00014662 Preliminary Results.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- OR11: MP 4 to Weston Intchge. Chip Seal Project
- Solicitation number
- S-73000-00014662
- Issued by
- Union County, Oregon
About this file
This document is a bid tabulation spreadsheet from the Oregon Department of Transportation (ODOT) for the OR11: MP 4 to Weston Interchange Chip Seal Project (ITB No. S-73000-00014662). The project involves pavement preservation work on Oregon Highway 11 between milepost 4 and 20.38 in Union County, with a bid closing date of September 30, 2025, at 2:00 PM. The solicitation seeks a contractor to perform chip seal treatment, including mobilization, temporary traffic protection, signage, flagging, erosion control, and pavement markings. The project is scheduled for implementation between June 1 and August 15, with substantial completion required by July 1, 2026, and final completion by August 1, 2026.
The bid tabulation includes detailed pricing from five bidders: Doolittle Construction LLC, Central Washington Asphalt Inc, Granite Construction Company, JAL Construction Inc, and American Rock Products. Total bid prices range from $1,791,250 to $2,207,148, covering 26 line items such as emulsified asphalt fog coat, chip seal placement, pavement markings, and traffic control elements. The project will utilize ODOT-owned aggregate from the Dry Creek Quarry in Umatilla County and is subject to state prevailing wage rates, Buy America requirements, and a comprehensive one-year warranty period. Liquidated damages are set at $1,100 per calendar day for missing the final completion date, with the contract to be awarded to the lowest responsible and responsive bidder through the OregonBuys eProcurement system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014662 Intent To Award.xlsx | XLSX spreadsheet | |
| Attachment A Special Provisions OR 11 MP 4 To Weston Intchge Chip Seal Project .pdf | ||
| Attachment C Bid Pricing Form~18.xlsx | XLSX spreadsheet | |
| Attachment E Minimal Assessment Memorandum.pdf | ||
| Attachment D Material Source Narrative.pdf | ||
| 00014662 Addendum 1.docx | DOCX document | |
| Carbon Dioxide ITB 20250815~1.pdf | ||
| 00014662 Addendum 2.docx | DOCX document | |
| Attachment B Plans~9.pdf | ||
| 00014662 Invitation.To.Bid.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/30/25 | ||||||
| ITB No. | S-73000-00014662 | BIDDER | |||||
| NAME: | Doolittle Construction LLC | Central Washington Asphalt Inc | Granite Construction Company | JAL Construction Inc | American Rock Products | ||
| Bid Closing: | 9/30/2025 @ 2:00 PM | ||||||
| Description: | OR11: MP 4 to Weston Intchge. Chip Seal Project | ||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1.0 | LS | $ 180,000.00 | $ 180,000.00 | $ 172,950.00 | $ 172,950.00 | $ 168,180.50 | $ 168,180.50 | $ 190,000.00 | $ 190,000.00 | $ 125,000.00 | $ 125,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1.0 | LS | $ 87,868.50 | $ 87,868.50 | $ 72,722.50 | $ 72,722.50 | $ 75,000.00 | $ 75,000.00 | $ 75,000.00 | $ 75,000.00 | $ 60,000.00 | $ 60,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 3 | TEMPORARY SIGNS | 2000.0 | SQFT | $ 30.00 | $ 60,000.00 | $ 23.00 | $ 46,000.00 | $ 12.50 | $ 25,000.00 | $ 33.50 | $ 67,000.00 | $ 25.00 | $ 50,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 4 | SEQUENTIAL ARROW SIGNS | 1.0 | EACH | $ 1,000.00 | $ 1,000.00 | $ 900.00 | $ 900.00 | $ 800.00 | $ 800.00 | $ 1,500.00 | $ 1,500.00 | $ 1,900.00 | $ 1,900.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 5 | PORTABLE CHANGEABLE MESSAGE SIGNS | 3.0 | EACH | $ 3,500.00 | $ 10,500.00 | $ 2,000.00 | $ 6,000.00 | $ 2,200.00 | $ 6,600.00 | $ 2,500.00 | $ 7,500.00 | $ 4,500.00 | $ 13,500.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 6 | FLAGGERS | 400.0 | HOUR | $ 100.00 | $ 40,000.00 | $ 90.00 | $ 36,000.00 | $ 101.00 | $ 40,400.00 | $ 100.00 | $ 40,000.00 | $ 140.00 | $ 56,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 7 | FLAGGER STATION LIGHTING | 2.0 | EACH | $ 1,500.00 | $ 3,000.00 | $ 2,100.00 | $ 4,200.00 | $ 700.00 | $ 1,400.00 | $ 1,500.00 | $ 3,000.00 | $ 1,550.00 | $ 3,100.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 8 | PILOT CARS | 230.0 | HOUR | $ 125.00 | $ 28,750.00 | $ 120.00 | $ 27,600.00 | $ 120.00 | $ 27,600.00 | $ 120.00 | $ 27,600.00 | $ 218.00 | $ 50,140.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 9 | AUTOMATED FLAGGER ASSISTANCE DEVICE | 3.0 | EACH | $ 1,500.00 | $ 4,500.00 | $ 1,900.00 | $ 5,700.00 | $ 3,000.00 | $ 9,000.00 | $ 2,500.00 | $ 7,500.00 | $ 3,900.00 | $ 11,700.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 10 | TEMPORARY BARRICADES, TYPE III | 6.0 | EACH | $ 100.00 | $ 600.00 | $ 190.00 | $ 1,140.00 | $ 45.00 | $ 270.00 | $ 200.00 | $ 1,200.00 | $ 130.00 | $ 780.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 11 | TEMPORARY PLASTIC DRUMS | 93.0 | EACH | $ 50.00 | $ 4,650.00 | $ 70.00 | $ 6,510.00 | $ 7.50 | $ 697.50 | $ 45.00 | $ 4,185.00 | $ 20.00 | $ 1,860.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 12 | TEMPORARY FLEXIBLE PAVEMENT MARKERS | 11500.0 | EACH | $ 2.17 | $ 24,955.00 | $ 3.20 | $ 36,800.00 | $ 2.00 | $ 23,000.00 | $ 2.00 | $ 23,000.00 | $ 1.80 | $ 20,700.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 13 | TEMPORARY TRANSVERSE RUMBLE STRIPS | 132.0 | FOOT | $ 20.00 | $ 2,640.00 | $ 55.00 | $ 7,260.00 | $ 20.00 | $ 2,640.00 | $ 125.00 | $ 16,500.00 | $ 39.00 | $ 5,148.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 14 | LEGEND REMOVAL | 540.0 | SQFT | $ 5.00 | $ 2,700.00 | $ 6.75 | $ 3,645.00 | $ 6.50 | $ 3,510.00 | $ 4.00 | $ 2,160.00 | $ 9.00 | $ 4,860.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 15 | BAR REMOVAL | 390.0 | SQFT | $ 5.00 | $ 1,950.00 | $ 6.75 | $ 2,632.50 | $ 6.50 | $ 2,535.00 | $ 4.00 | $ 1,560.00 | $ 9.00 | $ 3,510.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 16 | EROSION CONTROL | 1.0 | LS | $ 5,000.00 | $ 5,000.00 | $ 1,550.00 | $ 1,550.00 | $ 500.00 | $ 500.00 | $ 1,500.00 | $ 1,500.00 | $ 6,500.00 | $ 6,500.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 17 | POLLUTION CONTROL PLAN | 1.0 | LS | $ 5,000.00 | $ 5,000.00 | $ 1,550.00 | $ 1,550.00 | $ 500.00 | $ 500.00 | $ 250.00 | $ 250.00 | $ 1,000.00 | $ 1,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 18 | LEAD COMPLIANCE PLAN | 1.0 | LS | $ 5,000.00 | $ 5,000.00 | $ 2,000.00 | $ 2,000.00 | $ 5,000.00 | $ 5,000.00 | $ 250.00 | $ 250.00 | $ 500.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | |||
| CONSTRUCTION SURVEY WORK | 1.0 | LS | $ 25,000.00 | $ 25,000.00 | $ 12,500.00 | $ 12,500.00 | $ 5,000.00 | $ 5,000.00 | $ 20,000.00 | $ 20,000.00 | $ 14,200.00 | $ 14,200.00 | $ - 0 | $ - 0 | $ - 0 | ||||
| 19 | EMULSIFIED ASPHALT IN FOG COAT | 190.0 | TON | $ 350.00 | $ 66,500.00 | $ 290.00 | $ 55,100.00 | $ 750.00 | $ 142,500.00 | $ 1.00 | $ 190.00 | $ 1,410.00 | $ 267,900.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 20 | PLACEMENT OF EMULSIFIED ASPHALT CHIP SEAL | 459000.0 | SQYD | $ 1.40 | $ 642,600.00 | $ 1.95 | $ 895,050.00 | $ 1.10 | $ 504,900.00 | $ 1.50 | $ 688,500.00 | $ 1.30 | $ 596,700.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 21 | ASPHALT IN EMULSIFIED ASPHALT CHIP SEAL | 990.0 | TON | $ 475.00 | $ 470,250.00 | $ 290.00 | $ 287,100.00 | $ 650.00 | $ 643,500.00 | $ 650.00 | $ 643,500.00 | $ 700.00 | $ 693,000.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 22 | EXTRA FOR EMULSIFIED ASPHALT CHIP SEAL APPROACHES | 41.0 | EACH | $ 500.00 | $ 20,500.00 | $ 400.00 | $ 16,400.00 | $ 550.00 | $ 22,550.00 | $ 500.00 | $ 20,500.00 | $ 450.00 | $ 18,450.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 23 | LONGITUDINAL PAVEMENT MARKINGS - PAINT | 308000.0 | FOOT | $ 0.28 | $ 86,240.00 | $ 0.24 | $ 73,920.00 | $ 0.22 | $ 67,760.00 | $ 0.30 | $ 92,400.00 | $ 0.45 | $ 138,600.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 24 | PAVEMENT LEGEND, TYPE B: ARROWS | 56.0 | EACH | $ 150.00 | $ 8,400.00 | $ 675.00 | $ 37,800.00 | $ 650.00 | $ 36,400.00 | $ 150.00 | $ 8,400.00 | $ 900.00 | $ 50,400.00 | $ - 0 | $ - 0 | $ - 0 | |||
| 25 | PAVEMENT BAR, TYPE B | 390.0 | SQFT | $ 9.35 | $ 3,646.50 | $ 23.00 | $ 8,970.00 | $ 22.00 | $ 8,580.00 | $ 9.50 | $ 3,705.00 | $ 30.00 | $ 11,700.00 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTAL | $ 1,791,250.00 | $ 1,822,000.00 | $ 1,823,823.00 | $ 1,946,900.00 | $ 2,207,148.00 | $ - 0 | $ - 0 | $ - 0 |