0068-0217_07-Frontier Communications-FIO.pdf
PDF 1 MB Posted
- Solicitation number
- 0068-0217
- Issued by
- Tolland County, Connecticut
About this file
This is a utility relocation plan drawing prepared by the Connecticut Department of Transportation for the Frontier Communications fiber-optic cable (FIO) relocation associated with the replacement of Bridge No. 02599 on Route 101 over Alvia Chase Reservoir in Killingly, Connecticut. The project involves the temporary and permanent relocation of Frontier Communications overhead telecommunications infrastructure to accommodate bridge construction activities. The plan identifies twelve utility poles (numbered UP #1 through UP #12) with detailed coordinate locations and specifications for poles to be retained, temporarily staged, or replaced with proposed temporary poles and support systems during construction. Existing poles that will carry wires in temporary stages are identified by specific AT&T and SNET pole designations, while temporary earth retaining systems and anchor installations are noted as "TBD" (to be determined) or performed by others. The drawing was reviewed on July 17, 2025, and includes existing easement lines, property boundaries, highway rights-of-way, and construction easement requirements.
No pricing terms, set-asides, incumbent information, funding sources, or contract award details are specified in this technical drawing document. The plan serves as an informational reference for construction sequencing and utility coordination purposes during the bridge replacement project, with specific notation that certain temporary relocation work will be performed by utility companies or contractors designated as "by others."
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
SIGNATURE BLOCK: DRAWING TITLE:TOWN(S):
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
DESIGNER/DRAFTER: CHECKED BY:
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
INDEX OF DRAWINGSINX-01
DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
06 - UTILITY COMPANY07 - FRONTIER COMMUNICATIONS - FIO
INX - 01
FC - 02
INDEX OF DRAWINGS
FRONTIER COMMUNICATIONS FIO RELOCATION PLAN
FOR INFORMATION ONLY
INX-01
07.01
INDEX OF DRAWINGSKILLINGLY
REPLACEMENT OF BRIDGE NO. 02599
ROUTE 101 OVER ALVIA CHASE RESERVOIR
0068-0217
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
SIGNATURE BLOCK: DRAWING TITLE:TOWN(S):
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
DESIGNER/DRAFTER: CHECKED BY:
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
FC-02
07.02
0068-0217FRONTIER COMMUNICATIONS
FIO RELOCATION PLAN
KILLINGLY
REPLACEMENT OF BRIDGE NO. 02599
ROUTE 101 OVER ALVIA CHASE RESERVOIR
HARTFORD
TURNPIKE
ROUTE 101
CHESTNUT HILL RESERVOIR COMPANY
N/F
CHESTNUT HILL RESERVOIR COMPANY
N/F
CP-3
TREES
CP-9
CP-2
CP-8
#4622
AT&T
BRUSH
#3044
AT&T
#3045
AT&T
#3044S
AT&T
#3045S
AT&T
CP-9 (MAG NAIL)
1+00
2+00
3+00 4+00
LAWN W/ U/G
#3043
AT&T
GRASS
#3046
SNET
#3046S
SNET
ET A
PATRICK
N/
TEMPORARY RELOCATION
PROPOSED OVERHEAD WIRE
TEMPORARY RELOCATION
TELECOMMUNICATIONS
PROPOSED
EXISTING OVERHEAD WIRE CONDUIT
EXISTING TELECOMMUNICATIONS
PROPOSED EASEMENT
LEFT IN PLACE)
COFFERDAM (TO BE
PROPOSED LIMITS OF
OF EXCAVATION (TYP.)
TEMPORARY SUPPORT
NOT TO SCALE
A
3046S SNETRETAIN EXISTING POLE.1258939.9871536.5UP #12
3046 SNETRETAIN EXISTING POLE.1258932.6871493.9UP #11
TEMPORARY (TBD)PROPOSED TEMPORARY POLE AND GUY WIRE BY OTHERS.1258593.8871521.0UP #10
3045S AT&T
TEMPORARY STAGE.
RETAIN EXISTING POLE. POLE WILL NOT CARRY WIRES IN
1258588.9871557.4UP #9
3045 AT&T
TEMPORARY STAGE.
RETAIN EXISTING POLE. POLE WILL NOT CARRY WIRES IN
1258588.2871518.7UP #8
TEMPORARY (TBD)
TEMPORARY EARTH RETAINING SYSTEM TO CONSTRUCT.
PROPOSED TEMPORARY POLE BY OTHERS. REQUIRES
1258446.5871493.1UP #7
3044S AT&T
TEMPORARY STAGE.
RETAIN EXISTING POLE. POLE WILL NOT CARRY WIRES IN
1258245.8871515.0UP #6
3044 AT&T
TEMPORARY STAGE.
RETAIN EXISTING POLE. POLE WILL NOT CARRY WIRES IN
1258251.7871476.4UP #5
TEMPORARY (TBD)
TEMPORARY EARTH RETAINING SYSTEM TO CONSTRUCT.
PROPOSED TEMPORARY POLE BY OTHERS. REQUIRES
1258234.6871453.0UP #4
4622 AT&T
TEMPORARY STAGE.
RETAIN EXISTING POLE. POLE WILL NOT CARRY WIRES IN
1258086.0871434.5UP #3
TEMPORARY (TBD)PROPOSED TEMPORARY POLE AND ANCHOR BY OTHERS.1258116.6871430.7UP #2
3043 AT&TRETAIN EXISTING POLE.1257918.4871391.8UP #1
POLE NUMBERREMARKSEASTINGNORTHINGMARK
UP #1 UP #2
UP #3
UP #4
UP #5
UP #6
UP #7 UP #8
UP #10
UP #9
UP #11
UP #12
215'-8" ± 150'-0" ±
120'-0" ±
UTILITY RELOCATION PLAN
CONSTRUCTION EASEMENT REQUIRED
CONSTRUCTION EASEMENT LINE
EXISTING PROPERTY LINE
EXISTING HIGHWAY BOUNDARY LINE
EXISTING EASEMENT LINE
R.O.W. LEGEND
CHESTNUT HILL RESERVOIR COMPANY
N/F
CHESTNUT HILL RESERVOIR COMPANY
N/F
200'- 0"±
FRONTIER COMMUNICATIONS
REVIEWED 07/17/2025