LA-UR-21898
Contents:
1. Exhibit F High/Moderate Consequence Work
2. Exhibit F Low Consequence Work
3. Exhibit F Delegation of Authority/Responsibility
4. Attachment F1.0 Form 2101 IWD Part 2 FOD Requirements and Approval for
Entry and Area Hazards and Controls. Non Tenant Activity Form
5. Attachment F3-1 Safety Performance Eligibility Requirements
6. Attachment F3-2 Environment, Safety, and Health Worksheet
7. Attachment F6-1 Weekly Productive Man-Hour Report
8. Individual Accident/Incident Report
9. 5484 Addendum
10. Attachment F7-1 Subcontractor Training Matrix
11. Attachment F9-1 Samples of Inspection Checklist for Subcontractors
12. Attachment F10-1 Safety/Housekeeping Inspection Checklist
13. Attachment F15-1 Medical Surveillance for Toxic and Hazardous Substance Requirements
14. Attachment F16-1 Major Equipment Declaration
15. Attachment F19-1 Environmental Reporting Data for EPA Annual Toxic Release Inventory Report
16. Attachment F20-0 IWD Part 4, Post Job Review, Form 2104
17. Attachment F20-1 Attachment 20-1 IWD Form 2100
18. Attachment F20-2 IWD Validation and Release Form 2102A
19. Attachment F20-3 Form 20-3 Complete this form if work involves remodel, renovation, and/or demolition
20. Attachment F22-1 Spark - or Flame-Producing Operations Permit, Form 1563
21. Attachment F30-2 Specific Written Procedure for Lockout/Tagout
22. Attachment B, LO/TO Orders
23. Attachment F30-3 Subcontractor Lockout/Tagout Record for Simple Lockout/Tagouts
24. Attachment F30-4 Required Reading for Contractor-Supervised Lockout/Tagout
25. Attachment F31-1 Penetration Permit
26. Attachment F32-1 Ordinary/Moderate Risk Lift Procedure for Subcontractors
27. Attachment F32-2 LANL Critical Lift Plan for Subcontractors
28. Attachment F32-3 High Consequence Material Handling Activity
29. Attachment F36-0 Electrical Training Documentation for Subcontractors
30. Attachment F41-1 Heating Ventilation and Air Conditioning (HVAC) Systems
Maintenance Water Quality Guidance
31. Attachment F42-2 LANL EPC-CP Unplanned Release Report
32. Attachment F59-1 Safety and Environmental Performance Citation
33. An Introduction to Preparing Exhibit F Environmental, Safety, & Health
Requirements for Subcontractors
34. Exhibit F for ES&H Program Leaders
35. Exhibit F for STRs
36. Guide for Electrical Subcontractors For Developing an Electrical IWD
37. Environmental Permits & Requirements for Work Planning
Page 11 of 90 Requisition No. Subcontract No.
Exhibit F - February 2018, Rev 1
Page 12 of 90 Requisition No. Subcontract No.
EXHIBIT “F”
ENVIRONMENTAL, SAFETY, AND HEALTH REQUIREMENTS
PART I: COMMON CLAUSES
Note: References herein to 10 CFR 851 or subparts thereof refer to Title 10 of the Code of Federal Regulations, Part 851 Worker Safety and Health Program.
F1.0 General Requirements
1.1 For the purpose of this Exhibit, environmental, safety, and health (ES&H) protection encompasses industrial hygiene and safety, and environmental protection, compliance, pollution prevention, and waste management/minimization. The term “SUBCONTRACTOR” includes the SUBCONTRACTOR, its employees and any sub-tier subcontractors and their employees. The term “GOVERNMENT” for the purposes of this Exhibit applies to agencies and personnel of the United States Government, such as the Department of Energy (DOE), the National Nuclear Security Administration (NNSA), and the Department of Defense (DoD).
1.2 SUBCONTRACTOR shall have sole responsibility for implementing the SUBCONTRACTOR’s written Site-Specific ES&H plan as approved by the CONTRACTOR. Neither the CONTRACTOR nor the GOVERNMENT shall be responsible for supervising the implementation of SUBCONTRACTOR’s Site-Specific ES&H plan and neither CONTRACTOR nor the GOVERNMENT shall have responsibility for the safety and environmental compliance of the SUBCONTRACTOR, its employees or its lower-tier suppliers’ or subcontractors’ employees. The SUBCONTRACTOR shall not commence work on site until the SUBCONTRACTOR’s written Site-Specific ES&H plan is approved by the CONTRACTOR and a Notice to Proceed has been received by the SUBCONTRACTOR.
1.3 When performing work at sites controlled/managed by CONTRACTOR or the GOVERNMENT, the SUBCONTRACTOR shall comply with all applicable Federal, State, and Local laws and regulations protecting workers, air, water, soil, and those governing land use, waste management/disposal, and chemical and pesticide usage.
1.4 The requirements for the SUBCONTRACTOR in accordance with CONTRACTOR’s 10 CFR
851, Worker Safety and Health Program are contained in this Exhibit. Nothing in this Exhibit must be construed as relieving SUBCONTRACTOR from complying with any additional specific safety and health requirement that SUBCONTRACTOR determines to be necessary to protect the safety and health of workers. Some, but not all of the 10 CFR 851 requirements are set forth in this Exhibit. Even if not specifically set forth in this Exhibit, SUBCONTRACTOR is required under 10 CFR 851 to comply with the following regulations and safety and health standards that are applicable to the hazards of its work:
10 CFR 850, Chronic Beryllium Disease Prevention Program 29 CFR Part 1904.4 through 1904.11, 1904.29 through 1904.33, 1904.44 and 1904.46
– Recording and Reporting Occupational Injuries and Illnesses 29 CFR Part 1910, Occupational Safety and Health, excluding 1910.1096, Ionizing
Radiation 29 CFR Part 1926, Safety and Health Regulations for Construction
Page 13 of 90 Requisition No. Subcontract No.
29 CFR Part 1928, Occupational Safety and Health Standards for Agriculture American Conference of Governmental Industrial Hygienists (ACGIH), ‘‘Threshold Limit
Values for Chemical Substances and Physical Agents and Biological Exposure Indices’’ (2005)
ANSI Z88.2, Respiratory Protection (1992) ANSI Z136.1, Safe Use of Lasers (2000) ANSI Z49.1, Safety in Welding, Cutting and Allied Processes, Sections 4.3 and E4.3
(1999) NFPA 70E, Standard for Electrical Safety in the Workplace (2015) American Society of Mechanical Engineers (ASME) Boilers and Pressure Vessel Code, Sections I through XII, including applicable Code Cases, (2004) ASME B31 (ASME Code for Pressure Piping) as follows:
B31.1-2001-Power Piping, and B31.1a-2002 Addenda to ASME B31.1-2001;
B31.2-1968-Fuel Gas Piping;
B31.3-2002-Process Piping;
B31.4-2002-Pipeline Transportation Systems for Liquid Hydrocarbons and Other
Liquids;
B31.5-2001-Refrigeration Piping and Heat Transfer Components, and
B31.5a-2004, Addenda to ASME B31.5-2001;
B31.8-2003-Gas Transmission and Distribution Piping Systems;
B31.8S-2001-Managing System Integrity of Gas Pipelines;
B31.9-1996-Building Services Piping;
B31.11-2002-Slurry Transportation Piping Systems; and B31G-1991-Manual for Determining Remaining Strength of Corroded Pipelines.
DOE Manual 231.1B, Environment, Safety and Health Reporting Manual, May 13, 2013 DOE Standard DOE-1212-2012, Explosives Safety, June 2012
1.5 In accordance with 10 CFR 851.10(a), the SUBCONTRACTOR must provide a place of employment that is free from recognized hazards that are causing or have the potential to cause death or serious physical harm.
1.6 SUBCONTRACTOR shall have responsibility for taking action as is necessary to assure compliance with state and federal environmental laws, Laboratory environmental and waste management requirements identified in Exhibit D Statement of Work; and Department of Energy Orders related to environmental compliance and waste management. Where determined necessary by the scope, nature, location, or methods of work the requirements contained in this Exhibit F will be supplemented by the CONTRACTOR through attachment of the results generated by the LANL Integrated Review Tool (IRT) to Exhibit D Statement of Work; Laboratory Requirements.
1.7 In the event of any SUBCONTRACTOR non-compliance, including environmental or waste management violations, all such measures taken by the CONTRACTOR to correct the violations shall be at the SUBCONTRACTOR’s expense, and the cost thereof, including any stipulated penalties resulting from non-compliance, shall be deducted from payments otherwise due to SUBCONTRACTOR.
1.8 CONTRACTOR is dedicated to the concept that all accidents are preventable. Accordingly, CONTRACTOR is committed to a goal of zero accidents through continuous improvement practices. This "Zero Accident Performance" goal, including zero non-permitted releases and zero regulatory non-compliance with respect to protection of the environment, is an expectation
Page 14 of 90 Requisition No. Subcontract No.
of all SUBCONTRACTORS in the performance of their work. In accordance with 10 CFR 851.20(a)(1), SUBCONTRACTOR shall adopt the following “Zero Accident Performance” objectives:
1.8.1 Strive to eliminate all injuries, illnesses, and adverse impacts to the environment.
1.8.2 Promote environment, safety, and health (ES&H) objectives as a constant value in designing, planning, training, and executing work through the Integrated Safety Management (ISM) process (see Subclauses F1.11 and F1.12).
1.8.3 Spread ownership for the ES&H program effectiveness throughout the
SUBCONTRACTOR’s teams.
1.8.4 Enhance employee awareness and involvement in their ES&H program implementation.
1.8.5 Enforce employees’ consistent use of safe practices in their daily work activities.
1.8.6 Optimize the use of continuous improvement practices as the basis for "Zero Accident Performance" initiatives.
1.8.7 Demonstrate to CONTRACTOR that SUBCONTRACTOR is dedicated to safety and environmental compliance excellence.
1.8.8 Expect senior management to demonstrate leadership and direction for “Zero Accident Performance” implementation.
1.8.9 Ensure all SUBCONTRACTOR employees are empowered to implement and consistently strive for the “Zero Accident Performance” goal.
1.8.10 Ensure SUBCONTRACTOR management is accessible to employees for ES&H concerns.
1.8.11 SUBCONTRACTOR workers may report safety, health, or environmental concerns to the LANL Safety Concerns Hotline at 505-665-7233 (email safety@lanl.gov), or to the DOE Los Alamos Field Office at 505-606-0873, or to the DOE Albuquerque Employee Concerns Hotline at email: ecp@doeal.gov or 1-800-688-5713.
In accordance with DOE O 442.2 Chg 1 Differing Professional Opinions for Technical Issues involving Environmental, Safety, and Health Technical Concerns, if a SUBCONTRACTOR worker has a differing professional opinion on a technical issue related to environment, safety and health, it can be reported to:
Jeffry Roberson, Deputy Associate Administrator for Safety (NA-51/FORS) National Nuclear Security Administration, U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Email Jeffry.Roberson@nnsa.doe.gov or call 301-903-9228
The DPO process and DPO Submittal Form may be found at: http://www.energy.gov/ ehss/doe-differing-professional-opinions.
Page 15 of 90 Requisition No. Subcontract No.
1.8.12 SUBCONTRACTOR and CONTRACTOR workers have the right and responsibility to Pause Work or, if necessary, Stop Work in accordance with 10 CFR 851.20(a)(9) and LANL Policy without fear of reprisal when:
There is a reasonable belief that the task poses an imminent risk of death, serious physical harm, or other serious hazard to workers where the workers believe there is insufficient time to utilize normal hazard reporting and abatement procedure.
There is a reasonable belief that the work poses a potential uncontrolled environmental risk or violates the requirements of applicable laws or permits.
There is a reasonable belief that security of the Laboratory, information, or Government property could be compromised.
Work controlling and execution Information, instructions, or worker training is inadequate to execute the work safely and securely.
1.8.13 CONTRACTOR ES&H personnel may Pause or Stop SUBCONTRACTOR work at any time when conditions such as those in 1.8.12 are observed or when it is necessary to prevent the SUBCONTRACTOR’s activities from creating an uncontrolled hazard to collocated workers or to prevent / terminate an environmental, health, or safety violation.
1.9 In accordance with 10 CFR 851.20(a)(10) and 851.20(b)(2)(iv), SUBCONTRACTOR shall inform workers of their rights and responsibilities by appropriate means, including posting the U.S. Department of Energy/LANL “Worker Protection at Los Alamos National Laboratory” poster in the workplace where it is visible to all workers. In accordance with 10 CFR 851.20(b) (2), SUBCONTRACTOR shall allow workers to have access to DOE Safety and Health publications; the 10 CFR 851 Worker Safety and Health Program for the covered workplace;
the standards, controls, and procedures applicable to the covered workplace; limited information on any recordkeeping log (OSHA Form 300); and DOE Form 5484.3 (the DOE equivalent to OSHA Form 301) on official time. SUBCONTRACTOR shall designate a location or contact information for workers to obtain this information.
1.10 In accordance with 10 CFR 851.20(b)(5), SUBCONTRACTOR shall ensure that employee representatives have the right to participate in inspections by DOE officials on official time.
1.11 In accordance with 10 CFR 851.11(a)(3)(ii), CONTRACTOR is committed to implementing an Integrated Safety Management System (ISMS) and Environmental Management System (EMS) that promotes CONTRACTOR’s core values and the principles set forth by the U.S.
Department of Energy (DOE). The objective of ISMS and EMS is to systematically integrate safety and environmental compliance into management and work practices at all levels so that workers, the public, and the environment are protected while assigned projects are accomplished.
1.12 In accordance with 10 CFR 851.11(a)(3)(ii), SUBCONTRACTOR shall perform work in a safe and compliant manner that ensures adequate protection for employees, the public, and the environment, and shall be accountable for safety and environmental compliance.
SUBCONTRACTOR shall exercise a degree of care commensurate with the work and the associated hazards/risks. SUBCONTRACTOR shall ensure that management of ES&H functions and activities becomes an integral but visible part of SUBCONTRACTOR’s work planning and execution processes. The following ISMS and EMS principles must be adhered to:
Page 16 of 90 Requisition No. Subcontract No.
1.12.1 Line management is responsible for the protection of employees, the public, and the environment. Line management includes those SUBCONTRACTOR employees managing or supervising employees performing work.
1.12.2 Clear and unambiguous lines of authority and responsibility for ES&H matters are established and maintained at all organizational levels.
1.12.3 Personnel possess the experience, knowledge, skills, and abilities that are necessary to discharge their responsibilities.
1.12.4 Resources are effectively allocated to address ES&H, programmatic, and operational considerations. Protecting employees, the public, and the environment is a priority whenever activities are planned and performed.
1.12.5 Before work is performed, the associated hazards/risks are evaluated and an agreed-upon set of ES&H controls and requirements is established which, if properly implemented, provide adequate assurance that employees, the public, and the environment are protected from adverse consequences.
1.12.6 In accordance with 10 CFR 851.22(b), administrative and engineering controls to prevent and mitigate hazards shall be tailored to the work being performed and associated hazards. Controls are established according to the following hierarchy:
Hazard elimination by process modification;
Substitution of a less hazardous substance, if available;
Application of engineering controls such as enclosures, machine guards, interlocks, or similar devices;
Application of administrative controls, such as training, lockout/tag out, and procedures; and Use of Personal Protective Equipment (PPE).
1.12.7 The conditions and requirements to be satisfied for operations to be initiated and conducted are established and agreed upon by the CONTRACTOR and SUBCONTRACTOR. These agreed upon conditions and requirements are requirements of the subcontract and binding upon the SUBCONTRACTOR. The extent of documentation and level of authority for agreement shall be tailored to the complexity, hazards, and environmental requirements associated with the work.
1.13 CONTRACTOR reserves the right to perform both announced and unannounced inspections and assessments of SUBCONTRACTOR’s operations, equipment, and materials to verify compliance with the requirements of this subcontract. SUBCONTRACTOR shall cooperate and accommodate oversight assessments, audits, and inspections performed by the CONTRACTOR. The CONTRACTOR may invoke Stop Work at any time for violations of applicable laws and regulations.
1.14 In accordance with 10 CFR 851.20(a)(9), SUBCONTRACTOR shall ensure that workers have the authority and responsibility, and are encouraged to stop work when they discover unsafe conditions or other hazards. SUBCONTRACTOR shall ensure that work does not resume until the ES&H concerns associated with that activity are resolved. Restart of work activities may not
Page 17 of 90 Requisition No. Subcontract No.
occur except as follows:
1.14.1 The worker shall correct the hazardous condition and restart the activity or operation without notifications if (1) the condition does not pose an imminent danger, (2) the condition can be corrected immediately, and (3) the worker has the resources to correct the condition and restart work.
1.14.2 In all other cases, the worker must notify the SUBCONTRACTOR ES&H Representative prior to restart.
1.14.3 If the SUBCONTRACTOR ES&H Representative is notified of a stop work initiated by a worker, the ES&H Representative shall notify the STR.
1.15 In accordance with 10 CFR 851.20(a)(4) the SUBCONTRACTOR will provide mechanisms to involve workers and their elected representatives in the development of the worker safety and health program goals, objectives, and measures and in the identification and control of hazards in the workplace. The following are some ways to involve workers: (1) ES&H committees, (2) safety observers, (3) ad hoc health and safety problem-solving groups, (4) ES&H training of other employees, (5) analysis of job hazards, and (6) committees that plan and conduct ES&H awareness programs.
1.16 In accordance with 10 CFR 851.20(a)(6) and 10 CFR 851.20(b)(7), SUBCONTRACTOR shall establish procedures for workers to report without reprisal, job-related fatalities, injuries, illnesses, incidents and hazards and make recommendations about appropriate ways to control hazards. SUBCONTRACTOR must provide prompt response to such reports and recommendations in accordance with10 CFR 851.20 (a)(7).
1.17 In accordance with 10 CFR 851.20(b)(8), SUBCONTRACTOR’s workers shall have the right, without reprisal, to decline to perform an assigned task because of a reasonable belief that, under the circumstances, the task poses an imminent risk of death or serious physical harm to the worker coupled with a reasonable belief that there is insufficient time to seek effective redress through normal hazard reporting and abatement procedures.
1.18 In accordance with 10 CFR 851.20(a) and 851.20(a)(3), SUBCONTRACTOR shall assign worker safety and health responsibilities to line management and supervision, evaluate personnel performance, and hold both management and workers accountable for worker safety and health performance. SUBCONTRACTOR shall hold its line management personnel accountable for the safety and health of SUBCONTRACTOR’s workforce and for successfully performing the safety and health requirements of the subcontract and shall, at least annually, evaluate the effectiveness of its line management personnel’s performance in meeting this objective. If SUBCONTRACTOR, or any lower-tier subcontractor, independently either suspends or terminates an employee for unsafe acts resulting from performance of work under this subcontract, SUBCONTRACTOR shall immediately provide written notification to the STR with information on that action.
1.19 Where this Exhibit states that safety or accident prevention sign, label, or tag is required the
SUBCONTRACTOR shall be required to use signs, labels, or tags identical to those used by the CONTRACTOR unless otherwise authorized by the CONTRACTOR’s STR.
F2.0 Subcontractor's Site-Specific ES&H Plan
Page 18 of 90 Requisition No. Subcontract No.
2.1 To perform subcontract work at LANL, SUBCONTRACTOR is required to comply with CONTRACTOR’s 10 CFR 851 Worker Safety and Health Program, the requirements of which are set forth in this Exhibit. This Exhibit also contains additional safety, health and environment requirements that CONTRACTOR considers necessary for performance of work at LANL.
Further, SUBCONTRACTOR shall supplement the requirements of this Exhibit with such additional safety, health and environment elements, if any, as SUBCONTRACTOR considers necessary to protect the safety and health of the workers and the environment, and so certify to CONTRACTOR that this Exhibit together with any additional elements constitute the SUBCONTRACTOR’s Site-Specific ES&H Plan. The SUBCONTRACTOR will address in this Plan how it will comply with the specific requirements of clauses contained in this Exhibit during execution of work. Submission of a general safety manual or company ES&H policy unto itself is not adequate to constitute a Site-Specific ES&H Plan. SUBCONTRACTOR shall consolidate such ES&H plan elements and submit the complete SUBCONTRACTOR’s Site-Specific ES&H Plan to CONTRACTOR for review and approval. SUBCONTRACTOR’s Site-Specific ES&H Plan must be approved prior to issuance of a Notice to Proceed.
2.2 SUBCONTRACTOR is responsible for compliance with the ES&H requirements applicable to this subcontract regardless of the performer of the work. SUBCONTRACTOR’s Site-Specific ES&H Plan shall specify how safety requirements will flow down to employees and sub-tier subcontractors. In accordance with 10 CFR 851.20(a)(5) and 10 CFR 851.20(b)(2)(ii), SUBCONTRACTOR will ensure that workers have access to SUBCONTRACTOR’s Site- Specific ES&H Plan, and in accordance with 10 CFR 851.20(b) that workers comply with the requirements in the plan, respectively.
2.3 SUBCONTRACTOR’s Site-Specific ES&H plan shall describe how the SUBCONTRACTOR complies with compliance orders, if any, issued by the Secretary of DOE in accordance with 10
CFR 851.4.
2.4 SUBCONTRACTOR’s Site-Specific ES&H Plan shall include copies of any documents as specified in the following sections of this exhibit. Where the scope of work and this Exhibit specify Hazardous Waste Operations or Emergency Response as defined in 29 CFR 1910.120 or 29 CFR 1926.65 the SUBCONTRACTOR’s Site Specific ES&H Plan shall contain the safety and health program elements stated in 29 CFR 1910.120(b) and Site Specific Safety and Health Plan as required by 29 CFR 1910.120 (b)(4)(i) through 1910.120(b)(4(iv).
2.5 Changes to SUBCONTRACTOR’s Site-Specific ES&H Plan require re-submittal to and approval by CONTRACTOR.
F3.0 Subcontractor and Lower-Tier Subcontractor Minimum Performance Eligibility Factors
3.1 The SUBCONTRACTOR should have a demonstrated safety performance equal to or lower than the standards contained in Attachment F3-1, Safety Performance Eligibility Requirements, and shall complete Attachment F3-2, Environment, Safety and Health History Worksheet. If any of the maximum allowable averages in Attachment F3-1 is exceeded, the SUBCONTRACTOR shall provide information to the CONTRACTOR that clearly explains the excessive rate and that the anomaly causing that excess was not easily preventable using sound safety practice.
CONTRACTOR must approve any exceedances.
3.2 If SUBCONTRACTOR intends to use lower-tier subcontractors to perform elements of the
Page 19 of 90 Requisition No. Subcontract No.
subcontracted Scope of Work, such lower-tier subcontractors shall have a demonstrated safety performance equal to or lower than the standards contained in Attachment F3-1, Safety Performance Eligibility Requirements, and shall complete Attachment F3-2, Environment, Safety and Health History Worksheet. SUBCONTRACTOR must obtain approval from CONTRACTOR for any sub-tier SUBCONTRACTOR that exceeds one or more of the maximum allowable averages in Attachment F3-1.
3.3 SUBCONTRACTOR shall ensure that lower-tier subcontractors that perform elements of the subcontracted Scope of Work adhere to this Exhibit F and SUBCONTRACTOR’S Site-Specific ES&H Plan. SUBCONTRACTOR is responsible for ensuring that its lower-tier subcontractor’s activities are included in SUBCONTRACTOR’S Site-Specific ES&H Plan and that they work within the requirements of this Subcontract. The names and performance eligibility information of all the entities performing work at every tier must be provided to CONTRACTOR prior to commencement of work (see Attachment F3-1, Safety Performance Eligibility Requirements).
3.4 If new or additional lower-tier subcontractors are proposed to be used by SUBCONTRACTOR at any time after the award of the subcontract, SUBCONTRACTOR must notify CONTRACTOR at least 15 calendar days before the proposed start date of the new lower-tier subcontractor and submit eligibility information as provided in paragraph 3.1 above.
F4.0 Subcontractor ES&H Representative Duties and Responsibilities
SUBCONTRACTOR shall provide a competent person(s) and/or qualified person(s) as required in several sections of the OSHA regulations such as, Scaffolds, Excavations, Steel Erection, etc. onsite as long as tasks requiring competent / qualified person(s) are being conducted.
A competent person means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
A qualified person means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work, or the project.
SUBCONTRACTOR shall submit the competent person and/or the qualified person’s qualifications to the CONTRACTOR and must receive approval prior to Notice to Proceed. Approval is based on the complexity of work, related hazards and the relevant skill sets (qualifications) required to address those hazards. For example, when toxic chemicals are used by workers and a potential for exposure exists the ES&H representative must be qualified to evaluate the exposure, select appropriate controls (PPE, Ventilation, etc.) and ensure compliance with any medical surveillance protocols. Note: The selection of Options are based on STR and ES&H SME professional judgement. The selection of Option A does not preclude the selection of Option D (Environmental Professional) when there are environmental risk associated with the project.
OPTION A
4.1 SUBCONTRACTOR shall provide a full time dedicated ES&H Professional on-site and shall work closely with CONTRACTOR management personnel to implement and administer SUBCONTRACTOR’S approved Site-Specific ES&H Plan. This shall be the ES&H Professional’s sole responsibility. The dedicated ES&H Professional shall meet the following
Page 20 of 90 Requisition No. Subcontract No.
minimum acceptance criteria or pre-approved equivalent:
Certification by the American Board of Industrial Hygienists or Board of Certified Safety Professionals as a Certified Industrial Hygienist (CIH), Certified Safety Professional (CSP) or equivalent nationally recognized organization, or eligible for certification;
A bachelor’s degree (or equivalent) in safety engineering or industrial hygiene or an equivalent technical field;
Three to Five years of full time work experience in the field of environment, safety and health;
A minimum of 40 hours of formal environmental training in erosion control, waste management, or other environmental discipline, or pre-approved equivalent having other environmental related training and/or job experience;
Current training in CPR and First Aid.
4.2 SUBCONTRACTOR shall submit the ES&H Professional’s qualifications to CONTRACTOR and must receive approval prior to issuance of Notice to Proceed.
4.3 SUBCONTRACTOR’s ES&H Professional’s duties shall include, but are not limited to:
Manage implementation of SUBCONTRACTOR’s approved Site-Specific ES&H Plan, including review of integrated work documents.
Cease work and take immediate actions, as necessary, to remove personnel from hazardous areas if the safety or health of SUBCONTRACTOR’s personnel, other site personnel, or third parties is jeopardized by SUBCONTRACTOR’s work activities, and notify CONTRACTOR’s STR.
Cease work and take immediate actions, as necessary, to address environmental compliance issues, and notify the STR.
Interface with CONTRACTOR’s ES&H personnel and the STR to resolve ES&H issues.
Provide hazard-specific training for new employees and orientations for visitors.
Ensure ES&H requirements and goals have been identified to workers.
Ensure compliance with CONTRACTOR’s emergency response plans (including evacuation alarms, accountability rosters, and assembly points).
Continuously evaluate the site for any hazards not previously identified or adequately controlled, initiate measures required to protect personnel, the public and the environment, and revise documents accordingly.
Conduct safety and pre-job briefings as required.
Attend progress meetings held by the CONTRACTOR.
Represent SUBCONTRACTOR in incident investigations and/or critiques schedule by the CONTRACTOR.
Maintain first aid and OSHA 300 logs, report accidents and injuries to the STR immediately, conduct accident/incident investigations as required, and report results to the STR within 2 working days.
Ensure that proper hazard postings are in place, are legible, and are removed when the project is complete.
Conduct all operations so as to mitigate adverse environmental impacts (e.g., spill containment, erosion control).
Establish and maintain the Hazard Communication program (including Material Safety Data Sheets, inventory, and training).
Conduct and document ES&H inspections in accordance with the requirements of
Page 21 of 90 Requisition No. Subcontract No.
Subclause F10.1.
4.4 The ES&H Professional shall be at the worksite whenever SUBCONTRACTOR personnel are working. On occasions when the ES&H Professional must be away from the work site, the STR must be notified and a CONTRACTOR approved alternate shall be identified to act on the ES&H Professional’s behalf.
OPTION B
4.5 SUBCONTRACTOR shall provide a full time dedicated ES&H Specialist on-site and shall work closely with CONTRACTOR management personnel to implement and administer SUBCONTRACTOR’s approved Site Specific ES&H Plan. The dedicated ES&H Specialist shall meet the following minimum acceptance criteria or pre-approved equivalent:
Certified Associate Industrial Hygienist (CAIH) certification by the American Board of
Industrial Hygiene, or Associate Safety Professional (ASP), Occupational Health Safety Technicial or Construction Health Safety Technician certification by the Board of Certified Safety Professionals or equivalent nationally recognized organization, or eligible for certification;
An Associate degree (or equivalent) in safety engineering or industrial hygiene or an equivalent technical field;
At least three (3) years of full time work experience in the field of environment, safety and health.
A minimum of 40 hours of formal environmental training in erosion control, waste management, or other environmental discipline, or pre-approved equivalent having other environment related training and/or job experience.
Note: Sections 4.2 through 4.4 above for the ES&H Professional also apply to the ES&H Specialist, Option B.
OPTION C
4.6 SUBCONTRACTOR shall designate an on-site ES&H Representative for all tasks conducted under this subcontract. This person shall assist SUBCONTRACTOR’s supervision with implementation of SUBCONTRACTOR’s approved Site-Specific ES&H Plan and CONTRACTOR’s site requirements. The ES&H Representative should have formal ES&H training, such as the following (depending on the work to be performed):
A minimum of thirty (30) hours formal ES&H training in OSHA standards or pre-approved equivalent having other ES&H-related training certificates and/or job experience appropriate to the work being performed.
Formal environmental training and/or job experience in erosion control, waste management, or other environmental discipline.
4.7 SUBCONTRACTOR shall submit the ES&H Representative’s qualifications and receive approval from CONTRACTOR prior to issuance of a Notice to Proceed.
4.8 SUBCONTRACTOR’s ES&H Representative’s duties shall include, but are not limited to:
Page 22 of 90 Requisition No. Subcontract No.
Promote and assist in implementation of SUBCONTRACTOR’s Site-Specific ES&H Plan, including review of integrated work documents.
Cease work and take immediate actions, as necessary, to remove personnel from hazardous areas if the safety or health of SUBCONTRACTOR’s personnel, other site personnel, or third parties is jeopardized by SUBCONTRACTOR’s work activities, and notify CONTRACTOR’s STR.
Continuously evaluate the site for any hazards and environmental compliance issues not previously identified or adequately controlled, initiate measures required to protect personnel, the public and the environment, and revise documents accordingly.
Participate in ES&H and pre-job briefings as required.
Conduct and document ES&H inspections in accordance with the requirements of
Subclause F9.1.
4.9 SUBCONTRACTOR’s assigned ES&H Representative may have other duties as long as they will not interfere with or prevent the employee from performing the above stated responsibilities.
OPTION D
4.10 SUBCONTRACTOR shall provide a full-time dedicated Environmental Professional on site and shall work closely with CONTRACTOR management personnel to implement and administer SUBCONTRACTOR’s required environmental deliverables and CONTRACTOR’s environmental requirements. This shall be the Environmental Professional’s sole responsibility.
The dedicated Environmental Professional shall meet the following minimum acceptance criteria or pre-approved equivalent:
Certified Professional in Erosion and Sediment Controls (CPESC), Certified Inspector in
Sediment and Erosion Control (CISEC), or equivalent nationally recognized certification in erosion control, waste management, or other environmental discipline, or eligibility for certification.
A bachelor’s degree (or equivalent) in an environmental related field or an equivalent technical field.
At least three (3) years of full-time work experience in the field of environmental management.
Current training of at least 40 hours in environmental compliance field inspections.
4.11 SUBCONTRACTOR shall submit the Environmental Professional's qualifications and receive approval from CONTRACTOR prior to issuance of a Notice to Proceed.
4.12 SUBCONTRACTOR’s Environmental Professional's duties shall include, but are not limited to:
Conduct all operations so as to mitigate adverse environmental impacts (e.g., spill containment, erosion control, etc.);
Manage implementation of SUBCONTRACTOR’s environmental deliverables and
CONTRACTOR’s environmental requirements;
Cease work and take immediate actions, as necessary, to address environmental compliance issues and notify CONTRACTOR’s STR;
Interface with CONTRACTOR’s environmental personnel and the STR to resolve environmental issues;
Provide environmental protection/compliance training for new employees and
Page 23 of 90 Requisition No. Subcontract No.
orientations for visitors, as deemed necessary;
Ensure environmental requirements and goals have been identified to workers;
Continuously evaluate the site for environmental protection/compliance related issues, initiate measures required to mitigate identified issues, and update documents accordingly;
Conduct environmentally related pre-job briefings;
Attend progress meetings;
Represent SUBCONTRACTOR in incident investigations and/or critiques;
Ensure specific environmental controls are maintained throughout the project; and Conduct and document daily environmental inspections as required.
F5.0 Incident Reporting Requirements
5.1 In accordance with 10 CFR 851.26(b), SUBCONTRACTOR shall:
Report and investigate accidents, injuries and illnesses; and Analyze related data for trends and lessons learned (reference DOE Order 225.1B, Accident Investigations, March 04, 2011).
5.2 SUBCONTRACTOR must immediately notify CONTRACTOR’s STR verbally, and then in writing (within 24 hours), of any on-site event or condition that adversely affects, or may adversely affect CONTRACTOR, its mission, CONTRACTOR’s or SUBCONTRACTOR’s personnel, the public, property, or the environment. An on-site event or condition includes but is not limited to: employee injury/illness/first aid (including a significant change in severity of the original condition); fire; any accident, incident, or near-miss; property damage to equipment, facilities, or motor vehicles; non-compliance with safety, health or environmental requirements;
non-permitted release to the environment; or any other unplanned event that may be a violation of a regulatory requirement or that may be viewed negatively by the public, CONTRACTOR, or
GOVERNMENT.
5.3 In situations where any of the conditions mentioned above occur, the scene surrounding or associated with the event shall be preserved for continued investigation unless such actions interfere with establishing a safe condition or CONTRACTOR concurrence is obtained.
SUBCONTRACTOR and CONTRACTOR personnel may jointly investigate each injury/illness, accident, incident, near miss, or environmental noncompliance.
5.4 SUBCONTRACTOR shall provide a complete written accident/incident investigation report of any incident, outlining the causes, corrective actions, and measures taken to prevent recurrence of similar incidents, to CONTRACTOR’s STR within two working days of its occurrence. Furthermore, the SUBCONTRACTOR shall cooperate and participate as required with any CONTRACTOR or GOVERNMENT fact finding, learning team, critique, analysis, or investigation for such events/conditions.
F6.0 Injury/Illness Recordkeeping and Reporting
6.1 SUBCONTRACTOR shall maintain accurate accident and injury/illness logs in accordance with 10 CFR 851.26 (a)(1). Logs shall be available for review by CONTRACTOR upon request.
SUBCONTRACTOR must enter each recordable injury or illness on the SUBCONTRACTOR’s OSHA 300 Log and 301 Incident Report within seven (7) calendar days of receiving information that a recordable injury or illness has occurred.
Page 24 of 90 Requisition No. Subcontract No.
6.2 In accordance with 10 CFR 851.26(a)(2), the SUBCONTRACTOR is required to report all job-related injuries and illnesses, regardless of severity, immediately to CONTRACTOR’s STR.
Copies of the appropriate medical treatment forms (medical provider’s diagnosis, restrictions, treatment plan) shall be made available to CONTRACTOR Occupational Medicine when requested (see Clause F15.0). SUBCONTRACTOR shall also provide an investigation report using Attachment DOE Form 5484.3 to the CONTRACTOR STR within 2 working days, which includes the location where the injury/illness occurred, date, time, name, Z-number, home address for employees with recordable injuries/lost or restricted work days, body part injured, nature of injury, medical treatment, root cause of accident and corrective actions, restrictions, number of days hospitalized, number of work days lost, number of restricted work days, and number of productive man-hours for the month. Prior to injured or ill employee returning to work, copies of the attending physician’s report releasing the employee to full or limited duty shall also be submitted.
6.3 SUBCONTRACTOR shall maintain reports and documentation required by Federal, State, and
Local regulations in accordance with 10 CFR 851.26(a) and (b). This includes all hazard inventory information, hazard assessments, exposure measurements and exposure controls.
These reports and documentation shall be submitted to CONTRACTOR upon request.
SUBCONTRACTOR shall not conceal nor destroy any information concerning non-compliance or potential noncompliance with the requirements of 10 CFR 851.26(a)(4).
6.4 In accordance with 10 CFR 851.26 (a)(2), the SUBCONTRACTOR shall submit a weekly productive man-hours report to the STR every Monday for the preceding week (when work is performed) using Attachment F6-1, Weekly Productive Man-Hour Report.
F7.0 Employee Training
7.1 In accordance with 10 CFR 851.25(a), (b) and (c), SUBCONTRACTOR shall ensure that workers are properly trained and qualified to safely perform all assigned tasks in accordance with the Subcontractor Training Requirements (Attachment F7-0).
This includes training of workers in the hazards to which they may be exposed so they can perform their duties in a safe and healthful manner. This must include initial, periodic, and additional training and provide information on each hazard before the time of initial assignment to a job involving exposure to each hazard. SUBCONTRACTOR must provide training and information to workers who have worker safety and health program responsibilities that is necessary for them to carry out those responsibilities.
7.2 Any CONTRACTOR-required and provided training is noted in the applicable sections of this
Exhibit. CONTRACTOR will maintain records of any training provided to SUBCONTRACTOR and such records will be made available to SUBCONTRACTOR upon request.
7.3 SUBCONTRACTOR shall conduct or acquire training and maintain records of other specific training required to perform work safely. Training records shall be retained on site for the duration of the contract and made available to CONTRACTOR, upon request.
7.4 SUBCONTRACTOR workers shall complete any facility-specific training required and provided by the CONTRACTOR.
7.5 The training identified shall be completed prior to start of work associated with the respective
Page 25 of 90 Requisition No. Subcontract No.
training subject.
F8.0 ES&H Meetings/Pre-Job Briefings/Daily Briefings
8.1 In accordance with 10 CFR 851 20(a)(8), SUBCONTRACTOR shall provide for regular communication with workers about workplace safety and health matters.
8.2 Prior to commencement of work, all SUBCONTRACTOR personnel, either initially or as they are introduced to the site, shall attend a pre-job briefing / orientation. A pre-initiation of work briefing will be conducted by the CONTRACTOR. The SUBCONTRACTOR is responsible for any subsequent briefings of SUBCONTRACTOR employees and will be formally documented.
This documentation must be available for review by CONTRACTOR upon request. The pre-initiation of work briefing shall cover the scope of the subcontract, the associated hazards and environmental requirements, and the steps that will be taken to mitigate those hazards and assure environmental compliance, as well as the roles and responsibilities of CONTRACTOR, SUBCONTRACTOR, and its employees, at a minimum.
8.3 Once each month, CONTRACTOR will conduct a SUBCONTRACTOR ES&H meeting to provide a forum to focus on current ES&H topics, recognize exceptional performance/ compliance as well as review recent incidents and issues. SUBCONTRACTOR will be required to have a representative attend this meeting.
8.4 As required by circumstances and at the discretion of the CONTRACTOR an incident review board (IRB) will be convened. Those involved in selected incidents will be required to present the events surrounding the incident to the IRB as well as what actions that have been put in place by the SUBCONTRACTOR to mitigate the incident and to prevent re-occurrence.
SUBCONTRACTOR management will be required attendants at the IRB meeting.
8.5 SUBCONTRACTOR shall provide a daily briefing for its workers which specifically addresses the hazards and mitigating controls for work to be performed that day. This daily briefing or pre-task planning briefing shall be documented and made available to the CONTRACTOR on request. Pre-task planning documentation shall be available at the work location and provided to the STR upon request. In addition, SUBCONTRACTOR will conduct and document employee ES&H meetings. Documentation shall include the topic of said meetings, attendees, questions posed by workers, hazards identified by workers, and responses to worker questions and worker identified hazards by SUBCONTRACTOR’s ES&H Representative or Management.
F9.0 ES&H Inspections
9.1 SUBCONTRACTOR shall conduct and maintain records daily of initial, and other periodic inspections of the work areas to monitor compliance with ES&H requirements and provide a written report to the CONTRACTOR STR (see Attachment F9-1, Samples of Inspection Checklist for Subcontractors). CONTRACTOR will also perform periodic inspections including compliance monitoring/sampling of the work areas and provide a written report to the STR who will communicate issues to SUBCONTRACTOR.
9.2 SUBCONTRACTOR shall promptly initiate action to correct all identified hazards, deficiencies, or compliance issues that SUBCONTRACTOR is responsible for.
9.3 SUBCONTRACTOR shall report all identified hazards, deficiencies, or compliance issues not under the control of the SUBCONTRACTOR to the CONTRACTOR STR.
Page 26 of 90 Requisition No. Subcontract No.
9.4 SUBCONTRACTOR shall take all necessary steps to ensure the protection of employees, the public, and the environment until the hazards, deficiencies, or compliance issues are corrected.
9.5 In accordance with 10 CFR 851.20(b)(6), SUBCONTRACTOR shall ensure that workers have the right without reprisal to request and receive results of investigations, inspections and accident investigations.
9.6 Regulatory agencies such as the New Mexico Environment Department (NMED) and the U.S.
Environmental Protection Agency (EPA) will make unannounced visits to work areas and perform periodic environmental compliance inspections. The SUBCONTRACTOR shall notify the CONTRACTOR STR immediately if regulatory agency personnel schedule a visit or an inspection of the site, or arrive at the site unannounced.
F10.0 Housekeeping
10.1 Good housekeeping practices are an integral component to maintaining a safe and environmentally compliant work environment. SUBCONTRACTOR shall keep all work areas neat and orderly at all times by providing the necessary resources and by implementing the following housekeeping practices:
Keep tools and materials properly stored when not in use and remove all materials that are no longer needed.
Ensure trash, scrap materials, and waste are placed in appropriate containers. Locate containers strategically throughout the work area to promote use.
Keep floors clear of trip and slip hazards including hoses, welding leads, electric cords, liquids, and other obstacles. Keep cords, hoses, and leads clear of walkways, roadways, and other locations where possible exposure to damage exists.
Properly store and dispose of paint, solvents, oil soaked rags, and debris, etc., in approved containers in accordance with the appropriate waste management regulatory requirements.
Ensure protruding nails, screws, staples, and other sharp objects are protected or removed and do not present a hazard.
Provide and keep eating and sanitary facilities maintained in a clean and sanitary condition at all times, including adequate washing facilities with soap and disposable towels.
Provide clean, potable drinking water for employees in a safe, hygienic manner at all worksites. Single use cups shall be provided in a sanitary dispenser. Cups shall be replenished as needed during the day and trash cans provided for their disposal.
"Community" or common use cups shall not be used.
Unless specified elsewhere in the subcontract, SUBCONTRACTOR shall provide and maintain its own sanitary toilet facilities for its employees. The cleaning and maintenance of the facilities, and method and location of waste disposal, shall be acceptable to CONTRACTOR.
F11.0 Emergency Preparedness Requirements
11.1 SUBCONTRACTOR must comply with CONTRACTOR’s site-specific emergency response requirements which are covered in the General Employee Training and the facility-specific training for the facilities and buildings in which they work. CONTRACTOR will communicate site-specific emergency response requirements to SUBCONTRACTOR’s employees at the
Page 27 of 90 Requisition No. Subcontract No.
beginning of the work to be performed under this contract. Communication of requirements will be documented by CONTRACTOR.
11.2 Unless specified otherwise, communication of site-specific emergency response requirements to SUBCONTRACTOR employees who do not attend the initial communication briefing described in paragraph 11.1 above must be performed by SUBCONTRACTOR and formally documented. This documentation must be available for review by CONTRACTOR.
11.3 SUBCONTRACTOR is responsible for defining emergency procedures specific to the work scope relative to the site in the SUBCONTRACTOR’s Site-Specific ES&H Plan. These emergency procedures must be written and communicated to the employees. At a minimum, SUBCONTRACTOR will include the following information:
Protective actions Shelter-in-place Evacuation of personnel Notifications Emergency signals Evacuation routes Assembly areas Personnel accountability
An annual evacuation drill is required with documented results available for the CONTRACTOR’s review.
11.4 SUBCONTRACTOR is responsible for ensuring that all employees and personnel entering the site are informed of the emergency procedures for their location of work.
F12.0 Personal Protective Equipment
12.1 SUBCONTRACTOR shall provide, use, and maintain personal protective equipment (PPE) to protect SUBCONTRACTOR personnel from hazards directly related to the work. See 29 CFR 1910.132(a) and NFPA 70E.
12.2 SUBCONTRACTOR shall perform a required…