This document is a set of construction plans for the Pinellas County Public Works FY2025-2027 Countywide Pavement Preservation Program, specifically Local Group 123 Cobbs C project. The project involves pavement milling and resurfacing of multiple streets in an unincorporated Palm Harbor neighborhood, including Woodridge Parkway, Pinnacle Circle, Summit Way, Cobbs Boulevard, and associated side streets. The work includes milling existing asphalt to a depth of 1.5 inches and resurfacing with a 1.5-inch Type SP 12.5 Structural Course, with varying road grades between 2% and 4%. The project documents include detailed plan views, typical road sections, core location maps, and specific technical details for road reconstruction.
The project covers approximately 1.96 lane miles with an estimated project cost of $477,597. The core sampling and testing reveal primarily tan slightly cemented fine sand with limestone base conditions across eight test locations. The plan includes specifications for road milling, resurfacing, inlet protection, shoulder stabilization, and traffic maintenance. Detailed technical drawings provide insights into curb and gutter treatments, shoulder construction, and loop detector positioning. The project is part of Pinellas County's ongoing infrastructure maintenance program, aimed at preserving and improving local roadway conditions through systematic pavement preservation techniques.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PID 25-0791-006579A
FY2025-2027 COUNTYWIDE
PAVEMENT PRESERVATION PROGRAM
LOCAL GROUP 123 COBBS C
FINANCIAL PID 004192A
STATE OF
No.
PR
O
FESSIONAL ENGIN
EE
R
JE
FFR
EY S. THOMPSON
FLORI. A
93254
TYPICAL SECTION
* 2% (OR AS DIRECTED BY THE ENGINEER)
WOODRIDGE PKWY
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
PINNACLE CT S, SUMMIT WAY, COBBS BLVD, WOODRIDGE PL,
PINNACLE CIR S, PINNACLE CT N & PINNACLE CIR N.
* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)
TYPICAL SECTION
MILLING
MILL EXISTING ASPHALT
PAVEMENT FOR DEPTH (1.5")
RESURFACING
TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")
Feet 60300 15
| Sheets and Views |
| 1 Eng_Cover_SSM |
| 2 GENERAL NOTES |
| 3 TYPICAL SECTION |
| 4 SHEET 4 |
| 5 SHEET 5 |
| 6 SHEET 6 |
| 7 SHEET 7 |
| 8 SHEET 8 |
| 9 SHEET 9 |
| 10 SHEET 10 |
| 11 SHEET 11 |
| 12 CORE LOCATION MAP |
| 13 Typical Sections A_B |
| 14 Typical Section C |
| 15 LOOP DETAIL |
| 2025-07-15T21:26:13-0400 | |
| Jeffrey S Thompson |
File details come from the government source that posted it. Updated .