11-Plan Set Table of Contents (Addendum 6).pdf

PDF 99 KB Posted

Attached to
REBID of Public Water System Upgrade Project – Contract 3 – Electrical Construction
Solicitation number
US.261117
Issued by
Lehigh County, Pennsylvania

About this file

This document is a Plan Set Table of Contents for the Public Water System Upgrades project managed by the Fredericksburg Sewer & Water Authority (FSWA) in Pennsylvania. The comprehensive plan set encompasses ten series of detailed construction drawings totaling over 1,000 sheets, organized by discipline and work scope. The 100 Series contains process flow diagrams and chemical feed schematics; the 200 Series addresses building and site improvements including demolition and proposed plans for office buildings, processing facilities, and structures such as clarifiers and sludge holding tanks; the 300 Series details water piping plans and profiles across multiple locations with erosion and sediment control specifications; the 400 and 500 Series cover North Wells and South Wells improvements respectively; the 600 Series specifies treatment building plans including filter building and clearwell layouts; and the 700, 800, and 900 Series provide electrical, plumbing, and HVAC plan sets. The 1000 Series addresses filter building site improvements and stormwater management. Additionally, the document includes a historical archive section for the wastewater treatment plant covering structural, architectural, and process components.

This plan set table of contents serves as the foundational reference documentation for Contract 3 – Electrical Construction, a rebid of the Public Water System Upgrade Project with a sealed proposal deadline of 2:00 p.m. on Wednesday, December 16, 2026, through PennBid. The electrical contract encompasses furnishing and installing electrical power supply and distribution equipment, standby power generation, conduits and wiring for all process equipment, upgrades to Well 6, installation of controls at Wells 7 and 8, electrical installation of a mixer in the West Water Tower, demolition of existing electrical service to tower mixers, and underground 1" PVC conduit installation between specified rooms for future IT use. A ten percent (10%) bid bond or cashier's check is required with each proposal. Site visits are available by contacting the FSWA Operator, Dusty Keller, at 717-304-1061, with no pre-bid conference scheduled. All bidding documents are available at no cost through PennBid.

View the file

Other files

File Type Posted
31-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 6).pdf PDF
3-Bid Manual Table of Contents (Addendum 6).pdf PDF
32-700 SERIES PLOTS - Electrical Plan Set (Addendum 6).pdf PDF
15-655 - HT OIT Screens (Addendum 6).pdf PDF
34-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 6).pdf PDF
30-653 - HT Filter Control Panel (Addendum 6).pdf PDF
33-652 - HT Mech Dwgs - Piping Valves (Addendum 6).pdf PDF
23-755 - GES Distribution Pump Control Panel (Addendum 6).pdf PDF
7-Bid Manual Section 6 - Construction Specifications B (Addendum 6).pdf PDF
19-751 - GES Well 6 Control Panel (Addendum 6).pdf PDF
13-656 - HT Mech Dwgs - Tanks Piping Blowers (Addendum 6).pdf PDF
28-754 - GES Manganese FIlter Control Panel (Addendum 6).pdf PDF
6-Bid Manual Section 3 - Agreements Bonds (Addendum 6).pdf PDF
4-Bid Manual Section 10 - Electrical Specifications (Addendum 6).pdf PDF
20-100 SERIES PLOTS - Process Plans (Addendum 6).pdf PDF
5-Bid Manual Section 9 - Mechanical HVAC Plumbing Specifications (Addendum 6).pdf PDF
27-500 SERIES PLOTS - South Wells Plan (Addendum 6).pdf PDF
35-300 SERIES PLOTS - Water Piping Plans (Addendum 6).pdf PDF
10-Bid Manual Section 4 - General Specifications (Addendum 6).pdf PDF
12-654 - HT Mech Dwgs - Piping Layouts (Addendum 6).pdf PDF
22-753 - GES Well 8 Control Panel (Addendum 6).pdf PDF
29-251 - WWTP Contract 2 As-Built Plans (Addendum 6).pdf PDF
36-Bid Manual Section 1 - Front End Specifications (Addendum 6).pdf PDF
17-756 - GES Sludge Pump Control Panel (Addendum 6).pdf PDF
26-400 SERIES PLOTS - North Wells Plans (Addendum 6).pdf PDF
18-900 SERIES PLOTS - HVAC Plan Set (Addendum 6).pdf PDF
24-800 SERIES PLOTS - Plumbing Plan Set (Addendum 6).pdf PDF
21-752 - GES Well 7 Control Panel (Addendum 6).pdf PDF
9-Bid Manual Section 8 - Dutchland Specifications (Addendum 6).pdf PDF
8-Bid Manual Section 5 - Construction Specifications A (Addendum 6).pdf PDF
2-Bid Manual Section 7 - Process Equipment Specifications (Addendum 6).pdf PDF
14-651 - HT Mech Dwgs - Internals (Addendum 6).pdf PDF
1-Bid Manual Section 2 - Bid Forms (Addendum 6).pdf PDF
16-252 - WWTP Contract 3 As-Built Plans (Addendum 6).pdf PDF
25-600 SERIES PLOTS - Treatment Building Plans (Addendum 6).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN SET DRAWINGS TABLE OF CONTENTS

SHEET NO.

FSWA - PUBLIC WATER SYSTEM UPGRADES

Plan Set Drawings Table of Contents - Page 1 of 3

100 SERIES - PROCESS DRAWINGS

COVER SHEET

FSWA SEWER & WATER AUTHORITY SCHEMATIC

PROCESS FLOW SCHEMATIC CONCEPT

CHEMICAL FEED DIAGRAMS

200 SERIES - BUILDING AND SITE IMPROVEMENTS

COVER SHEET

YARD PIPING & EXISTING CONDITION DEMOLITION PLAN

YARD PIPING EXTENSION DEMOLITION PLAN

FIRST FLOOR DEMOLITION PLAN

LOWER LEVEL DEMOLITION PLAN

FIRST FLOOR HVAC AND PLUMBING DEMOLITION PLAN

LOWER LEVEL PROCESSING DEMOLITION PLAN

CHLORINE ROOM DEMOLITION PLAN

OXIDATION DITCH DEMOLITION PLAN

DISTRIBUTION BOX DEMOLITION PLAN

CLARIFIER DEMOLITION PLAN

SLUDGE HOLDING TANK DEMOLITION PLAN

SLUDGE HOLDING TANK DEMOLITION PLAN

CHLORINE CONTACT TANK DEMOLITION PLAN

EXISTING OFFICE BUILDING ELEVATIONS DEMOLITION PLAN

EXISTING GARAGE DEMOLITION PLAN

PROPOSED OVERALL SITE PLAN

OFFICE BUILDING GROUND LEVEL PROPOSED PLAN

OFFICE BUILDING BASEMENT PROPOSED PLAN

OFFICE BUILDING ELEVATIONS PROPOSED PLAN

PROPOSED FILTER BUILDING GENERAL LAYOUT PLAN

PROPOSED FILTER BUILDING INTERIOR ROOM LAYOUT PLAN & FINISH SCHEDULE

PROPOSED FILTER BUILDING ELEVATIONS PLAN

PROPOSED GARAGE PLAN

300 SERIES - WATER PIPING PLAN

COVER SHEET

INDEX SHEET

INDEX SHEET

INDEX SHEET

EASEMENT SUMMARY SHEET

PLAN & PROFILE - W. MAIN STREET TO NORTH WELLS

PLAN & PROFILE - AIRPORT ROAD TO W. MAIN STREET

PLAN & PROFILE - AIRPORT ROAD

PLAN & PROFILE - AIRPORT ROAD TO TREATMENT PLANT

PLAN & PROFILE - FUTURE WATER FILTRATION PLANT

EXISITNG PLAN & PROFILE - ROUTE 22 CROSSING

EXISTING PLAN & PROFILE - SOUTH OF ROUTE 22

EXISTING PLAN & PROFILE - SOUTH CENTER STREET

EXISTING PLAN & PROFILE - SOUTH CENTER STREET CONTINUED

EXISTING PLAN & PROFILE - THROUGH FIELDS

EXISTING PLAN & PROFILE - GREBEL ROAD CROSSING

EXISTING PLAN & PROFILE - WEST OF SOUTH WELLS 7 & 8

PLAN & PROFILE - SOUTH WELLS 7 & 8

DETAIL SHEET

DETAIL SHEET

DETAIL SHEET

E&S - AIRPORT ROAD

E&S - AIRPORT ROAD TO W. MAIN STREET

E&S - W. MAIN STREET TO NORTH WELLS

E&S - AIRPORT ROAD TO TREATMENT PLANT

E&S - FUTURE WATER FILTRATION PLANT

E&S - SOUTH WELLS 7 & 8

E&S DETAIL SHEET

E&S NOTES

400 SERIES - NORTH WELLS PLAN

COVER SHEET

WELL 6 EXISTING CONDITIONS AND DEMOLITION PLAN

WELL 6 PROPOSED IMPROVEMENTS PLAN

WELL 6 EQUIPMENT PEDESTAL EXISTING AND PROPOSED LAYOUT

WELL 6 E EXISTING AND PROPOSED ONE-LINE DIAGRAMS

NORTH WELLS DISTRIBUTION MAIN PIPING EXISTING COND / PROPOSED

FSWA - PUBLIC WATER SYSTEM UPGRADES

Plan Set Drawings Table of Contents - Page 2 of 3

WELLS 2 & 5 PIPING EXISTING CONDITIONS AND DEMOLITION

WELLS 2 & 5 PROPOSED PIPING

NORTH WELLS DETAILS

NORTH WELLS DETAILS

500 SERIES - SOUTH WELLS PLAN

COVER SHEET

WELLS 7 & 8 EXISTING CONDITIONS PLAN

WELLS 7 & 8 PROPOSED WATERLINE PLAN

WELLS 7 & 8 PROPOSED PLANS / ZOOMED

WELLS 7 & 8 PROPOSED EQUIPMENT RACKS

WELLS 7 & 8 DETAILS

WELLS 7 & 8 DETAILS

600 SERIES - TREATMENT BUILDING PLANS

COVER SHEET

PROPOSED BUILDING PLAN & ELEVATIONS

FILTER BUILDING LAYOUT

FILTER BUILDING CLEARWELL LAYOUT

BACKWASH BASIN SECTION VIEW

TURBINE PUMP CROSS SECTION

FILTER BUILDING INSULATION PLAN

FILTER BUILDING DETAILS

DUTCHLAND CLEARWELL CONCEPT

700 SERIES - ELECTRICAL PLAN SET

COVER SHEET

OFFICE GROUND FLOOR LIGHTING EXISTING CONDITIONS/DEMO PLAN

OFFICE GROUND FLOOR ELECTRIC EXISTING CONDITIONS/DEMO PLAN

OFFICE BASEMENT ELECTRICAL EXISTING CONDITIONS/DEMO PLAN

GARAGE ELECTRIC AND LIGHTING EXISTING CONDITIONS/DEMO PLAN

OFFICE GROUND FLOOR PROPOSED DATA / POWER PLAN

PROPOSED OFFICE GROUND FLOOR POWER PLAN

OFFICE GROUND FLOOR PROPOSED DATA / RECEPTACLE PLAN

PROPOSED OFFICE BASEMENT LIGHTING PLAN

PROPOSED OFFICE BASEMENT RECEPTACLE PLAN

PROPOSED GARAGE POWER / RECEPTACLE PLAN

PROPOSED GARAGE LIGHTING PLAN

PROPOSED FILTER BUILDING POWER PLAN

PROPOSED FILTER BUILDING LIGHTING PLAN

PROPOSED FILTER BUILDING DATA / RECEPTACLE PLAN

ELECTRICAL POWER DISTRIBUTION PLAN

EXISTING ELECTRICAL PANEL SCHEDULES

PROPOSED ELECTRICAL PANEL SCHEDULES

ELECTRIC SCHEDULES

ELECTRICAL SPECIFICATIONS

800 SERIES - PLUMBING PLAN SET

COVER SHEET

OFFICE GROUND FLOOR EXISTING CONDITIONS/DEMO DRAIN PLAN

OFFICE GROUND FLOOR PROPOSED DRAIN PLAN

OFFICE GROUND FLOOR PROPOSED WATER SUPPLY LINES

OFFICE BUILDING DRAIN AND SUPPLY DIAGRAMS

PROPOSED FILTER BUILDING DRAIN LINES

PROPOSED FILTER BUILDING SUPPLY LINES

PROPOSED FILTER BUILDING DRAIN AND SUPPLY DIAGRAMS

PROPOSED SITE PIPING LAYOUT

900 SERIES - HVAC PLAN SET

COVER SHEET

PROPOSED OFFICE GROUND FLOOR HVAC PLAN

PROPOSED OFFICE BASEMENT HVAC PLAN

PROPOSED FILTER BUILDING HVAC PLAN

HVAC SCHEDULES

1000 SERIES - FILTER BUILDING SITE IMPROVEMENTS

COVER SHEET

OVERALL NPDES/LOD PERMIT BOUNDARIES

FILTER BUILDING SITE EROSION AND SEDIMENT CONTROL PLAN

EROSION AND SEDIMENT CONTROL DETAILS

EROSION AND SEDIMENT CONTROL DETAILS

FSWA - PUBLIC WATER SYSTEM UPGRADES

Plan Set Drawings Table of Contents - Page 3 of 3

EROSION AND SEDIMENT CONTROL NOTES

POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN

SCM METES AND BOUNDS

POST-CONSTRUCTION STORMWATER MANAGEMENT DETAILS

POST-CONSTRUCTION STORMWATER MANAGEMENT DETAILS

POST-CONSTRUCTION STORMWATER MANAGEMENT NOTES

PROPOSED FILTER BUILDING SITE STORM SEWERS PROFILES

PROPOSED FILTER BUILDING SITE STORM SEWERS PROFILES

HISTORICAL ARCHIVE WASTEWATER TREATMENT PLANT - CONTRACT NO. 2

TITLE SHEET

SHEET INDEX

GENERAL STRUCTURAL NOTES, ABBREVIATIONS & LEGEND

HORIZONTAL LAYOUT - AREA I

HORIZONTAL LAYOUT - AREA II

SITE GRADING - AREA I

SITE GRADING - AREA II GRADING DETAILS

YARD PIPING - AREA I

YARD PIPING - AREA II

YARD PIPING PROFILES

YARD PIPING PROFILES

HYDRAULIC PROFILE

SLUDGE FLOW

CONTROL BUILDING - ARCHITECTURAL ELEVATIONS

CONTROL BUILDING - ARCHITECTURAL FIRST FLOOR PLAN

CONTROL BUILDING - ARCHITECTURAL DOOR & FINISH SCHEDULE, LABORATORY LAYOUT & DETAILS

CONTROL BUILDING - ARCHITECTURAL WALL & ROOF SECTIONS

CONTROL BUILDING - ARCHITECTURAL WALL & ROOF SECTIONS

CONTROL BUILDING - ARCHITECTURAL ADDITIONAL SECTIONS

CONTROL BUILDING - ARCHITECTURAL STAIR DETAILS

CONTROL BUILDING - PLUMBING RISER DIAGRAMS

CONTROL BUILDING - HVAC LOWER LEVEL

CONTROL BUILDING - PLUMBING, HVAC FIRST FLOOR

CONTROL BUILDING - STRUCTURAL FOUNDATION PLAN

CONTROL BUILDING - STRUCTURAL FIRST FLOOR FRAMING PLAN

CONTROL BUILDING - STRUCTURAL CONCRETE BEAM SCHEDULE & DETAILS

CONTROL BUILDING - STRUCTURAL ROOF FRAMING PLAN

CONTROL BUILDING - STRUCTURAL STAIR & CUTOUT DETAILS

CONTROL BUILDING - STRUCTURAL ELEVATION & ROOF SECTIONS

CONTROL BUILDING - PROCESS LOWER LEVEL PLAN-CHEMICAL FEED SCHEMATIC

CONTROL BUILDING - PROCESS ISOMETRICS - LOWER LEVEL WATER, SLUDGE & DRAINAGE

CONTROL BUILDING - PROCESS CHLORINATION, PLAN & SECTIONS

OXIDATION DITCH - STRUCTURAL - PROCESS - PLAN, SECTIONS & PAVING

OXIDATION DITCH - STRUCTURAL BRIDGE AND EFFLUENT WEIR BOX

OXIDATION DITCH - STRUCTURAL PLAN & SECTION - ROTOR

OXIDATION DITCH - PROCESS PLAN & SECTION - ROTOR

OXIDATION DITCH - PROCESS EFFLUENT WEIR PLAN & SECTIONS

CLARIFIER DISTRIBUTION BOX STRUCTURAL AND PROCESS PLAN & SECTIONS

CLARIFIERS - STRUCTURAL PLAN, SECTIONS AND DETAILS

CLARIFIERS - PROCESS PLAN, SECTIONS AND DETAILS

SLUDGE HOLDING TANK - STRUCTURAL PLAN, SECTIONS & DETAILS

SLUDGE HOLDING TANK - PROCESS PLAN SECTIONS AND DETAILS

CHLORINE CONTACT TANK - STRUCTURAL PLAN AND SECTIONS

CHLORINE CONTACT TANK - PROCESS PLAN, SECTIONS AND DETAILS

MISCELLANEOUS DETAILS

HISTORICAL ARCHIVE ELECTRICAL - CONTRACT NO. 3

TITLE SHEET AND SHEET INDEX

SITE PLAN - ELECTRICAL .............................................................................................................................................................. E-1 FIRST FLOOR PLAN - LIGHTING .................................................................................................................................................... E-2 FIRST FLOOR PLAN - POWER ....................................................................................................................................................... E-3 LOWER LEVEL PLAN - LIGHTING AND POWER ............................................................................................................................ E-4 PANELBOARD SCHEDULES AND DETAILS .................................................................................................................................. E-5 ONE LINE RISER DIAGRAM - DETAILS .......................................................................................................................................... E-6 PUMPING STATION SITE PLANS ................................................................................................................................................... E-7 CONTROL CIRCUIT WIRING DIAGRAMS ....................................................................................................................................... E-8 MOTOR CONTROL CENTER .......................................................................................................................................................... E-9 MOTOR CONTROL CENTER ........................................................................................................................................................ E-10

File details come from the government source that posted it. Updated .