Project # 999-26-341 - Utilities, Stormwater and Landscape Campuswide Study
Closed State & local contract opportunity Posted
- Solicitation number
- PE-54300-RFQC-2026-000000114
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90607 Architect Services, Professional
- 90657 Land Development And Planning - Architectural
- 90666 Planning, Site (Installation And Project)
- 91832 Consulting Services (Not Otherwise Classified)
- 91873 Landscaping Consulting
- 91889 Real Estate/Land Consulting (Including Land Survey Consulting)
- 91890 Strategic Technology Planning And Consulting Services
- 91897 Utilities: Gas, Water, Electric Consulting
- UNSPSC codes
- Point of contact
-
- Tommie Goodgames tgoodgam@kennesaw.edu (470) 578-2228
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Board of Regents of the University System of Georgia, on behalf of Kennesaw State University (KSU), is soliciting statements of qualifications through a qualifications-based selection (QBS) process for professional consultant services to develop integrated campuswide master plans for Project No. 999-26-187, the Utilities, Stormwater and Landscape Campuswide Study. The procurement covers three distinct but coordinated planning studies across KSU's Kennesaw and Marietta campuses in Cobb County, Georgia: a Utilities Campuswide Plan assessing electric, thermal, telecommunications, water, and sanitary sewer infrastructure; a Stormwater Campuswide Plan evaluating drainage networks, conveyance systems, and detention facilities; and a Landscape Campuswide Plan addressing exterior circulation, pedestrian realms, and site development. The selected consultant must align deliverables with KSU's 2024 Strategic Plan, 2020 Presidential Master Plan Update, and Sustainability Master Plan, with primary draft deliverables due within nine months of kickoff and final plans due by June 2027. The qualifications submission deadline is March 9, 2026 at 10:00 AM, with finalists to be notified on March 12, 2026, a mandatory pre-proposal virtual meeting scheduled for March 16, 2026, and fee proposals from finalists due March 31, 2026 with interviews on April 1, 2026. The applying firm must be an individual firm performing a minimum of 50 percent of master planning and design services in-house, though an associated firm may provide up to 50 percent of services on an equal basis, and statements of qualifications are limited to 50 pages in PDF format. Selection will follow a QBS evaluation process with firm stability weighted at 25 percent, relevant project experience and qualifications at 45 percent, and suitability to the project at 30 percent, while finalist interviews will be evaluated on design team qualifications and experience (50 percent), design plan and methodology (25 percent), and team communications and project solutions (25 percent).
The RFQ does not identify specific set-aside designations for disadvantaged enterprises; however, respondents must disclose Minority-Owned Business Enterprise (MBE) and Woman-Owned Business Enterprise (WBE) status on the Project Team Composition Form as part of their qualifications submission. All respondents are required to submit notarized certifications confirming compliance with professional conduct standards, federal work authorization requirements under O.C.G.A. 13-10-91(b)(1), E-Verify registration, and professional liability insurance coverage, with specific coverage amounts and deductibles to be documented. Respondents must also complete a Proposers' Disclosure Statement describing any business transactions with the Board of Regents or KSU within the prior two years, any gifts or benefits provided within the prior one-year period, and any actual or potential conflicts of interest. The existing Stormwater Management Plan (SWMP) update prepared by Terracon Consultants, Inc., the Campuswide Transportation Study completed in October 2025, and current campus maps documenting the Kennesaw and Marietta campus boundaries will inform the scope of work and required integration. The anticipated professional consultant fee for basic services is estimated between $425,000 and $450,000, with finalists required to submit detailed fee proposals including specialty consultant costs and reimbursable expenses such as printing and travel, and the Owner reserves the right to reject any or all proposals and will negotiate contract terms with the highest-ranked firm.
Opportunity text
The Board of Regents of the University System of Georgia by and on behalf of Kennesaw State University (¿KSU¿) as (¿Owner¿) is soliciting statements of Qualifications from firms interested in providing Professional Consultant (¿PC¿) services for master planning for a project known as Project No. 999-26-187, ¿Utilities, Stormwater and Landscape Campuswide Study¿ at Kennesaw State University, Kennesaw and Marietta, Georgia. This Request for Qualifications (RFQ) seeks to identify potential providers of the above-mentioned services. Some firms that respond to this RFQ, who are determined by the Owner to be especially qualified, may be deemed eligible and may be invited to interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The Owner reserves the right to reject any or all statements of qualifications or proposals, and to waive technicalities and informalities at their discretion. The deadline for submission of questions relating to the RFQ is the time and date shown in the Schedule of Events (Section 5). Questions about any aspect of the RFQ, or the project, shall be submitted by email to: Theresa Neylon Senior Campus Planner email: tneylon@kennesaw.edu
Files
| File | Type | Posted |
|---|---|---|
| 999_26_187_Utility SW Landscape MP_PC RFQ_RFP.pdf | ||
| Exhibit_E___Contractor_Affidavit.docx | DOCX document | |
| Exhibit G_KSU_campus maps.pdf | ||
| Exhibit H_KSU Transportation Study_2025_10.pdf | ||
| Exhibit I_KSU_SWMP Update_Final.pdf | ||
| Exhibit_C___Project_Team_Composition_Form.docx | DOCX document | |
| Exhibit_F___Proposers_Disclosure_Statement.doc | DOC document | |
| Exhibit_B___Certificate_of_Minority_Form.docx | DOCX document | |
| Exhibit_D___DP_Fee_Proposal.doc | DOC document | |
| Exhibit_A___Certification_Form.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity