This document is a Form of Agreement for construction contracts issued by the Fredericksburg Sewer & Water Authority (FSWA) in Pennsylvania for the Public Water System Upgrades project. The bid manual contains five separate prime construction contracts: Contract 1 covers pipeline construction consisting of approximately 1,135 linear feet of 10-inch, 6,570 linear feet of 8-inch, and 876 linear feet of 6-inch PVC water mains, along with demolition and disinfection work; Contract 2 encompasses general construction including a manganese filtration facility, well modifications, office building and garage rehabilitation, water tower mixer modifications, and site work; Contract 3 addresses electrical construction for power supply, distribution, standby generation, and controls; Contract 4 covers plumbing installation for drinking water and wastewater systems; and Contract 5 includes heating, ventilation, and air conditioning equipment. All contracts are designed by Steckbeck Engineering & Surveying, Inc. and have identical timelines with substantial completion required within 365 days and final completion within 395 days from the notice to proceed. Sealed electronic proposals via PennBid are due by 2:00 p.m. prevailing time on Wednesday, December 16, 2026, with bid results posted thereafter. No pre-bid conference is scheduled, though site visits are available by contacting the FSWA Operator.
Progress payments will be made monthly at 95 percent of work completed with 5 percent retainage prior to substantial completion. Upon substantial completion, payment increases to 100 percent of completed work less the engineer's estimated value of remaining work. Final payment follows upon project completion and acceptance. All contracts require performance and payment bonds and are subject to liquidated damages of $500 per day for delays beyond the substantial completion date. The contract price is based on the contractor's bid as submitted, with interest accruing at 6 percent per annum on any payments not made when due. Contractors must comply with Build America, Buy America (BABA) and American Iron and Steel Act (AIS) requirements as specified in contract sections 01310 and 01320. Each bid must be accompanied by a 10 percent bid bond or bank cashier's check. All bidders must provide written notice within ten days of any claims or disputes, accompanied by full accounting of damages and time delays, or such claims become null and void.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form of Agreement – Contract No. 1 00521-1
FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT No. 1
FSWA PUBLIC WATER SYSTEM UPGRADES
PIPELINE CONSTRUCTION
THIS AGREEMENT is by and between Fredericksburg Sewer &
Water Authority (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
A. The work of this contract generally consists of the construction of approximately 1,135 l.f. of 10-inch, 6,570 l.f. of 8-inch, and 876 l.f. of 6-inch PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of the pipelines, and other incidental work as indicated in the Contract Documents.
ARTICLE 2 – THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:
A. FSWA PUBLIC WATER SYSTEM UPGRADES
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Steckbeck Engineering & Surveying, Inc., 279 N. Zinns Mill Road, Suite A, Lebanon, PA 17042 (Engineer), which is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
00521-2
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 395 days after the date when the Contract Times commence to run.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraph 5.01.A below:
A. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an Exhibit.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 30th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of
00521-3 values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions.
a. 95 percent of Work completed (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 200 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
ARTICLE 7 – INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of 6 percent per annum.
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
00521-4
D. Contactor has carefully studied all: (1) reports of exploration and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable “technical data,” and (2) reports and drawings of Hazardous Environmental Conditions if any, at the Site that have been identified in Paragraph SC-
4.06 of the Supplementary Conditions as containing reliable “technical data.”
E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Contract Documents; and the Site-related drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work;
(2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
J. Contractor has read and understands Sections 01310 and 01320 regarding Build America, Buy America (BABA) and American Iron and Steel Act (AIS) requirements, and has incorporated those requirements in their bid.
ARTICLE 9 – CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
00521-5
1. This Agreement (pages 1 to ___, inclusive).
2. Performance bond (pages 1 to ___, inclusive).
3. Payment bond (pages 1 to ___, inclusive).
4. Other bonds (pages to , inclusive).
a. (pages to , inclusive).
b. (pages to , inclusive).
c. (pages to , inclusive).
5. General Conditions (pages 1 to 62, inclusive).
6. Supplementary Conditions (pages 1 to ___, inclusive).
7. Specifications as listed in the table of contents of the Project Manual.
8. Drawings consisting of ___ sheets with each sheet bearing the following general title: Fredericksburg Water Treatment Plant.
9. Addenda (numbers to , inclusive).
10. Exhibits to this Agreement (enumerated as follows):
a. Contractor’s Bid (pages to , inclusive).
b. Documentation submitted by Contractor prior to Notice of Award (pages to , inclusive).
c. Other Documentation as listed below.
1) __________________________________________________
2) __________________________________________________
11. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
a. Notice to Proceed (pages to , inclusive).
b. Work Change Directives.
c. Change Orders.
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above).
00521-6
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions.
ARTICLE 10 – MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
10.05 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution;
00521-7
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
10.06 Claims for Additional Compensation, Disputes, or Breach of Contract
A All claims, disputes and other matters in question between Owner and Contractor arising out of, or relating to the Contract Documents which would affect the cost of the work or which would represent a demand for additional compensation due the Contractor, or relating to a breach of the Contract shall be presented in writing by Contractor to Owner or designated Owner's representative within ten (10) days of the date of the event giving rise to such claim, dispute, or other matter in question. Failure by the Contractor to comply with this requirement shall make null and void any claim, dispute, or other matter in question. Additionally, any such written notice of claim, dispute, or other matter in question shall be accompanied by a full accounting of all damages, costs, and/or time delays to the Contractor. Failure by the Contractor to comply with this requirement shall make null and void that claim, dispute, or other matter in question.
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner and Contractor or on their behalf.
This Agreement will be effective on (which is the Effective Date of the Agreement).
OWNER: CONTRACTOR
Fredericksburg Sewer & Water Authority
By: By:
Title: Title:
00521-8
(If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest: Attest:
Title: Title:
Address for giving notices: Address for giving notices:
113 East Main Street
Fredericksburg, PA 17026
License No.:
(If Owner is a corporation, attach evidence of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.)
(Where applicable)
Agent for service of process:
Form of Agreement – Contract No. 2 00522-1
FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT No. 2
GENERAL CONSTRUCTION
Water Authority (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
A. Without intending to limit or restrict the extent of Work, the project is summarized as the upgrade and modification of the existing public water system owned and operated by the Fredericksburg Sewer & Water Authority (FSWA).
1. Work shall generally include the following:
a. Construction of a manganese filtration facility.
b. Modifications to existing Well 6.
c. Final development of two new groundwater wells.
d. Rehabilitation of an existing office building and garage.
e. Modification to the mixers in two existing elevated water towers.
f. Modification or demolition of decommissioned wastewater treatment plant equipment.
g. Yard piping and site work.
h. Rehabilitation and upgrade of the existing access driveway.
i. Coordination of all contractors with each other to facilitate complete project within budget and schedule.
j. All other work necessary to make for a complete installation.
whole or only a part is generally described as follows:
A. FSWA Public Water System Upgrades
00522-2
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Steckbeck Engineering & Surveying, Inc., 279 N. Zinns Mill Road, Suite A, Lebanon, PA 17042 (Engineer), which is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 395 days after the date when the Contract Times commence to run.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment.
00522-3
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraph 5.01.A below:
A. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an Exhibit.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 30th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions.
a. 95 percent of Work completed (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 200 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
00522-4
ARTICLE 7 – INTEREST
7.01 All monies not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of 6 percent per annum.
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Contactor has carefully studied all: (1) reports of exploration and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable “technical data,” and (2) reports and drawings of Hazardous Environmental Conditions if any, at the Site that have been identified in Paragraph SC-
4.06 of the Supplementary Conditions as containing reliable “technical data.”
E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Contract Documents; and the Site-related drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work;
(2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
00522-5
G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
J. Contractor has read and understands Sections 01310 and 01320 regarding Build America, Buy America (BABA) and American Iron and Steel Act (AIS) requirements, and has incorporated those requirements in their bid.
ARTICLE 9 – CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 1 to ___, inclusive).
2. Performance bond (pages 1 to ___, inclusive).
3. Payment bond (pages 1 to ___, inclusive).
4. Other bonds (pages to , inclusive).
a. (pages to , inclusive).
b. (pages to , inclusive).
c. (pages to , inclusive).
5. General Conditions (pages 1 to 62, inclusive).
6. Supplementary Conditions (pages 1 to ___, inclusive).
7. Specifications as listed in the table of contents of the Project Manual.
8. Drawings consisting of ___ sheets with each sheet bearing the following general title: Fredericksburg Water Treatment Plant.
9. Addenda (numbers to , inclusive).
10. Exhibits to this Agreement (enumerated as follows):
a. Contractor’s Bid (pages to , inclusive).
00522-6
b. Documentation submitted by Contractor prior to Notice of Award (pages to , inclusive).
c. Other Documentation as listed below.
1) __________________________________________________
2) __________________________________________________
11. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
a. Notice to Proceed (pages to , inclusive).
b. Work Change Directives.
c. Change Orders.
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions.
ARTICLE 10 – MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, 00522-7 successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
10.05 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
10.06 Claims for Additional Compensation, Disputes, or Breach of Contract
A All claims, disputes and other matters in question between Owner and Contractor arising out of, or relating to the Contract Documents which would affect the cost of the work or which would represent a demand for additional compensation due the Contractor, or relating to a breach of the Contract shall be presented in writing by Contractor to Owner or designated Owner's representative within ten (10) days of the date of the event giving rise to such claim, dispute, or other matter in question.
Failure by the Contractor to comply with this requirement shall make null and void any claim, dispute, or other matter in question.
Additionally, any such written notice of claim, dispute, or other matter in question shall be accompanied by a full accounting of all damages, 00522-8 costs, and/or time delays to the Contractor. Failure by the Contractor to comply with this requirement shall make null and void that claim, dispute, or other matter in question.
to sign.)
Attest: Attest:
Title: Title:
Address for giving notices: Address for giving notices:
of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution
Form of Agreement – Contract No. 3 00523-1
FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT No. 3
ELECTRICAL CONSTRUCTION
Water Authority (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
The work of this contract generally consists of furnishing and installing electrical power supply and distribution, standby electrical power generation, electrical components required for drinking water manganese filtration equipment, existing office building and garage, and South Wells, provided under Contract No. 2 and other incidental work as indicated in the Contract Documents.
whole or only a part is generally described as follows:
A. FSWA PUBLIC WATER SYSTEM UPGRADES
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Steckbeck Engineering & Surveying, Inc., 279 N. Zinns Mill Road, Suite A, Lebanon, PA 17042 (Engineer), which is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
00523-2
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 395 days after the date when the Contract Times commence to run.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraph 5.01.A below:
A. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an Exhibit.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 30th day
00523-3 values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions.
a. 95 percent of Work completed (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 200 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
ARTICLE 7 – INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of 6 percent per annum.
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local
00523-4
D. Contactor has carefully studied all: (1) reports of exploration and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable “technical data,” and (2) reports and drawings of Hazardous Environmental Conditions if any, at the Site that have been identified in Paragraph SC-
4.06 of the Supplementary Conditions as containing reliable “technical data.”
E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Contract Documents; and the Site-related drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work;
(2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
J. Contractor has read and understands Sections 01310 and 01320 regarding Build America, Buy America (BABA) and American Iron and Steel Act (AIS) requirements, and has incorporated those requirements in their bid.
ARTICLE 9 – CONTRACT DOCUMENTS
00523-5
1. This Agreement (pages 1 to ___, inclusive).
2. Performance bond (pages 1 to ___, inclusive).
3. Payment bond (pages 1 to ___, inclusive).
4. Other bonds (pages to , inclusive).
a. (pages to , inclusive).
b. (pages to , inclusive).
c. (pages to , inclusive).
5. General Conditions (pages 1 to 62, inclusive).
6. Supplementary Conditions (pages 1 to ___, inclusive).
7. Specifications as listed in the table of contents of the Project Manual.
8. Drawings consisting of ___ sheets with each sheet bearing the following general title: Fredericksburg Water Treatment Plant.
9. Addenda (numbers to , inclusive).
10. Exhibits to this Agreement (enumerated as follows):
a. Contractor’s Bid (pages to , inclusive).
b. Documentation submitted by Contractor prior to Notice of Award (pages to , inclusive).
c. Other Documentation as listed below.
1) __________________________________________________
2) __________________________________________________
11. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
a. Notice to Proceed (pages to , inclusive).
b. Work Change Directives.
c. Change Orders.
00523-6
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions.
ARTICLE 10 – MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
10.05 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of
00523-7
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
10.06 Claims for Additional Compensation, Disputes, or Breach of Contract
A All claims, disputes and other matters in question between Owner and Contractor arising out of, or relating to the Contract Documents which would affect the cost of the work or which would represent a demand for additional compensation due the Contractor, or relating to a breach of the Contract shall be presented in writing by Contractor to Owner or designated Owner's representative within ten (10) days of the date of the event giving rise to such claim, dispute, or other matter in question.
Failure by the Contractor to comply with this requirement shall make null and void any claim, dispute, or other matter in question.
Additionally, any such written notice of claim, dispute, or other matter in question shall be accompanied by a full accounting of all damages, costs, and/or time delays to the Contractor. Failure by the Contractor to
00523-8 to sign.)
Attest: Attest:
Title: Title:
Address for giving notices: Address for giving notices:
attach evidence of authority to sign and resolution
Form of Agreement – Contract No. 4 00524-1
FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT No. 4
PLUMBING CONSTRUCTION
Water Authority (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
The work of this contract generally consists of furnishing and installing domestic drinking water and wastewater plumbing, equipment and other incidental work as indicated in the Contract Documents.
whole or only a part is generally described as follows:
A. FSWA Public Water System Upgrades
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Steckbeck Engineering & Surveying, Inc., 279 N. Zinns Mill Road, Suite A, Lebanon, PA 17042 (Engineer), which is to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and
00524-2
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 395 days after the date when the Contract Times commence to run.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraph 5.01.A below:
A. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an Exhibit.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 30th day
00524-3 values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions.
a. 95 percent of Work completed (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 200 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
ARTICLE 7 – INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate of 6 percent per annum.
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local
00524-4
D. Contactor has carefully studied all: (1) reports of exploration and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable “technical data,” and (2) reports and drawings of Hazardous Environmental Conditions if any, at the Site that have been identified in Paragraph SC-
4.06 of the Supplementary Conditions as containing reliable “technical data.”
E. Contractor has considered the information known to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .