TILE TO REMAIN, CLEAN

GROUT AND TILES

QUARRY TILE

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-FREIGHT ELEV. AREA

EXISTING TILE INTEGRAL BASE

ACT

PAINT UPPER WALL ABOVE TILE,

CLEAN EXISTING TILE, BASE,

REPAIR BROKEN TILE, PAINT TO

MATCH TILE COLOR

UPO FLOOR-DARK GREY MOSAIC

EXPANSION JOINT

COVER PLATE

(WALLS AND FLOOR)

1 1

3 3

GREEN

ELEVATOR

LOBBY

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-BLUE & GREEN ELEV. AREA

RB 6"

ACT

PAINT, STANDARD HEIGHT WP

4'-0" HIGH AND 2" TOP CAP

TRIM PIECE

LVT - UPO FLOOR

QT-1 &

QT-22

A-501

BLUE

PASSENGER

ELEVATOR

LOBBY

LVT-5

LVT-2

FREIGHT

ELEVATOR

LOBBY

LVT-1LVT-1

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-CAFETERIA HALL

RB 6"

ACT

PAINT (SW MEDICI IVORY,

EGGSHELL FINISH), .060 THICK

34" H WP TO STOP BEHIND

WALL BUMPER @ CHAIR RAIL

HEIGHT @36", DIGITAL

GRAPHIC WP ABOVE ON THE

SOUTH WALL

LVT-UPO FLOORING

LVT-6

LVT-1

QT-1 &

QT-2

LVT-4

LVT-1

A-501

A-501

A-501

A-501

A-501

LVT-1

E Q

E Q

EQ 2 EQ 2

E Q

E Q

ALIGN

ALIGN

ALIGN

ALIGN

E Q

E Q

LVT-1

LVT 4

ALIGN

ALIGN

EQ 4EQ 4

E Q

E

Q

R=6'-2 1/2"

R=3'-1 0 1/2"

R=11'-7 1/2"

R=9'-0 1/2"

R=27'-5 1/2"

R=17'-10"

HEAVY DUTY SS CORNER

PROTECTION W/ 4" WINGS

NO RAILING

BUMPER GUARDS 700 SERIES

CONT. RETAINER (BEECHNUT)

WITH HANDRAIL (BEECHNUT)

HEAVY DUTY SS CORNER

GUARDS W/ 4" WINGS, NEW

HIGH/LOW BUMPERS 700 SERIES

CONT. RETAINER (OATMEAL)

HEAVY DUTY SS CORNER

PROTECTION W/ 4" WINGS

A-501

A-501

A-501

A-501

A-501

A-501

A-501

ALIGN

EXISTING STAINLESS

BUMPER TO REMAIN

3 3

K E

Y N

O T

E

S E

E

A-501

A-501

A-201

A-2013 4

STORAGE

DG011 HEM/ONC

OFFICE

DG009

OFFICE

DG007

OFFICE

ESCORT

DG005

DG005B

OFFICE

ESCORT

DG005A

STORAGE

DG001

FIRE PROTECTION

CORRIDOR B

STAIR - 5

WOMENS

DG002

MENS SHOWER

DG004

STORAGE

DG006

MECH

CG015

CEILING

WALL

BASE

FLOOR

NEW FINISHES-MAIN ENTRY

INTEGRAL BASE QUARRY TILE

PAINT EXISTING

PAINT, EXISTING YELLOW LEAD

TILE TO REMAIN, CLEAN GROUT

AND TILE, NO HANDRAILS

QUARRY TILE

CEILING

WALL

BASE

FLOOR

NEW FINISHES-ESCORT HALL

INTEGRAL BASE QUARRY TILE

ACT

EXISTING FULL HEIGHT YELLOW

LEAD TILE TO REMAIN, CLEAN

GROUT AND TILES, NO

HANDRAILS

QUARRY TILE

3 3

QT-1 &

QT-2

QT-1& QT-2

QT-1 &

QT-2

QT-1 & QT-2

QT-1 & QT-2

LVT-2

A-501

A-501 _____ 2

A-501

A-501

A-501

E Q

E Q

CEILING

FLOOR

BASE

HANDRAIL

NEW FINISHES-STAIR 5 CORRIDOR

NONE

ACT

LVT-2

RB 6"

A-501

A-501

A-501

REPLACE

EXPANSION JOINT

COVER PLATE

(WALL AND FLOOR)

6 6

A-501

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: BEIGE MOSAIC # 8323

SIZE: 24" X 24"

LVT - 1

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: GREY MOSAIC #8319

SIZE: 24" X 24"

LVT - 2

LVT - 3 MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT LINES #8223 - BEIGE

SIZE: 12" X 24"

LVT - 6

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - BLUE

#8355 QUARTZ BLUE

SIZE: 24" X 24"

LVT - 4

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - GREEN

#8366 PROSPEROUS PERIDOT

SIZE: 24" X 24"

LVT - 5

MATERIAL: QUARRY TILE

MANUFACTURER: DAL TILE

COLOR: 0Q48, ARID FLASH

SIZE: SQUARE 6"X 6"

QT - 1

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - BROWN

#8324 MOSAIC

SIZE: 24" X 24"

STANDARD HEIGHT 4'-0" WALL

PROTECTION WITH INPRO BUMPER

GUARD (UNO) AT CHAIR RAIL HEIGHT

AT 36"

STANDARD HEIGHT WALL PROTECTION

WITH HIGH/LOW INPRO BUMPER GUARDS

34" HEIGHT WALL PROTECTION TO STOP

BEHIND INPRO BUMPER GUARD (UNO) AT

CHAIR RAIL HEIGHT AT 36" AND DIGITAL

GRAPHIC WALL PROTECTION ABOVE

MATERIAL: BASE QUARRY TILE

MANUFACTURER: DAL TILE

COLOR: 0Q48, ARID FLASH

SIZE: INTEGRAL COVE BASE TILE

QT - 2

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:2

:1

A

M

A-101

GROUND FLOOR PLAN - C AND D WING

CORRIDORS

4 13KC NPM, DGC

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

SCALE: 1/8" = 1'-0"

GROUND FLOOR DEMOLITION, CONSTRUCTION, AND

FLOOR FINISH PLANS - C WING CORRIDORS 0 4 8 16

NORTH

C

D

B

C

A

C

EXISTING FINISHES:

WALL: PAINTED UPPER GYPSUM

WALL BOARD WITH CERAMIC

TILE WALL AND TILE COVE

BASE ON THE LOWER WALL

PORTION

FLOOR: VCT

CEILING: ACT

EXISTING FINISHES:

WALL: PAINTED UPPER GYPSUM WALL BOARD

WITH HANDRAIL, VINYL WALL PROTECTION,

AND RUBBER COVE BASE ON THE LOWER PORTION

FLOOR: VCT

CEILING: ACT

EXISTING FINISHES:

WALL: FULL HEIGHT GYPSUM WALL

BOARD WITH WALL COVERING

AND RUBBER COVE BASE

FLOOR: VCT

CEILING: ACT

EXISTING FINISHES:

WALL: FULL HEIGHT YELLOW LEAD

TILE WALL WITH QUARRY

TILE COVE BASE IN

CORRIDOR CG004

FLOOR: QUARRY TILE AND BASE

CEILING: ACT

SCALE: 1/8" = 1'-0"

GROUND FLOOR DEMOLITION, CONSTRUCTION, AND

FLOOR FINISH PLANS - D WING CORRIDORS 0 4 8 16

NORTH

C

D

EXISTING FINISHES:

WALL: PAINTED UPPER GYPSUM WALL BOARD WITH

CERAMIC TILE WALL ON THE LOWER HALF

AND TILE COVE BASE OUTSIDE OF COOK-CHILL UNITS DG013

FLOOR: QUARRY TILE

CEILING: ACT

EXISTING FINISHES:

WALL: FULL HEIGHT CERAMIC TILE

WALL WITH TILE COVE TOE

BASE IN CORRIDOR FROM

STORAGE DG001 TO DG011

FLOOR: QUARRY TILE

CEILING: ACT

FINISH LEGEND

DEMO NOTES

1 REMOVE EXISTING EXPANSION JOINT COVER

PLATE AT FLOOR AND WALLS. (DO NOT REMOVE

UNTIL NEW COVER PLATES ARE ON SITE AND

READY TO BE INSTALLED.)

2 REMOVE EXISTING QUARRY TILE FLOORING,

BASE, & GROUT. REFURBISH & SMOOTH

CONCRETE FLOOR AS RECOMMENDED BY THE

MANUFACTURER OF NEW FLOORING.

3 REMOVE EXISTING VINYL WALL PROTECTION,

RUBBER COVE BASE AND WALL GUARDS.

REMOVE BUMPER GUADS & HANDRAILS (UNO).

1 PROVIDE ALUMINUM EXPANSION JOINT COVER

PLATE AT FLOOR AND WALLS.

2 DIGITAL IMAGE ON FULL HEIGHT INPRO WALL

PROTECTION. (VA FURNISHED CONTRACTOR

INSTALLED. IMAGES TO BE PROVIDED BY VA.)

3 CORNER GUARD - STAINLESS STEEL WITH 4"

WINGS

4 PAINT UPPER WALL AND PROVIDE STANDARD

WALL PROTECTION WITH BUMPER GUARD ON

LOWER HALF.

5 REWORK AND REALIGN WALL AND BASE

APPROXIMATELY 60 SF WALL AREA. PROVIDE

TEMPORARY SUPPORT TO FIRE ALARM PULL,

MAIL BOX, MAIL CHUTE, AND REMOVE

SIGNAGES.

6 REPLACE STEEL PROTECTION AT BOTH SIDES

OF EXPANSION JOINT COVER PLATE.

A. REFURBISH AND PAINT EXISTING HOLLOW

METAL DOOR FRAMES AND HOLLOW METAL

CASE OPENINGS IN THE CORRIDORS.

(SCANNABLE LOCATION LABELS ON DOOR

FRAMES ARE NOT PAINTED OVER.)

B. PROVIDE CRACK ISOLATION MEMBRANE FOR

QUARRY TILE FLOORING PER

MANUFACTURER'S RECOMMENDATIONS.

C. WALL PROTECTIONS ARE .060 THICK.

D. PRODUCT NAMES AND COLOR NUMBERS ARE

BASIS OF DESIGN.

E. DIGITAL GRAPHIC WALL PROTECTION IS

PROVIDED BY THIS VA.

F. ALL WALL MOUNTED ITEMS SHOULD BE

REMOVED FROM THE WALL FOR PAINTING AND

PATCHING, THEN REINSTALLED AS DIRECTED

BY VA.

B A

C

A

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

C D

NOTE SS CORNER PROTECTION

REMOVE ALL DISPLAY CASES -

GLASS ENCLOSED BULLETIN

BOARDS

NOTE REMOVE TAGGED ART AND

RETURN TO VA INTERIORS

WALL PAINT, STANDARD

HEIGHT WP

EXISTING FINISHES:

CEILING: ACT

FLOOR: VCT

BASE: RUBBER COVE BASE

EXPOSED CONDUIT

REFLECTIVE METER

HEATER

60 SF

APPROX.

F

S S

S SS S S

S S

S

S

S

SSS S

S SS

S S

S

S S

S

SS

SS

SS

SS

S

S

SS

S

S

S S

UP

DN

S

S S S

S S

S

S SS

SS SSSSS

S S

S

S S

S

S S

S

S

S

S

S

S

S

S

S

S S

S

S S

S

S

S

S S

S

S

S S

S

SS

S S

S

S

S S

FEMALE TLT

AG003

FEMALE TOILET

AG001

P3

P1

MECH RM

BG001A

CORRIDOR

CAFETERIA

AG002A

CAFETERIA

AG002

CORRIDOR

FIRE

PROTECTION

CORRIDOR

CANTEEN

STORAGE

AG009

AG009A

RETAIL STORE

AG015

TELEPHONE

AG017

KITCHEN

AG010

A-20111 12

A-202

A-202 34

A-203

A-201 109

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-CANTEEN TO GF CORRIDOR

RB 6"

ACT

PAINT AND WALL PROTECTION

AND BUMPER (UNO), DIGITAL

GRAPHIC WALL PROTECTION

WHERE SHOWN ONLY

LVT - UPO FLOORING

EXPANSION JOINT

COVER PLATE

WALL

OPENING

3 3

LVT-1

LVT-1 LVT-1

LVT-1

LVT-1

LVT-1

A-102

A-102

LVT-1

LVT-4

A-102

LVT-3

LVT-1

LVT-2

A-501 _____ 7

A-501

A-501

A-501

A-501

A-501

A-501

LVT-5

LVT-1

LVT-4 LVT-1

LVT-5

A-501

A-102

A-102

A-501

AG005

AG009

AG009A

CANTEEN

AG005

44 4 4

NEW HIGH/LOW BUMPER

GUARDS IN CAFETERIA

CORRIDOR

A-501

A-202

HOUSE

KEEPING

BG003

MORGUE

ELEVATOR

CORRIDOR

BG001

SHAFT

FIRE PROTECTION

MECH RM

BG001A

HOUSE

KEEPING

EG001

VENDING RM

BG000CANTEEN

STORAGE

BG002

CORRIDOR

CORRIDOR

ELECTRONIC SHOP

BG004

STORAGE

BIO-MED

BG005

BIO-MED

ADMIN OFFICE

BG007

BIO-MED CLINICAL EQUIP UNIT

BG009

CORRIDOR

STORAGE

BG009A

FIRE PROTECTION

OFFICE

BG015

STORAGE

BG010

OFFICE

BG006

EXPANSION JOINT

COVER PLATE

A-202 87

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-WAREHOUSE/MAIL RM CORR.

EXISTING BASE

ACT

PAINT UPPER WALL, EXISTING

HALF HT YELLOW LEAD TILE WALL

AND COVE BASE TO REMAIN,

CLEAN & GROUT TILE.

UPO FLOOR-DARK GREY MOSAIC

CEILING

WALL

BASE

FLOOR

NEW FINISHES-VESTIBULE

RB 6"

ACT

REPAIR, PATCH, PAINT EXISTING

WALL (NO RAILING)

UPO FLOOR-DARK GREY MOSAIC

EXPANSION JOINT

COVER PLATE

LVT-2

LVT-1

LVT-2

LVT-2 LVT-6

LVT-2

3 3

A-501

A-501

A-501

A-501

A-501

A-501

A-501

A-501

A-501

EQ 5EQ 5

E Q

E

Q

WALL

PROTECTION

CEILING

WALL

BASE

FLOOR

NEW FINISHES-CORRIDOR BG001

RB 6"

ACT

PAINT WALL, 4'-0" STANDARD

HEIGHT WALL PROTECTION

UPO FLOOR-DARK GREY MOSAIC

NEW HIGH/LOW BUMPERS 700

SERIES CONT. RETAINER

(OATMEAL) (UNO)

NEW HIGH/LOW BUMPERS 700

SERIES CONT. RETAINER

(OATMEAL)

LVT-2

A-501

MAIL PROCESSING AREA

BG008

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: BEIGE MOSAIC # 8323

SIZE: 24" X 24"

LVT - 1

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: GREY MOSAIC #8319

SIZE: 24" X 24"

LVT - 2

LVT - 3 MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT LINES #8223 - BEIGE

SIZE: 12" X 24"

LVT - 6

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - BLUE

#8355 QUARTZ BLUE

SIZE: 24" X 24"

LVT - 4

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - GREEN

#8366 PROSPEROUS PERIDOT

SIZE: 24" X 24"

LVT - 5

MATERIAL: QUARRY TILE

MANUFACTURER: DAL TILE

COLOR: 0Q48, ARID FLASH

SIZE: SQUARE 6"X 6"

QT - 1

MATERIAL: SOLID VINYL TILE

MANUFACTURER: UPO

SERIES: QUARTZ

COLOR: ACCENT TILE - BROWN

#8324 MOSAIC

SIZE: 24" X 24"

STANDARD HEIGHT 4'-0" WALL

PROTECTION WITH INPRO BUMPER

GUARD (UNO) AT CHAIR RAIL HEIGHT

AT 36"

STANDARD HEIGHT WALL PROTECTION

WITH HIGH/LOW INPRO BUMPER GUARDS

34" HEIGHT WALL PROTECTION TO STOP

BEHIND INPRO BUMPER GUARD (UNO) AT

CHAIR RAIL HEIGHT AT 36" AND DIGITAL

GRAPHIC WALL PROTECTION ABOVE

MATERIAL: BASE QUARRY TILE

MANUFACTURER: DAL TILE

COLOR: 0Q48, ARID FLASH

SIZE: INTEGRAL COVE BASE TILE

QT - 2

A-2027 8

A-203

HOUSE

KEEPING

EG001

OFFICE

EG002

EG003A EG003B

OFFICE

EG003

OFFICE

EG005A

OFFICE

EG005

ELECTRICAL

CLOSET

EG007A

OFFICE

EG004

OFFICE

EG006

CORRIDOR

OFFICE

EG007

OFFICE

EG009

OFFICE

EG008

ELECTRICAL

CLOSET

EG010

OFFICE

EG011

STORAGE

EG013

LAB

EG012

EG012A

ELEVATOR

EG015

FIRE

PROTECTION

STORAGE

EG018

RESEARCH

EG017

CORRIDOR

EG014

CEILING

WALL

BASE

FLOOR

NEW FINISHES-E WING CORR.

NO WORK

DRY FOG

PAINT

RB 6"

CEILING

WALL

BASE

FLOOR

NEW FINISHES-CORRIDOR EG014

NO WORK

DRY FOG

PAINT

RB 6"

EXPANSION JOINT

COVER PLATE

(WALL AND FLOOR)

1 1

A-501

F.E.

A-501

A-102

AFTER REMOVING

EXISTING RADIATOR AND

SCREEN, INFILL WALL TO

MEET EXISTING 2 HOUR

FIRE RATING. WALL AREA

IS APPROX. 10 SF.

A-102 _____5&7

A-102

IN ADDITION TO DOOR FRAME WORK, REFURBISH, PATCH HOLES AND CRACKS

OR DAMAGED AREA ON THE DOORS WITH BONDO FOR METAL AND PAINT. ADD

SS KICK PLATE TO EXISTING DOORS AS SHOWN IN THE FIELD PHOTOS BELOW.

NEW SS ARMOR

KICK PLATE

AG005 AG009 AG009A

4 1/2"

METAL

STUD

2 SHEETS

5/8" GYPSUM

BOARD

(UL #415)

4 1/2"

METAL

STUD

ALIGN

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved:

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:2

:3

A

M

A-102

GROUND FLOOR PLAN - A, B, AND E

WING CORRIDORS

5 13KC NPM, DGC, GS

RENOVATE GROUND FLOOR

BUILDING 1 HALLS AND WALLS

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705 JANUARY 26, 2021

BID DOCUMENTS

558-18-26018-305

0 4 8 16

NORTH

SCALE: 1/8" = 1'-0"

GROUND FLOOR DEMOLITION, CONSTRUCTION, AND

FLOOR FINISH PLANS - A WING CORRIDORS

C

A

C

A

B A

A

F E.

EJ COVER

EXISTING FINISHES:

WALL: PAINTED GYPSUM WALL BOARD WITH HANDRAIL,

VINYL WALL PROTECTION AND RUBBER

COVE BASE ON THE LOWER HALF OF WALL

FLOOR: VCT

CEILING: ACT

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B E

SCALE: 1/8" = 1'-0"

GROUND FLOOR DEMOLITION, CONSTRUCTION, AND

FLOOR FINISH PLANS - B WING CORRIDORS

B

C

B A

E

B

EXISTING FINISHES:

WALL: PAINTED UPPER GYPSUM WALL BOARD

WITH HANDRAIL, VINYL WALL PROTECTION

AND RUBBER COVE BASE ON THE LOWER

HALF OF WALL

FLOOR: VCT

CEILING: ACT

EXISTING FINISHES:

WALL: PAINTED UPPER GYPSUM WALL BOARD

WITH CT AND TILE COVE BASE

ON THE LOWER HALF

FLOOR: VCT

CEILING: ACT

0 4 8 16

NORTH

FINISH LEGEND

EXISTING FINISHES:

WALL: PAINTED CMU WALL

(CONCRETE AT

STRUCTURAL COLUMNS)

FLOOR: VCT

CEILING: EXPOSED

EXISTING FINISHES:

WALL: PAINTED CMU WALL

FLOOR: EXPOSED CONCRETE

CEILING: EXPOSED

E

B

0 4 8 16

NORTH

SCALE: 1/8" = 1'-0"

GROUND FLOOR DEMOLITION, CONSTRUCTION, AND

FLOOR FINISH PLANS - E WING CORRIDORS

## DEMO NOTES

1 REMOVE EXISTING EXPANSION JOINT COVER

PLATE AT FLOOR AND WALLS. (DO NOT REMOVE

UNTIL NEW COVER PLATES ARE ON SITE AND

READY TO BE INSTALLED.)

2 REMOVE EXISTING QUARRY TILE FLOORING,

BASE, & GROUT. REFURBISH & SMOOTH

CONCRETE FLOOR AS RECOMMENDED BY THE

MANUFACTURER OF NEW FLOORING.

3 REMOVE EXISTING VINYL WALL PROTECTION,

RUBBER COVE BASE AND WALL GUARDS.

REMOVE BUMPER GUADS & HANDRAILS (UNO).

A. REFURBISH AND PAINT EXISTING HOLLOW

METAL DOOR FRAMES AND HOLLOW METAL

CASE OPENINGS IN THE CORRIDORS.

(SCANNABLE LOCATION LABELS ON DOOR

FRAMES ARE NOT PAINTED OVER.)

B. PROVIDE CRACK ISOLATION MEMBRANE FOR

QUARRY TILE FLOORING PER MANUFACTURER'S

RECOMMENDATIONS AND SPECIFICATIONS.

C. WALL PROTECTION IS .060 THICK.

D. PRODUCT NAMES, COLOR NUMBERS ARE BASIS

OF DESIGN.

E. DIGITAL GRAPHIC WALL IS PROVIDED BY THE VA.

F. ALL WALL MOUNTED ITEMS SHOULD BE

REMOVED FROM THE WALL FOR PAINTING AND

PATCHING, THEN REINSTALLED AS DIRECTED BY

THE VA.

G. REMOVE EXISTING FLOORING, PREP AND

INSTALL NEW FLOORING AS NOTED.

WALL MOUNT

EXPANSION JOINT

COVER PLATE

SCALE: 1/4" = 1'-0"

DEMOLITION OF THE

EXISTING RADIATOR - A

CORRIDOR

SCALE: 1/2" = 1'-0"

INFILLED WALL DETAIL

SCALE: N.T.S.

CANTEEN STORAGE DOORS

SCALE: 1 1/2" = 1'-0"

RATED ASSEMBLY DETAIL

FE

A

WALL MOUNT

EXPANSION JOINT

COVER PLATE

FLOOR EXPANSION JOINT

COVER PLATE

(WALL AND FLOOR)

FLOOR EXPANSION JOINT

COVER PLATE

(WALL AND FLOOR)

ARTWORK

C

NOTES REMOVE AND KEEP TAGGED ART

& SIGNAGE - SEE INTERIORS FOR

FINAL PLACEMENT

1 PROVIDE ALUMINUM EXPANSION JOINT COVER

PLATE AT FLOOR AND WALLS.

2 DIGITAL IMAGE ON FULL HEIGHT INPRO WALL

PROTECTION. (VA FURNISHED CONTRACTOR

INSTALLED. IMAGES TO BE PROVIDED BY VA.)

3 CORNER GUARD - STAINLESS STEEL WITH 4"

WINGS

4 PAINT UPPER WALL AND PROVIDE STANDARD

WALL PROTECTION WITH BUMPER GUARD ON

LOWER HALF.

5 REWORK AND REALIGN WALL AND BASE

APPROXIMATELY 60 SF WALL AREA.

This is the start of the file's text. The full file is on GovTribe.