REBID of Public Water System Upgrade Project – Contract 3 – Electrical Construction

Open State & local contract opportunity Posted

Solicitation number
US.261117
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from pennbid.bonfirehub.com. Updated .

About this opportunity

Fredericksburg Sewer & Water Authority is soliciting rebid sealed proposals for Public Water System Upgrade Project Contract 3 – Electrical Construction, due December 16, 2026 at 2:00 p.m. prevailing time through PennBid. Prime contractors must also document Disadvantaged Business Enterprise (DBE) solicitation efforts, identified through the Pennsylvania Department of General Services website. The project is PENNVEST-funded and subject to Davis-Bacon, Pennsylvania Prevailing Wage Act, E-Verify, and Build America, Buy America and American Iron and Steel requirements.

Scope covers furnishing and installing electrical power supply and distribution equipment, standby power generation, and conduits and wiring for process and powered equipment. Additional work includes an electrical upgrade of Well 6, well controls at new Wells 7 and 8, electrical installation of a mixer in the West Water Tower, demolition of electrical service to existing mixers in both water towers, and an underground 1-inch PVC conduit with pull rope between Electric/Utility Room 110 and Water Filtration Bay 300 for future IT installation. The standby unit is a 150 kW diesel generator set, and its manufacturer must have at least ten years of experience maintaining 24-hour service availability and hold ISO 9001 certification. Materials must carry Underwriters' Laboratories approval and conform to the National Electrical Code. The contractor must provide a one-year warranty on equipment and wiring, a five-year warranty on the generator set, and 12 months of initial maintenance, including quarterly exercising.

Each proposal requires a 10% bid bond or bank cashier's check, plus performance and payment bonds. Substantial completion is required within 365 days and final completion within 395 days of notice to proceed. Liquidated damages are $500 per day beyond substantial completion. Progress payments are monthly at 95% of work completed, with 5% retainage before substantial completion. This rebid is part of a multi-prime project, and the other prime contracts were previously bid and awarded. The place of performance is 2529 State Route 22, Fredericksburg, PA 17026.

Site visits are available by contacting FSWA Operator Dusty Keller at 717-304-1061. The notice states no pre-bid conference is scheduled, although Bid Manual Section 1 references a mandatory pre-bid conference on September 16, 2026, a date that predates this rebid. Bidder questions go through PennBid's Public Q&A feature. Bidding documents are available at no cost on PennBid at pennbid.bonfirehub.com, and bid results will be posted there after opening. Addendum 6 bid documents were posted November 3, 2026.

Opportunity text

Sealed proposals will be received electronically via the PennBid program by the Fredericksburg Sewer & Water Authority for the Public Water System Upgrade Project - Contract 3 - Electrical Construction until 2:00 p.m. prevailing time on Wednesday, December 16, 2026. The bid results will be posted on PennBid shortly thereafter. All bidding documents and specifications are available at no cost on PennBid: https://pennbid.bonfirehub.com Each proposal must be accompanied by a bank cashier's check or bid bond (in the required form) for ten percent (10%) of the bid total. The work shall generally be comprised of one (1) prime contract as follows: Contract No. 3 - Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents. This contract shall also be responsible to install an underground 1" PVC conduit with a pull rope between the Electric/Utility Room (110) and the Water Filtration Bay (300) for use during future IT installation. Individual descriptions of the work for each contract and bid item are set forth in the bid documents. Bidders should note that this bid is part of a larger project with multiple prime contracts, which were previously bid and awarded. There will be no pre-bid conference for this Contract. If the bidder wishes to view the project site (2529 State Route 22, Fredericksburg, PA 17026) they may contact the FSWA Operator - Dusty Keller at 717-304-1061. Questions shall be submitted via the "Public Q & A" feature within PennBid. Bidders are advised that this project is subject to the Davis-Bacon Act and applicable Davis-Bacon Related Acts. The successful bidders and all subcontractors shall pay laborers and mechanics employed on the project not less than the prevailing wage rates and fringe benefits contained in the applicable U.S. Department of Labor wage determination included in the Contract Documents. Contractors shall comply with the labor standards and requirements of 29 CFR Parts 1, 3, and 5, including weekly certified payroll requirements. Bidders are also advised that this project is subject to the American Iron and Steel (AIS) and Build America, Buy America (BABA) Act requirements. The Fredericksburg Sewer & Water Authority hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in any bid at its sole discretion.

Files

File Type Posted
22-753 - GES Well 8 Control Panel (Addendum 6).pdf PDF
9-Bid Manual Section 8 - Dutchland Specifications (Addendum 6).pdf PDF
18-900 SERIES PLOTS - HVAC Plan Set (Addendum 6).pdf PDF
34-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 6).pdf PDF
33-652 - HT Mech Dwgs - Piping Valves (Addendum 6).pdf PDF
21-752 - GES Well 7 Control Panel (Addendum 6).pdf PDF
7-Bid Manual Section 6 - Construction Specifications B (Addendum 6).pdf PDF
26-400 SERIES PLOTS - North Wells Plans (Addendum 6).pdf PDF
30-653 - HT Filter Control Panel (Addendum 6).pdf PDF
12-654 - HT Mech Dwgs - Piping Layouts (Addendum 6).pdf PDF
11-Plan Set Table of Contents (Addendum 6).pdf PDF
29-251 - WWTP Contract 2 As-Built Plans (Addendum 6).pdf PDF
31-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 6).pdf PDF
20-100 SERIES PLOTS - Process Plans (Addendum 6).pdf PDF
10-Bid Manual Section 4 - General Specifications (Addendum 6).pdf PDF
35-300 SERIES PLOTS - Water Piping Plans (Addendum 6).pdf PDF
25-600 SERIES PLOTS - Treatment Building Plans (Addendum 6).pdf PDF
32-700 SERIES PLOTS - Electrical Plan Set (Addendum 6).pdf PDF
15-655 - HT OIT Screens (Addendum 6).pdf PDF
1-Bid Manual Section 2 - Bid Forms (Addendum 6).pdf PDF
8-Bid Manual Section 5 - Construction Specifications A (Addendum 6).pdf PDF
2-Bid Manual Section 7 - Process Equipment Specifications (Addendum 6).pdf PDF
3-Bid Manual Table of Contents (Addendum 6).pdf PDF
14-651 - HT Mech Dwgs - Internals (Addendum 6).pdf PDF
16-252 - WWTP Contract 3 As-Built Plans (Addendum 6).pdf PDF
6-Bid Manual Section 3 - Agreements Bonds (Addendum 6).pdf PDF
23-755 - GES Distribution Pump Control Panel (Addendum 6).pdf PDF
13-656 - HT Mech Dwgs - Tanks Piping Blowers (Addendum 6).pdf PDF
28-754 - GES Manganese FIlter Control Panel (Addendum 6).pdf PDF
19-751 - GES Well 6 Control Panel (Addendum 6).pdf PDF
4-Bid Manual Section 10 - Electrical Specifications (Addendum 6).pdf PDF
36-Bid Manual Section 1 - Front End Specifications (Addendum 6).pdf PDF
17-756 - GES Sludge Pump Control Panel (Addendum 6).pdf PDF
5-Bid Manual Section 9 - Mechanical HVAC Plumbing Specifications (Addendum 6).pdf PDF
27-500 SERIES PLOTS - South Wells Plan (Addendum 6).pdf PDF
24-800 SERIES PLOTS - Plumbing Plan Set (Addendum 6).pdf PDF
Show all 36

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors