Ex C Form A (LS) (Rev. A, 06/26/2018) Exhibit C Form A, Schedule of Quantities and Prices Revision #A, Dated 06/26/2018
Subcontract No. 0000186 Exhibit C – Quantities, Pricing and Data Form A – Schedule of Quantities and Prices (Lump Sum)
EXHIBIT “C”
FORM A
SCHEDULE OF QUANTITIES AND PRICES
TA-21 Delta Prime Site Aggregate Area
Delayed Sites Project
1.0 WORK TO BE PERFORMED
Complete the TA-21 Delta Prime Site Aggregate Area Delayed Sites Project work in accordance with the requirements of all Subcontract Documents.
2.0 BASE SCOPE LUMP SUM PRICING
The Total Lump Sum Price for performing all base scope work is $__________________. The breakdown of this Lump Sum Price against pay items is detailed below: The following items under 2.0 “Base Scope” are to be used for measured monthly progress payments.
Item Description Unit Total Units
Lump Sum
2.1 Submittal Preparation, Site Training, Readiness
Review (Exhibit D 3.0 and Exhibit I required submittals)
LS 1
2.2 Site Mobilization and “Cold & Dark” Verification
(Ex. D 1.1.1)
LS 1
2.3 Develop Sample and Analysis Plan and complete
characterization of 21-257 and associated Tanks and Equipment (Ex. D 1.1.2)
LS 1
2.4 21-257 Universal Waste, Asbestos and Hazardous Materials abatement and removal.
(Ex. D 1.1.3 and 1.1.4)
LS 1
2.5 Remediate oils, sludges, and liquids from 21-257 tanks
and equipment (Ex. D 1.1.5) **
LS 1
2.6 Remove, size reduce and package accessible
contaminated items associated with 21-0257 and associated tanks; apply fixative (Ex. D 1.1.6 and 1.1.7)
LS 1
2.7 Demolish, size reduce, load and package 21-0257 and
all associated tanks (Ex. D 1.1.8 and 1.1.9)
LS 1
2.8 Soil Sampling outlined in the DP Site Aggregate Area
Building 21-257 Footprint Letter Work Plan (Ex. D 1.1.11.2)
LS 1
Subcontract No. 0000186 Exhibit C – Quantities, Pricing and Data Form A – Schedule of Quantities and Prices (Lump Sum)
Item Description Unit Total Units
Lump Sum
2.9 Excavate, stabilize, size reduce, load and package
5,900 linear feet of Industrial Waste Lines. (Ex. D 1.1.10, 1.1.10.1, 1.1.10.2 and 1.1.10.3)
LS 1
2.10 Excavate, verify and sample previously removed
structures associated with former 21-0035 Treatment Facility (Ex. D 1.1.11.1.7 and Figure 7.2-1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.11 Remove, size reduce, load and package 200 linear ft
associated with former 21-0035 Treatment Facility and back-fill. (Ex. D 1.1.11.1.8.1 and Figure 7.2-1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.12 Remove, size reduce, load and package (3) manhole
structures associated with former 21-0035 Treatment Facility and back-fill. (Ex. D 1.1.11.1.8.2 and Figure 7.2- 1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.13 Remove, size reduce, load and package (2)
underground tank structures associated with former 21-0035 Treatment Facility and back-fill. (Ex. D
1.1.11.1.8.3 and Figure 7.2-1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.14 Remove to native soils, load and package (1) Leach
Field structure associated with former 21-0035 Treatment Facility and back-fill. (Ex. D 1.1.11.1.8.4 and Figure 7.2-1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.15 Remove, size reduce, load and package (1) Grit
Chamber structure associated with former 21-0035 Treatment Facility and back-fill. (Ex. D 1.1.11.1.8.5 and Figure 7.2-1 of the IWP DP Site Aggregate Area, Rev 1)
LS 1
2.16 Soil Sampling outlined in the “Investigation Work Plan
for Delta Prime Site Aggregate Area Delayed Sites, Revision 1 (Ex. D 1.1.11.1)
LS 1
2.17 Remediate, load and package as contaminated soil
25% of estimated soil volume to 10 ft. bgs. (Ex. D 1.1.14)
LS 1
2.18 Back-fill all excavations, depressions and void spaces
to match existing contour. (Ex. D 2.4.17)
LS 1
2.19 Prepare and submit the Investigation Report for all
Consent Order activities defined in the Statement of Work. (Ex. D 1.2)
LS 1
2.20 Site stabilization with base-course per the SWPPP
(Ex. D 2.4.17)
LS 1
2.21 Turnover and Submit Final Project Closeout Report
(Ex. D 2.6 and 2.4.30)
LS 1
2.22 Demobilization from the site (Ex. D 2.4.31) LS 1
TOTAL FIRM FIXED PRICE LS 1
Subcontract No. 0000186 Exhibit C – Quantities, Pricing and Data Form A – Schedule of Quantities and Prices (Lump Sum)
3.0 FIXED UNIT RATE PRICING
The following unit rate prices for changes shall be full and complete compensation for additional work or credit for deleted work. Prices are inclusive of all costs including, but not limited to labor, material, services, overhead and profit. Because these are all-inclusive rates (inclusive of overhead and profit) they are not for use as component rates in negotiated changes where overhead and profit are separately determined.
Item Description Unit Unit Rate
3.2 Investigation sample 0’-4’ (bgs) 1
3.3 Investigation sample 4’-8’ (bgs) 1
3.4 Investigation sample 8’-12’ (bgs) 1
3.5 Investigation sample 12’-18’ (bgs) 1
3.6 Investigation sample 18’-26’ (bgs) 1
3.7 Remediation of Contaminated Soils YD³
3.8 Size reduce, load, package misc. metal equipment YD³
3.9 Size reduce, load, package concrete YD³
3.10 Size reduce, load, package asphalt YD³
3.11 Stabilize areas with 4” compacted base course TN
3.12 Backfill material (including placement and compaction) TN
3.13 Excavate, size reduce, remove, load and package; 2-6 inch pipe
(e.g. Cast iron/Duruiron, orangeburg, fiber, steel pipe)
LF
4.0 ADJUSTMENTS
All prices are fixed for the duration of the Subcontract and are not subject to escalation for any cause.
Payment of the Total Lump Sum Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by SUBCONTRACTOR in accomplishing the Work in accordance with the provisions of this Subcontract.
SUBCONTRACTOR shall maintain all work in progress until it is accepted. SUBCONTRACTOR shall repair, rework or replace, as necessary, any damage or lost work due to normal wear and tear, anticipated events, or conditions within its control. No separate payment shall be made for such maintenance costs which are deemed included in the original Subcontract price. Any failure to maintain the Work shall be considered a defect in accordance with the General Condition titled “WARRANTY.”
5.0 REQUIRED SUBMITTALS
The following submittals are prerequisite to payment for mobilization:
5.1 Subcontract Schedule
5.2 Insurance Certificates, Insurance Endorsements
5.3 SSHASP Plan
5.4 IWDs / AHA’s
5.5 Proof of completed training per Exhibit D, Appendix D-2 - Training Requirements
5.6 Project Execution Plan (PEP)