Replacement of Bridge No. 02599 Route 101 in the Town of Killingly
Solicitation number
0068-0217
Issued by
Tolland County, Connecticut

About this file

This document is a utility relocation plan prepared for the Connecticut Department of Transportation (CT DOT) regarding fiber optic cable relocation for the replacement of Bridge No. 02599 on Route 101 in Killingly, Connecticut. The project involves the temporary and permanent relocation of Level 3 Communications fiber optic cables (specifically 180-count Level 3 cable, 432-count Unicorn cable, and 148-count Wiltel cable) to accommodate the CT DOT's proposed bridge replacement over Alvia Chase Reservoir. The scope of work encompasses two phases: Phase I involves exposing and removing approximately 40 feet of fiber optic cables from existing surface-mounted 6-inch fiberglass conduits crossing the bridge, relocating cables to temporary supports on a coffer dam (approximately 100 feet of slack movement), and wrapping exposed cables in orange split duct with warning tape. Phase II includes attaching replacement bridge crossing ducts to new wing walls, moving temporarily relocated fibers back to the bridge crossing in Osburn split steel conduit, and encasing underground HDPE conduits in flowfill and backfill. The project is identified as DOT Project 0068-0217 and is located between North Road in Killingly, Connecticut, and Pray Hill Road in Chepachet, Rhode Island.

The engineering and design for this fiber relocation project was completed by GrecoWolf Engineering (P-579606) under the direction of Stephen Becker, the CenturyLink engineer responsible for the Level 3 Communications infrastructure. The relocation plan specifies replacement of conduits with comparable inside diameters, utilizing Champion fiberglass ducts for underground sections and Osburn split steel conduit for active fiber protection at the bridge crossing. The project documentation includes detailed construction notes, legends, typicals, site index maps with photo location symbols, and cost unit summary information. All existing underground Lumen duct banks are identified with hand holes, man holes, pull boxes, and vaults marked according to the project legend. The plans incorporate standard utility industry practices including proper notification procedures ("Know what's below, before you dig" call requirement) and identification of existing infrastructure to ensure safe construction execution during the bridge replacement work.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

SIGNATURE BLOCK: DRAWING TITLE:TOWN(S):

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

DESIGNER/DRAFTER: CHECKED BY:

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

INDEX OF DRAWINGSINX-01

DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER

INDEX OF DRAWINGS

06 - UTILITY COMPANY08 - LEVEL 3 COMMUNICATIONS - FIO

INX - 01

LC - 02

LC - 03

LC - 04

LC - 05

INDEX OF DRAWINGS

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

LC - 06

LC - 07

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

FOR INFORMATION ONLY

INX-01

08.01

INDEX OF DRAWINGS

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

LC - 08 LEVEL 3 COMMUNICATIONS FIO RELOCATION PLAN

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-02

08.02

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TomTom

SYMBOL CORRESPONDS TO PHOTO LOCATIONS AND

ORIENTATION. SEE SHEET # FOR SITE PHOTOGRAPHS.

P-579606 LUMEN RELOCATION PROJECT

KILLINGLY - ROUTE 101 HARTFORD PIKE

CT DOT PROJECT 0068-0217 BRIDGE NO.02599 REPLACEMENT

BETWEEN NORTH RD, KILLINGLY, CT

PRAY HILL RD, CHEPACHET, RI

CONTACTS

SITE INDEX

CENTURYLINK ENGINEER:

Stephen Becker 203.241.5830 Stephen.Becker@CenturyLink.com

ENGINEERING FIRM:

GrecoWolf Engineering 203.816.7291 Support@GrecoWolf.com

CONFIDENTIAL/PROPRIETARY SHEET: OF 1 7

SCOPE OF WORK

TEMPORARILY RELOCATE LEVEL 3 180ct, UNICORN 432ct, AND WILTEL 148ct FIBER OPTIC

CABLES TO FACILITATE CT DOT PROPOSED

BRIDGE REPLACEMENT.

1. COVER SHEET

2. GENERAL NOTES

3. LEGEND

4. TYPICALS

5. PHASE I - RELOCATE

6. PHASE II - RESTORATION

7. COST UNIT SUMMARY

PROJECT

LOCATION

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-03

08.03

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

GENERAL NOTES

Know what'sbelow.

before you dig.Call

R

CONFIDENTIAL/PROPRIETARY SHEET: OF 2 7

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-04

08.04

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

X X

ID

LEVEL3

HH-

HANDHOLE

LEVEL3

MH-

MANHOLE

LEVEL3

PB-

PULLBOX

LEVEL3

VAULT-

VAULT

LEVEL 3

#F

#F

#F

MANUFACTURER

NAME

LEGEND

Know what's below.

before you dig.Call

CONFIDENTIAL/PROPRIETARY SHEET: OF 3 7

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-05

08.05

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

TYPICALS

Know what's below.

before you dig.Call

CONFIDENTIAL/PROPRIETARY SHEET: OF 4 7

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-06

08.06

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

EXISTING LUMEN

DUCT BANK

CONSTRUCTION NOTES

PHASE I- RELOCATION

1. REMOVE FLOWFILL AND EXPOSE LUMEN

UNDERGROUND DUCTS TO APROX 25' FROM

COFFER DAM ON EACH SIDE OF BRIDGE.

2. CUT SLOTS IN EXISTING 3x SURFACE

MOUNTED 6" FIBERGLASS CONDUITS

CROSSING BRIDGE TO REMOVE LUMEN FIBER

OPTIC CABLES. (APROX 40')

432ct UNICORN CABLE 180ct LEVEL 3 CABLE 148ct WILTEL CABLE

3. RELOCATE ALL LUMEN CABLES TO

TEMPORARY ATTACHMENT TO COFFER DAM

OR TEMP SUPPORTS OUTSIDE OF

COFFERDAM (TO BE INSTALLED BY BRIDGE

CONSTRUCTION CONTRACTOR). (APROX 100'

OF SLACK MOVEMENT)

WRAP ALL EXPOSED FIBER OPTIC CABLES IN

ORANGE SPLIT DUCT AND WARNING TAPE

FLAGS TO INCREASE VISIBILITY OF EXPOSED

FIBER OPTIC CABLES NEAR WORK ZONE

SLACK FOR CABLE RELOCATION HAS BEEN

GATHERED IN ADJACENT MANHOLES

CONFIDENTIAL/PROPRIETARY SHEET: OF 5 7

Know what's below.

before you dig.Call

R

EXISTING LUMEN

DUCT BANK 1

EXISTING LUMEN

BRIDGE ATTACHMENT

3 3

WATER

WATER

WATER

WATER

HARTFORD PIKE (ROUTE 101HARTFORD PIKE (ROUTE 101

PROPOSED LIMITS OF

COFFERDAM

WATER

WATER

EXISTING LUMEN 3x DUCT

BRIDGE ATTACHMENT

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-07

08.07

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY

BRIDGE 02599 ROUTE 101 HARTFORD PIKE

EXISTING LUMEN

DUCT BANK

CONSTRUCTION NOTES

PHASE II - RESTORATION

1. ATTACH REPLACEMENT BRIDGE

CROSSING DUCTS TO NEW WING WALLS AND

SUPPORTS. TIE EMPTY UNDERGROUND HDPE

CONDUITS INTO NEW BRIDGE CROSSING

DUCTS. (APROX 40')

2. MOVE TEMPORARLIY RELOCATED FIBER

OPTIC CABLE FROM COFFER DAM SUPPORTS

BACK TO BRIDGE CROSSING IN OSBURN SPLIT

STEEL CONDUIT.

3. ENCASE ALL UNDERGROUND HDPE

CONDUITS IN FLOWFILL AND BACKFILL

TRENCH

REPLACEMENT CONDUITS CROSSING BRIDGE

ARE TO BE COMPARABLE IN INSIDE DIAMETER

TO EXISTING.

USE CHAMPION FIBERGLASS DUCTS TO

REPLACE EMPTY CONDUITS CROSSING

BRIDGE

USE OSBURN SPLIT STEEL CONDUIT TO

ENCLOSE ACTIVE FIBERS AT BRIDGE

CROSSING.

CONFIDENTIAL/PROPRIETARY SHEET: OF 6 7

Know what's below.

before you dig.Call

R

EXISTING LUMEN

DUCT BANK 3

2 2

WATER

WATER

WATER

WATER

HARTFORD PIKE (ROUTE 101HARTFORD PIKE (ROUTE 101

PROPOSED LIMITS OF

COFFERDAM

WATER

WATER

EXISTING LUMEN 3x DUCT

BRIDGE ATTACHMENT

REPLACE IN KIND

REPLACE WITH

OSBURN STEEL

SPLIT CONDUIT

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

LC-08

08.08

LEVEL 3 COMMUNICATIONS

FIO RELOCATION PLAN

REPLACEMENT OF BRIDGE NO. 02599

ROUTE 101 OVER ALVIA CHASE RESERVOIR KILLINGLY 0068-0217

DRAWING NAME:

LEVEL 3 ENGINEER:

ENGINEERING FIRM:

PROJECT NUMBER:

LOCATION:

P-579606 Killingly Bridge No.02599 DOT project 0068-0217 LUMEN fiber relocate.dwg

NO.

Stephen Becker

GRECOWOLF ENGINEERING

P-579606

KILLINGLY