Exhibit D Appendix D-14 Request for Information Form

View the file

Other files

File Type Posted
Exhibit_D_Appendix_D-17_NMED_SSG.pdf PDF
Exhibit_D_Appendix_D-16_N3B_EXID_Procedure.pdf PDF
Exhibit_D_Appendix_D-5_SWPPP.pdf PDF
Exhibit_D_Appendix_D-4_Maps.pdf PDF
Exhibit_C_Form_C_Subcontractor_and_Vendor_List.doc DOC document
Exhibit_C_Form_C-1_Lower_Tier_Experience_Statement.doc DOC document
Exhibit_D_Appendix_D-10_TA-21_PRS_Status.pdf PDF
Exhibit_D_Appendix_D-12_NMED_Consent_Order.pdf PDF
SCA_15-5463.txt TXT text file
Exhibit_I_Attachment_B_-_Subcontractor_Submittal_Requirements_Summary_TA-21_DP_DD_Final.pdf PDF
Exhibit_D.pdf PDF
Exhibit_C_Form_A_Final.pdf PDF
Exhibit_D_Appendix_D-9_WCS_Genarator_Handbook.pdf PDF
Exhibit_C_Form_H_Resume_of_Key_Personnel.doc DOC document
Exhibit_D_Appendix_D-15_SDDR_Form_2178.pdf PDF
Form_9100_-_Subcontract_Long_Form_Rev._0_RFP-0000186.pdf PDF
Exhibit_D_Appendix_D-18_Earth_Moving_Spec.pdf PDF
Exhibit_G_TA-21_Delta_Prime_Site_Aggregate_Area_9-25-18.pdf PDF
Exhibit_B_RFP-0000186_-_N3B_General_Conditions_for_Fixed_Price_Subcontracts.pdf PDF
Exhibit_A_RFP-0000186_-_Prime_Contract_Flow_Down_Clauses_N3B_Form_9055.pdf PDF
Exhibit_J__Insurance_Requirements.pdf PDF
RFP-0000186_TA-21_building_257_FINAL.pdf PDF
Exhibit_D_Appendix_D-8_Work_Plans.pdf PDF
Exhibit_C_Form_N_Experience_Statement.doc DOC document
Exhibit_D_Appendix_D-6_WCSF.pdf PDF
Exhibit_H_TA-21-257_DP_RLW.pdf PDF
Exhibit_C_Form_B_Construction_Plant_Equipment_List.doc DOC document
Exhibit_D_Appendix_D-1_Photos.pdf PDF
Exhibit_D_Appendix_D-7_Training_Matrix.pdf PDF
Exhibit_C_Form_E_Personnel_Tabulation.doc DOC document
Reps__Certs_N3B_Form_9071__(00000003).pdf PDF
Exhibit_D_Appendix_D-2_Drawings.pdf PDF
Exhibit_D_Appendix_D-13_Threemile_SIR.pdf PDF
Exhibit_C_Form_D_Subcontract_Schedule.doc DOC document
Exhibit_D_Appendix_D-3_Suveys.pdf PDF
Exhibit_D_Appendix_D-11_N3B_SOP's_DIR.pdf PDF
Exhibit_F_TA-21-257_DP_RLW.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Subcontract Management

REQUEST FOR INFORMATION

SUBCONTRACT No. RFI No. Date: Page 1 of

Project ID: Date Reply Requested By:

Reference Information (Document/Drawing/Specification/Location)

INFORMATION REQUESTED / PROBLEM:

PROPOSED RESPONSE / SOLUTION:

SUBCONTRACTOR Representative: STR: Receipt Date:

INFORMATION TO SUBCONTRACTOR

REQUESTED INFORMATION:

CONTRACTOR Representative: Date:

RFP No.

Technical Subcontract Management

INSTRUCTIONS

This procedure provides for controlled identification, notification and resolution of SUBCONTRACTOR initiated technical questions. A Request for Information (RFI) is a SUBCONTRACTOR initiated technical question. An RFI is initiated if the

SUBCONTRACTOR:

• Is unable to understand technical documents: scope, specifications, drawings or data.

• Discovers or perceives a conflict, ambiguity, error or omission in or among the technical documents.

Upon determination that an RFI is required, the SUBCONTRACTOR should prepare its question on the attached form, log the RFI using a sequential numbering system (e.g., the first RFI is [SUBCONTRACT #]-RFI-0001), and deliver the RFI to CONTRACTOR’S STR or designated location (address). SUBCONTRACTOR shall maintain a log to track and document status. At a minimum the log shall contain the RFI identifier, date submitted, date returned, status, and a section for comments. SUBCONTRACTOR shall provide an updated copy of this log at each weekly Project Status Meeting for review.

RFI’s that request a specific date for a required response should be monitored for a response and, if no response has been issued three (3) days before the response is due, the originator should contact CONTRACTOR to ascertain the status of the response. CONTRACTOR will target to respond to most RFI’s with three (3) working days and all RFI’s within two (2) weeks.

The RFI may not be used to request deviations to the Subcontract. See the Supplier Deviation Disposition Request (SDDR) section of the Subcontract Documents for deviations. CONTRACTOR responses to RFIs shall not be construed as permission to deviate from contract requirements. RFI’s are not authorized change documents and cannot be used to direct a change in subcontract requirements. If CONTRACTOR’S response on the RFI has a cost and/or schedule effect, it is the SUBCONTRACTOR’S responsibility to immediately advise CONTRACTOR’S Procurement Specialist with a SUBCONTRACTOR Change Proposal. Work undertaken without CONTRACTOR authorization is at the SUBCONTRACTOR’S risk and expense.

INFORMATION TO SUBCONTRACTOR