The document is a Pinellas County Public Works project plan for the FY2025-2027 Countywide Pavement Preservation Program, Local Group 215, covering roadway resurfacing and improvement work. The project involves milling and resurfacing multiple roadways including Tanglewood Trail, Bolt Drive, Tangle Terr, Rosewood Dr, Cherrywood Ct, Pinewood Ct, Ruen Dr, and portions of Annwood Rd. The project includes removing existing asphalt to a depth of 1.5 inches and applying a new Type SP 12.5 Structural Course (Traffic C) surface layer. The roadway plans detail precise milling and resurfacing specifications for various road sections, with work to be performed at 2% grade (or as directed by the engineer, up to 4% maximum).
The project documents are dated July 2025 and include detailed roadway plans spanning 16 separate aerial map sheets showing precise road locations, markings, and construction details. The plans include specific technical specifications for road surface preparation, including guidelines for existing base treatment, shoulder stabilization, and precise elevation and grading requirements. The project appears to be funded through Pinellas County's public works budget, with engineering oversight ensuring precise implementation of road preservation and improvement techniques. Roadway sections include detailed cross-section diagrams showing existing and proposed surface treatments, with specific instructions for maintaining proper road elevation, drainage, and interface with existing curbs and gutters.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0791-006770A
FY2025-2027 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
LOCAL GROUP 215
FINANCIAL PID 005700A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORI. A
93254
TANGLEWOOD TRAIL (STA. 20+33.32 - STA. 52+78.30)
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
TYPICAL SECTION
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
TYPICAL SECTION
TANGLEWOOD TRAIL (STA. 52+78.30 - STA. 71+10.58), BOLT DR,
TANGLE TERR, ROSEWOOD DR, CHERRYWOOD CT, PINEWOOD CT,
RUEN DR
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
TYPICAL SECTION
ANNWOOD RD (STA. 72+37.05 - STA. 73+48.59), (STA. 112+66.74 -
115+29.41)
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
TYPICAL SECTION
ROSEWOOD CT
Feet 60300 15
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES-(2) |
| 3 TYPICAL ROAD SECTION |
| 4 ROADWAY PLAN 4 |
| 5 ROADWAY PLAN 5 |
| 6 ROADWAY PLAN 6 |
| 7 ROADWAY PLAN 7 |
| 8 ROADWAY PLAN 8 |
| 9 ROADWAY PLAN 9 |
| 10 ROADWAY PLAN 10 |
| 11 ROADWAY PLAN 11 |
| 12 ROADWAY PLAN 12 |
| 13 ROADWAY PLAN 13 |
| 14 ROADWAY PLAN 14 |
| 15 ROADWAY PLAN 15 |
| 16 ROADWAY PLAN 16 |
| 17 Typical Sections A_B-SHEET-(40) |
| 18 Typical Section C-SHEET-(41) |
| 19 LOOP DETAIL-(42) |
| 2025-07-15T21:30:43-0400 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .