This file contains the structural design plans and technical drawings for the Replacement of Bridge No. 02599 over the Alvia Chase Reservoir on Route 101 in Killingly, Connecticut, prepared by the Connecticut Department of Transportation (CTDOT). The project involves the design and construction of a 12-foot by 8-foot precast concrete box culvert structure with associated wingwalls, parapets, and foundation systems to replace the existing bridge. The contract plans include 18 detailed drawing sheets covering structural elements such as general plans, boring logs, culvert elevations and sections, precast wingwall and parapet details, reinforcement specifications, and water handling procedures. The project design incorporates hydraulic data indicating a 1.35 square-mile drainage area with a 100-year design frequency discharge of 365 cubic feet per second and design water surface elevations of 570.1 feet upstream and 569.1 feet downstream. The structure features a 42-inch vertical-shaped concrete parapet meeting TL-4 MASH 2016 criteria and includes provisions for utility relocation, cofferdam and dewatering systems, and erosion control measures.
The construction plans specify concrete strength requirements of f'c = 5,000 PSI for precast components and f'c = 4,000 PSI for cast-in-place concrete, with all reinforcement galvanized after fabrication in accordance with ASTM A767 Class 1 standards. The designs comply with AASHTO LRFD Bridge Design Specifications (10th Edition, 2020) and Connecticut Department of Transportation standards as supplemented July 2025. The precast wingwall components range from 11 feet 6 inches to 19 feet in length with shipping weights between 23,300 and 83,200 pounds, requiring coordination with specialized handling and lifting procedures. The project includes protected species management protocols, specifically an odonate management plan for pine barrens bluet habitat protection with seasonal restrictions from April 15 to October 31 and a five-month emergence period from May 15 to August 31. In-stream work is restricted to June 1 through September 30, and the suggested construction sequence comprises 48 sequential phases including temporary traffic control, utility relocation, cofferdam installation, structure demolition and removal, new culvert installation, and roadway restoration.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VERTICAL SHAPE PARAPET - REINFORCEMENT DETAILS (2 OF 2)S-18
VERTICAL SHAPE PARAPET - REINFORCEMENT DETAILS (1 OF 2)S-17
VERTICAL SHAPE PARAPET - DETAILSS-16
WATER HANDLING PLANS-15
MISCELLANEOUS DETAILSS-14
WINGWALL AND PARAPET DETAILSS-13
PRECAST CONCRETE WINGWALL DETAILSS-12
CULVERT SECTIONS-11
CULVERT ELEVATIONS-10
LAYOUT PLAN AND FOUNDATION PLANS-09
BORING LOGS (5 OF 5)S-08
BORING LOGS (4 OF 5)S-07
BORING LOGS (3 OF 5)S-06
BORING LOGS (2 OF 5)S-05
BORING LOGS (1 OF 5)S-04
GENERAL NOTESS-03
GENERAL PLANS-02
STRUCTURES INDEX OF DRAWINGSS-01
DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
SUBSET 04 - STRUCTURES
MCFARLAND JOHNSON
DESIGNED BY:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-01
TOWN(S):
KILLINGLY
ALVIA CHASE RESERVOIR
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_SubsetCoverSheet.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
IO
N
0068-0217
DESIGNER/DRAFTER: EAP/SLM CHECKED BY: CLG/DMK
STRUCTURES INDEX OF DRAWINGS
TRANSPORTATION
DEPARTMENT OF
CONNECTICUT
04.01
MBR
RIPRAP
BIT BIT
3+00 4+00
B-1
NATURAL STREAMBED MATERIAL (TYP.)
P-1CP-1BP-1A
B-2 P-2CP-2BP-2A
FLOOD (CALCULATED)
EXISTING 100-YEAR
12'-0"
V A
R
V A
R
C U
R B
-T O
-C U
R B
M
IN
M
IN
(R-B MASH) (TYP.)
METAL BEAM RAIL
EASEMENT LINE
CONSTRUCTION
TO BE REMOVED AND RESET
EXISTING FIRE SUPPLY DRY HYDRANT
PROPOSED CONTOURS (TYP.)
SHOULDER
VARIES
EB LANE
12'-0"
WB LANE
12'-0"
SHOULDER
VARIES
(TYP.)
1'-3"
TYPICAL SECTION (STA 3+25)
SCALE: ¼" = 1'-0"
INLETOUTLET
DESIGN WSEL 570.1
PROPOSED 100-YEAR
EXISTING AND
WSEL 567.6
OHW
CUT-OFF WALL
RETURN WALL
STONE
NO. 6 CRUSHED
SHAPE PARAPET (TYP.)
42" CONCRETE VERTICAL
STRUCTURE
UTILITY SUPPORT
TO BE TEMPORARILY RELOCATED
EXISTING 6" DIA. CONDUITS
BOX CULVERT
12' X 8' PRECAST CONCRETE
35'-0"
(HEIGHT VARIES) (TYP.)
INTEGRATED CONCRETE HEADWALL
FLOW
(4'-3" MIN.)
LEVEL
3'-0" NATURAL STREAMBED
MATERIAL @ INLET, OUTLET,
AND WITHIN CULVERT
INLET EL. 564.1OUTLET EL. 564.1
(COLD LIQUID ELASTOMERIC)
MEMBRANE WATERPROOFING
INVERT EL. 561.1INVERT EL. 561.1
(2 EQUAL LIFTS)
4" HMA S0.5 (TRAFFIC LEVEL 2)
VARIES)
SUBBASE (THICKNESS
B ROUTE 101L
WSEL 567.6
OHW
DESIGN WSEL 569.1
PROPOSED 100-YEAR
EXISTING AND
EXISTING GROUND (TYP)
EL. 562.5 ±
EL. 558.1
EL. 558.1
FOR BRIDGES (TYP.)
GUTTERLINE SEALING
3" HMA S1 (TRAFFIC LEVEL 2)
(4'-3" MIN.)
0.2% 0.6% -4.7%
-4.7%
TO BE REMOVED AND RESET
EXISTING FIRE SUPPLY DRY HYDRANT
GEOTEXTILE (SEPARATION - CLASS 1)
EVALUATION.
INSPECTION, UNLESS OTHERWISE DIRECTED BY THE MANAGER OF BRIDGE SAFETY AND
STRUCTURE SHALL BE IN ACCORDANCE WITH THE GOVERNING MANUALS FOR BRIDGE
OF ANY OTHER COMPONENT OF THE STRUCTURE). THE FREQUENCY OF INSPECTION OF THIS
SPECIFIC ATTENTION SHALL NOT BE CONSTRUED TO REDUCE THE IMPORTANCE OF INSPECTION
FOLLOWING SPECIAL COMPONENTS AND DETAILS. (THE LISTING OF COMPONENTS FOR
MANUALS FOR BRIDGE INSPECTION. ATTENTION MUST BE GIVEN TO INSPECTING THE
BUT NOT LIMITED TO, ALL APPROPRIATE COMPONENTS INDICATED IN THE GOVERNING
THE DEPARTMENT'S BRIDGE SAFETY PROCEDURES REQUIRE THIS BRIDGE TO BE INSPECTED FOR, NONE
COMPONENTS OR DETAIL
NONE
STRUCTURE SHEET REFERENCE
1" = 10'SCALE:
ITEM
LENGTH
SHIPPING
HEIGHT
SHIPPING
WIDTH
SHIPPING
WEIGHT
SHIPPING
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
AVERAGE DAILY FLOW ELEVATION
WATER SURFACE ELEVATION
100-YEAR UPSTREAM DESIGN
WATER SURFACE ELEVATION
100-YEAR DOWNSTREAM DESIGN
1.35 SQ. MILES
100 YEAR
365 CFS
567.3 FT
570.1 FT
569.1 FT
PRECAST BOX CULVERT 7'-0"
V
WINGWALL 1A & 1B FOOTING
WINGWALL 1A & 1B STEM
WINGWALL 2A FOOTING
WINGWALL 2B STEM
19'-0"
11'-6" 1'-6" 23,300 LB
42,800 LB
31,500 LB
31,500 LB
46,200 LB14'-0"10'-0"
1'-6"
1'-6"
1'-6"
10'-0"14'-6"
14'-6" 10'-0"
10'-0"
9'-0"
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-02
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_GenPlan.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
GENERAL PLAN
TRANSPORTATION
WINGWALL 2A STEM
WINGWALL 2B FOOTING 11'-6" 1'-6" 25,900 LB10'-0"
19'-0" 42,800 LB1'-6" 10'-0"
83/11
C O
O R
D
IN
A T E G
R
ID
AD
C O
N N
E C
T
IC
U T
PRECAST WINGWALL 1A
PRECAST WINGWALL 2A
C BOX CULVERT
BOX CULVERT
12' X 8' PRECAST CONCRETE
B ROUTE 101L
ORDINARY HIGH WATER
PRECAST WINGWALL 1B
PRECAST WINGWALL 2B
6" GRANULAR FILL (TYP.)
18" INTERMEDIATE RIPRAP OVER
STA. 3+25
C CULVERT
SYSTEM (TYP.)
CONTROL
SEDIMENTATION
L
OVERLAY (TYP.)
LIMITS OF MILL AND
STANDARD HW-910_27(TYP.)
RAIL ATTACHMENT
THRIE BEAM APPROACH
(SKEW)
0.14°
EASEMENT LINE
CONSTRUCTION
L
F L O
W
ROUTE 101
ALVIA CHASE
RESERVOIR
NOTICE TO BRIDGE INSPECTORS
GENERAL PLAN
TRANSPORTATION DIMENSIONS AND WEIGHT
HYDRAULIC DATA
18" INTERMEDIATE RIPRAP
LEGEND
TYPE "A" BORING APPROXIMATE LOCATION
NATURAL STREAMBED MATERIAL
EXISTING OVERHEAD UTILITIES
LIMITS OF ORDINARY HIGH WATER
EDGE OF WATER
TYPE "B" BORING APPROXIMATE LOCATION
NO. 6 CRUSHED STONE
04.02
GENERAL NOTES
FRONTIER COMMUNICATIONS OF CONNECTICUT
EVERSOURCE ENERGY - ELECTRIC DISTRIBUTION
LEVEL 3 COMMUNICATIONS, LLC A.K.A. CENTURYLINK COMMUNICATIONS, LLC
ATLANTIC BROADBAND, LLC DBA BREEZELINE
ATTACHMENT METHOD FOR THE SIGNS SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.
UNDER ITEM 1208937A SIGN FACE SHEET ALUMINUM (TYPE XI RETROREFLECTIVE SHEETING). THE FINAL LOCATION AND
SHALL READ: 02599. ALL COSTS ASSOCIATED WITH PROVIDING AND INSTALLING THE BRIDGE SIGNS SHALL BE COVERED
METAL. THE SIGNS SHALL BE 4" X 12" WITH 3" WHITE REFLECTIVE BLOCK LETTERS ON GREEN REFLECTIVE SHEETING. EACH SIGN
AT THE LEADING END OF EACH BRIDGE WINGWALL. THE SIGNS SHALL BE FABRICATED WITH 40 GAUGE ALUMINUM SHEET
: THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW BRIDGE IDENTIFICATION SIGNSBRIDGE IDENTIFICATION PLACARDS
STRUCTURE.
: THE CONTRACTOR SHALL SUBMIT DEMOLITION PROCEDURES PRIOR TO THE REMOVAL OF THE EXISTINGDEMOLITION
: THE 42" VERTICAL SHAPED CONCRETE PARAPET MEETS THE TL-4 CRITERIA FOR MASH 2016.MASH TEST LEVEL
CONSTRUCTION:
THE FOLLOWING UTILITIES ARE LOCATED WITHIN THE PROJECT LIMITS AND SHALL BE PROTECTED DURINGUTILITIES:
FOR REFERENCE BY THE REVIEWER.
MEASUREMENTS ARE SUBMITTED FOR REVIEW, THE FIELD MEASUREMENTS SHALL ALSO BE SUBMITTED
WORK AND SHALL ASSUME FULL RESPONSIBILITY FOR THEIR ACCURACY. WHEN SHOP DRAWINGS BASED ON FIELD
THE CONTRACTOR SHALL TAKE ALL FIELD MEASUREMENTS NECESSARY TO ASSURE PROPER FIT OF THE FINISHED
REFERENCE ONLY. THEY HAVE BEEN TAKEN FROM THE ORIGINAL DESIGN DRAWINGS AND ARE NOT GUARANTEED.
: DIMENSIONS OF THE EXISTING STRUCTURE SHOWN ON THESE PLANS ARE FOR GENERALEXISTING DIMENSIONS
DIGITS SHALL BE ASSUMED TO BE ZEROS.
: WHEN DECIMAL DIMENSIONS ARE GIVEN TO LESS THAN THREE DECIMAL PLACES, THE OMITTEDDIMENSIONS
: NONESALVAGE
EQUAL LIFTS) ON 3" HMA S1 (TRAFFIC LEVEL 2).
: THIS SHALL CONSIST OF TWO COURSES, 4" HMA S0.5 (TRAFFIC LEVEL 2) (PLACED IN 2 BITUMINOUS CONCRETE OVERLAY
: SEE STRUCTUAL STEEL NOTES FOR DESIGNATIONS AND REQUIREMENTS.STRUCTURAL STEEL
: HL93, LEGAL AND PERMIT VEHICLESLIVE LOAD
Fy = 50,000 PSI(AASHTO M270 GRADE 50 GALVANIZED)
:STRUCTURAL STEEL
Fy = 60,000 PSI(ASTM A615 GRADE 60)
:REINFORCEMENT
TO THE REQUIREMENTS OF 6.01 - CONCRETE FOR STRUCTURES, AND M.03 - PORTLAND CEMENT CONCRETE.
THE COMPRESSIVE STRENGTH OF THE CONCRETE IN THE CONSTRUCTED COMPONENTS SHALL CONFORM
THE CONCRETE STRENGTH, f'c, USED IN DESIGN OF THE CONCRETE COMPONENTS IS NOTED ABOVE.
f'c = 5,000 PSICLASS PRC05062 f'c = 4,000 PSICLASS PCC04462
: CONCRETE
:MATERIAL STRENGTHS
RELEASE 1.1 (2025).
BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION BRIDGE AND ROADWAY STRUCTURES DESIGN MANUAL, : AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS - 10TH EDITION, 2020 AS SUPPLEMENTEDDESIGN SPECIFICATIONS
DATED JULY 2025 AND SPECIAL PROVISIONS.
: CONNECTICUT DEPARTMENT OF TRANSPORTATION FORM 819 (2024), SUPPLEMENTAL SPECIFICATIONSSPECIFICATIONS
CONCRETE NOTES
PERMITTED WITHOUT THE PRIOR APPROVAL OF THE ENGINEER.
: CONSTRUCTION JOINTS, OTHER THAN THOSE SHOWN ON THE PLANS, WILL NOT BE CONSTRUCTION JOINTS
IN THE ITEM "DEFORMED STEEL BARS - GALVANIZED.
SUPPLEMENTAL REQUIREMENTS. THE COST OF FURNISHING AND PLACING THIS REINFORCEMENT SHALL BE INCLUDED
ALL REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF ASTM A767, CLASS 1, INCLUDING
: ALL REINFORCEMENT SHALL BE GALVANIZED AFTER FABRICATION UNLESS NOTED OTHERWISE.REINFORCEMENT
: ALL REINFORCEMENT SHALL HAVE TWO INCHES COVER UNLESS DIMENSIONED OTHERWISE.CONCRETE COVER
: EXPOSED EDGES SHALL BE BEVELED 3/4"x3/4" UNLESS DIMENSIONED OTHERWISE.EXPOSED EDGES
PCC04462 BRIDGE PARAPETS PARAPET CONCRETE
PCC CLASS CULVERT COMPONENT ITEM
COMPONENTS:
THE FOLLOWING PAY ITEMS AND CONCRETE CLASSES ARE REQUIRED FOR CAST-IN-PLACE BRIDGE
PRECAST CONCRETE NOTES
BE ADEQUATE FOR THE SAFETY FACTORS REQUIRED BY THE ERECTION PROCEDURE.
: THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE DESIGN OF THE LIFTING DEVICES, WHICH SHALL LIFTING DEVICES
: THE FIRST DIMENSION FOR THE BOX CULVERT IS WIDTH, THE SECOND IS HEIGHT.DIMENSIONS
THE FOLLOWING PAY ITEMS AND CONCRETE CLASSES ARE REQUIRED FOR PRECAST BRIDGE COMPONENTS:
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-03
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_General_Notes.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
GENERAL NOTES
TRANSPORTATION
ADHESIVE BONDED DOWELS NOTES
INSPECT AND TEST THE DOWELS SHALL BE PAID FOR UNDER THE ITEM "DRILLING HOLES AND BONDING DOWELS."
THE WORK TO FURNISH THE DOWELS AND ADHESIVE BONDING MATERIAL, DRILL HOLES, INSTALL DOWELS, AND 5.
FIELD TESTING OF THE DOWELS IS NOT REQUIRED.4.
REINFORCEMENT TO OBTAIN REQUIRED EMBEDMENT.
WHEN DRILLING HOLES, IF EXISTING REINFORCEMENT IS ENCOUNTERED, CORE DRILL THROUGH 3.
ACCORDANCE WITH ASTM A767, CLASS 1, INCLUDING SUPPLEMENTAL REQUIREMENTS.
THE REINFORCEMENT SHALL CONFORM TO ASTM A 615, GRADE 60 AND BE HOT DIP GALVANIZED IN 2.
5 KSI.
THE COMPRESSIVE STRENGTH OF THE EXISTING CONCRETE IN THE DESIGN OF ADHESIVE BONDED DOWELS WAS 1.
PRC05062
RETURN WALLS
CUT-OFF WALLS
PRECAST CONCRETE CUT-OFF WALL
PRC05062BOX CULVERT12' X 8' PRECAST CONCRETE BOX CULVERT
PRC05062
WINGWALL FOOTINGS
WINGWALL STEMS
PRECAST SUBSTRUCTURE ELEMENT
PCC CLASSCULVERT COMPONENTITEM
WITH D1.5 AND ANY ADDITIONAL REQUIREMENTS SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS.
QUANTITY, AND TYPE OF NON-DESTRUCTIVE TESTING OF SHOP AND FIELD WELDS SHALL BE IN ACCORDANCE
ANSI/AASHTO/AWS D1.5 - BRIDGE WELDING CODE, UNLESS OTHERWISE NOTED ON THE PLANS. THE FREQUENCY, WELDING, WELDING PROCEDURES, WELDING INSPECTION, AND TESTING METHODS SHALL MEET THE 2.
ACCORDANCE WITH ASTM A123.
STRUCTURAL STEEL SHALL CONFORM TO AASHTO M270, GRADE 50 T2 AND SHALL BE HOT DIPPED GALVANIZED IN 1.
STRUCTURAL STEEL NOTES
04.03
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-04
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Boring_Logs.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
BORING LOGS (1 OF 5)
TRANSPORTATION
04.04
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-05
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Boring_Logs.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
BORING LOGS (2 OF 5)
TRANSPORTATION
04.05
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-06
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Boring_Logs.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
BORING LOGS (3 OF 5)
TRANSPORTATION
04.06
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-07
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Boring_Logs.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
BORING LOGS (4 OF 5)
TRANSPORTATION
04.07
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-08
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Boring_Logs.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
BORING LOGS (5 OF 5)
TRANSPORTATION
04.08
SCALE: 1" = 5'
F L
O W
WINGWALL 2B
11'-6"
14'-0"
WINGWALL 1B
14'-6"
WINGWALL 2A
19'-0"
WINGWALL 1A
14'-6"
B ROUTE 101L
LC CULVERT
WP-9 WP-5 WP-6 WP-10
WP-1 WP-11 WP-2
WP-7 WP-3 WP-4 WP-8
DETAIL A
JOINT (TYP.)
CULVERT
CULVERT
CONCRETE BOX
12' X 8' PRECAST
U N
IT
U N
IT
U N
IT
U N
IT
U N
IT
(TYP.)
90°00'00"
JOINT FILLER (TYP.) (SEE NOTE 2)
" PREFORMED EXPANSION2
LAYOUT PLAN
SCALE: 1" = 5'
F L
O W
WINGWALL 2B
11'-6"
WINGWALL 1B
14'-6"
WINGWALL 2A
19'-0"
WINGWALL 1A
14'-6"
B ROUTE 101L
LC CULVERT
WALL STEM (TYP.)
PRECAST CONCRETE
WALL FOOTING (TYP.)
PRECAST CONCRETE
CUTOFF WALL (TYP.)
C PRECAST CONCRETE
RETURN WALL (TYP.)
C PRECAST CONCRETE
(TYP.)
1'-0"
(T Y
P
L
L
(TYP.)
1'-0"
(T Y
P
WP-11
SCALE: 1
2" = 1'-0"
JOINT FILLER (SEE NOTE 2)
" PREFORMED EXPANSION2
WINGWALL (TYP.) (SEE NOTE 3)
MEMBRANE (TO THE INSIDE OF THE
INSTALL 2' WIDE PEEL AND STICK RUBBER
JOINT (SEE NOTE 1)
INSTALL BACKER ROD AT EXPOSED
EQUAL AT EXPOSED JOINT (SEE NOTE 1)
INSTALL SIKAFLEX OR AN APPROVED
PRECAST CONCRETE PARAPET
CONCRETE PARAPET ON
WITH END OF BOX CULVERT
BACK OF PARAPET ALIGNED
WP-6
WP-1
THE COST OF THE ITEM "PRECAST SUBSTRUCTURE ELEMENT".
COST OF INSTALLING AN APPROVED PEEL AND STICK RUBBER MEMBRANE SHALL BE INCLUDED IN3.
OF THE ITEM "PRECAST SUBSTRUCTURE ELEMENT".
PREFORMED EXPANSION JOINT FILLER SHALL BE INCLUDED IN THE COST"2
PAYMENT TO INSTALL 2.
ITEM "PRECAST SUBSTRUCTURE ELEMENT".
PAYMENT TO INSTALL BACKER ROD AT EXPOSED JOINTS SHALL BE INCLUDED IN THE COST OF THE 1.
WP-2
WP-3
WP-4
WP-5
WP-6
WP-7
WP-8
WP-9
WP-10
WP-11
3+18.25
3+32.25
3+18.37
3+32.21
3+18.13
3+32.30
3+04.05
3+50.98
3+03.45
3+43.94
3+25.25
17.53 LT
17.50 LT
17.47 RT
17.50 RT
17.71 LT
17.67 LT
17.29 RT
17.42 RT
871514.6014
871517.2340
871531.8283
871534.4306
871497.4382
871500.0405
871529.1331
871537.9622
871494.7431
871502.1780
871515.9344
1258330.9680
1258344.7182
1258327.7091
1258341.4651
1258334.2147
1258347.9708
1258313.4618
1258360.1340
1258319.9674
1258359.2704
1258337.8399
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-09
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Layout_Foundation_Plan.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
FOUNDATION PLAN
LAYOUT PLAN AND
TRANSPORTATION
83/11
O
O R
D
IN
A T E G
R
N N
E C
T
IC
O
O R
D
IN
A T E G
R
N N
E C
T
IC
FOUNDATION PLAN
DETAIL A
POINT
NOTES:
WORKING POINTS
STATION OFFSET NORTH EAST
04.09
12'-0"
14'-0"
M
IN
CONCRETE BOX CULVERT
12' X 8' PRECAST
FINISHED GRADE
PROPOSED
STONE
NO. 6 CRUSHED
WSEL 567.6
OHW
WSEL 569.1
100-YEAR DESIGN
EXISTING AND PROPOSED
FINISHED GRADE
PROPOSED
DOWNSTREAM ELEVATION
SCALE: ¼" = 1'-0"
(PRECAST WINGWALL 2A)
19'-0"
(PRECAST WINGWALL 1A)
14'-6"
(SEE NOTE 2)
EL. 568.1 (TYP.)
4" DIA. WEEPHOLE
INV. EL. 561.1
FOOTING
1'-6"
EL. 560.1
BOTTOM OF FOOTING & CULVERT
AND RETURN WALLS
PRECAST CUTOFF WALL
47'-6"
(TYP.)
1'-0"
1'-6"
EL. 564.1
12'-0"
14'-0"
M
IN
CONCRETE BOX CULVERT
12' X 8' PRECAST
FINISHED GRADE
PROPOSED WSEL 567.6
OHW
DESIGN WSEL 570.1
PROPOSED 100-YEAR
EXISTING AND
FINISHED GRADE
PROPOSED
UPSTREAM ELEVATION
(PRECAST WINGWALL 1B)
14'-6"
(PRECAST WINGWALL 2B)
11'-6"
(SEE NOTE 2)
EL. 568.1 (TYP.)
4" DIA. WEEPHOLE
FOOTING
1'-6"
EL. 560.1
BOTTOM OF FOOTING & CULVERT
AND RETURN WALLS
PRECAST CUTOFF WALL
40'-0"
EL. 564.1
PARAPET
42" VERTICAL SHAPE
SHAPE PARAPET
42" VERTICAL
TO BE RELOCATED
EXISTING 6" DIA. CONDUITS
GEOTEXTILE (SEPARATION - CLASS 1)
(TYP.)
EL. 567.6
MATERIAL
12" NATURAL STREAMBED
18" INTERMEDIATE RIPRAP
6" GRANULAR FILL
SCALE: ¼" = 1'-0"
INV. EL. 561.1
2:
2:1
2:
12:1
MATERIAL
12" NATURAL STREAMBED
18" INTERMEDIATE RIPRAP
6" GRANULAR FILL
STONE
NO. 6 CRUSHED
(SEE NOTE 1)
TO BE REMOVED AND RESET
EXISTING FIRE SUPPLY DRY HYDRANT
- CLASS 1)
GEOTEXTILE (SEPARATION
UTILITY SUPPORT BRACKET - SPACE @ 6'-0" MAX.
THRIE BEAM ATTACHMENT THRIE BEAM ATTACHMENT
BELOW BOTTOM OF CHANNEL
IN WATERCOURSE 2'
CUT OFF COFFERDAM SHEETING
BELOW BOTTOM OF CHANNEL
IN WATERCOURSE 2'
CUT OFF COFFERDAM SHEETING
(TYP.)
EL. 567.6
7'-6"± 5'-0"±
EL. 570.69
EL. 570.75 EL. 570.73
EL. 570.66
EL. 571.54
EL. 571.59 EL. 571.55
EL. 571.39
THRIE BEAM ATTACHMENT THRIE BEAM ATTACHMENT
(SEE NOTE 2)
EL. 565.1 (TYP.)
4" DIA. WEEPHOLE
2- YEAR WSEL 568.0
2- YEAR WSEL 568.0
AND DEWATERING)
(EXCLUDING COFFERDAM
EXCAVATION - EARTH
LIMITS OF STRUCTURE
DEWATERING)
EARTH (EXCLUDING COFFERDAM AND
LIMITS OF STRUCTURE EXCAVATION -
EXISTING FINISHED GRADE
IN PLACE, SEE NOTE 4.
COFFERDAM MATERIAL LEFT
DEWATERING SHOWN. FOR
PROPOSED COFFERDAM AND
EXISTING STRUCTURE REMOVAL ELEVATION
SCALE: N.T.S.
LINE (TYP.)
GROUND
PROPOSED
MATERIAL
OF EXISTING CHANNEL BOTTOM
LIMITS OF EXCAVATION AND REUSE
CRUSHED STONE (TYP.)
TO LIMITS OF PROPOSED NO. 6
EXISTING FOOTING TO BE REMOVED
SCALE:
16" = 1'-0"
EARTHWORK ELEVATION
12'-0"
NO. 6 CRUSHED STONE
1'-6" THICK LAYER OF
C CULVERTL
BACKFILL
STRUCTURE
PERVIOUS
ROADWAY
EXISTING
CONTRACTOR (TYP.)
DETERMINED BY THE
BOTTOM EL. TO BE
EL. 560.1
(SEE NOTE 3)
STREAMBED MATERIAL
PLACE 3'-0" OF NATURAL
1.5
1.5
(SEE SHEET S-15)
(APPROXIMATE LOCATION SHOWN)
TRENCHED IN THE ROADWAY
36" TEMPORARY BYPASS PIPE
MATERIAL LEFT IN PLACE, SEE NOTE 4.
DEWATERING SHOWN. FOR COFFERDAM
PROPOSED COFFERDAM AND
LEGEND
18" INTERMEDIATE RIPRAP
NATURAL STREAMBED MATERIAL
6" GRANULAR FILL
NO. 6 CRUSHED STONE
REMOVAL OF EXISTING MASONRY
NOTES
LEFT IN PLACE".
THIS WORK WILL BE PAID UNDER ITEM 0204139 "COFFERDAM MATERIAL
FOLLOWING SHAPE OF STREAMBED AND RIPRAP MATERIAL PLACED.
COFFERDAM SHALL BE CUT OFF 2 FEET BELOW BOTTOM OF CHANNEL4.
MATERIAL".
UNDER THE ITEM "SUPPLEMENTAL STREAMBED CHANNEL
PLACED OUTSIDE OF EACH CULVERT END SHALL BE PAID FOR
CHANNEL BOTTOM MATERIAL". NATURAL STREAMBED MATERIAL
PAID FOR UNDER THE ITEM "EXCAVATION AND REUSE OF EXISTING
NATURAL STREAMBED PLACED INSIDE OF THE CULVERT SHALL BE3.
WEEPHOLE LOCATIONS.
1' x 1' x 1' BAGGED STONE SHALL BE PLACED IN BACKFILL BEHIND2.
AND TO BE DETAILED ON CULVERT FABRICATION DRAWINGS.
DRY HYDRANT CONNECTION BRACKETS TO MATCH EXISTING
DRY HYDRANT SUPPORT BRACKETS CONCEPTUALLY SHOWN.1.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-10
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Culvert_Elevations.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
CULVERT ELEVATION
TRANSPORTATION
BOX CULVERT
MATERIAL WITHIN
3' NATURAL STREAMBED
BOX CULVERT
MATERIAL WITHIN
3' NATURAL STREAMBED
04.10
NOTES:
INSTALLATION INSTRUCTIONS.
REFER TO SPECIAL PROVISIONS FOR 12' X 8' PRECAST CONCRETE BOX CULVERT FOR
INDUSTRY STANDARD LAP JOINTS THAT SHALL BE APPROVED BY THE ENGINEER.
TOGETHER BY MEANS OF MECHANICAL CONNECTIONS AND PROVIDED WITH
THE PRECAST CONCRETE BOX CULVERT UNITS SHALL BE PERMANENTLY FASTENED4.
RESPECTIVE CULVERT UNITS.
PROVIDE ONE WEEP HOLE AT EL. 565.1 WITHIN EACH VERTICAL WALL FOR THE3.
ALL REINFORCEMENT SHALL HAVE 2" COVER, UNLESS DIMENSIONED OTHERWISE.2.
= 1.14 TSF (SERVICE I)
MAXIMUM DESIGN FOUNDATION PRESSURE = 1.51 TSF (STRENGTH I)1.
SECTION - 12' X 8' PRECAST CONCRETE BOX CULVERT
SCALE:
2" = 1'-0"
13 - #5 BARS EQUALLY SPACED (UPPER BARS - TOP SLAB)
18 - #5 BARS EQUALLY SPACED (LOWER BARS - TOP SLAB)
13 - #5 BARS EQUALLY SPACED (UPPER AND LOWER BARS - BOTTOM SLAB)
SPLICE (TYP.)
2'-6"
SPLICE (TYP.)
2'-6"
WALL
12'-0" (SPAN)
WALL
1'-0"
(R
IS
E
(T Y
P
(T Y
P
.) (MIN.)
6"
(TYP.)
S P
L
IC
E
T Y
P
C L
E A
R
(I N
T E
R
IO
R A
N D
E X
T E
R
IO
R F
A C
E S
V
E R
T
IC
A L
W A
L L
S
B
A R
S E
Q U
A L
L Y
S P
A C
E D
(M
IN
S P
L
IC
E
T Y
P
#5 @ 6"
B O
T
S L
A B
#6 @ 6"
#6 @ 6"
#5 @ 9"
#5 @ 6"
#6 @ 6"
#6 @ 6"
T O
P S
L A
B
#5 @ 6"
R = 6" (TYP.)
#5 @ 6" #5 @ 9"
#5 @ 6"
#5 @ 6"
(T Y
P
(COLD LIQUID ELASTOMERIC)
MEMBRANE WATERPROOFING
TOP SLAB SIDE JOINT
BOTTOM SLAB
SCALE:
4" = 1'-0" SCALE:
4" = 1'-0"
SCALE:
4" = 1'-0"
BEFORE PLACING ANY FILL
EXPOSED EXTERIOR JOINTS
SILICONE JOINT SEALANT ALL
WITH NON-SHRINK GROUT
FILL JOINTS ALL AROUND
FLEXIBLE GASKET
RUBBER EXPANDED
ALL INTERIOR JOINTS
SILICONE JOINT SEAL
WITH NON-SHRINK GROUT
FILL JOINTS ALL AROUND
BEFORE PLACING ANY FILL
EXPOSED EXTERIOR JOINTS
SILICONE JOINT SEALANT ALL
RUBBER GASKET
FLEXIBLE EXPANDED
ALL INTERIOR JOINTS
SILICONE JOINT SEAL
RUBBER GASKET
FLEXIBLE EXPANDED
ALL INTERIOR JOINTS
SILICONE JOINT SEAL
WITH NON-SHRINK GROUT
FILL JOINTS ALL AROUND
TYPICAL CULVERT LAP JOINT DETAILS
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-11
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Culvert_Section.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: CHECKED BY:
CULVERT SECTION
TRANSPORTATION
EAP/SLM CLG/DMK 04.11
GROUTED SPLICE COUPLER TOLERANCES
A
B
C
D
SHIM PACK HEIGHT
REINFORCING HEIGHT
LOCATION OF REINFORCING & GROUTED SPLICE
COUPLERS MEASURED FROM A WORKING LINE
GAP BETWEEN REINFORCING
4" ±
4"
4" ±
2"
4"
4"
GROUTED SPLICE COUPLER DETAIL
SCALE: N.T.S.
GROUTED SPLICE COUPLER NOTES:
ENTERING GROUTED SPLICE COUPLER.
WASHER TO BE PROVIDED AROUND REINFORCING TO PREVENT GROUT FROM6.
SPLICE COUPLER USED.
INSTALLATION RECOMMENDATIONS FROM THE MANUFACTURER OF THE GROUTED
BEFORE EXECUTING GROUTED SPLICE COUPLER ASSEMBLIES, ALWAYS SEEK5.
DIMENSIONS "B" AND "D" AND FOR TOLERANCES ON THESE AND ALL DIMENSIONS.
CONSULT MANUFACTURER OF THE GROUTED SPLICE COUPLER FOR PROPER4.
DIMENSION "C".
SPLICE COUPLER PLACEMENT WITHIN THE ELEMENTS TO CONTROL THE CRITICAL
USE MATCHING TEMPLATES FOR THE LOCATION OF REINFORCEMENT AND GROUTED3.
NO. 0514719A "PRECAST SUBSTRUCTURE ELEMENT" AND SHALL BE GALVANIZED.
GROUTED SPLICE COUPLERS SHALL BE INCLUDED IN COST FOR ITEM2.
GREATER THAN SHIM PACK.
(MIN.)"2
PRE-BED PRECAST ELEMENT WITH NON-SHRINK GROUT WITH THICKNESS 1.
C PRECAST CONCRETE STEM AND WORKING LINEL
REINFORCING (TYP.)
PRECAST CONCRETE STEM
COUPLER (TYP.)
GROUTED SPLICE
B
REINFORCING (TYP.)
SHIM PACK
(TYP.)
NON-SHRINK GROUT
A
D
COUPLER MANUFACTURER
GROUT SUPPLIED BY
GROUT TUBE (TYP.)
FOOTING
PRECAST CONCRETE
WASHER (TYP.)
(SEE NOTE 6)
4 C
O V
E R
0"
"C
O V
E R
1'-3"
6"
C A
S T
-I N
-P L
A C
E C
O N
C R
E T
E
E A
C H
F A
C E
1" X 1" BEVEL (TYP.)
OVERLAY
CONCRETE
TOP OF BIT.
V E
R T
IC
A
L S
H A
P E
P A
R A
P E
T
TYPICAL PRECAST WINGWALL SECTION
SCALE:
4" = 1'-0"
(TYP.)
3" COVER
(M
IN
V
R
IE
S
10'-0"
6'-6"
2'-0"
(TOP & BOTTOM)
#6 @ 12" (GALVANIZED)
#6 @ 6"
#6 @ 6"
#6 @ 6"
#6 @ 12"
(PRECAST STEM ONLY)
#5 TIES SPACED AT 12" (VERT.) & 24" (HORIZ.)
COUPLER (TYP.)
GROUTED SPLICE
#6 @ 12"
L
IM
IT
S
O F
P E
N E
T R
A T
IN
G
S E
A L
E R
#6 @ 6"
#6 @ 12"
#6 @ 12"
(TYP.)
#6 @ 12"
8H:1V
WEEPHOLE
C 4" DIA.L
L
IM
IT
S
O F
P R
E C
A S
T S
U B
S T
R U
C T
U R
E E
L E
M E
N T
SURFACE (TYP.)
ROUGHENED
ELEVATION VARIES (TYP.)
SEE SHEET S-10 FOR ELEVATIONS
EACH WEEPHOLE
2'x2'x2' BAGGED STONE AT
UTILITY SUPPORT - SECTION
SCALE:
4" = 1'-0"
NOTES:
INSTALLATION OF UTILITIES ON ROLLER SUPPORTS BY "OTHERS".6.
ITEM "STRUCTURAL STEEL".
"STRUCTURAL STEEL". THE ROLLER ASSEMBLY SHALL ALSO BE PAID FOR UNDER
ITEMS FOR THE SUPPORT UTILITY MAINS SHALL BE PAID FOR UNDER THE ITEM5.
ANGLES (TYP.)2
THE 4x4x
ACCORDANCE WITH ASTM A123. GRADE 36 STEEL CAN BE SUBSTITUTED FOR
STEEL USED FOR THE UTILITY SUPPORTS SHALL BE HOT DIPPED GALVANIZED IN4.
THREADED INSERTS SHALL HAVE A MINIMUM PULLOUT STRENGTH OF 2 KIPS.3.
AND WINGWALL UNITS DURING PRODUCTION.
UTILITY SUPPORT INSERTS TO BE FACTORY-CAST INTEGRALLY WITH THE CULVERT2.
UTILITY SUPPORTS SHALL BE SPACED AT A MAXIMUM OF 6 FT.1.
3'-2"
CONCRETE PARAPET
HMA WEARING SURFACE
ASSEMBLY
UTILITY ROLLER
SUPPORT FOR 6"
" STEEL PLATE2
L4x4x
UTILITY SUPPORT - PLAN
SCALE:
4" = 1'-0"
C 3 - 6" UTILITY CONDUITS
BY "OTHERS"
L
PARAPET
CONCRETE
SURFACE
HMA WEARING
C 3 - 6" UTILITY CONDUITS
BY "OTHERS"
L
S T
E E
L P
L A
T E
L4x4x
L4x4x3
4" THREADED INSERT FOR
4" DIA. H.S. BOLT (TYP.)
H.S. BOLT COSTS INCIDENTAL
TO STRUCTURAL STEEL
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-12
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Wingwall_Details.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
WINGWALL DETAILS
PRECAST CONCRETE
TRANSPORTATION
LEGEND
CAST-IN-PLACE CONCRETE
NON-SHRINK GROUT
#6 @ 6"
04.12
HEADWALL & PARAPET DETAIL
SCALE:
4" = 1'-0"
NOTES:
CONCRETE".
CONCRETE FOR CAST-IN-PLACE CONCRETE PARAPET SHALL BE CLASS PCC04462 PAID UNDER "PARAPET 2.
PRECAST THE CONCRETE HEADWALLS AS PART OF THE CULVERT END UNITS.1.
4 C
O V
E R
3" COVER
0"
C O
V E
R
C O
V E
R
1'-3"
C A
S T
-I N
-P L
A C
E C
O N
C R
E T
E
E A
C H
F A
C E
1" X 1" BEVEL (TYP.)
#6 @ 6"
#6 @ 6"
OVERLAY
CONCRETE
TOP OF BIT.
V E
R T
IC
A
L S
H A
P E
P A
R A
P E
T
BOX CULVERT
12' X 8' PRECAST CONCRETE
E
Q S
P A
L
IM
IT
S
O F
P E
N E
T R
A T
IN
G
S E
A L
E R
SURFACE (TYP.)
ROUGHENED
IN
T
E G
R A
L
V A
R
IE
S
H E
A D
W A
L L
MEMBRANE WATERPROOFING AT PARAPET
SCALE: 1" = 1'-0"
P A
V E
M E
N T
B
E L
O W
CAST-IN-PLACE PARAPET
PRECAST HEADWALL S
U
R F
A C
E
NOTE: REINFORCEMENT NOT SHOWN FOR CLARITY PURPOSES
PAVEMENT SURFACE
(COLD LIQUID ELASTOMERIC)
MEMBRANE WATERPROOFING
12' x 8' PRECAST CONCRETE BOX CULVERT
TYPICAL PAY LIMITS AT U-TYPE WINGWALLS
SCALE:
2" = 1'-0"
(M
IN
(TYP.)
1'-0"
(TYP.)
2'-6"
GUTTER LINE
PARAPET
CONCRETE
BOTTOM OF SUBBASE
OBTRUDES WITHIN THIS AREA
UNDISTURBED MATERIAL
SLOPE LINE EXCEPT WHERE
1.5
TO WINGWALL
MEASURED PERPENDICULAR
PERVIOUS
STRUCTURE
BACKFILL
DAMPPROOFING
LIMITS OF
GRADE
EXISTING
SEE NOTE 1
(T Y
P
CLASS 1)
ON GEOTEXTILE (SEPARATION -
1'-6" - NO. 6 CRUSHED STONE
LIMITS OF STRUCTURE EXCAVATION - EARTH (EXCLUDING COFFERDAM AND DEWATERIN
WINGWALL
PRECAST CONCRETE
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-13
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Wingwall_Details.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DETAILS
WINGWALL AND PARAPET
TRANSPORTATION
NOTES:
RIPRAP MATERIAL PLACED. THIS WORK WILL BE PAID UNDER ITEM 0204139 "COFFERDAM MATERIAL LEFT IN PLACE".
COFFERDAM SHALL BE CUT OFF 2 FEET BELOW BOTTOM OF CHANNEL FOLLOWING SHAPE OF STREAMBED AND1.
04.13
PRECAST RETURN WALL ELEVATION
SCALE: 1" = 1'-0"
2'-0"
3"
2 - #5
2 - #5
3 EQUAL SPACES
(U S
E
S
P L
IC
E
S P
L
IC
E
IF
N
E C
E S
S A
R Y
3" CL.
C 3"DIA. HOLEL
AS ORDERED BY ENGINEER
NO. 6 CRUSHED STONE
(DOWEL) (SEE NOTE 4)
AFTER INSTALLING #6 x 1'-6" LONG ANCHOR BAR
CULVERT END UNITS. FILL HOLE WITH NON-SHRINK GROUT
DRILL 3" DIA. HOLE @ 1'-6" SPA. IN BOTTOM SLAB OF BOX
BAR IN HOLE IN BOTTOM SLAB (SEE NOTE 4).
USE NON-SHRINK GROUT. CENTER ANCHOR
(DOWEL) INTO CUTOFF WALL AFTER PLACING END UNIT.
WITH PVC PIPE. PLACE #6 x 1'-6" LONG ANCHOR BAR
DRILL 2" DIA. HOLE IN PRECAST CULVERT/HEADWALL
BOTTOM SLAB)
(TO BE ALIGNED WITH BOX CULVERT
PRECAST CONCRETE CUTOFF WALL
BOX CULVERT BOTTOM SLAB
OUTLET)
(INLET AND
EL. 558.10
#4 @ 12"
OF RETURN WALL
#5 EACH FACE
CUTOFF WALL (PRECAST)
CAST MONLITHICALLY WITH
1'-6" WIDE RETURN WALL,
PRECAST CONCRETE U-TYPE WINGWALL / CUTOFF WALL / RETURN WALL NOTES:
FOR ITEM 0601183A "PRECAST CONCRETE CUT-OFF WALL".
PRECAST CONCRETE CUT-OFF AND RETURN WALLS SHALL BE FABRICATED IN ACCORDANCE WITH THE SPECIAL PROVISION6.
OF ITEM 0610002 "DRILLING HOLES AND BONDING DOWELS".
PAYMENT FOR DRILLING HOLES IN CONCRETE AND INSTALLING ADHESIVE BONDED DOWELS SHALL BE INCLUDED IN THE COST5.
CULVERT".
PAYMENT FOR PLACING NON-SHRINK GROUT SHALL BE INCLUDED IN ITEM 0601139A "12' x 8' PRECAST CONCRETE BOX4.
ALL REINFORCEMENT TO HAVE 2" COVER UNLESS OTHERWISE NOTED.3.
SATISFACTION OF THE ENGINEER.
AND SETTING THE UNITS SHALL BE GROUTED OVER TO A SMOOTH FINISH UPON COMPLETION OF THE WORK, AND TO THE
ALL INSERTS OR HOLES CAST INTO THE WINGWALL AND CUTOFF WALL SECTIONS FOR THE SOLE PURPOSE OF HANDLING2.
IN THESE PLANS.
RETURN WALLS IN ACCORDANCE WITH RESPECTIVE SPECIAL PROVISIONS AND TO THE DIMENSIONS AND DETAILS SHOWN
THE CONTRACTOR SHALL MANUFACTURE AND CONSTRUCT THE PRECAST CONCRETE WINGWALLS, CUTOFF WALLS, AND1.
6"
(TYP.)
2'-6"
(T Y
P
(T Y
P
3" COVER (TYP.)
(TYP.)
4 - #5 , EQUALLY SPACED (TYP.)
C OF CUTOFF WALL
C OF DRILLED HOLE
L
L
15 - #4 @ 12"
CUT OFF WALL PAY LIMIT
3" COVER
(T Y
P
R E
T U
R N
W A
L L
WALL (TYP.)
C OF RETURNL
SPACED (TYP.)
#5, EQUALLY
P A
Y L
IM
IT
T
Y P
R E
T U
R N
W A
L L
#5, EQUALLY SPACED 1'-0"
HOLES AND BONDING DOWELS"
CUTOFF WALL (TYP.), SEE ITEM "DRILLING
2" DIA. X 1'-0" LONG DRILLED HOLE IN
A
PLAN - TYPICAL PRECAST CUTOFF AND RETURN WALL
SCALE:
2" = 1'-0"
ELEVATION - TYPICAL PRECAST CUTOFF AND RETURN WALL
SCALE:
2" = 1'-0"
RETURN WALL (TYP.)
CUTOFF WALL (TYP.)
2" DIA. X 1'-0" LONG HOLE DRILLED IN
T O
F F
W A
L L
(TYP.)
1'-6"
BOTTOM SLAB
TOP OF CULVERT
SLAB (TYP.)
CAST IN CULVERT BOTTOM
C OF 3" DIA. PIPE SLEEVEL
WITH NON-SHRINK GROUT (TYP.)
CULVERT BOTTOM SLAB TO BE FILLED
DRILL 3" DIA. PIPE SLEEVE THROUGH
PRIOR TO SETTING THE CULVERT SECTIONS
GROUT ON THE CUT-OFF AND RETURN WALLS
" THICK LAYER OF NON-SHRINK2
PLACE A
DOWEL BAR (TYP.)
18" LONG #6 GALVANIZED
CUT-OFF WALL
DRILL 2" DIA. X 1'-0" LONG HOLE INTO
DOWEL DETAIL
SCALE: 1" = 1'-0"
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-14
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Wingwall_Details.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
MISCELLANEOUS DETAILS
TRANSPORTATION
04.14
3+00 4+00
TOP EL. 570.0 (TYP.)
COFFERDAM AND DEWATERING
B ROUTE 101L
ORDINARY HIGH WATER
EDGE OF WATER
TO BE TEMPORARILY REMOVED
EXISTING FIRE SUPPLY DRY HYDRANT
PROPOSED CULVERT STRUCTURE
F L
O W
TEMPORARY CONSTRUCTION EASEMENT (TYP.)
OF THE ENCLOSED COFFERDAM
IN WATER SURFACE ELEVATION UPSTREAM AND DOWNSTREAM
LOW FLOW PUMPING RATE = 8CFS TO PROVIDE BALANCE
APPROXIMATE TEMPORARY PUMP LOCATION, MINIMUM
TOP OF COFFERDAM EL = 570.0 (MIN)
(CALCULATED)
EXISTING 100-YEAR FLOOD
CLOSURE
BE INSTALLED PRIOR TO BRIDGE
PORTION OF COFFERDAM TO
CLOSURE
BE INSTALLED PRIOR TO BRIDGE
PORTION OF COFFERDAM TO
36" TEMPORARY BYPASS PIPE
RETAINING SYSTEM
TEMPORARY EARTH
TEMPORARY DEWATERING BASIN
TO BE REMOVED
EXISTING BRIDGE STRUCTURE
INVERT EL. 565.00
INVERT EL. 565.00
(CUT OFF ELEVATION VARIES) (TYP.)
COFFERDAM MATERIAL LEFT IN PLACE
RETAINING SYSTEM
TEMPORARY EARTH
(SEE HIGHWAY SUBSET)
UTILITY RELOCATION
LEVEL 3 COMMUNICATIONS, LLC
RELOCATION (SEE HIGHWAY SUBSET)
ENERGY - ELECTRICAL DISTRIBUTION UTILITY
C.L. + POWER CO. DBA EVERSOURCE
(SEE HIGHWAY SUBSET)
TEMPORARY UTILITY POLE
UTILITIES
EXISTING OVERHEAD
CONDUITS
EXISTING TELECOMMUNICATIONS
AVERAGE DAILY FLOW (ADF)
AVERAGE SPRING FLOW (ASF)
2-YEAR FREQUENCY DISCHARGE
TEMPORARY WATER SURFACE ELEVATION DOWNSTREAM
TEMPORARY WATER SURFACE ELEVATION UPSTREAM
2.5 CFS
4.9 CFS
40 CFS
567.9 FT
569.5 FT
1" = 10'SCALE:
* IN-STREAM WORK SHALL BE DONE DURING PERIODS OF LOW FLOW.
EXTENT POSSIBLE
* DISTURBED AREAS AND THE DURATION OF DISTURBANCE SHALL BE MINIMIZED TO THE
TURBIDITY/SEDIMENT TRANSPORT DOWNSTREAM
* BEST MANAGEMENT PRACTICE SHALL BE UTILIZED WHEREVER POSSIBLE TO MINIMIZE
AND PERMANENT IMPACT
* DISTURBANCE SHALL BE LIMITED TO AREAS THAT HAVE BEEN APPROVED FOR TEMPORARY
* ALL UNCONFINED IN-WATER WORK SHALL BE MINOR IN NATURE
* PROPOSED SCHEDULE FOR WORK OPERATIONS
CONSIDERATION OF THE FOLLOWING:
THE DEPARTMENT WILL REVIEW AND MAY APPROVE THE METHODS OF UNCONFINED IN-WATER WORK WITH 2.
JUNE 1 TO SEPTEMBER 30, INCLUSIVE.
ANY UNCONFINED IN-STREAM WORK WITHIN THE WATERCOURSE SHALL BE RESTRICTED TO THE PERIOD FROM 1.
IMPACT SHEETS OF THE PERMIT PLANS.
WATER HANDLING SYSTEM SHALL NOT EXCEED IMPACT AREAS SHOWN ON THE WETLAND AND FLOODPLAIN 8.
ABLE TO SUPPORT CONSTRUCTION ACTIVITY, AND SHALL CONFORM TO PERMITS.
ELECTS TO USE, WHICH WILL SAFELY CONVEY WATER FLOWS THROUGH THE CONSTRUCTION AREA, SHALL BE
TEMPORARY WATER HANDLING SYSTEM SHALL CONSIST OF AN APPROVED SYSTEM THAT THE CONTRACTOR 7.
A DEWATERING BASIN SHALL BE ESTABLISHED OUTSIDE OF THE WETLAND LIMITS.6.
CONSTRUCTION.
THE CONTRACTOR IS REQUIRED TO HAVE A PRIMARY AND SECONDARY PUMP ON-SITE AT ALL TIMES DURING5.
REQUIRED DURING CONSTRUCTION OF THE NEW STRUCTURE.
THE CONTRACTOR SHALL MAINTAIN WATER THROUGH THE TEMPORARY WATER HANDLING SYSTEM AS 4.
TOP OF TEMPORARY COFFERDAM SHALL BE MINIMUM EL. (570.0 FT).3.
HANDLING STORM DRAINAGE TO THE ENGINEER FOR APPROVAL.
DISCHARGED TO A STABLE LOCATION. THE CONTRACTOR SHALL SUBMIT THE MEANS AND METHODS OF
FLOW PUMP(S). PUMP(S) SHALL BE SIZED BY THE CONTRACTOR TO HANDLE THE EXPECTED FLOWS AND BE
ALL WATER PUMPED FROM WITHIN THE TEMPORARY COFFERDAMS SHALL BE HANDLED THROUGH LOW-2.
HANDLING WATER TO THE ENGINEER FOR APPROVAL.
THE CONTRACTOR SHALL DESIGN THE TEMPORARY COFFERDAMS AND SUBMIT MEANS AND METHODS OF 1.
) WITHIN THE PROJECT LIMITS.ENALLAGMA DAECKIIBLUET (
), AND ATTENUATED ENALLAGMA MINUSCULUM), LITTLE BLUET (ENALLAGMA PICTUMSCARLET BLUET (
), ENALLAGMA RECURVATUMLETTER 202504829 FOR THE PROTECTION OF PINE BARRENS BLUET (
THE CONTRACTOR SHALL COMPLY WITH REQUIRED BMPS OUTLINED IN THE NDDB DETERMINATION 3.
PRIMARILY BETWEEN MAY 15TH AND AUGUST 31ST.
MEASURES FOR STATE-LISTED SPECIES OF CONCERN WITH EMERGENCE AND FLIGHT PERIODS
AN ODONATE MANAGEMENT PLAN HAS BEEN DEVELOPED TO OUTLINE PROPOSED PROTECTION 2.
TO OCTOBER 31.
NO TRIMMING, CUTTING, OR REMOVAL OF TREES WITH A 3" DBH OR GREATER FROM APRIL 15 1.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-15
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Water_Handling_Plan.dgn FILE NAME: DKull LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
WATER HANDLING PLAN
TRANSPORTATION
O
O R
D
IN
A T E G
R
N N
E C
T
IC
REMOVE TEMPORARY SIGNAL.48.
RESTORE EXISTING GRADES ON SOUTH SIDE.47.
SIDE.
INSTALL METAL BEAM RAIL ON SOUTH 46.
REMOVE CRANE PAD AND TERS.45.
INSTALL PERMANENT UNDERGROUND UTILITIES.44.
INSTALL PERMANENT AERIAL UTILITIES AND PERMANENT UTILITY POLES IN FINAL LOCATIONS.43.
IMPLEMENT ALTERNATING ONE-WAY TRAFFIC ON NORTH SIDE OF ROADWAY.42.
5STAGE
RESTORE EXISTING GRADES ON NORTH SIDE.41.
INSTALL METAL BEAM RAIL ON NORTH SIDE.40.
REMOVE TERS ON NORTH SIDE OF ROADWAY.39.
REINSTALL DRY HYDRANT.38.
IMPLEMENT ALTERNATING ONE-WAY TRAFFIC ON SOUTH SIDE OF ROADWAY.37.
UNCOVER TEMPORARY SIGNAL.36.
STAGE 4
OF ROAD.
COMPLETE ROADWAY APPROACH EXCEPT 2" FINAL LIFT OF HMA AND INSTALL TTB ON THE SOUTHERN EDGE 35.
REMOVE TEMPORARY BYPASS PIPE.34.
CUT OFF COFFERDAM SHEETING IN WATERCOURSE 2 FEET BELOW BOTTOM OF CHANNEL.33.
REMOVE COFFERDAM SHEETING.32.
GRADE IN FRONT OF CULVERT AT UPSTREAM AND DOWNSTREAM SIDES.31.
TOP DRESS WITH NATURAL STREAMBED MATERIAL UP TO OHW ELEVATION.30.
POUR CAST-IN-PLACE PARAPETS.29
PLACE RIP-RAP IN FRONT OF WINGWALL.28.
BACKFILL BEHIND WINGWALLS AND CULVERT.27.
ERECT WINGWALLS STEMS.26.
ERECT WINGWALLS FOOTINGS.25.
PLACE EXISTING CHANNEL BOTTOM MATERIAL IN BOX CULVERT.24.
PLACE CUT-OFF WALLS AND BOX CULVERT.23.
EXCAVATION TO BOTTOM OF NO. 6 CRUSHED STONE.22.
REMOVE REMAINING PORTIONS OF STRUCTURE.21.
REMOVE EXISTING STREAMBED MATERIAL WITHIN EXISTING STRUCTURE.20.
REMOVE TOP OF EXISTING STRUCTURE.19.
INSTALL REMAINING TEMPORARY COFFERDAM AND DEWATERING.18.
STAGE 3 - DETOUR
COVER TEMPORARY SIGNAL EQUIPMENT [WW1].17.
INSTALL PORTION OF TEMPORARY BYPASS PIPE.16.
INSTALL TERS AND IN-WATER PORTIONS OF COFFERDAM.15.
INSTALL TTB ON SOUTHERN EDGE OF ROAD AND SHIFT TRAFFIC TO SOUTH SIDE OF ROADWAY.14.
STAGE 2
INSTALL PORTION OF TEMPORARY BYPASS PIPE.13.
RELOCATE UNDERGROUND TELECOMMUNICATIONS LINES.12.
INSTALL IN-WATER PORTIONS OF COFFERDAMS.11.
RELOCATE AERIAL UTILITIES.10.
INSTALL T.E.R.S. CRANE PAD AND TEMPORARY SUPPORT OF EXCAVATION FOR TEMPORARY UTILITY POLES.9.
IMPLEMENT ALTERNATING ONE-WAY TRAFFIC ON NORTH SIDE OF ROADWAY.8.
INSTALL TEMPORARY SIGNAL EQUIPMENT.7.
STAGE 1
MATERIAL APPROVAL.6.
ESTABLISH FIELD OFFICE.5.
INSTALL EROSION AND SEDIMENTATION CONTROLS.4.
CLEAR AND GRUB SITE.3.
MOBILIZATION.2.
INSTALL CONSTRUCTION SIGNS.1.
BOTTOM MATERIAL (TYP.)
NATURAL CHANNEL 6" GRANULAR FILL (TYP.)
18" INTERMEDIATE RIPRAP OVER
ROUTE 101
ALVIA CHASE
RESERVOIR
TEMPORARY HYDRAULIC SUMMARY DATA
WATER HANDLING PLAN
"TEMPORARY EARTH RETAINING SYSTEM")
"COFFERDAM AND DEWATERING" OR
TEMPORARY COFFERDAM (PAID FOR UNDER
EDGE OF WATER
LIMITS OF ORDINARY HIGH WATER
LEGEND
EXISTING 100-YEAR FLOOD (CALCULATED)
ODONATE HABITAT
WATER HANDLING NOTES:
UNCONFINED IN-STREAM WORK:
PROTECTED SPECIES TIME-OF-YEAR:
SUGGESTED CONSTRUCTION SEQUENCE:
(CUT OFF ELEVATION VARIES)
COFFERDAM MATERIAL LEFT IN PLACE
04.15
3" COVER (TYP.)
OR DECK JOINT
0" CONTRACTION, EXPANSION
REINFORCEMENT (TYP.)
PARAPET VERTICAL
3" COVER (TYP.)
1" X 1" BEVEL
THE JOINT (TYP.)
BE TERMINATED AT
REINFORCEMENT TO
PARAPET HORIZONTAL
COVER
REINFORCEMENT (TYP.)
PARAPET VERTICAL
CONTROL JOINT
CONTINUOUS ACROSS
REINFORCEMENT TO BE
PARAPET HORIZONTAL
JOINT
{ OF CONTROL
JOINT SEAL
INSTALL SILICONE
1'-6"
SCALE: ¾" = 1'-0"
4"
1'-10¾"
CONTROL JOINT SPACING
GUTTER LINE
½
3'-6"
5'-0"
SCALE: ¾" = 1'-0"
3'-6"
5'-0"CONTROL JOINT
@ 5'-0" C/C CONTROL JOINT SPACING
CONTROL JOINTCONTROL JOINT
SCALE: N.T.S.
PLAN SECTION - PARAPET JOINT DETAIL
30°
SCALE: ¾" = 1'-0"
CONCRETE OVERLAY
TOP OF BITUMINOUS
TRAFFIC
C
CONTROL JOINT
@ 5'-0" C/C
2"
SECTION - PARAPET CONTROL JOINT DETAIL
SCALE: ¾" = 1'-0" -
B
END VIEW
CONCRETE OVERLAY
TOP OF 4" BITUMINOUS
4"1'-2"
4'-6"
PARTIAL PLAN
PARTIAL ELEVATION
1'-3"
4½"
3"
SLEEVE (TYP.)
1" DIA. STANDARD PIPE
B
4'-6"
BOTTOM OF PARAPET
TOP OF CONCRETE SURFACE/
BOTTOM OF PARAPET
TOP OF CONCRETE SURFACE/
A
SCALE: ¾" = 1'-0"
1'-3"
BOTTOM OF PARAPET (ROUGHENED)
TOP OF CONCRETE SURFACE/
1" X 1" BEVEL (TYP.)
SHOWN FOR CLARITY.
REINFORCEMENT NOT
NOTE:
CONCRETE OVERLAY
TOP OF 4" BITUMINOUS
CONCRETE OVERLAY
TOP OF 4" BITUMINOUS
A
SECTION - VERTICAL PARAPET
CONTROL JOINT
START OF
CONNECTOR
THRIE-BEAM TERMINAL
1" MAX.
10"
BOLT & SPLICE
{ OF THRIE-BEAM
CONTROL JOINT
@ 5'-0" C/C
CONTROL JOINT
CONTROL JOINT
@ 5'-0" C/C
CONTROL JOINT
CONTROL JOINT
@ 5'-0" C/C
CONTROL JOINT
@ 5'-0" C/C
WINGWALL
HEADWALL/
BOX CULVERT
PRECAST CONCRETE
HEADWALL/WINGWALL
PRECAST CONCRETE BOX CULVERT
HEADWALL/WINGWALL
PRECAST CONCRETE BOX CULVERT
CPLAN SECTION - CONTROL JOINT DETAIL
SCALE: N.T.S.
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-16
KILLINGLYALVIA CHASE RESERVOIR
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Parapet_Standard_Details.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
- DETAILS
VERTICAL SHAPE PARAPET
TRANSPORTATION
AWAY FROM VIEW
PARAPET END SLOPING
1⅝"
1⅝"
1⅝"
CONTROL JOINT
LIMIT OF
¼
⅛
(T
Y P
⅛
(T Y
P
1"
½"
3"
FORM
CONCRETE
USE 1" X 1" MOLDING (TYP.)
OR PLASTIC MATERIAL FOR FORMING
USE ¼" WOOD, GALVANIZED STEEL
04.16
CONTROL JOINT CONTROL JOINT
CONTROL JOINT (TYP.)
CONTINUOUS ACROSS
REINFORCEMENT TO BE
OR DECK JOINTS (TYP.)
AT EXPANSION, CONTRACTION
REINFORCEMENT TO BE TERMINATED
1'-3"
4¼"
3" COVER
3" COVER
0"
1" X 1" BEVEL (TYP.)
PARTIAL ELEVATION - TYPICAL REINFORCED CONCRETE PARAPET DETAILS
E A
C H
F A
C E
SCALE: ¾" = 1'-0"
E A
C H
F A
C E
SCALE: ¾" = 1'-0"
A
SCALE: ¾" = 1'-0" -
A
PLAN SECTION - PARAPET END REINFORCEMENT
#6 @ 6"
BAR SIZE SPLICE LENGTH
2'-6"#6
SPLICED AT THE SAME LOCATION.
50% OR LESS OF THE LONGITUDINAL BARS ARE
THE SPLICES SHALL BE ALTERNATED SO THAT2.
DIMENSIONED OTHERWISE:
IN THE PARAPETS SHALL BE AS FOLLOWS UNLESS
THE SPLICE LENGTH FOR THE REINFORCEMENT1.
(TYP.)
PARAPET ON CULVERT HEADWALL
REINFORCEMENT SPLICE NOTES:
#6 @ 6"
#6 @ 6"
#6 @ 6"
#6 @ 6"
ISOMETRIC VIEW - REINFORCEMENT DETAIL
SCALE: N.T.S.
AT PARAPET END
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-17
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Parapet_Standard_Details.dgn FILE NAME: DKull LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: EAP/SLM CHECKED BY: CLG/DMK DETAILS (1 OF 2)
- REINFORCEMENT
VERTICAL SHAPE PARAPET
TRANSPORTATION
E
A C
H F
A C
E
TOP OF PARAPET
#6 @ 6"
6"
1" COVER
TOP OF HEADWALL
1" COVER
1'-0"6"
V A
R
IE
S
5'-0"
3" COVER
3" COVER (TYP.)
3" COVER
#6 @ 6"
#6 @ 6"
CONC. OVERLAY
TOP OF BIT.
CULVERT HEADWALL
PRECAST CONCRETE
CULVERT TOP SLAB
TOP OF PRECAST CONCRETE
04.17
CONTROL JOINT CONTROL JOINT
CONTROL JOINT (TYP.)
CONTINUOUS ACROSS
REINFORCEMENT TO BE
OR DECK JOINTS (TYP.)
AT EXPANSION, CONTRACTION
REINFORCEMENT TO BE TERMINATED
1'-3"
4¼"
3" COVER
3" COVER
0"
1" X 1" BEVEL (TYP.)
M I
½
½
10'-0"
3 - TYPE "B" REBAR @ 6"6"
2 - TYPE "A" REBAR @ 6"
3 - TYPE "B" REBAR @ 6"6"
2 - TYPE "A" REBAR @ 6"
3 - TYPE "B" REBAR @ 6"6"
EQUALLY SPACED
ADDITIONAL 5 - #6 DOWELS,
PARTIAL ELEVATION - TYPICAL REINFORCED CONCRETE PARAPET DETAILS
E A
C H
F A
C E
SCALE: ¾" = 1'-0"
E A
C H
F A
C E
TYPE "B" REBAR
SCALE: ¾" = 1'-0"
A
SCALE: ¾" = 1'-0" -
A
PLAN SECTION - PARAPET END REINFORCEMENT
#6 @ 6"
SCALE: ¾" = 1'-0" -
B
PLAN SECTION - PARAPET END REINFORCEMENT
TYPE "A" REBAR
SCALE: N.T.S.
B
BAR SIZE SPLICE LENGTH
2'-6"#6
SPLICED AT THE SAME LOCATION.
50% OR LESS OF THE LONGITUDINAL BARS ARE
THE SPLICES SHALL BE ALTERNATED SO THAT2.
DIMENSIONED OTHERWISE:
IN THE PARAPETS SHALL BE AS FOLLOWS UNLESS
THE SPLICE LENGTH FOR THE REINFORCEMENT1.
(TYP.)
VARIES
6"
2'-6¾"
1'-10¾"
ISOMETRIC VIEW - REINFORCEMENT DETAIL
SCALE: N.T.S.
SCALE: N.T.S.
PARAPET ON WINGWALL
REINFORCEMENT SPLICE NOTES:
AT PARAPET END
ALL HORIZONTAL REINFORCEMENT TO BE CONTINUOUS WITHIN THIS LIMIT
#6 @ 6"
#6 @ 6"
#6 @ 6"
#6 @ 6"
#6 @ 6"
#6 @ 6"
PROJECT TITLE: PROJECT NO.: DRAWING NO.:
SHEET NO.:
5/26/2026
SIGNATURE BLOCK: DRAWING TITLE:
S-18
REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER
PLOTTED DATE:
M:\DDE\Worksets\CTDOT\0068-0217\Bridge\Contract_Plans\SB_CP_0068_0217_Parapet_Standard_Details.dgn FILE NAME: MDoreo LASTED SAVED BY:
R E
V
D A
T E
R E
V
IS
IO
N
D E
S C
R
IP
T
DESIGNER/DRAFTER: EAP/SLM CHECKED BY: CLG/SLM DETAILS (2 OF 2)
- REINFORCEMENT
VERTICAL SHAPE PARAPET
TRANSPORTATION
E
A C
H F
A C
E
TOP OF PARAPET
#6 @ 6"
6"
1" COVER
TOP OF WINGWALL
5'-0"
PIPE SLEEVE (TYP.)
1" ~ STANDARD
8"
OF PARAPET, EACH FACE
#6 TO FOLLOW TOP
⅝
⅝
3�"
3�"
1'-10¾"
3" COVER
#6 #6
PIPE SLEEVE (TYP.)
{ OF 1" ~ STANDARD
V A
R
IE
S
3" COVER (TYP.)
3" COVER (TYP.)
#6 @ 6"
2 - TYPE "A" REBAR @ 6"
3 - TYPE "B" REBAR @ 6"
2 - TYPE "A" REBAR @ 6"
#6 @ 6"
3" COVER
CONC. OVERLAY
TOP OF BIT.
WINGWALL STEM
PRECAST CONCRETE
ADDITIONAL 5 - #6
04.18
| SB_CP_0068_0217_SubsetCoverSheet |
| SB_CP_0068_0217_GenPlan |
| SB_CP_0068_0217_General_Notes |
| SB_CP_0068_0217_Boring_Logs |
| SB_CP_0068_0217_Boring_Logs |
| SB_CP_0068_0217_Boring_Logs |
| SB_CP_0068_0217_Boring_Logs |
| SB_CP_0068_0217_Boring_Logs |
| SB_CP_0068_0217_Layout_Foundation_Plan |
| SB_CP_0068_0217_Culvert_Elevations |
| SB_CP_0068_0217_Culvert_Section |
| SB_CP_0068_0217_Wingwall_Details |
| SB_CP_0068_0217_Wingwall_Details |
| SB_CP_0068_0217_Wingwall_Details |
| SB_CP_0068_0217_Water_Handling_Plan |
| SB_CP_0068_0217_Parapet_Standard_Details |
| SB_CP_0068_0217_Parapet_Standard_Details |
| SB_CP_0068_0217_Parapet_Standard_Details |
| 2026-05-26T16:34:06-0400 | |
| David Kull |
File details come from the government source that posted it. Updated .