4-Bid Manual Section 10 - Electrical Specifications (Addendum 6).pdf

PDF 2 MB Posted

Attached to
REBID of Public Water System Upgrade Project – Contract 3 – Electrical Construction
Solicitation number
US.261117
Issued by
Lehigh County, Pennsylvania

About this file

This electrical specifications document, prepared for the Fredericksburg Sewer & Water Authority's Public Water System Upgrade Project – Contract 3, establishes comprehensive technical requirements for electrical construction work across multiple divisions and sections. The project encompasses furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment (a 150 kW diesel generator set), electrical conduits and wiring, controls, transformers, lighting devices, transfer switches, and related accessories. The work includes upgrading the electrical service to Well 6, installing well controls at new Wells 7 and 8, electrical installation of a mixer in the West Water Tower, demolition of electrical service to existing water tower mixers, and installation of an underground 1-inch PVC conduit between the Electric/Utility Room (110) and Water Filtration Bay (300) for future IT installation. Sealed electronic proposals are due by 2:00 p.m. prevailing time on Wednesday, December 16, 2026, via the PennBid program, with bid results posted thereafter. Bidders are encouraged to view the project site at 2529 State Route 22, Fredericksburg, PA 17026, by contacting FSWA Operator Dusty Keller at 717-304-1061. No pre-bid conference will be held, and questions shall be submitted through PennBid's "Public Q & A" feature. Each proposal must be accompanied by a bank cashier's check or bid bond for ten percent (10%) of the bid total.

The specifications detail extensive technical requirements across 16 divisions including general electrical provisions, basic materials and methods, conduit installation, wiring, boxes, wiring devices, cabinets and enclosures, grounding and bonding, supporting devices, generator sets, transformers, and lighting devices. All materials and equipment must be new, bear Underwriters' Laboratories approval, and conform to the National Electrical Code, Pennsylvania Department of Labor and Industry Fire and Panic Code, and applicable state and local regulations. The electrical contractor is responsible for all permits, inspections, and associated costs, with certificates supplied in triplicate to the Engineer. The generator set shall be rated at 150 kW and 226 A (standby rating) at 277/480 volts, three-phase, 0.8 power factor, and must be produced by a manufacturer with at least ten years of experience maintaining 24-hour service availability and holding ISO 9001 certification. A one-year warranty on all equipment and wiring covers defects in materials and workmanship, with a five-year warranty available for the generator set following substantial completion. The contractor must provide initial maintenance service for 12 months, including quarterly exercising and routine preventive maintenance. Submittals including shop drawings, catalog cuts, and data sheets require Engineer approval prior to material purchase or installation, with a minimum of seven copies submitted for review.

View the file

Other files

File Type Posted
31-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 6).pdf PDF
3-Bid Manual Table of Contents (Addendum 6).pdf PDF
32-700 SERIES PLOTS - Electrical Plan Set (Addendum 6).pdf PDF
15-655 - HT OIT Screens (Addendum 6).pdf PDF
34-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 6).pdf PDF
30-653 - HT Filter Control Panel (Addendum 6).pdf PDF
33-652 - HT Mech Dwgs - Piping Valves (Addendum 6).pdf PDF
23-755 - GES Distribution Pump Control Panel (Addendum 6).pdf PDF
7-Bid Manual Section 6 - Construction Specifications B (Addendum 6).pdf PDF
19-751 - GES Well 6 Control Panel (Addendum 6).pdf PDF
13-656 - HT Mech Dwgs - Tanks Piping Blowers (Addendum 6).pdf PDF
28-754 - GES Manganese FIlter Control Panel (Addendum 6).pdf PDF
6-Bid Manual Section 3 - Agreements Bonds (Addendum 6).pdf PDF
20-100 SERIES PLOTS - Process Plans (Addendum 6).pdf PDF
5-Bid Manual Section 9 - Mechanical HVAC Plumbing Specifications (Addendum 6).pdf PDF
27-500 SERIES PLOTS - South Wells Plan (Addendum 6).pdf PDF
35-300 SERIES PLOTS - Water Piping Plans (Addendum 6).pdf PDF
10-Bid Manual Section 4 - General Specifications (Addendum 6).pdf PDF
12-654 - HT Mech Dwgs - Piping Layouts (Addendum 6).pdf PDF
22-753 - GES Well 8 Control Panel (Addendum 6).pdf PDF
29-251 - WWTP Contract 2 As-Built Plans (Addendum 6).pdf PDF
11-Plan Set Table of Contents (Addendum 6).pdf PDF
36-Bid Manual Section 1 - Front End Specifications (Addendum 6).pdf PDF
17-756 - GES Sludge Pump Control Panel (Addendum 6).pdf PDF
26-400 SERIES PLOTS - North Wells Plans (Addendum 6).pdf PDF
18-900 SERIES PLOTS - HVAC Plan Set (Addendum 6).pdf PDF
24-800 SERIES PLOTS - Plumbing Plan Set (Addendum 6).pdf PDF
21-752 - GES Well 7 Control Panel (Addendum 6).pdf PDF
9-Bid Manual Section 8 - Dutchland Specifications (Addendum 6).pdf PDF
8-Bid Manual Section 5 - Construction Specifications A (Addendum 6).pdf PDF
2-Bid Manual Section 7 - Process Equipment Specifications (Addendum 6).pdf PDF
14-651 - HT Mech Dwgs - Internals (Addendum 6).pdf PDF
1-Bid Manual Section 2 - Bid Forms (Addendum 6).pdf PDF
16-252 - WWTP Contract 3 As-Built Plans (Addendum 6).pdf PDF
25-600 SERIES PLOTS - Treatment Building Plans (Addendum 6).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 16 – Electrical Section 16010 – Electrical General Provisions

FSWA

Public Water System Upgrades 16010-1

DIVISION 16 – ELECTRICAL WORK

SECTION 16010 – ELECTRICAL GENERAL PROVISIONS

PART 1 – GENERAL

1.1 GENERAL CONDITIONS

A. The General Conditions and Supplemental Conditions are a part of this section and contract for this work and apply to this section as if stated herewith in full.

1.2 SCOPE

A. The intent of the drawings and specifications is to enable the Contractor to completely provide, unless otherwise shown or indicated, all the material, labor, tools and equipment required to complete the electrical work for the project. The work shall generally consist of, but shall not be limited to, the furnishing, installing, and connection of the systems or items listed in the following sections:

Section 16100 – Basic Materials and Methods Section 16111 – Conduit Section 16123 – Wire and Cable Section 16130 – Boxes Section 16141 – Wiring Devices Section 16160 – Cabinets and Enclosures Section 16170 – Grounding and Bonding Section 16190 – Supporting Devices Section 16231 – Generator Set Section 16270 – Low Voltage Transformers Section 16400 – Lighting Devices Section 16415 – Transfer Switch Section 16442 – Panelboards Section 16475 – TVSS

1.3 DEFINITIONS

A. Wherever the term “This Contractor” or the “Electrical Contractor” is used in the specification, it shall be interpreted to refer to the Contractor responsible for all work described under all Electrical Sections of these Specifications.

B. Those responsible for work covered by other portions of the Specifications will be indicated by trade, such as Mechanical Contractor, General Contractor, and/or Plumbing Contractor.

C. Unless otherwise stated, reference is directed to the drawings when the terms, “As shown”, “As indicated”, “As detailed” or when words of similar import are used in the Specifications.

Public Water System Upgrades 16010-2

1.4 GENERAL

A. Bidders shall visit the site to determine actual conditions which will be encountered. No extra compensation will be allowed for failure to determine existing conditions.

B. In addition to the general outline of work as covered under “Scope”, this contract will require that all items of labor, materials and equipment not specified in detail, or shown on the drawing, but incidental to or necessary to complete the installation and the proper operation of the several branches of the work described herein, or reasonably implied in connection therewith, shall be furnished as if called for in detail by the specifications or drawings.

C. All electrical equipment or apparatus of any one system shall be the product of one manufacturer or equivalent products of a number of manufacturers suitable for use in a unified system. The term “manufacturer” as used in the specification shall be understood as applying to a company of established reputation in the manufacture of the particular equipment or apparatus from products of their own make or others and who assumes full responsibility for the equipment and all the components used in its manufacture.

D. Anything called for in one Contract Document and not in the others, shall be of like effect as if shown or mentioned in all. This contractor shall be required to perform all work necessary to carry out the intent of the plans and specifications, regardless of which division’s drawings require the work.

E. This contractor shall determine in advance the locations and sizes of all chases and openings necessary for proper installation of this work and have them provided by the General Contractor during the erection work in which such chases and openings may be required.

F. In case cutting of the building construction becomes necessary, due to this contractor’s initial failure to arrange for the chases or openings or to properly install the conduit or cable systems, such cutting shall be done and repaired to match the original conditions of the area so disturbed, at this contractor’s expense and to the satisfaction of the Engineer.

G. This contractor shall apply for and obtain detailed information regarding the position of all equipment before rough-in as the final or required location may differ from those indicated on the drawings.

H. The Electrical Drawings are a combination of scale and symbolic representation of the electrical system required to be installed. The drawings and specifications are based on qualified, skilled craftsman procuring and installing the work. No measurements of a drawing shall be used as a working dimension. Working dimensions shall be taken from figured dimensions and thru cooperation with all other contractors.

FSWA

Public Water System Upgrades 16010-3

I. The Owner, through the Engineer, reserves the right to move any outlet or stubbed-up conduit, a distance of twenty-five (25) feet before roughing in, with out any additional cost to the Owner.

J. All materials shall be new and conform with the standards of the Underwriters’

Laboratories, Inc., in every case where such standard have been established for the particular materials in question. Where two or more items of one type are required, they shall all be of one manufacturer.

K. All work shall be installed in a neat and workmanlike manner by personnel experienced in the work and shall present a neat mechanical appearance when completed. All work shall be subject to the approval of the Engineer.

1.5 SCOPE

A. Provide all labor, demolition, new materials, equipment and services necessary for complete installation of all electrical work required to complete the project, whether specifically shown in the documents or not, to complete the job to meet all project requirements in full conformity with the requirements of all authorities (federal, state and local) having jurisdiction, and as indicated on the drawings and herein specified or reasonably implied. Division 16 work shall be comprised of all electrical work indicated in the plans and specs of all divisions in this project and shall not be specifically limited to Division 16 documents.

1.6 CODES, RULES, PERMITS, FEES

A. The electrical installation shall meet all the requirements of the National Electric Code, Pennsylvania Department of Labor and Industry Fire and Panic Code, and the National Board of Fire Underwriters amended to date. In addition, any state, municipal of other authorities’ laws, rules or regulations applicable to the work shall be followed.

B. This contractor shall secure and pay for any and all permits and inspections required by any of the foregoing authorities and shall pay all other costs in connection with the work. All Certificates shall be supplied in triplicate and shall be delivered to the Engineer and become the property of the Owner.

1.7 APPROVAL OF MATERIALS

A. The naming of a manufacturer in the specifications shall not be construed as eliminating the materials, products or services of other manufacturers and suppliers having approved equivalent items. Wherever certain definite makes of materials, apparatus or suppliers are specified by one name, the bidder must make his proposal upon the basis of furnishing the make specified.

B. Where more than one name is used, without the words “or as approved”, the bidder must make his proposal upon the basis of furnishing one of the specified names. Where one or more names are used, followed by the words, “or as approved”, the bidder may make this proposal upon the basis of furnishing one of the specified names or an approved substitute.

FSWA

Public Water System Upgrades 16010-4

C. Equipment or products differing from those specified may be submitted for approval no later than 10 days prior to the submission of bids, provided the bidder clearly states all such differences and provided all essential requirements of the type specified are strictly adhered to. If in the opinion of the Engineer the equipment or product submitted is equal to or better than tat specified, it will be given consideration. If approved, all bidders will be notified of the change prior to the bid date. The submission for substitution shall be made sufficiently in advance of the bid date to allow time for the Engineer to evaluate and provide notice of acceptance in a timely manner. Where a statement of such departure by the Engineer is not made prior to the bid date, it will be understood by the Electrical Contractor that the equipment or products will be furnished in strict accordance with the specification.

D. Where a Contractor proposes to use an item or equipment other than that specified or detailed on the drawings which requires any redesign, new drawings shall be prepared at his own expense after approval for the substitution is granted.

E. Where an approved deviation requires a different quantity and/or arrangement of wiring, conduit and equipment from that specified or indicated on the drawings, the Contractor proposing the substitution shall furnish and install any such structural supports, controllers, motor starters, electrical wiring and conduit, and any other additional equipment required by the system, at no additional cost to the owner. Where such change causes additional expense at the hands of another contractor, the Contractor proposing the substitution shall be responsible for such costs.

1.8 SUBMITTALS

A. This contractor shall submit to the Engineer, for approval, a minimum of seven

(7) copies of shop drawings, catalog cuts, data sheets, wiring diagrams, etc., of all products and/or materials where required. The Engineer shall retain three (3) copies of such drawings and cuts for his own use.

B. This contractor shall have examined all submittals before submitting them for approval, and shall affix an approval stamp which will denote that all the details have been reviewed and marked and to the best of his knowledge are in accordance with the drawings and specifications. Submittals which have not been properly marked, stamped, and certified will not be approved. All shop drawings not approved by the Engineer shall be corrected as directed by the Engineer and seven (7) copies shall be resubmitted until satisfactory.

C. Submittals for approval shall be made early to allow ample time for review without delaying delivery of the materials to the job site. A review of any submittal which results in a requirement to resubmit shall not be justified as the basis of work delay or extra cost.

D. No materials, equipment, or apparatus shall be purchased, delivered to the site, or installed until submittals have been approved by the Engineer.

FSWA

Public Water System Upgrades 16010-5

E. The Engineer’s approval of any submittal shall not relieve this contractor from responsibility for deviation from the drawings or specifications unless he has called them to the attention of the Engineer in writing at the time of submission nor shall it relieve this contractor from errors in these submittals.

F. Required submittals shall include the following: Panelboards, circuit breakers, thermal switches, nameplates, lighting fixtures and controls, disconnect switches, toggle switches, receptacles, and contactors for approval. Submit collated cuts of lighting fixtures and lamps for approval. Unrequested submittals may be returned without review at the discretion of the Engineer.

1.9 DRAWINGS

A. The drawings are generally indicative of the work to be installed but do not include all bends, fittings, boxes, and other materials as may be required. This contractor shall carefully investigate the structural and finish conditions affecting his work, arrange his work accordingly and furnish such fittings as may be required to meet conditions.

B. The wiring layout as shown on the drawings shall not be considered as absolute unless so stated herein. It shall be subject to changes as will facilitate erecting the work, or where necessary, to overcome obstacles in the building construction. Where a major deviation from the plans is indicated by practical consideration, this contractor shall submit shop drawings showing all deviations in such detail as will clearly indicate the necessity or desirability for a change.

1.10 DRAWINGS, RECORD

A. This contractor shall keep a set of contract documents including specifications, drawings, addenda, modifications and shop drawings, at the site in good order and annotated to show all changes made during the construction process.

These documents re to be delivered to the Engineer when the project is completed and prior to and as a condition to the final payment.

1.11 INSPECTION, TESTS, ADJUSTMENTS, INSTRUCTIONS, AND GUARANTEES

A. Electrical inspection shall be made by the applicable inspection agency.

B. All electrical conductors, after installation of wiring and apparatus has been completed, shall be tested by this contractor to insure continuity, proper splicing, freedom from grounds (except “made ground” and those required for protection) and insulation resistance in accordance with Underwriters requirements. This contractor shall furnish and employ suitable instruments such as ammeters, volt meters, meggers, etc.

C. All of the equipment, wiring, and/or systems installed under this contract shall be tested, adjusted and reviewed with the Owner’s personnel. Complete information necessary for the maintenance and operation of the equipment and systems shall be provided by this contractor for the Owner’s use.

FSWA

Public Water System Upgrades 16010-6

D. Verbal instruction and printed material such as drawings, catalog cuts and brochures shall be provided by this contractor in order that all equipment and systems can be properly operated and maintained by the Owner.

E. This contractor shall guarantee all equipment and wiring free from inherent mechanical and electrical defects for a period of one (1) year from the date of final acceptance. Any replacement of parts, or adjustments, including labor, made necessary by inherent mechanical or electrical defects, shall be rendered without cost to the Owner within the guarantee period. The replacement or repair shall be done as soon as notified by the Engineer or authorized by his representative. Contractor shall also repair all damage to surrounding work caused by the failure, repair or replacement of the defective equipment or material.

1.12 COORDINATION WITH OTHER TRADES

A. This contractor shall coordinate his work with that of other trades so that all work may be installed in the most direct manner and that interferences between piping ducts, equipment, and architectural or structural features will be avoided.

B. If this contractor installs his work before coordinating with other trades, he shall make the necessary changes in his work to correct the condition without extra charge.

C. If interference or fouling results, the Engineer shall decide which work is to be relocated, regardless of which is first installed.

1.13 CLEANING AND PROTECTION

A. The contractor shall, at his own expense, repair, replace and maintain in service any utilities, facilities, or services (underground, overground, interior, or exterior) damaged, broken or otherwise rendered inoperative during the course of construction. The method the contractor uses in repairing, replacing, or maintaining the services shall be approved by the Engineer.

B. This contractor shall effectually protect, at his own expense, such of his work, materials, or equipment that are liable to damage or injury during the construction period.

C. All openings into any part of the conduit system, as well as all associated fixtures, equipment, and materials both before and after being set in place must be securely covered or otherwise protected to prevent destruction, damage or injury due to carelessly or maliciously dropped tools or materials, grit, dirt, or other foreign matter. This contractor shall be held responsible for all damage so done until his work is fully and finally accepted. Conduit ends shall be covered with capped bushings.

D. Contractor shall remove from the building and site, on a daily basis, all trash and accumulated waste of his trade.

FSWA

Public Water System Upgrades 16010-7

E. Any damage caused by neglect on the part of this contractor or his representative, or by the elements due to neglect on the part of this contractor or his representatives, either to existing work, or to his work, or to the work of any other contractor, shall be repaired at his expense to the Engineer’s satisfaction.

F. This contractor shall, upon completion of the electrical work, remove all dirt, foreign materials, stains, finger prints, and similar items from all lighting fixtures, glassware, panelboards, wall plates, system equipment, walls or ceilings adjacent to the above equipment where stains were caused by this contractor’s workmen and leave the electrical work in such a condition that no cleaning will be required by the Owner. The complete system shall be subject to inspection and approval by the Engineer before acceptance by the Owner.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Where applicable, all materials and equipment shall bear the label of approval of the National Board of Fire Underwriters Laboratory.

B. All materials shall be new, the best of their respective kinds without imperfections or blemishes, and shall be protected from the elements prior to installation in the building.

C. Material and equipment shall be suitably protected against corrosion inside and outside by a coating of approved corrosion resistant material such as zinc, cadmium or enamel.

D. Equipment and hardware shall be of materials that are corrosion resistant or have corrosion protection suitable for the environment in which they are to be installed.

2.2 NAMEPLATES

A. Unless notes otherwise, nameplates shall be made of laminated phenolic plastic with beveled edges consisting of two outer layers of black phenolic and an inner layer of white. Engraving shall be to the inner layer. The nameplates shall be suitably sized for their location.

PART 3 – EXECUTION

3.1 GENERAL INSTALLATION

A. All work shall be installed in a first class, neat and workman-like manner by mechanics skilled in the trade involved.

B. All equipment and materials installed by this contractor shall be firmly supported and secured to the building construction. He shall furnish and set all sleeves, inserts and hanger supports associated with the work under this electrical specification.

FSWA

Public Water System Upgrades 16010-8

C. All conduit, wire, cable, wiring devices, and equipment shall be installed in such manner as to preserve access to any equipment installed under this specification or other specifications, or contracts for this building.

3.2 NAMEPLATES INSTALLATION

A. The Electrical Contractor shall furnish and install a full complement of nameplates for all items of electrical equipment he is to install. In general, nameplates shall be provided for all motor starters, disconnects, individual circuit breakers and panels.

B. Nameplates shall generally be attached with stainless steel screws or epoxy cement.

C. This contractor shall submit a complete itemized listing of nameplates he proposes to use for approval by the Engineer with submittals.

END OF SECTION 16010

Section 16100 – Basic Electrical Materials and Methods

Public Water System Upgrades 16100-1

DIVISION 16 – ELECTRICAL WORK

SECTION 16100 – BASIC ELECTRICAL MATERIALS AND METHODS

1.1 GENERAL CONDITIONS

A. The General Requirements - Electrical, Section 16010, are a part of this Section and the contract for this Work, and apply to this section as if stated herewith in full.

1.2 SCOPE

A. The work included in this section shall consist of all labor, material and equipment required for the installation of conduit, wire and cable, and all accessories required to complete the work and not covered in other Sections.

This Section generally includes the following:

1. Supporting devices for electrical components.

2. Concrete equipment bases.

3. Touchup painting.

1.3 COORDINATION

A. Coordinate chases, slots, inserts, sleeves, and openings with general construction work and arrange in building structure during progress of construction to facilitate the electrical installations that follow.

1. Set inserts and sleeves in poured-in-place concrete, masonry work, and other structural components as they are constructed.

B. Sequence, coordinate, and integrate installing electrical materials and equipment for efficient flow of the Work. Coordinate installing large equipment requiring positioning before closing in the building.

C. Coordinate electrical service connections to components furnished by utility companies.

1. Coordinate installation and connection of exterior underground and overhead utilities and services.

2. Comply with requirements of authorities having jurisdiction and of utility company providing electrical power and other services.

D. Coordinate location of access panels and doors for electrical items that are concealed by finished surfaces.

2.1 MATERIALS

A. Electrical Tape shall be vinyl plastic electrical tape, Scotch All-Weather Tape No.

33+, or equal.

Public Water System Upgrades 16100-2

2.2 SUPPORTING DEVICES

A. Material: Cold-formed steel, with corrosion resistant coating acceptable to Owner.

B. Material Items for Use Outdoors or in Damp Locations: Hot-dip galvanized steel.

C. Slotted Steel Channel Supports: Flange edges turned toward web and 9/16 inch diameter slotted holes at a maximum 2 inches o.c. in webs.

1. Channel Thickness: Selected to suit structural loading.

2. Fittings and Accessories: Products of the same manufacturer as channel supports.

D. Raceway and Cable Supports: Manufactured clevis hangers, riser clamps, straps, threaded C-clamps with retainers, ceiling trapeze hangers, wall brackets and spring-steel clamps or click-type hangers.

E. Pipe Sleeves: ASTM A53, Type E, Grade A, Schedule 40, galvanized steel, plain ends.

F. Cable Supports for Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug for non-armored electrical cables in riser conduits. Plugs have number and size of conductor gripping holes as required to suit individual risers. Body constructed of malleable-iron casting with hot-dip galvanized finish.

G. Expansion Anchors: Carbon-steel wedge or sleeve type.

H. Toggle Bolts: All-steel springhead type.

2.3 CONCRETE BASES

A. Concrete bases shall be provided in accordance with the requirements of Section 03300.

2.4 TOUCH UP PAINT

A. For Equipment: Equipment manufacturer’s paint selected to match installed equipment finish.

B. Galvanized Surfaces: Zinc-rich paint recommended by item manufacturer.

FSWA

Public Water System Upgrades 16100-3

3.1 ACCESS PANEL INSTALLATION

A. The Electrical Contractor shall furnish and install access panels not smaller than 12 x 16 inches for access to concealed pull boxes, junction boxes, or smaller items where no other means of access is provided.

B. All metal parts shall be factory primed, and final finish shall be by this contractor as verified by the Engineer.

C. All access panels shall be set true and square and frame shall be rigidly secured.

3.2 SLEEVE INSTALLATION

A. The Electrical Contractor shall provide and install sleeves through walls and concrete floor slabs where required to protect equipment or facilities and insure proper installation.

B. Each sleeve shall extend through its respective floor, wall, or partition and shall be cut flush with each surface unless otherwise required. All sleeves shall be standard weight steel pipe furnished with smooth edges and shall be properly installed and securely cemented places.

C. Floor sleeves shall extend 1 inch above the finished floor. Space between floor sleeves and passing conduit shall be caulked with graphite packing and waterproof caulking compound as required for a waterproof installation.

D. Where conduits pass through waterproof floors or walls, design of sleeves shall be such that waterproofing can be flashed into and around the sleeves. Sleeves through exterior walls below grade shall have the spaces between conduit and sleeve caulked watertight. Seal shall be O.Z. type FSK or as approved.

3.3 MOUNTING HEIGHTS

A. Mounting heights of enclosures and safety switches shall conform to applicable electrical codes.

3.4 DIMENSIONS

A. Unless otherwise noted, all dimensions are to the center of the finished outlet with all wiring devices in place.

B. When stated as "clear", dimensions shall be to the top or bottom or the wiring device, plate, or trim.

C. All dimensions given herein shall be verified by the Engineer before roughing in outlets where field conditions prevent application of these dimensions.

FSWA

Public Water System Upgrades 16100-4

3.5 LOCATIONS

A. Locations of all outlets and equipment shall be verified with the Engineer when the conditions require major deviation from this Specification, before roughing in outlets or conduit, as the final location may differ from that shown on the Drawings.

END OF SECTION 16100

Division 16 - Electrical Section 16111- Conduit

Fredericksburg WWTP 16111-1

DIVISION 16 – ELECTRICAL

SECTION 16111 - CONDUIT

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. The work of this section consists of furnishing and installing conduits, raceways and fittings for above grade installations, underground duct installations and inside buildings as shown on the Drawings and as described herein.

B. Rigid Metal Conduit and Fittings (All Sizes).

C. Intermediate Metal Conduit and Fittings (Sizes 3” or less).

D. Electrical Metallic Tubing and Fittings (Sizes 2” or less).

E. Flexible Metal Conduit and Fittings (Sizes 1-1/2” or less).

F. Liquidtight Flexible Metal Conduit and Fittings (Sizes 1-1/2” or less).

G. Rigid Non-Metallic Conduit and Fittings (All Sizes).

H. Wireways.

1.2 RELATED SECTIONS

A. Section 16130 - Boxes

B. Section 16170 - Grounding and Bonding

C. Section 16190 - Supporting Devices

1.3 REFERENCES

A. Work and material shall be in compliance with and according to the requirements of the latest revision of the following standards and codes.

1. American National Standards Institute (ANSI):

a. C80.1 Specification for Zinc Coated Rigid Steel Conduit.

b. C80.3 Specification for Zinc Coated Electrical Metallic Tubing.

2. Federal Specifications (FS):

a. A-A-55810 Flexible Metal Conduit.

3. National Electrical Manufacturers Association (NEMA):

a. TC 2 Electrical Polyvinyl Chloride (PVC) Tubing and Conduit (EPC

40 and EPC 80).

4. Underwriters Laboratories (UL):

a. 797 Electrical Metallic Tubing - Steel.

b. 360 Liquid-Tight Flexible Steel Electrical Conduit.

c. 514B Fittings for Cable and Conduit.

d. 6 Rigid Metal Conduit.

Fredericksburg WWTP 16111-2

e. 651 Schedule 40 and 80 Rigid PVC Conduit.

f. 1479 Fire Tests of Through-Penetrations Firestops.

g. 1 Flexible Metal Conduit.

1.4 SUBMITTALS

A. Submit under provisions of Sections 01300 and 16010.

B. Product Data: Provide for metallic conduit, liquidtight flexible metal conduit, PVC conduit, fittings, and conduit bodies.

1.5 PROJECT RECORD DOCUMENTS

A. Submit under provisions of Section 01700.

B. Accurately record actual routing of conduits larger than 2 inches.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Delivery, store, protect, and handle Products to site under provisions of Section

01400.

B. Accept conduit on site. Inspect for damage.

C. Protect conduit from corrosion and entrance of debris by storing above grade.

Provide appropriate covering.

D. Store rigid PVC conduit on a flat surface and shielded from the sun.

1.7 PROJECT CONDITIONS

A. Verify by field measurements.

B. Verify routing and termination locations of conduit prior to rough-in.

C. Conduit routing shown on Drawings is in approximate locations unless dimensioned and is not intended to show actual routing or configuration. Route as required to complete wiring system.

2.1 CONDUITS AND RACEWAYS

A. Rigid Metal Conduit (Type RMC) shall be galvanized after fabrication, conforming to ANSI C80.1 and UL 6. It shall be of sufficient weight and toughness to withstand cracking and peeling during bending. Galvanizing shall consist of a coating of uniform thickness zinc, applied by either electrolytic or hot metal dip process. Each piece of conduit shall be straight, free from blisters and other defects; cut square and taper reamed and shall be furnished in 10' lengths and threaded at each end. Couplings shall be supplied at one end of the conduit

Fredericksburg WWTP 16111-3 length and a protector at the other end. All threads shall be cleanly cut and each length shall bear the Underwriter's label.

B. Intermediate Metal Conduit (Type IMC): Galvanized steel conduit.

C. Flexible Metal Conduit (Type FMC): Flexible metal conduit (Greenfield) shall be galvanized steel or aluminum interlocked from a continuous metal strip and shall conform to UL 1 and FS A-A-55810.

D. Liquidtight Flexible Metal Conduit (Type LFMC): Liquidtight flexible metal conduit shall be constructed of galvanized steel interlocked from a continuous metal strip with an extruded polyvinyl chloride cover and shall conform to UL 360 and FS A- A-55810. The conduit shall have a continuous copper ground built in. The liquid-tight flexible metal conduit shall be Anaconda Sealtite type U.A. or an approved equal and shall be U.L. listed.

E. Electrical Metallic Tubing (Type EMT) shall be hot-dip galvanized after fabrication, conforming to ANSI C80.3 and UL 797.

F. Rigid Polyvinyl Chloride Conduit (Type PVC): Rigid non-metallic conduit for concrete encasement shall be Type EB, all others shall be PVC Schedule 40 (PVC-40 or NEMA TC2 Type EPC-40) conduit approved for underground use and for use with 90C wires. It shall conform to UL 651, shall be U.L. listed and shall comply with article 352 of the 2011 National Electric Code for underground use. The material must have tensile strength of 5500 PSI at 78 Deg. F., flexural strength of 11,000 PSI, and compression strength of 8,600 PSI.

2.2 WIREWAYS

A. NEMA Type 1 wireways shall be made of code gauge steel, with hinged covers and flanges at both ends, and shall be furnished complete with all fittings and hangers.

B. Wireways shall be Keystone, flange hinged-cover wireways, Series KD or as approved. Match NEMA rating where indicated.

2.3 FITTINGS

A. Provide threaded-type couplings and connectors for Rigid Metal Conduit (Type RMC). Set-screw type and compression-type are not acceptable. Union couplings shall be the Erickson type. Threadless couplings shall not be used.

Provide threaded couplings and raintight conduit (“Meyers”) hubs for rigid steel conduit exposed to weather. Fittings shall be galvanized steel or galvanized cast ferrous metal; access fittings shall have gasketed cast covers.

B. Provide set-screw type or compression-type couplings and connectors for

Electrical Metallic Tubing (Type EMT) conduits.

C. Fittings for Liquidtight Flexible Metal Conduit (Type LFMC) shall have neoprene gaskets.

Fredericksburg WWTP 16111-4

D. Fittings for use with Rigid Polyvinyl Chloride Conduit (Type PVC) shall be PVC and have solvent-weld-type conduit connections.

E. All conduit fittings shall be equipped with screw-on type covers and, when used in damp or wet locations, these covers shall be gasketed and attached with stainless steel screws.

F. Expansion fittings shall be O-Z type EX furnished with bonding jumper Type "BJ" or as approved.

2.4 BUSHINGS

A. Bushings shall be the insulated type.

B. Bushings for rigid steel shall be insulated grounding type.

2.5 CONDUIT SEALANTS

A. Fire Retardant Types: Fire stop material shall be reusable, non-toxic, asbestos-free, expanding, putty type material with a 3-hour rating in accordance with UL 1479.

2.6 CONDUIT SUPPORTS

A. Conduit clamps, straps and supports. Steel or malleable iron.

3.1 CONDUIT INSTALLATION

A. Install conduit in accordance with NECA “Standard of Installation.”

B. Support conduit using conduit supports as specified under provisions of Section 16190 and arrange supports to prevent misalignment during wiring installation.

C. Arrange conduit to present neat appearance. Conduits shall be routed parallel and perpendicular to building lines while maintaining adequate clearance between conduit and piping as per the National Electrical Code. Where conduits and piping are closer than allowed in the Code, an approved pipe covering shall be used over the conduit for the length of the run of such exposures.

D. Cut conduit square using saw or pipe cutter and de-burr cut ends.

E. Bring conduit to shoulder of fittings and fasten securely.

F. Use conduit hubs or sealing locknuts to fasten conduit to sheet metal boxes in damp and wet locations and to cast boxes.

G. Use suitable caps to protect installed conduit against entrance of dirt and moisture.

Fredericksburg WWTP 16111-5

H. Ground and bond conduit under provisions of Section 16170.

I. Provide a nylon pull cord in each empty raceway.

J. From pull point to pull point, the sum of the angles of all of the bends and offset shall not exceed 270 degrees regardless of direction.

K. PVC conduits 3" and larger shall be provided with 48" radius bends.

L. RMC conduit shall be run below slab or concealed where possible and shall be run as straight and direct as possible to minimize the number of bends and offsets. Exposed conduits shall be installed with runs parallel or perpendicular to walls and ceiling and with right angle turns utilizing condulets or symmetrical bends. Exposed vertical conduit runs shall be run on the buildings walls or columns where possible.

M. PVC shall be cut square (using a fine tooth handsaw) and deburred. PVC sections shall be joined using approved solvent cleaners and cements applied as recommended by the manufacturer. Each joint shall be completely watertight.

N. All PVC conduit field bends shall be made using an electric hot box bender designed to handle the size of the PVC to be bent. The heating, forming and cooling of each bend shall be in strict compliance with the manufacturer's recommendations and with the minimum radius of the curve of the inner edge as specified in the National Electric Code.

O. Contractor shall install internal support in all PVC of two (2) inch diameter or larger before heating and bending to prevent crimping. Internal supports may be provided by filling the conduit with sand, by using helical springs or by installing plugs in the end of the conduit.

P. All ells in underground runs of PVC shall be painted RGS or IMC conduit.

Q. Plastic coated, liquid-tight flexible steel conduit shall be used for final connection to motors, pipe mounted equipment and equipment exposed to vibration.

R. Maximum length of plastic coated, liquid-tight flexible conduit permitted for final connection to motors and equipment shall be two (2) feet. Minimum size shall be 1/2". Flexible conduit for final connection to belt drives shall have sufficient slack to permit motor adjustment.

S. Running threads will not be permitted. Approved threaded couplings or a suitable union shall be used where such construction is required.

T. Not more than three (3) ninety (90) degree bends will be allowed in any one run of conduit; where more bends are necessary, a pull box shall be installed.

U. The use of conduit smaller than 3/4" trade size will not be permitted . All couplings shall be pulled up tight so as to provide an electrical bond throughout the entire conduit system.

Fredericksburg WWTP 16111-6

V. Each end of every conduit run terminating in a pressed steel box of any type shall be provided with galvanized locknut and bushing inside and locknut outside.

W. Conduit shall be bent using a pipe bending machine or hickey.

X. Any steel conduit installed in cinder fill shall be encased in 3" minimum concrete envelope.

Y. Seal all penetrations made thru fire rated walls. Sealing material shall provide a rated installation and shall be specified as such. Fire stop sealants, foams and compounds shall be manufactured by 3M, Dow Corning, Nelson or an approved substitute.

3.2 LOCATION

A. Galvanized rigid steel conduit shall be used for all above ground exterior work, for exposed interior work up to eight feet above finished floor, and for work embedded in concrete unless otherwise noted.

B. Rigid non-metallic conduit (PVC) shall be used for all underground exterior work, unless otherwise noted.

C. Rigid non-metallic conduit (PVC) shall be used in any area containing corrosive materials such as chlorine or other chemical rooms, damp locations, and wet locations.

D. Electrical Metallic Tubing (EMT) shall be used for interior concealed work or above eight feet exposed as acceptable to the local authority having jurisdiction.

E. Flexible Metal conduit (Greenfield) shall be used for interior work in short lengths

(six foot maximum) for the connection of recessed lighting fixtures, motors, and any vibrating equipment, unless otherwise noted or where liquid tight flexible metal conduit is required.

F. Weathertight Flexible Metal conduit (Sealtight) shall be used wherever flexible conduit is required and moisture may be present.

1. Provide liquid tight flexible metal conduit for all motors in mechanical equipment spaces, for any vibrating equipment where moisture may be present, and when making connections between two building structures.

3.3 FITTINGS INSTALLATION

A. Cast conduit fittings shall be used on all exposed conduit runs, except at locations where it is impractical; at these locations, factory ells shall be used. No factory ells shall be permitted on exterior of building.

B. Suitable expansion fittings shall be used in conduit runs that cross building expansion joints. Proper provisions shall be made to insure continuous grounding of the conduit system with flexible copper wire bonds, having loops to allow for sufficient movement in the expansion joint.

Fredericksburg WWTP 16111-7

3.4 ROUTING

A. Run all concealed conduits above ceilings and inside walls parallel to building lines, unless otherwise noted.

B. Run all exposed conduits parallel or perpendicular to building lines, unless otherwise noted.

C. Coordinate conduit locations with equipment, fixtures, and with structural and architectural elements. Conduits attached to walls or columns shall be as unobtrusive as possible and shall avoid windows.

3.5 WIREWAYS INSTALLATION

A. Wireways of ample size shall be provided as required. Wireways shall be installed only for exposed work. Wireways intended for outdoor use shall be of approved rain-tight (NEMA 3R or 4X as applicable) construction.

B. Wireways shall be supported at intervals not exceeding five (5) feet, unless specifically approved for supports at greater intervals, but in no case shall the distance between supports exceed ten (10) feet.

C. Vertical runs of wireways shall be supported in intervals not to exceed fifteen (15) feet and shall have not more than one joint between supports. Adjoining wireway sections shall be securely fastened together to provide a rigid joint.

D. Wireways may extend transversely through walls if in unbroken lengths where passing through.

E. Wireways shall be marked so that the manufacturer's name or trademark will be visible after installation.

3.6 CONDUIT SUPPORTS

A. Properly support all conduits as required by the local electrical codes. Wherever possible, run all conduits concealed except where otherwise shown on the drawings.

B. Conduits shall not be supported from ceiling support wires. Provide "J" hangers on threaded rods or multiple conduits on trapezes consisting of Unistrut or Superstrut channels, or approved equal, supported by minimum 3/8" threaded rod from the structure above. Conduits shall not be supported from ductwork, water, fire sprinkler or HVAC lines.

C. Exposed Conduits:

1 Support exposed conduits within three feet of any junction box, coupling, equipment, fixture or device and at intervals meeting local requirements.

2. Wherever possible, group conduits together and support on common supports located away from walls. Support exposed conduits fastened to the surface of the concrete structure by one-hole clamps, or with channels. Use conduit spacers with one-hole clamps.

Fredericksburg WWTP 16111-8

3. Group together exposed conduits in horizontal runs and support on trapeze hangers unless otherwise noted. Arrange such conduits uniformly and neatly. Trapeze hangers shall consist of channels of adequate size, suspended by means of rods or other suitable means from the ceiling or from pipe hangers.

4. Support conduit risers in shafts with Unistrut or Superstrut channels, or approved equal, and straps.

3.7 MOISTURE SEALS

A. Provide in accordance with NEC requirements.

3.8 FLEXIBLE CONDUIT:

A. Flexible metallic conduit shall have a maximum length of six feet unless otherwise noted.

B. Flexible metallic conduit shall not be considered as a ground conductor. Flexible metallic conduit shall be installed only in exposed or accessible locations. Fixture whips may be a maximum of six feet. Fixture whips provided by light fixture manufacturers may be a maximum of twelve feet in length.

3.9 UNDERGROUND RACEWAY

A. Conduits embedded in concrete floors on grade shall be installed between grids of reinforcing steel, or shall be encased below the floors, provided the concrete is thickened as shown on the Drawings. EMT shall not be embedded in concrete.

B. Slope all underground raceways to provide drainage; for example, slope conduit from equipment located inside a building to the pull box or manhole located outside the building.

C. All PVC conduits terminating into pull boxes and vaults shall be provided with bell fittings at ends.

D. PVC direct buried conduits shall be installed in soil, covered with sand under a warning tape and compacted soil at a minimum depth of 18" below grade. All PVC conduit installed below grade shall be provided with galvanized rigid steel 90's and risers. Rigid Steel shall be wrapped with 20 mil tape and extend a minimum of 12" above finished grade.

E. PVC conduits installed under slabs shall be installed in soil, covered with sand under a vapor barrier and crushed rock at a minimum depth of 6" below slab. All PVC conduit installed below slab shall be provided with galvanized rigid steel 90's and risers. Rigid steel shall be wrapped with 20 mil tape and extend minimum 12" above finished grade.

END OF SECTION 16111

Section 16123 – Building Wire and Cable

Public Water System Upgrades 16123-1

SECTION 16123 – BUILDING WIRE AND CABLE

A. Building wire and cable.

B. Underground feeder and branch circuit cable.

C. Service Entrance Cable.

D. Armored Cable.

E. Metal Clad Cable.

F. Wiring connectors and connections.

A. Section 16111 – Conduit.

B. Section 16130 – Boxes.

1.3 REFERENCES

A. ANSI/NFPA 70 – National Electrical Code.

1.4 SUBMITTALS

A. Submit under provisions of Section 01300.

B. Product Data: Provide for each cable assembly type.

C. Test Reports: Indicate procedures and values obtained.

D. Manufacturer’s Installation Instructions: Indicate application conditions and limitations of use stipulated by product testing agency specified under Regularly Requirements.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years of documented experience.

1.6 REGULATORY REQUIREMENTS

FSWA

Public Water System Upgrades 16123-2

A. Conform to requirements of ANSI/NFPA 70.

B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and shown.

A. Verify field measurements.

B. Conductor sizes are based on copper. Aluminum conductors will not be permitted.

C. Wire and cable routing shown on Drawings in approximate unless dimensioned.

Route wire and cable as required to meet project conditions.

D. Where wire and cable routing is now shown, and destination only is indicated, Electrical Contractor shall determine exact routing and lengths required.

1.8 COORDINATION

A. Determine required separation between cable and other work.

B. Determine cable routing to avoid interference with other work.

2.1 BUILDING WIRE AND CABLE

A. Description: Single conductor insulated wire.

B. Conductor: Copper.

C. Insulation Voltage Rating: 600 volts.

D. Insulation: ANSI/NFPA 70, Types THW, THHN, THWN, or XHHW.

2.2 WIRING CONNNECTORS

A. Split Bolt Connectors:

1. Thomas & Betts.

2. Penn Union.

3. Burndy.

4. Or Equal

B. Solderless Pressure Connectors:

1. Anderson.

2. Thomas & Betts

3. Burndy.

4. Or Equal

FSWA

Public Water System Upgrades 16123-3

C. Spring Wire Connectors

1. Ideal

2. Three M.

3. Or Equal.

3.1 EXAMINATION

A. Verify that mechanical work likely to damage wire and cable has been completed.

B. Verify that interior of building has been protected from weather.

3.2 PREPARATION

A. Completely and thoroughly swab raceway before installing wire.

3.3 WIRING METHODS

A. Wet and Dry Interior and Exterior Locations: Use only building wire Type THW, THHN/THWN, XHHW insulation in raceway.

3.4 INSTALLATION

A. Install products in accordance with manufacturer’s instructions.

B. Use solid conductor for feeders and branch circuits 10 AWG and smaller.

C. Use stranded conductors for control circuits.

D. Use conductor not smaller than 12 AWG for power and lighting circuits.

E. Use conductor not smaller than 14 AWG for control circuits.

F. Use 10 AWG conductors for 20 ampere, 120 volt branch circuits longer than 75 feet unless larger wire size is shown on Drawings.

G. Pull all conductors into raceway at same time.

H. Use suitable wire pulling lubricant for building wire 4 AWG and larger.

I. Neatly train and lace wiring inside boxes, equipment, and panelboards.

J. Clean conductor surfaces before installing lugs and connectors.

K. Make splices, taps, and termination’s to carry full ampacity of conductors with no perceptible temperature rise.

FSWA

Public Water System Upgrades 16123-4

L. Use split bolt connectors for copper conductor splices and taps, 6 AWG and larger. Tape uninsulated conductors and connector with electrical tape to 150 percent of insulation rating of conductor.

M. Use solderless pressure connectors with insulating covers for copper conductor splices and taps, 8 AWG and smaller.

N. Use insulated spring wire connectors with plastic caps for copper conductor splices and taps, 10 AWG and smaller.

3.5 INTERFACE WITH OTHER PRODUCTS

A. Identify wire and cable under provisions of Section 16195.

B. Identify each conductor with its circuit number or other designation indicated on drawings.

3.6 FIELD QUALITY CONTROL

A. Perform field inspection and testing under provisions of Section 01400.

B. Inspect wire for physical damage and proper connection.

C. Measure tightness of bolted connections and compare torque measurements with manufacturer’s recommended values.

D. Verify continuity of each branch circuit conductor.

END OF SECTION 16123

Section 16130 - Boxes

Public Water System Upgrades 16130-1

DIVISION 16130 - BOXES

1.1 SECTION INCLUDED

A. Wall and ceiling outlet boxes.

B. Pull and junction boxes.

A. Section 16141 – Wiring Devices.

A. ANSI/NEMA FB 1 – Fittings and Supports for Conduit and Cable Assemblies.

B. ANSI/NEMA OS 1 – Sheet-steel Outlet Boxes, Device Boxes, Covers, and Box

Supports.

C. ANSI/NFPA 70 – National Electrical Code

D. NEMA 250 – Enclosures for Electrical Equipment. (1000 Volts Maximum)

1.4 PROJECT RECORD DOCUMENTS

A. Submit under provisions of Section 01700.

B. Accurately record actual locations and mounting height of outlet, pull, and junction boxes.

1.5 REGULATORY REQUIREMENTS

1.6 PROJECT CONDITIONS

A. Verify field measurements are as shown on the Drawings.

B. Verify locations of floor boxes and outlets prior to rough-in.

C. Electrical boxes are shown on Drawing in approximate locations unless dimensioned. Install at location required for box to serve intended purpose.

Install within 10 feet of location shown on Drawings.

Section 16130 - Boxes

FSWA

Public Water System Upgrades 16130-2

2.1 OUTLET BOXES

A. Cast Boxes: NEMA FB 1, type FD, cast feralloy. Provide gasketed cover by box manufacturer. Provide threaded hubs.

B. Material: Cast metal.

C. Shape: Rectangular.

D. Conform to regulatory requirements for concrete-tight floor boxes.

2.2 PULL AND JUNCTION BOXES

A. Surface-mounted cast Metal Box: NEMA 250, Type 6, outside flanged, recessed cover box for flush mounting.

1. Material: Galvanized cast iron.

2. Cover: Nonskid cover with neoprene gasket and stainless steel cover screws.

3.1 INSTALLATION

A. Install electrical boxes as shown on Drawings, and as required for splices, taps, wire pulling, equipment connections and compliance with regulatory requirements.

B. Install electrical boxes to maintain headroom and to present neat mechanical appearance.

C. Install boxes to preserve fire resistance rating of partitions and other elements.

D. Align adjacent wall-mounted outlet boxes for switches, thermostats and similar devices with each other.

E. Use surface mounting outlet boxes.

F. Support boxes independently of conduit, except cast box that is connected to two rigid metal conduits both supported within 12 inches of box.

G. Use gang box where more than one device is mounted together. Do not use sectional box.

H. Use cast outlet box in exterior locations exposed to the weather and wet locations.

END OF SECTION 16130

Section 16141 – Wiring Devices

Public Water System Upgrades 16141-1

SECTION 16141 – WIRING DEVICES

A. Wall switches

B. Receptacles.

C. Device plates.

A. Section 16130 – Boxes.

1.3 REFERENCES

A. NEMA WD 1 – General Purpose Wiring Devices.

B. NEMA WD 6 – Wiring Device Configurations.

1.4 DEFINITIONS

A. EMI: Electromagnetic interference.

B. GFCI: Ground-fault circuit interrupter.

C. PVC: Polyvinyl chloride.

D. RFI: Radio frequency interference.

E. TVSS: Transient voltage surge suppressor.

F. UTP: Unshielded twisted pair.

1.5 SUBMITTALS

A. Submit under provisions of Section 01300.

B. Product Data: Provide Manufacturer’s catalog information showing dimensions, colors, and configurations.

C. Manufacturer’s Instructions:

1. Indicate application conditions and limitations of use stipulated by product testing agency specified under regulatory requirements.

2. Include instructions for storage, handling, protection, examination, preparation, operation and installation of product.

Public Water System Upgrades 16141-2

1.6 QUALIFICATIONS

Section with minimum three years documented experience.

1.7 REGULATORY REQUIREMENTS

A. Match plug configuration for equipment supplied.

2.1 WALL SWITCHES

A. Manufacturers:

1. Leviton

2. Hubbell

3. Pass & Seymour

4. Bryant

5. Or Equal

B. Description: NEMA…