This file is a comprehensive specification document for the Fredericksburg Sewer & Water Authority's Public Water System Upgrade Project, specifically addressing Division 11 (Equipment) and related construction specifications. The document covers multiple systems including process equipment, piping and valves, water tower mixer installation, green sand filtration systems, and chemical addition equipment. The project involves furnishing and installing four (4) skid-mounted, pre-plumbed green sand filtration units designed for iron and manganese removal from raw well water, with a maximum of three units active at any time and one in standby or backwash mode. Additional equipment includes a PAX Water Mixer for a water storage tank (with NSF/ANSI Standard 61 certification), stainless steel and PVC piping systems, butterfly valves, gate valves, check valves, ball valves, pressure reducing valves, and multiple chemical addition systems (influent and effluent sodium hypochlorite, hydrofluorosilicic acid, and ortho-polyphosphate). The specification document requires equipment delivery within one hundred twenty (120) calendar days from the contract award date, with liquidated damages of five thousand dollars ($5,000.00) per day for failure to meet this deadline. All equipment must comply with ASME, AWWA, ASTM, NSF, and UL standards as referenced throughout the specifications.

The bidding process requires sealed proposals submitted electronically via PennBid by 2:00 p.m. prevailing time on Wednesday, December 16, 2026, with a bid bond or cashier's check required for ten percent (10%) of the bid total. The green sand filtration system is based on GreensandPlus equipment manufactured by Hungerford and Terry, Inc., with pre-qualification requirements for alternate equipment manufacturers to be submitted fifteen (15) days prior to bid opening; bidders proposing non-specified equipment will be considered non-responsive. The chemical feed systems utilize Stenner peristaltic pumps selected as the basis of design, available through Pyrz Water Supply Co., with single-source responsibility required for complete system coordination. Equipment manufacturers must demonstrate minimum ten (10) years of experience in municipal installations, with all pumps requiring UL and cULus approval. A one (1) year manufacturer warranty is required, effective upon project acceptance and startup by the Owner. Factory-trained technician services are specified for installation, media loading, conditioning, system commissioning, and operator training, with the filtration system manufacturer providing supervisory personnel for multiple defined service periods. All equipment must be NSF-certified where applicable, and the contractor bears responsibility for securing all necessary DEP permits and compliance with applicable federal, state, and local regulations.

View the file

Other files

File Type Posted
31-1000 SERIES PLOTS - Filter Building Site Improvement Plans (Addendum 6).pdf PDF
3-Bid Manual Table of Contents (Addendum 6).pdf PDF
32-700 SERIES PLOTS - Electrical Plan Set (Addendum 6).pdf PDF
15-655 - HT OIT Screens (Addendum 6).pdf PDF
34-200 SERIES PLOTS - Ex Building and Site Improvements (Addendum 6).pdf PDF
30-653 - HT Filter Control Panel (Addendum 6).pdf PDF
33-652 - HT Mech Dwgs - Piping Valves (Addendum 6).pdf PDF
23-755 - GES Distribution Pump Control Panel (Addendum 6).pdf PDF
7-Bid Manual Section 6 - Construction Specifications B (Addendum 6).pdf PDF
19-751 - GES Well 6 Control Panel (Addendum 6).pdf PDF
13-656 - HT Mech Dwgs - Tanks Piping Blowers (Addendum 6).pdf PDF
28-754 - GES Manganese FIlter Control Panel (Addendum 6).pdf PDF
6-Bid Manual Section 3 - Agreements Bonds (Addendum 6).pdf PDF
4-Bid Manual Section 10 - Electrical Specifications (Addendum 6).pdf PDF
20-100 SERIES PLOTS - Process Plans (Addendum 6).pdf PDF
5-Bid Manual Section 9 - Mechanical HVAC Plumbing Specifications (Addendum 6).pdf PDF
27-500 SERIES PLOTS - South Wells Plan (Addendum 6).pdf PDF
35-300 SERIES PLOTS - Water Piping Plans (Addendum 6).pdf PDF
10-Bid Manual Section 4 - General Specifications (Addendum 6).pdf PDF
12-654 - HT Mech Dwgs - Piping Layouts (Addendum 6).pdf PDF
22-753 - GES Well 8 Control Panel (Addendum 6).pdf PDF
29-251 - WWTP Contract 2 As-Built Plans (Addendum 6).pdf PDF
11-Plan Set Table of Contents (Addendum 6).pdf PDF
36-Bid Manual Section 1 - Front End Specifications (Addendum 6).pdf PDF
17-756 - GES Sludge Pump Control Panel (Addendum 6).pdf PDF
26-400 SERIES PLOTS - North Wells Plans (Addendum 6).pdf PDF
18-900 SERIES PLOTS - HVAC Plan Set (Addendum 6).pdf PDF
24-800 SERIES PLOTS - Plumbing Plan Set (Addendum 6).pdf PDF
21-752 - GES Well 7 Control Panel (Addendum 6).pdf PDF
9-Bid Manual Section 8 - Dutchland Specifications (Addendum 6).pdf PDF
8-Bid Manual Section 5 - Construction Specifications A (Addendum 6).pdf PDF
14-651 - HT Mech Dwgs - Internals (Addendum 6).pdf PDF
1-Bid Manual Section 2 - Bid Forms (Addendum 6).pdf PDF
16-252 - WWTP Contract 3 As-Built Plans (Addendum 6).pdf PDF
25-600 SERIES PLOTS - Treatment Building Plans (Addendum 6).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division 11 - Equipment Section 11000 – Common Requirements for Process Equipment

FSWA 11000-1

Public Water System Upgrades

DIVISION 11 – EQUIPMENT

SECTION 11000 – COMMON REQUIREMENTS FOR PROCESS EQUIPMENT

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications, apply to this Section.

B. Related Sections

1. Division 1 Sections as referenced.

2. Division 11 Sections as referenced.

1.2 SUMMARY

A. This Section includes common requirements for equipment specified in individual Sections of Division 11-Equipment.

1.3 SUBMITTALS

A. Product Data: Make submissions in accordance with Section 01300. Submit Product Data applicable to items listed under Submittals in each Section of Division 11, and such items as may be scheduled on the Drawings.

B. Shop Drawings: Make submissions in accordance with Section 01300. Submit shop drawings applicable to items listed under Submittals in each Section of Division 11, and such items as may be scheduled on the Drawings.

C. Operation and Maintenance (O&M) Manuals: Make submissions in accordance with Section 01300. Submit O&M Manuals, as prepared by the manufacturers or the Contractor, for the items listed under O&M Manuals in each Section of Division 11.

1.4 QUALITY ASSURANCE

A. Component Standards: All equipment and materials furnished shall be new and shall bear manufacturer’s name and trade name. Equipment shall be manufacturer by a manufacturer regularly engaged in the production of the equipment specified, and shall be the manufacturer’s latest approved design.

B. Requirements of Regulatory Agencies: Comply with construction requirements of State, County, and such other local political subdivision specifications as may exceed the requirements of the codes, standards, and approving bodies referenced herein.

C. Electrical Requirements: Comply with requirements for both the Underwriters’

Laboratories, Inc. (UL) Listings, Labels and Certifications and the National Electrical Manufacturers’ Associations (NEMA) Stamps or Seals as applicable to electrical equipment or apparatus forming parts of the Equipment.

FSWA 11000-2

Public Water System Upgrades

1. Provide Electrical Control panels constructed in accordance with the practices and requirements of the Underwriters’ Laboratories, or other nationally recognized certification agency, with the appropriate certification label installed.

D. Equipment Compatibility: Where like items of equipment are incorporated into manufactured units or equipment systems (i.e. three pumps) such items shall be identical.

E. Specification Compliance: Manufacturers of equipment specified in individual

Sections of Division 11 shall be completely responsible for providing equipment which fully satisfies the intent of the Specifications including mechanical and electrical integrity, materials quality, and functional requirements established in the Specification Sections.

1.5 DELIVERY, STORAGE AND HANDLING

A. Deliver, store and handle equipment according to Section 01600. In addition, unless specified otherwise in the individual Specification Sections of Division 11, deliver, store and handle products according to the following:

1. Delivery:

a. Deliver equipment crating and packaging shall clearly identify pick points or lift points. In the absence of crating or packaging, pick points or lift points shall be identified on the equipment.

b. When transporting materials, equipment and machinery both on site and from Contractor’s storage to the Site, do so in accordance manufacturer’s recommendations.

2. Unloading:

a. When unloading materials and equipment, provide special lifting harness or apparatus as may be required by manufacturers.

Handle materials and equipment according to manufacturer’s instructions.

b. Contractor shall determine the required equipment needed for unloading operations and have such equipment on Site to perform unloading work on the date of equipment delivery.

3. Storage: Store materials, equipment and machinery, both on and off Site, according to manufacturer’s recommendations.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

3.1 EXAMINATION

FSWA 11000-3

Public Water System Upgrades

A. Examine substrates and conditions for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Examine rough-in of piping systems to verify locations of piping connections before equipment installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. General Requirements:

1. Install equipment with skilled mechanical erection labor according to manufacturer’s instructions and installation drawings.

2. Install equipment level, plumb and properly aligned.

3. Check motor and control panel data plates to compatibility to service voltage.

4. Check tightness of all fasteners.

5. Verify proper installation of supports and anchors for equipment and piping.

6. Grout bases as recommended by equipment manufacturer.

3.3 FIELD QUALITY CONTROL

A. Acceptance (Field) Tests: Upon Completion of the installation and adjustment of the equipment in a manner satisfactory to the Engineer, the Contractor with his own forces (including such equipment and other experts as may be necessary) shall place equipment in satisfactory operation and perform the Acceptance Tests.

1. Give the Owner at least seven days written notice prior to placing equipment in operation and designate the day for the Acceptance Tests.

2. Have on hand for the Engineer’s use during the Acceptance Tests, the complete test procedures and the installation acceptance certificate, as prepared by the manufacturer.

3. If during the demonstrations deficiencies are found, then subsequent to correction of the deficiencies by the Contractor, the Acceptance Test shall be repeated.

4. The Acceptance test shall be considered concluded at the end of the time period designated for the Test if the Engineer is satisfied with the test results.

5. During the Acceptance Test time, the Contractor’s Personnel shall instruct and train the Owner’s Personnel in the operation and maintenance of the equipment. Training shall include, but not be limited to, the following:

a. Start-up and shut-down procedures.

b. Equipment adjustments.

c. Troubleshooting.

d. Review of the equipment Installation, Operation, and Maintenance

Manual. This portion of the training is to include classroom

FSWA 11000-4

Public Water System Upgrades instruction, along with detailed discussions of the components and subsystems equipment.

e. Supervision of Owner operating personnel during total system operation.

f. Preventive maintenance scheduling and procedures.

B. Operating Costs: Include in the Bid Price the costs for lubricating grease, lubricating oils, and other materials and apparatus not specifically identified herein, but required to conduct the Acceptance Tests.

1. Electrical Power: The Owner will provide the electrical power for conducting the Acceptance Test through the permanent electrical service as installed to the equipment.

3.4 MANUFACTURER’S REPRESENTATIVE

A. Provide services of manufacturer’s authorized representative as indicated in the individual Sections of Division 11.

B. Provide written certification upon request from Engineer indicating names of authorized representatives.

END OF SECTION 11000

Division 11 – Equipment Section 11010 – Process Piping, Valves, and Appurtenances

FSWA 11010-1

SECTION 11010 – PROCESS PIPING, VALVES, AND APPURTENANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes piping and related components, valves, and appurtenances for Process Piping and Chemical Feed Systems.

B. Related Sections

1. Division 11 – Equipment

C. Piping, valves and specialties specified in this Section cover those Products not furnished as part of equipment systems specified in the individual Sections of Division 11 –Equipment.

1.3 REFERENCES

A. ASTM A74 – Standard Specification for Cast Iron Soil Pipe and Fittings.

B. ASTM C564 – Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings.

C. ASTM D1785 – Standard Specification for Poly Vinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80 and 120.

D. ASTM D2241 – Standard Specification for Poly Vinyl Chloride (PVC) Plastic Pipe

(SDR-PR).

E. ASTM D2729 – Standard Specification for Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

F. ASTM D2855 – Standard Practice for Making Solvent-Cemented Joints with Poly Vinyl Chloride (PVC) Pipe and Fittings.

G. ASTM D3033 – Standard Specification for Type PSP Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

H. ASTM D3034 – Standard Specification for Type PSM Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings.

FSWA 11010-2

I. ASTM F477 – Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.

J. AWWA C105 – Polyethylene Encasement for Ductile Iron Piping for Water and Other Liquids.

K. AWWA C110 – Ductile Iron and Gray Iron Fittings 3 in. through 48 in., for Water and Other Liquids.

L. AWWA C111 – Rubber-Gasket Joints for Ductile Iron and Gray Iron Pressure Pipe and Fittings.

M. AWWA C151 – Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds, for Water or Other Liquids.

N. AWWA C500 – Gate Valves for Water and Sewerage Systems.

O. AWWA C504 – Rubber-Seated Butterfly Valves.

P. AWWA C507 – Ball Valves, 6 in. through 48 in.

Q. AWWA C508 – Swing-Check Valves for Waterworks Service, 2 in. through 24 in.

NPS.

R. AWWA C509 – Resilient-Seated Gate Valves for Water Supply Service.

S. AWWA C550 – Protective Epoxy Interior Coatings for Valves and Hydrants.

T. AWWA C601 – Standard Methods for the Examination of Water and Waste Water.

U. CISPI 301 – Cast Iron Soil Pipe and Fittings for Hubless Cast Iron Sanitary Systems.

1.4 QUALITY ASSURANCE

A. Pipe: Manufacturer’s name and class of pipe marked on the pipe. Manufacturer’s certification on manufacturing and testing.

B. Welding Materials and Procedures: Conform to ASME Code and applicable state labor regulations.

C. Welder’s Certification: In accordance with ANSI/ASME Section 9 or ANSI/ASME D1.1.

1.5 SUBMITTALS

A. Product Data: For each type of product indicated.

1. Include rating data, flow rates, pressure classifications, capacities, and other data specified in this Section.

FSWA 11010-3

2. Include materials, seats, trim, connections, arrangement, and other details of construction specified in this Section.

3. Include dimensions and arrangement, of each product.

B. Field quality-control test reports.

1. Include results of leakage tests.

C. Operation and Maintenance Data:

1. Provide for products requiring installation instructions, operating instructions, setup, calibration, or initial adjustment.

2. Provide for products requiring periodic inspection, calibration, or adjustment; or for products with replaceable components, wear items, or spare parts.

3. Provide for electrically operated products.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Preparation for Transport: Prepare items according to the following:

1. Ensure that items are dry and internally protected against rust and corrosion.

2. Protect against damage to threaded ends and flange faces.

3. Set valves in best position for handling. Set valves closed to prevent rattling.

B. During Storage: Use precautions for valves according to the following:

1. Do not remove end protectors unless necessary for inspection; then reinstall for storage.

2. Protect products from weather. Store indoors and maintain temperature higher than ambient dew-point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

C. Handling: Use sling to handle valves if size requires handling by crane or lift. Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

E. Protect stored products from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.

F. Protect flanges, fittings, and specialties from moisture and dirt.

G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

PART 2 - PRODUCTS

FSWA 11010-4

2.1 STAINLESS STEEL PIPE AND FITTINGS

A. Pipe 1/2” through 2-1/2”: 304L stainless steel manufactured to ASTM A-312, Schedule 40.

B. Pipe 3” and up: 304L stainless steel manufactured to ASTM A-778, Schedule 40.

C. Fittings 1/2” through 2-1/2”: 304 stainless steel, threaded, ASTM A-312, 150 lb.

D. Fittings 3” and up: 304 stainless steel, butt welded, ASTM A-778, 150 lb.

2.2 BLACK STEEL PIPE AND FITTINGS

A. ASTM A53, Schedule 40 up to 12-inch diameter; 0.375” nominal wall thickness for pipe 12” diameter and larger.

B. Joints 2” diameter and smaller shall be screwed. Joints 2-1/2” diameter and larger shall be flanged.

C. Fittings 2” diameter and smaller shall be ANSI 125 pound screwed in accordance with ASTM B16.4. Fittings 2-1/2” diameter and larger shall be flanged.

2.3 GALVANIZED STEEL PIPE

A. ASTM A120, Schedule 40 Galvanized Steel.

B. Fittings and Joints 1/2” through 2-1/2”: threaded.

C. Fitting and Joints 3” and up: Butt welded.

2.4 DUCTILE-IRON PIPE AND FITTINGS

A. Mechanical-Joint, Ductile-Iron Pipe (Below Grade): AWWA C151, ANSI A21.10 and ANSI A21.11, with mechanical-joint bell and plain spigot end. Provide with standard asphaltic coating and double cement lining with seal coat.

1. Mechanical-Joint, Ductile-Iron Fittings: AWWA C110, ANSI A21.10 and

ANSI A21.11, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.

2. Glands, Gaskets, and Bolts: AWWA C111 and ANSI A21.11, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

B. Push-on-Joint, Ductile-Iron Pipe (Below Grade): AWWA C151 and ANSI A21.11, with push-on-joint bell and plain spigot end. Provide with standard asphaltic coating and double cement lining with seal coat.

1. Push-on-Joint, Ductile-Iron Fittings: AWWA C110 and ANSI A21.11, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.

2. Gaskets: AWWA C111, rubber.

FSWA 11010-5

C. Flanged, Ductile-Iron Pipe (Above Grade, Inside Buildings and Structures):

AWWA C151, with flanged ends. Provide with standard asphaltic coating and double dement lining with seal coat.

1. Flanged, Ductile Iron Fittings: AWWA C110, ductile iron standard pattern.

Flanges conforming to ASME B16.1, class 125.

2. Gaskets: AWWA C110 and AWWA C111, full face.

3. Bolts: ANSI B18.2.2, low carbon steel conforming to ASTM A307, hex head.

D. Piping designated to carry air shall not receive the double cement interior lining.

E. Force mains shall be lined with Sewper Coat by Griffin Pipe, or Protecto 401 Ceramic Epoxy by US Pipe and Foundry Co. or equal.

2.5 PE PRESSURE PIPE

A. Polyethylene pipe shall be manufactured in accordance with AWWA C901 for sizes ½-inch through 3” and in accordance with AWWA C906 for sizes 4” through 54”.

B. Polyethylene fittings shall be made from material meeting same requirements as pipe. Polyethylene fittings shall be molded or fabricated by the manufacturer of pipe.

C. Molded fittings shall be manufactured in accordance with either ASTM D2683 (socket fused) or ASTM 3261 (butt fused) and shall be so marked.

2.6 POLYVINYL CHLORIDE (PVC) GRAVITY PIPE AND FITTINGS

A. Pipe: Type PSM SDR 35, ASTM D 3034 (4” – 15”).

B. Fittings: Conforming to same applicable standards as pipe.

C. Joints: ASTM D3212 push on joint with ASTM F477 elastomeric gaskets. Gasket shall be locked in groove of bell to prevent displacement when pipes are joined.

2.7 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE AND FITTINGS

A. PVC, Schedule 80 Pipe: ASTM D 1784 and D 1785.

1. PVC, Schedule 80 Socket Fittings: ASTM D 2467.

B. Solvent Cements for Joining Plastic Piping:

1. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.

2.8 PVC PRESSURE PIPE AND FITTINGS – SDR 21

A. Pipe: ASTM D2241, SDR-21, Class 200, NSF 14 certified.

FSWA 11010-6

B. Fittings: Conforming to same applicable specifications as pipe.

C. Joints: ASTM D3139 push on joints with ASTM F477 elastomeric gasket. Gaskets shall be locked in groove of bell to prevent displacement when pipes are joined.

2.9 COPPER TUBING AND FITTINGS

A. Underground

1. Tubing: ASTM B88 Type K annealed.

2. Joints: Compression.

3. Fittings: Cast copper alloy compression tube fittings.

B. Above Grade

1. Tubing: ASTM B88 Type L, drawn tempered.

2. Joints: Solder

3. Fittings:

a. Wrought copper or bronze solder joints, ANSI B16.22

b. Cast bronze solder joint fittings ANSI B16.18

4. Solder: ASTM B32 alloy grade 95TA. Use flux recommended by solder manufacturer.

2.10 BLOWER/AIR PIPE AND FITTINGS

A. Underground

1. Ductile Iron Pipe, ANSI A21.51, minimum class thickness Class 52, unlined, uncoated and unpainted on interior of pipe.

2. Joints: Mechanical and Push-On Joints, ANSI A21.11

3. Fittings: Mechanical Joint, ANSI A21.10 and ANSI A21.11, unlined, uncoated and unpainted on interior of fitting.

B. Above Grade

1. Stainless Steel Pipe, ASTM A312, 10 Gauge, welded and seamless, Type

304L stainless steel.

2. Joints: Butt weld

3. Fittings: ASTM A403, butt weld.

2.11 CHEMICAL TUBING

A. Flexible, reinforced, clear Nylon tubing. Rated for 150 psi @ 70 degrees F.

B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. “Nylobrade” by Newage Industries

2. STI Flow

3. Flo-Products

4. Indelco Plastics

5. Or Equal

FSWA 11010-7

2.12 FABRICATED PIPE SUPPORTS

A. Adjustable Saddle Supports

1. Galvanized Steel construction, with base plate drilled for anchor bolts, steel pipe stand, threaded adjusting mechanism, and saddle to hold pipe.

2. For plastic pipe, provide with metal shields to prevent point loads on the piping.

3. Where Pipe Supports are installed on sloped floors, provide shims and grout under base plate to make support vertical.

B. Pipe Rack and Trapeze Systems

1. Standard galvanized steel framing channels, threaded rods, and associated fittings and hardware as detailed on the Drawings.

2. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Cooper “B-Line

b. Uni-Strut

c. Power Strut

d. Or Equal

C. Other Supports

1. Provide wall clips, steel bands, or other standard products at intervals consistent with manufacturer’s recommendations and applicable regulations.

2. Secure plastic piping with appropriate supports to prevent point loading, pinching, binding, or abrasion against other work. Provide supports as required to permit operation of valves without causing movement in the adjacent piping.

3. General Contractor shall be responsible to provide all necessary vibration control measures.

2.13 PIPING SPECIALTIES

A. Flexible Pipe Couplings: Ductile Iron sleeve, glands, and follower rings. 304 Stainless steel nuts and bolts. Resilient wedge-shaped gaskets of synthetic base compound designed for wastewater and sludge service.

1. Manufacturers

a. Dresser Manufacturing Division of Dresser Industrial, Inc.; Dresser Style 253.

b. Smith-Blair; Style 441

c. Or Equal

B. Flanged Adapters: For joining plain end pipe to flanged fittings, valves and pumps.

1. Manufacturers

a. Dresser Manufacturing Division of Dresser Industrial, Inc.; Dresser Style 127

b. Smith Blair Style 912

c. Or Equal

FSWA 11010-8

2. ASTM A-126, Class B cast iron. Flanges shall mate with standard ANS/AWWA C207/B16.1 and B16.5 flanges of same nominal size.

C. Quick Couplers: Equivalent to EverTite 800 Series, stainless steel construction.

Provide adapters, dust cap and stainless steel chain.

D. Expansion and Vibration Isolation Joints

1. Spool type with single filled arch and integral flanges

2. Non-metallic reinforced neoprene.

3. Galvanized split steel retaining rings

4. Control rod assembly.

5. Manufacturers

a. Mercer Rubber Company

b. General Rubber Company

c. Proco Products, Inc.

d. Or Equal

E. Pipe Wall and Floor Sleeves: Schedule 20 black steel pipe with a 2” wide intermediate anchoring flange of 3/16” steel midway on pipe sleeve, or provide sleeve product similar to wall sleeves manufactured by Trumbull Industries, Inc.

1. Size sleeves two pipe sizes larger than pipe passing through, or size sleeves for a minimum of 1/2” clearance between inside of sleeve and outside diameter of pipe passing through.

2. Wall and partition sleeve length shall be equal to the total thickness of the wall or partition and shall terminate flush with finished surfaces.

3. Floor sleeve lengths shall be equal to the total depth of floor construction, including finish, and shall extend a minimum of 1” and a maximum of 2” above floor level.

F. Pipe Wall Seals

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Advance Products & Systems, Inc.

b. Metraflex, Inc.

c. Pipeline Seal and Insulator, Inc.

d. Or Equal

2. For use at piping penetrations through concrete walls with or without the use of a metal sleeve. Description: Modular sealing element unit, designed for field assembly, used to fill annular space between pipe and opening.

3. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

4. Pressure Plates: Stainless steel.

5. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements.

2.14 HOSE BIBBS

A. Standard: ASME A112.18.1

FSWA 11010-9

B. Body Material: Bronze.

C. Seat: Bronze, replaceable.

D. Supply Connections: NPS 1” threaded inlet.

E. Outlet Connection: 1” Hose thread.

F. Pressure Rating: 125 psig

G. Finish: Rough bronze, or chrome or nickel plated.

H. Operation: Wheel handle.

2.15 VALVES, GENERAL

A. Refer to Part 3 "Valve Applications" Article for applications of valves.

B. Bronze Valves: NPS 3 and smaller with threaded ends, unless otherwise indicated.

C. Ferrous Valves: NPS 3 and larger with flanged ends, unless otherwise indicated.

D. Valve Pressure and Temperature Ratings: 150 psi CWP unless otherwise indicated.

E. Valve Sizes: Same as upstream pipe, unless otherwise indicated.

F. Valve Actuators: Unless specified otherwise

1. Handwheel: For valves other than quarter-turn types.

2. Lever Handle: For quarter-turn valves NPS 6 and smaller.

3. Motor or Pilot actuated: As specified with the particular valve.

G. Extended Valve Stems: As noted on Drawings.

H. Valve Flanges: ASME B16.1 for iron valves.

I. Threaded: With threads according to ASME B1.20.1.

2.16 PLUG VALVES

A. Manufacturers

1. DeZurik

2. M & H Valve Company

3. Milliken Valve Co., Inc.

4. Or Equal

B. General: Non lubricated eccentric type valves with resilient seated plugs rated for 175 psi working pressure for valves up to and including 12 inches, and 150 psi for valves 14 inches and larger. ANSI 125/150 lb standard end connections.

FSWA 11010-10

C. Valve Body: ASTM A126, Class B cast iron with a 1/8 inch welded overlay seat of not less than 90% nickel. Seat area shall be raised with surface completely covered with weld to insure that plug face contacts only nickel.

D. Plug: ASTM A126, Class B cast iron resilient face with neoprene or hycar, suitable for use with sewage. Interface between plug face and body seat with plug in closed position shall be externally adjustable in the field with the valve under pressure.

E. Bearings and Seats: Stainless steel bearings and nickel seats.

F. Port area shall be at least 80% of full pipe area.

G. Provide enclosed worm and gear operator for valves 8 inches and larger and for valves less than 8 inches that must be chain operated.

2.17 BUTTERFLY VALVES FOR WATER AND SEWAGE SERVICE

A. Designed for a minimum working pressure of 200 psi for valves thru 12 in. and 150 psi for valves 14 in. and larger.

B. Valves and operators shall conform to AWWA C504. Valves shall be of stainless steel to rubber seated tight closing type.

C. Body: Cast iron ASTM A126, Class B of short body design.

D. Disc: Cast iron ASTM A48, Class 40 securely attached to 18-8 Type 304 or Type 316 stainless steel one piece shaft with 18-8 Type 304 or Type 316 stainless steel pins.

E. Seat: Buna N (Hycar) rubber for sewage with 18-8 Type 304 or Type 316 stainless steel mating material.

F. Bearings: Self-lubricating Teflon.

G. Shaft Seals: Bronze cartridge with two (2) o-rings for valves through 24 in and split V-type packing for larger valves.

H. Operators: Designed and sized in accordance with AWWA C504.

I. Available Manufacturers:

1. DeZurik

2. Henry Pratt Company

3. Milliken

4. Or Equal

2.18 BUTTERFLY VALVES FOR AIR SERVICE

A. Body: Cast iron ASTM A126, Class B of short body design.

FSWA 11010-11

B. Disc: Aluminum bronze, ASTM B 148-953 attached to 18-8 Type 304 or Type 316 stainless steel one piece shaft with 18-8 Type 304 or Type 316 stainless steel pins.

C. Seat: EPDM with 18-8 Type 304 or Type 316 stainless steel mating material.

D. Bearings: Self lubricating Teflon.

E. Shaft Seals: Bronze cartridge with O-rings for valves through 24-inch.

F. Available Manufacturers

1. DeZurik

2. Henry Pratt Company

3. Milliken

4. Or Equal

G. Operators:

1. Manual operators shall be 10 position lever type which provides positive latching in the open, closed, and eight intermediate positions.

2.19 GATE VALVES

A. AWWA, Ductile Iron Body Gate Valves:

1. Manufacturers:

a. American Cast Iron Pipe Co.; American Flow Control Div.

b. Mueller Co.; Water Products Div.

c. U.S. Pipe and Foundry Company.

2. Nonrising-Stem, Resilient-Seated Gate Valves:

a. Description: ductile-iron body and bonnet; with bronze or ductile-iron gate, resilient seats, bronze stem, and handwheel.

1) Standard: AWWA C509.

2) Minimum Pressure Rating: 200 psig.

3) End Connections: Flanged.

4) Interior Coating: Complying with AWWA C550.

3. Valves smaller than 3 inches in diameter:

a. Solid bronze with tapered split wedge disc.

b. Physical properties of brass pressure containing parts shall conform to ASTM B62.

c. Acceptable Manufacturers

1) Crane Company

2) Wm. Powell Co.

3) Or equal

4. Hose End Type:

a. Bronze construction, tapered solid wedge disc, non-rising stem, female inlet and outlet having American Standard Taper Pipe thread.

b. Acceptable Manufacturers

1) Crane Company; No. 451 with cap and chain; 1 in. through

2-1/2 in.

2) Wm. Powell Co.; No. 502HS; 1/2 in. through 3 in.

3) Or equal

FSWA 11010-12

2.20 CHECK VALVES

A. Requirements

1. Provide full flow swing type check valve, with end type to match adjoining pipe, capable of passing a 3 inch spherical solid. A bronze body ring shall be threaded into the valve port. Valve clapper shall be cast iron, bronze face and shall swing completely clear of waterway when valve is full open.

Hinge pin shall be of 18-8 stainless steel construction and shall be utilized with bronze bushings and o-ring seals. Valves shall be equipped with a removable cover plate to permit entry or complete removal of internal components without removing the valve from the line. Valves shall be rated at 175 psi working pressure, 350 psi hydrostatic test pressure.

2. Valves 10 inches and larger shall be furnished with external lever and spring. Valves less than 10 inches shall be furnished with external lever and weight. Valves other than full flow type or valves mounted in such a manner that prevents the passage of a 3 inch spherical solid will not be acceptable.

3. Acceptable Manufacturers

a. Clow Corporation

b. M & H Valve Company

c. Mueller Company

d. Or equal

2.21 BALL VALVES

A. Manually operated PVC ball valves (3 inch and smaller)

1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Spears.

b. Hayward.

c. Koflo Corporation.

d. Or Equal

2. Threaded ends, full ported, union style with Teflon seats. Provide with PVC T-handle. Provide socket adaptors to connect to PVC piping.

B. Bronze Ball Valve

1. One piece bronze Body, threaded ends, brass ball, Teflon seats, operating handle. Minimum 150 psi rating.

a. Nibco

b. Stockham

c. Apollo

d. Milwaukee

e. Or Equal

2.22 PRESSURE REDUCING VALVE

A. Designed for at least 200 psi maximum inlet pressure with a maximum allowable outlet pressure 10 percent above spring setting or 5 psig whichever is greater.

FSWA 11010-13

B. Provide bronze trimmed valve with a nitrile or 3/16 inch cloth insert neoprene rubber diaphragm.

C. Valves Less Than 1 Inch Diameter: Bronze body; cast iron or aluminum spring chamber.

D. Valves 1 Inch in Diameter and Larger: Bronze body; cast iron spring chamber.

E. Available Manufacturers:

1. Fisher Controls; Type 75A Water Pressure Regulator

2. Union Flonetics Corp.; Series U-1 Spring Loaded Pressure Reducing

Regulator.

3. Or Equal

PART 3 - EXECUTION

3.1 EARTHWORK

A. Perform trenching, backfilling and compaction according to Section 02300.

3.2 PIPING APPLICATIONS

A. Drawings indicate piping types to be used.

B. Do not use flanges or unions for underground piping.

C. Flanges, unions, and special fittings may be used, instead of joints indicated, on aboveground piping and piping in vaults.

3.3 VALVE APPLICATIONS

A. Drawings indicate valve types to be used.

3.4 PIPING INSTALLATION

A. Clean piping prior to installation and following installation to prepare for painting.

Keep open ends of piping and pipe attachment openings on equipment capped or plugged until actual connection.

B. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

C. Install piping at indicated slopes.

D. Install piping free of sags and bends with supports as indicated, or as recommended by the piping manufacturers.

FSWA 11010-14

E. Sleeves are not required for core-drilled holes.

F. Install sleeves for pipes passing through concrete walls.

G. Install ductile-iron, piping according to AWWA C600 and AWWA M41.

H. Install underground piping with restrained joints at horizontal and vertical changes in direction. Use restrained-joint piping, thrust blocks, anchors, as indicated on the Drawings, or as recommended by the piping manufacturer.

3.5 JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

D. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

E. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.

2. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and

PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

F. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.

3.6 VALVE INSTALLATION

A. AWWA Gate Valves: Comply with AWWA C600 and AWWA M44. Install each underground valve with stem pointing up and with valve box.

B. AWWA Valves Other Than Gate Valves: Comply with AWWA C600 and

AWWA M44.

C. MSS Valves: Install as component of connected piping system.

FSWA 11010-15

3.7 FIELD QUALITY CONTROL

A. Mechanical-Component Testing: After piping connections have been made, test all operators, and components to assure proper operation. Adjust or replace components that do not operate correctly.

B. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Conduct piping tests as specified in this Section.

3.8 TESTING OF NON-PRESSURE LINES

A. General Requirements: Conduct tests specified herein so that each pipe line installed in the Project is tested to the Engineer’s satisfaction.

1. Provide tools, materials (including water), apparatus and instruments necessary for pipe line testing.

2. Conduct tests in the presence of and to the satisfaction of the Engineer.

B. Leakage Tests:

1. Air Testing: The Contractor shall test linesusing low pressure air. Testing shall not be performed, until all backfilling has been completed. The Contractor may, at his option, test the section of sewer for his own purposes, prior to completion of backfilling; however, the requirements of this subsection shall not be deemed to be completed until the lines have been tested after the backfilling has been completed and trench settlement has been minimized.

2. A minimum of two minutes shall be provided to allow equilibrium of the air temperature with pipe wall before test readings shall commence. The rate of air loss shall be determined by measuring the time interval required for the average internal pressure to decrease by 1.0 psig.

3. The initial test pressure to be developed in the line shall be determined as follows:

a. For depths six (6) feet or less, the internal pressure shall not be less than 6.0 psig.

b. For depths greater than six (6) feet, the internal pressure in psig shall be calculated as the sum of 3.5 plus the maximum height in feet divided by 2.3 between the invert of the sewer and the existing ground surface in the section of sewer to be tested. (For example, if the maximum height is determined to be 9.2 feet, the added pressure would be 4.0 psig. The initial test pressure in the sewer would then be 7.5 psig. The allowable drop would be to 6.5 psig within the time indicated elsewhere in this subsection.)

c. In no case shall the test pressure in the sewers or laterals be greater than the maximum internal differential joint pressure recommended by the manufacturer of the pipe.

4. The pipe shall be considered acceptable if the air loss rate does not exceed

0.0030 cubic feet per minute per square foot of internal pipe surface when tested at the initial pressure previously defined in this subsection. The time for the air pressure to decrease 1.0 psig shall not be less than the time indicated in the following table:

FSWA 11010-16

Pipe Diameter Minutes Seconds

6" 2 55 8" 3 57 10" 4 43

12" 5 5 15" 7 5 18" 8 30 21" 9 50 24" 11 20 27 12 45 30" 14 10 36" 17 00 42" 19 50 48" 22 40

5. If the above rates of leakage are exceeded, the Contractor shall determine source of leakage and make all necessary corrections and retest.

6. The Contractor shall submit to the Engineer for approval the detailed test procedure and list of test equipment he proposes to use prior to testing.

C. Infiltration:

1. After the air testing described in the preceding paragraph has been completed by the Contractor, regardless of any indications of the test results made by the Engineer or the Owner, the Engineer and the Owner reserve the right to perform field investigations, prior to final written acceptance of each sewer run by the Owner and/or during the maintenance period specified elsewhere in these Specifications, to establish the leakage of groundwater into the sewer and laterals constructed under this contract.

2. Should the leakage exceed 100 gallons per day per inch diameter per mile of pipe for any section, the Contractor shall, at the direction of the Engineer or Owner, and at no cost to the Owner, perform any additional testing or corrective work required to reduce the infiltration in each manhole run from those lines installed by the Contractor to less than 100 gallons per day per inch diameter per mile of pipe. This leakage applies to each manhole run separately and should not be construed to mean total leakage in the total system. The scope of this corrective work shall include, but not be limited to, cleaning, televising and testing the sewer and laterals to the limits installed by the Contractor, to include testing and grouting of joints, excavation and replacement of faulty or damaged portions of the work, and all final restoration.

3.9 TESTING OF PRESSURE LINES

A. Hydrostatic Testing for Pressure Lines:

1. Leakage Test Requirements:

a. After the pipe has been installed as specified, all newly laid pipe, or any valved section thereof, shall be subjected to a pressure of 150

FSWA 11010-17

pounds per square inch, or 50% in excess of the normal working pressure, whichever is greater.

b. Leakage is defined as the quantity of water to be supplied into the newly laid pipe, or any valved section thereof, necessary to maintain the specified leakage test pressure after the pipe has been filled with water and the air expelled.

c. No pipe installation will be accepted until the leakage is less than the number of gallons per hour as determined by the formula, L = N x D x SQ RT of P in which "L" equals the allowable leakage in gallons per hour; "N" is the number of joints in the length of pipelines tested; "D" is the nominal diameter of the pipe, in inches, and "P" is the average test pressure during the leakage test, in pounds per square inch gauge.

(The allowable leakage according to the formula is equivalent to

11.6 gallons per 24 hours per mile of pipe per inch nominal diameter, for pipe in 18' lengths evaluated on a pressure basis of 150 psi.)

2. Duration of Test: The duration of the test under pressure shall be two hours.

3. Procedure: Each valved section shall be slowly filled with water and the specified test pressure, based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gauge, shall be applied by means of a pump connected to the pipe in a manner satisfactory to Engineer. The pump, pipe connections, and all necessary apparatus, including gauges, shall be furnished by Contractor. Contractor will make all taps into the pipe, and furnish all necessary assistance for conducting the tests.

4. Expelling Air Before Test: Before applying the specified test pressure, all air shall be expelled from the pipe. If hydrants or blowoffs are not available at high places, Contractor shall make the necessary taps at points of highest elevation before the test is made and insert the plugs after the test has been completed, at no additional cost to Owner.

5. Variation from Permissible Leakage: Should any test of pipe laid disclose leakage greater than that specified above, Contractor shall, at his own expense, locate, repair and replace the defective joints, pipe or fittings until the leakage is within the specified allowance.

6. Time for Making Test:

a. Where any section of a main is provided with concrete reaction backing, the hydrostatic pressure test shall not be made until at least five days have elapsed after the concrete reaction backing was installed. If high early strength cement is used in the concrete reaction backing, the hydrostatic pressure test shall not be made until at least two days have elapsed.

b. Engineer shall be present during the operating of valves required to fill mains for pressure and leakage test.

c. Contractor shall advise Engineer of any pressure test and leakage test at least 48 hours in advance. No testing will be authorized unless air temperature is 35 degrees or higher.

d. The pressure and leakage tests shall be witnessed by Engineer.

FSWA 11010-18

e. Contractor shall furnish laboratory calibrated test gauges and measuring devices for the leakage test.

f. The section under test shall be brought back to test pressure at one-half hour intervals during the testing. Engineer will record both the makeup water amount and pressure at each one-half hour repressurization.

B. Alignment Test for Pressure Lines:

1. Prior to backfilling of pressure lines, the joint alignment shall be inspected to assure the maximum deflection present in each joint does not exceed the manufacturer's recommendations.

2. Pressure lines which are a portion of a pump discharge system shall be inspected to assure the line is installed at a constant or increasing grade so as to eliminate the possibility for air accumulation at an intermediate high point.

3. Any and all defects shall be corrected by Contractor at no additional cost to Owner and to the satisfaction of Engineer prior to backfilling. This shall be completed before the work shall proceed and before acceptance of and/or payment shall be made.

C. Acceptance: Observation of successful testing of manholes, sewers or force mains by the Engineer does not constitute acceptance of the system or any portion thereof. Upon completion of any determined portion of a total system, and successful testing thereof, the Engineer may recommend final acceptance to the Owner. Only upon final inspection by the Owner or Engineer, and upon written acceptance for same will the system or portion thereof be considered substantially completed. Upon such acceptance, the warranty period as specified for the manholes, sewers or force main will commence.

1. If, during this final inspection, any irregularities are observed, the condition must be corrected at the Contractor's expense prior to acceptance.

3.10 IDENTIFICATION

A. Install continuous underground detectable warning tape during backfilling of trench for underground piping. Locate below finished grade, directly over piping.

3.11 DISINFECTION OF POTABLE WATER MAINS

A. Disinfect potable water lines following installation according to AWWA C651.

END OF SECTION 11010

Division 11 – Specialties Section 11220 – Water Tower Mixer

FSWA 11220-1

SECTION 11220 – WATER TOWER MIXER

1.1 SCOPE

A. This section covers submersible tank mixing systems up to 2.0 HP in size intended for continuous use while submersed in potable water storage tanks. Each mixer shall have the ability to function continuously on a year-round basis, regardless of drain and fill cycles. Each mixer shall consist of a water-filled submersible motor, an impeller and a non-submersible control center that houses all control electronics.

1.2 THE REQUIREMENT

A. CONTRACTOR shall furnish a PWM250V3 PAX Mixer with a PCC255V3 PAX Control Center and install submersible mixing system together with controls and accessories necessary for a complete and operable system.

B. UTILITY shall furnish electrical conduit with 230VAC Single Phase voltage and a Safety disconnect switch and a 20 Amp non-GFCI circuit breaker up to the point of installation of the mixing system utilizing a PAX control center.

C. UTILITY shall also provide conduit from control center or Safety disconnect to tank penetration for submersible motor cable and penetration through tank for same cable.

1.3 REFERENCE SPECIFICATIONS, CODES AND STANDARDS

A. Comply with the applicable reference specifications as specified in the

General Requirements B. Occupational Safety and Health Administration, OSHA

C. NSF/ ANSI Standard 61 D. Underwriters Laboratories Inc., UL 508

1.4 CONTRACTOR

SUBMITTALS

A. NSF Certification

1. Copies of the NSF-61 certified listing for all material being placed inside the tank and headspace, including the motor and power cable.

B. Installation, Operations, and Maintenance Manuals shall be obtained from the equipment manufacturer and submitted. The following sections shall be included:

1. General equipment specifications and data sheets

2. Installation, start-up, operation, and maintenance instructions

3. Factory-recommended maintenance schedule

4. Wiring diagrams specifying what electrical wiring needs to be done onsite during and prior to the installation, and by which responsible party

5. List of equipment or tooling necessary for diagnostics, trouble-shooting, repair or general maintenance

1.5 QUALITY ASSURANCE

A. Each mixing system shall be tested prior to deployment according to standard engineering practices at the factory testing facilities.

B. Complete mixing system is NSF/ANSI Standard 61 certified by NSF

1.6 WARRANTY

A. For the period of time beginning with shipment to Buyer and ending on the time periods listed below, the Product is warranted to be substantially free from defects in material

FSWA 11220-2

and workmanship and to conform to Seller’s specifications applicable to the Product –

1. Three (3) years on all supplied parts

2. One hundred twenty (120) days labor

2.1 PERFORMANCE

A. Mixing system shall completely mix reservoir according to the following minimum performance requirements. These requirements can be measured and validated after installation by operators with readily-available tools such as temperature probes and total chlorine grab samplers.

1. Temperature Uniformity

For tanks up to 2,000,000 gallons in volume: All temperatures shall converge to within 0.50°C within 24 hours after mixer is installed and activated.

2. Disinfectant Residual Uniformity For tanks up to 2,000,000 gallons in volume: Disinfectant residual within top five feet of tank and bottom five feet of tank will converge to within

0.20 ppm within 24 hours after mixer is installed and activated. During continuous operation of the mixer, disinfectant residual will converge to within 0.20 ppm at least once every 24 hours.

2.2 GENERAL

A. Mixing system consists of a spiral-shaped nozzle mounted in a submersible stainless steel casing. System is lowered to the tank floor and creates a vortical flow pattern inside the tank. Devices with an externally mounted pump shall not be acceptable.

Mixer operation shall be independent of tank drain and fill cycles to ensure constant mixing. Mixer shall weigh less than 60 pounds (~ 27kg) and be able to be hoisted, installed, and/or removed by on-site personnel without additional equipment needed, and so that there is no crush hazard or entanglement hazard present, and so that weight of mixer on tank floor does not cause damage to interior coating.

B. Mixing system inlet shall be elevated at a minimum of 6 inches above tank floor to avoid disturbing accumulated tank sediment or entraining particles and causing accelerated wear of moving parts.

C. Mixers using submersible pump with slit or “water sheet” or horizontal motor mounting designs are not acceptable.

D. Mixers shall include a buoyancy mechanism to keep nozzle pointing upright no matter the angle of the tank floor

E. Mixers shall include integrated chain as a lowering mechanism for simplicity F. Mixer provider must have more than 1000 installation of similar equipment in potable water tank G. Mixers shall have no oil-filled parts H. All wet-side mixer components shall be certified by NSF to the NSF/ANSI Standard 61 I. Dry-side mixer components shall include sine filter to prolong motor life and reduce noise level.

J. Power source for mixer shall be 230VAC single phase grid power to allow unit to continue 24/7 operation.

K. No maintenance required on the wet-side components in typical potable water application L. No passive mixing system allowed.

FSWA 11220-3

2.3 CONSTRUCTION

A. Components – wet-side: shall be NSF/ANSI Standard 61 certified.

Equipment entering tank shall not adhere to, scratch or otherwise cause damage to internal tank coating or put undue stress on the materials of the tank construction.

Equipment shall fit through a standard hatch of size 18” x18” or larger. UTILITY may prefer to puncture side-wall or ceiling of tank (in place of penetrating the hatch-way) to allow motor cable entry into the tank and protection against freezing/ice damage.

Each submersible mixer shall consist of the following components, regardless of the power source selected:

1. Nozzle

AISI Type 316 Stainless Steel

Electropolished to minimize surface corrosion

2. Nozzle housing

AISI Type 316 Stainless Steel Brush finish to minimize surface corrosion Buoyancy mechanism to keep nozzle pointing upright no matter the angle of the tank floor Chlorine/chloramine resistant rubber foot pad to avoid scratching tank floor Integrated power cable and lowering mechanism for simplicity

3. Motor Stainless Steel 304 body Chlorine/Chloramine resistant rubber seals Fully submersible

B. Components – dry-side: 230VAC control center shall consist of the following components:

1. Enclosure

Type 4 (NEMA 4) Lockable Weather Resistant Overall weight of control center not to exceed 50 lbs. Green and Red LED Indicator lights show motor status White Power Indicator Led Cooling Fan

2. Motor Controller/VFD Rated to 3.0 HP Operating temperature range -4 ºF to 131 ºF (-20 ºC to 55 ºC) HOA Switch Manual speed control Thermal shut-off protection built-in Current overload protection built-in SCADA outputs included:

Digital Output signal indicating motor running Digital Output signal indicating fault Digital Input/output signal allowing remote motor on/off RS-485 or Dry Contact connections 4-20mA Signal

3. 230VAC, single-phase, with a 300mA trip level GFCI included inside control center

4. Panel equipped with a 230VAC 20-Amp main breaker

5. Sine Filter

FSWA 11220-4

2.4 CONTROLS

A. Each unit shall be equipped with all necessary controls, inter-wired, to provide the following minimum functions:

1. On/Off switch to control power to mixer.

2. Automatically-activated motor shut-off if water level drops below motor height in tank.

3. Sine filter

4. Any other controls shown on electrical and instrumentation drawings

2.5 ACCEPTABLE MANUFACTURERS:

A. PAX Water Technologies (Richmond, California)

PART 3 – EXECUTION

3.1 INSTALLATION

A. The CONTRACTOR shall furnish services of a factory-trained installation contractor or crew having experience with installation procedures and operation and maintenance requirements for the type of equipment installed under these specifications. Mixer must be able to be installed through an 18x18 inch hatch.