Exhibit_C_Form_H_Resume_of_Key_Personnel.doc

DOC document 41 KB Posted

Attached to
TA-21 Delta Prime Site Aggregate Area Delayed Sites Project
Solicitation number
0000186
Issued by

About this file

Exhibit C Form H Resume of Key Personnel

View the file

Other files

File Type Posted
Exhibit_D_Appendix_D-17_NMED_SSG.pdf PDF
Exhibit_D_Appendix_D-16_N3B_EXID_Procedure.pdf PDF
Exhibit_D_Appendix_D-5_SWPPP.pdf PDF
Exhibit_D_Appendix_D-4_Maps.pdf PDF
Exhibit_C_Form_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement.doc DOC document
Exhibit_D_Appendix_D-10_TA-21_PRS_Status.pdf PDF
Exhibit_D_Appendix_D-12_NMED_Consent_Order.pdf PDF
SCA_15-5463.txt TXT text file
Exhibit_I_Attachment_B_-_Subcontractor_Submittal_Requirements_Summary_TA-21_DP_DD_Final.pdf PDF
Exhibit_D.pdf PDF
Exhibit_C_Form_A_Final.pdf PDF
Exhibit_D_Appendix_D-9_WCS_Genarator_Handbook.pdf PDF
Exhibit_D_Appendix_D-15_SDDR_Form_2178.pdf PDF
Form_9100_-_Subcontract_Long_Form_Rev._0_RFP-0000186.pdf PDF
Exhibit_D_Appendix_D-18_Earth_Moving_Spec.pdf PDF
Exhibit_G_TA-21_Delta_Prime_Site_Aggregate_Area_9-25-18.pdf PDF
Exhibit_B_RFP-0000186_-_N3B_General_Conditions_for_Fixed_Price_Subcontracts.pdf PDF
Exhibit_A_RFP-0000186_-_Prime_Contract_Flow_Down_Clauses_N3B_Form_9055.pdf PDF
Exhibit_J__Insurance_Requirements.pdf PDF
RFP-0000186_TA-21_building_257_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_Work_Plans.pdf PDF
Exhibit_C_Form_N_Experience_Statement.doc DOC document
Exhibit_D_Appendix_D-6_WCSF.pdf PDF
Exhibit_H_TA-21-257_DP_RLW.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List.doc DOC document
Exhibit_D_Appendix_D-1_Photos.pdf PDF
Exhibit_D_Appendix_D-7_Training_Matrix.pdf PDF
Exhibit_C_Form_E_Personnel_Tabulation.doc DOC document
Reps__Certs_N3B_Form_9071__(00000003).pdf PDF
Exhibit_D_Appendix_D-2_Drawings.pdf PDF
Exhibit_D_Appendix_D-13_Threemile_SIR.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule.doc DOC document
Exhibit_D_Appendix_D-3_Suveys.pdf PDF
Exhibit_D_Appendix_D-11_N3B_SOP's_DIR.pdf PDF
Exhibit_F_TA-21-257_DP_RLW.pdf PDF
Exhibit_D_Appendix_D-14_N3B_Request_for_Information_Form.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ex C Form H (Rev. 1, 9/22/08) Exhibit C Form H – Resumes of Key Personnel October 1, 2018

EXHIBIT “C”

FORM H

RESUMES OF KEY PERSONNEL

Bidder shall provide a resume for each key person to be assigned to the Subcontract, containing at least the following information for each person. Attach and properly designate additional pages, if necessary.

a.

Name:

b.

Title c.

Position d.

Education/Qualifications:

e.

Present Position in Bidder’s Company:

f.

Relevant Experience:

g.

Employment History:

h.

Citizenship:

Resumes are required for the following positions: PN: List positions for which resumes are required. Resumes are generally required for the Project Manager, Site/Construction Manager, Lead Site Engineers, Scheduling Engineers, Safety personnel (See Form G) and Lead Site Supervisors, all of whom would be assigned full time to the Subcontract.

· Project Manager

· Field Operation Manager/Team Lead/Superintendent

· ES&H Professional PN: When appropriate, include the optional Special Condition titled “KEY PERSONNEL” in Exhibit “B” and add the following sentence.

Key personnel must meet minimum requirements listed in the Special Condition titled “KEY PERSONNEL”, restricting their replacement without CONTRACTOR’S consent.

NOTE:

RESUMES ARE FOR BID EVALUATION AND WILL NOT BE A PART OF THE SUBCONTRACT. Nominated personnel shall be made available for interview during any negotiations.

PR# RFP-0000186

File details come from the government source that posted it.