D-3- Transmittal Sheet FRM-0226.pdf

PDF 540 KB Posted

Attached to
Groundwater Sampling and Geochemical Testing Federal contract opportunity
Solicitation number
0000313-CC-25
Issued by
Department of Energy

About this file

The document is a Mission Support and Test Services (MSTS) Transmittal Sheet - Subcontract form (FRM-0226), dated 01/29/18, with revision 02. This blank template is designed for transmitting subcontractor documents, with sections for submittal information, approvals, and routing through different organizational stages. The form provides spaces to track document transmission, including checkboxes for approval or filing, details about the subcontractor, and multiple review/action status options (such as "Work may proceed" or "Revise and resubmit"). The form is specifically for MSTS, located in Las Vegas, NV, and appears to be a standard internal document used for managing subcontractor documentation and workflow processes.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Company Form

FRM-0226

POST OFFICE BOX 98521

LAS VEGAS, NV 89193-8521

TRANSMITTAL SHEET - SUBCONTRACT

01/29/18 Rev. 02

SUBMITTAL

REQUEST FOR CLARIFICATION TRANSMITTAL NO.:

SU

B

C O

N

TR

A C

TO

R

Name of Subcontractor:

Address:

PO. No.: MSTS Subcontract No.: Date:

1. copies of the following data are transmitted for: Approval File

Please return copies.

Description:

Subcontractor POC:

POC Signature:

ST

2. To: Date:

Attention:

Forwarded copies for Approval File

Please return copies within Days or by date: STR:

STR Signature:

EN

G

IN

EE

R

IN

G

3. To: Received Date:

Attention: Transmitted Date:

Work may proceed. (Status 1)

Revise and resubmit – Work may proceed subject to resolution of indicated comments. (Status 2)

Revise and resubmit – Work may not proceed. (Status 3)

Review not required – Work may proceed. (Status 4) Project Engineer:

Comments Attached PE Signature:

ST

4. To: Date:

Address:

Copies Returned With Action as Indicated in Item 3, Above. STR:

STR Signature:

File details come from the government source that posted it. Updated .