0068-0217_03_Highway.pdf

PDF 2 MB Posted

Attached to
Replacement of Bridge No. 02599 Route 101 in the Town of Killingly
Solicitation number
0068-0217
Issued by
Tolland County, Connecticut

About this file

This is a highway contract plan document prepared by the Connecticut Department of Transportation for the Replacement of Bridge No. 02599 on Route 101 over Alvia Chase Reservoir in Killingly, Connecticut (Project No. 0068-0217). The contract encompasses comprehensive bridge replacement work including pavement reconstruction, temporary accommodation measures, and utility relocation. The project involves full-depth bituminous concrete pavement reconstruction between stations 2+70.00 and 3+80.00, with an 8-inch subbase, 3-inch HMA S1 traffic level 2 course, and 4-inch HMA S0.5 traffic level 2 course. Additional work includes fine milling of bituminous concrete pavement, erosion control matting installation, turf establishment, metal beam rail (R-B MASH) installation, and slope stabilization. The project is located entirely within the floodplain with an existing 100-year flood elevation calculated at 570.1 feet, and project limits extend approximately 590 feet along Route 101 from station 0+00 to station 5+90.00.

The contract plans specify temporary accommodation requirements including a temporary cofferdam needed for bridge work, temporary utility pole pads, temporary earth pads, and temporary crane pads to be installed using geotextile separation materials and temporary retaining systems. Excavated material may be stockpiled for later reuse, with costs paid under earth excavation item 0202000. Environmental restrictions include a tree-trimming prohibition from April 15 through October 31 for any trees measuring 3 inches diameter at breast height or greater. Construction easements are required for the project, and overhead telecommunications lines require temporary relocation during construction. The plans were prepared on May 26, 2026, by designer JER/MAD and checked by EWM, indicating this represents the final contract document subset for highway construction services.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEMPORARY ACCOMMODATION PLANACC-01HIGHWAY PLANPLN-01

ROUTE 101 CROSS SECTIONSXSC-1 TO XSC-3TYPICAL SECTIONSTYP-01

HIGHWAY PROFILEPRO-1INDEX OF DRAWINGSINX-01

DRAWING TITLEDRAWING NUMBERDRAWING TITLEDRAWING NUMBER

INDEX OF DRAWINGS

SUBSET 03 - HIGHWAY

CONSULTANT COMPANY NAME

DESIGNED BY:

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

INX-01

TOWN(S):

KILLINGLY

ALVIA CHASE RESERVOIR

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_SubsetCoverSheet.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

IO

N

0068-0217

DESIGNER/DRAFTER: JER/MAD CHECKED BY: EWM

INDEX OF DRAWINGS

TRANSPORTATION

DEPARTMENT OF

CONNECTICUT

03.01

FF

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

TYP-01

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_Typicals.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

TYPICAL SECTIONS

TRANSPORTATION

SECTIONS

SEE CROSS A

B

C

D

SECTIONS

SEE CROSS

JIH

EXISTING GROUND

TRAVEL LANE

12'-0"

TRAVEL LANE

12'-0"

12 H:1V

STA. 2+70.00 TO STA. 3+17.00

ROUTE 101

B ROUTE 101L

H I J

12 H:1V

E E

NOT TO SCALE

STA. 3+35.00 TO STA. 3+80.00

3'-0" (MIN.)

4'-0"

SHOULDER

4'-3"

2H:1V (MAX.)

2H:1V (MAX.)

3'-0" (MIN.)

4'-0"

SHOULDER

4'-3"

G

8" SUBBASEN

3" HMA S0.5 - TRAFFIC LEVEL 2 (PLACED IN A SINGLE LIFT)M

CUT BITUMINOUS CONCRETE PAVEMENTL

4" FINE MILLING OF BITUMINOUS CONCRETE K

EROSION CONTROL MATTING (TYPE D)J

TURF ESTABLISHMENTI

4" TOPSOILH

FORMATION OF SUBGRADEG

6" PROCESSED AGGREGATE F

METAL BEAM RAIL (R-B MASH)E

12" SUBBASED

3" HMA S1 - TRAFFIC LEVEL 2C

4" HMA S0.5 - TRAFFIC LEVEL 2 (PLACED IN 2 EQUAL LIFTS)B

POINT OF APPLIED GRADEA

LEGEND

PAVEMENT TRANSITION DETAIL

BEGIN OR END PROJECT

NOT TO SCALE

10'-0" LIMIT OF FULL DEPTH

BINDER COURSE

1V:1H

D C

B K

PAVEMENT RECONSTRUCTION

L

OF BITUMINOUS CONCRETE"

LIMITS OF "FINE MILLING

TEMPORARY PAVEMENT PATCH

NOT TO SCALE

N

L

M

EXISTING GROUND

03.02

B.M. 402

C.G.S. 5281

Elev. 570.90

WOODS

WOODS

TREES

CP-9

CP-2

CP-3

CP-8

GRASS

GRAVEL

#4622

AT&T

TEL MH'S

ANCHOR

END

MBR

MBR

#02599

BRIDGE

PARAPET

PARAPET

CONDUITS

6" UTIL.

RIPRAP

BRUSH

#3044

AT&T

#3045

AT&T

ANCHOR

END

MBR

BIT BIT BIT

#3044S

AT&T

#3045S

AT&T

HYDRANT

DRY

CHESTNUT HILL RESERVOIR COMPANY

N/F

CHESTNUT HILL RESERVOIR COMPANY

N/F

N/F

CHD

N/F

CHD

N/F

CHD

N/F

CHD

ET AL

JOHN A. KOCUR

N/F

NAVD 1988

0+00

1+00

2+00 3+00

4+00

5+00 N76°37'55.2"E

261.46'

E

.1

N

.1

.0

B e g in S ta

E

.4

N

.5

.4

P

C

O

O R

D

IN

A T E G

R

ID

AD

O

N N

E C

T

IC

U T

HARTFORD

TURNPIKE

ROUTE 101

12'

10.5'

1" = 20'

HORIZONTAL SCALE

20' 40'

CP-2 (STEEL PIN)

N= 871,514.46

E=1,258,236.23

7.70' 2.71'

9.12'

TURNPIKEHARTFO

RD

CP-1

TO

CP-3

TO

MBR POSTS

D.H.'S IN

#3044S

AT&T

NAIL IN

CP-3 (STEEL PIN)

N= 871,561.34

E=1,258,594.91

TURNPIKE

HARTFORDCP-2

TO

CP-4

TO

15.33'

6.72' 3.95'

9" OAK

NAIL IN

#3045S

AT&T

NAIL IN

MBR POST

D.H. IN

CP-1 (STEEL PIN)

N= 871,391.01

E=1,257,865.59

CP-2

TO

33.43'

TURNPIKEHARTFO

RD

CP-9

TO

47.78'

52.22'

AT&T#3043

NAIL IN

24" SPRUCE

NAIL IN

(B.M.#401)

CONC STEPS

EAST SIDE

BRASS BOLT IN

CP-8 (STEEL PIN)

N= 871,506.50

E=1,258,419.88

CP-7

TO

CP-9

TO

TURNPIKE

HARTFORD

4.85'

MBR POSTS

D.H.'S IN

5.12' 10.30'

CP-9 (MAG NAIL)

N= 871,471.24

E=1,258,209.35

CP-8

TO

CP-1

TO

TURNPIKEHARTFORD

MBR POSTS

D.H.'S IN

11.03'

5.29'42.18'

AT&T#3044

NAIL IN

CP-7 (STEEL PIN)

N= 871,516.19

E=1,258,736.82

MBR POSTS

D.H.'S IN

3.88' 3.85'

9.66'

CP-6

TOCP-8

TO

TURNPIKE

HARTFORD

A

A

A

A

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

PLN-01

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_PlanPro.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

HIGHWAY PLAN

TRANSPORTATION

E

.9

N

.6

E n d S ta

.0

SAWCUT BITUMINOUS CONCRETE PAVEMENT

STA. 2+50.00

N 871499.91

E 1258264.32

BEGIN STATE PROJECT 0068-0217 STA. 2+70.00

RECONSTRUCTION

PAVEMENT

LIMIT OF FULL DEPTH

STA. 3+80.00

RECONSTRUCTION

PAVEMENT

LIMIT OF FULL DEPTH

0068-0217END STATE PROJECT

SAWCUT BITUMINOUS CONCRETE PAVEMENT

STA. 4+00.00

N 871528.09

E 1258411.59

CURVE 1

SYSTEM (TYP.)

SEDIMENTATION CONTROL

LIMITS (TYP.)

APPROX. SLOPE

#02599

BRIDGE

(TYP.)

(R-B MASH)

METAL BEAM RAIL

STREAM EDGE

EASEMENT LINE

CONSTRUCTION

EASEMENT LINE

CONSTRUCTION

(TYP.)

ATTACHMENT

THRIE-BEAM

52.2' LT

STA. 2+73,

LT.3'51

STA. 3+80,

RAIL (TYP.)

EXISTING METAL BEAM

R-B MASH TO

TRANSITION

CHESTNUT HILL RESERVOIR COMPANY

N/F

CHESTNUT HILL RESERVOIR COMPANY

N/F

ORDINARY HIGH WATER

(CALCULATED)

EXISTING 100-YEAR FLOOD

TO BE REMOVED AND RESET

EXISTING FIRE SUPPLY DRY HYDRANT

BOX CULVERT

12’ X 8’ CONCRETE

ET AL

JOHN A. KOCUR

N/F

FL

O

W

38' RT

STA. 00+07,

52' RT

STA. 1+64,

52' RT

STA. 5+84,

HIGHWAY LINE

HIGHWAY LINE

52' RT

STA. 2+61,

ALVIA CHASE RESERVOIR

ALVIA CHASE RESERVOIR

ANCHORAGE TYPE I

R-B END

SURVEY TIES

1258435.98 E:

871540.70 PI N:

164.98'TANGENT:

328.54' LENGTH:

13°01'37.2" DELTA:

1445.00' RADIUS:

CURVE NO. 1

CONSTRUCTION DEWATERING.

TEMPORARY COFFERDAM NEEDED FOR BRIDGE

TEMPORARY WORK AREA TO ACCOMMODATE

SHALL BE PAID UNDER ITEM 0202000 - EARTH EXCAVATION.

3. EXCAVATED MATERIAL CAN BE STOCKPILED FOR LATER RE-USE. STOCKPILING AND MOVEMENT OF MATERIAL

2. THE ENTIRE PROJECT IS WITHIN THE FLOODPLAIN.

1. NO TRIMMING, CUTTING, OR REMOVAL OF TREES WITH A 3" DBH OR GREATER FROM APRIL 15 TO OCTOBER 31.

NOTES:

CONSTRUCTION EASEMENT REQUIRED

CONSTRUCTION EASEMENT LINE

EXISTING PROPERTY LINE

EXISTING HIGHWAY BOUNDARY LINE

EXISTING EASEMENT LINE

R.O.W. LEGEND

03.03

.9

E L

.0

P

V T

S T

A

.5

E L

.0

P

V C

S T

A

-3.18%

S=

-0.04%S=

.3

E L

.0

P

V I

S T

A

.0

E L

.0

P

V I

S T

A

0+00

0+00

1+00

1+00

2+00

2+00

3+00

3+00

4+00

4+00

324.242'SSD =

50.919'K =

160.000'L =

P V

I S

T A

.0

L

.9

HORIZONTAL SCALE IN FEET

20 40

VERTICAL SCALE IN FEET

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

PRO-1

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_PlanPro.dgn FILE NAME: gmccarthy LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

HIGHWAY PROFILE

TRANSPORTATION

PROFILE LAYOUT LINE

EXISTING GRADE

BRIDGE NO. 02599

STA. 2+50.00

SAWCUT BITUMINIOUS CONCRETE PAVEMENT

BEGIN STATE PROJECT 0068-0217 0068-0217END STATE PROJECT

STA. 4+00.00

MATCH EXISTING PAVEMENT

STA. 3+80.00

RECONSTRUCTION

PAVEMENT

LIMIT OF FULL DEPTH

STA. 2+70.00

RECONSTRUCTION

PAVEMENT

LIMIT OF FULL DEPTH

PROPOSED GRADE

03.04

STA.2+00.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

STA.2+25.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

STA.2+50.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

STA.2+75.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

550 550

560 560

570 570

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-1

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_XSC.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

DESIGNER/DRAFTER: JER/MAD CHECKED BY: MAD

ROUTE 101 CROSS SECTIONS

TRANSPORTATION

-4.6% -0.6% -4.9% -6.3%

L

.1

S H

D R

S H

D R

E

R

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

ELEVATION (CALCULATED) = 570.1

EXISTING 100-YEAR FLOOD

12:1 -2.9% -0.6% -5.0% -6.4% 12:1

E L

.9

D R

S H

D R

E

2:

1.6:1

ELEVATION (CALCULATED) = 570.1

EXISTING 100-YEAR FLOOD

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

1" = 10'

HORIZONTAL SCALE

10' 20'

03.05

STA.3+00.00

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

550 550

560 560

570 570

12:1 -2.2% -0.9% -5.2% -5.9% 12:11.7:1

E L

D R

S H

D R

E

1.

9:

ELEVATION (CALCULATED) = 570.1

EXISTING 100-YEAR FLOOD

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

STA.3+25.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

550 550

560 560

570 570

580 580

STA.3+50.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

STA.3+75.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-2

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_XSC.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

ROUTE 101 CROSS SECTIONS

TRANSPORTATION

0.2% 0.6% -4.7% -4.7%

E L

D R

S H

D R

E

ELEVATION (CALCULATED) = 570.1

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

-0.5% 0.2% -5.3% -6.3% 12:1

E L

D R

S H

D R

E

2.9 :1

2:1

ELEVATION (CALCULATED) = 570.1

EXISTING 100-YEAR FLOOD

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

2:

1 12:1 -0.2% 0.5%

-6.1% -6.8% 12:1

E L

D R

S H

D R

E

2:1

EXISTING 100-YEAR FLOOD

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

1" = 10'

HORIZONTAL SCALE

03.06

STA.4+00.00

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

0.7% 0.7% -6.5% -6.5%

E L

D R

S H

D R

E

ELEVATION (CALCULATED) = 569.1

EXISTING 100-YEAR FLOOD

STA.4+25.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

STA.4+50.00

-140

-140

-130

-130

-120

-120

-110

-110

-100

-100

-90

-90

-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

560 560

570 570

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

XSC-3

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\HW_CP_0068_0217_XSC.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

ROUTE 101 CROSS SECTIONS

TRANSPORTATION

1" = 10'

HORIZONTAL SCALE

03.07

HARTFORD

TURNPIKE

ROUTE 101

CHESTNUT HILL RESERVOIR COMPANY

N/F

CHESTNUT HILL RESERVOIR COMPANY

N/F

TREES

CP-9

CP-2

CP-3

CP-8

#4622

AT&T

BRUSH

#3044

AT&T

#3045

AT&T

#3044S

AT&T

#3045S

AT&T

CP-9 (MAG NAIL)

1+00

2+00

3+00 4+00

5+00

LAWN W/ U/G

#3043

AT&T

GRASS

#3046

SNET

#3046S

SNET

ET AL

PATRICK J. BARS

N/F

TEMPORARY RELOCATION

PROPOSED OVERHEAD WIRE

TEMPORARY RELOCATION

TELECOMMUNICATIONS

PROPOSED

EXISTING OVERHEAD WIRE

CONDUIT

EXISTING TELECOMMUNICATIONS

PROPOSED EASEMENT

COFFERDAM (SEE NOTE 1)

PROPOSED LIMITS OF

RETAINING SYSTEM (TYP.)

TEMPORARY EARTH

POLE PAD

TEMPORARY UTILITY

POLE PAD

TEMPORARY UTILITY

TEMPORARY CRANE PAD

TEMPORARY CRANE PAD

(NOT TO SCALE)

ROUTE 101

(BORROW)

TEMPORARY FILL

CRANE PAD

GEOTEXTILE(SEPARATION - CLASS 1)

RETAINING SYSTEM

TEMPORARY EARTH

ELEV. 571.0 ±

OHW ELEV. 567.6

TEMPORARY UTILITY POLE PAD

(NOT TO SCALE)

ROUTE 101

(BORROW)

TEMPORARY FILL

GEOTEXTILE(SEPARATION - CLASS 1)

RETAINING SYSTEM

TEMPORARY EARTH

UTILITY POLE

TEMPORARY

STA. 4+29.00 ELEV. 570.8 ±

STA. 2+09.00 ELEV. 571.8 ±

OHW ELEV. 567.6

ELEV. 565'

ELEV. 570'

TEMPORARY CRANE PAD

NOT TO SCALE

PROJECT TITLE: PROJECT NO.: DRAWING NO.:

SHEET NO.:

5/26/2026

SIGNATURE BLOCK: DRAWING TITLE:

ACC-01

REPLACEMENT OF BRIDGE NO. 02599 ROUTE 101 OVER

PLOTTED DATE:

M:\DDE\Worksets\CTDOT\0068-0217\Highways\Contract_Plans\SB_CP_0068_0217_Temporary Accomodation_Plan.dgn FILE NAME: MDoreo LASTED SAVED BY:

R E

V

D A

T E

R E

V

IS

IO

N

D E

S C

R

IP

T

TEMPORARY ACCOMMODATION PLAN

TRANSPORTATION

UP #1 UP #2

UP #3

UP #4

UP #5

UP #6

UP #7 UP #8

UP #10

UP #9

UP #11

UP #12

C O

O R

D

IN

A T E G

R

ID

AD

N N

E C

T

IC

U T

TEMPORARY ACCOMMODATION PLAN

BELOW BOTTOM OF CHANNEL.

1. CUT OFF COFFERDAM SHEETING IN WATERCOURSE 2'

NOTE:

CHESTNUT HILL RESERVOIR COMPANY

N/F

CHESTNUT HILL RESERVOIR COMPANY

N/F

03.08

HW_CP_0068_0217_SubsetCoverSheet
HW_CP_0068_0217_Typicals
Plan
HW_CP_0068_0217_PlanPro
Profile
HW_CP_0068_0217_PlanPro
Cross Sections
HW_CP_0068_0217_XSC
HW_CP_0068_0217_XSC
HW_CP_0068_0217_XSC

SB_CP_0068_0217_Temporary Accomodation_Plan

2026-05-26T18:25:55-0400
Eugene McCarthy

File details come from the government source that posted it. Updated .