Pre-Advertisement Notice for Annual Sanitary Sewer Repairs
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66062-NONST-2026-000000373
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91340 Construction, Pipeline
- 91345 Construction, Sewer And Storm Drain
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91356 Construction, Utility/Underground Projects
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 96292 Video Scanning Of Sewers, Water Wells, Etc.
- 96873 Storm Drain Cleaning, Repair, And Sludge Removal Services
- 96884 Traffic Control Services (To Include Placement And Removal Of Control Devices)
- 96893 Well Pointing Services (Dewatering)
- UNSPSC codes
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 46161538 Vehicle height restriction bars
- 72152707 Retaining wall construction service
- 72152706 Driveway construction service
- 95111616 Pedestrian way
- 72141126 Underground utilities construction service
- 76121603 Sludge disposal
- 72103305 Drain laying service
- 72141120 Sewer line construction service
Show all 28
- 72152705 Sidewalk or ramp construction service
- 95111608 Bike path
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 78142214 Airport and passenger terminals simulation modelling (airside and landside)
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141123 Manhole construction service
- 46161535 Pedestrian walkway street boundary marker
- 72141105 Sidewalk construction and repair service
- 95111617 Footpath
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 72154007 Dewatering service
- Point of contact
-
- Teri Swinton tswinton@atlantaga.gov (770) 833-0462
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta's Department of Watershed Management is conducting a multi-step sealed bid procurement process to support the rehabilitation, renewal, and repair of the sanitary sewer collection system through work-order assignments covering sewer mains, manholes, service laterals, and related site restoration activities. The procurement will commence with a prequalification phase, followed by an Invitation for Bid, with a pre-solicitation conference to be scheduled and noticed separately. The selected vendor must demonstrate proper staffing levels, equipment, materials, and field experience to perform multiple sewer repair assignments across various city locations and ensure timely mobilization, coordination, and completion of work orders in accordance with approved schedules and contract documents. Deliverables include a comprehensive range of services such as bypass pumping, sewer cleaning, CCTV and sonar inspection, point repairs, open-cut pipe replacement, cured-in-place pipe installation, pipe bursting, jack and bore operations, manhole rehabilitation and replacement, service lateral replacement, chemical foam treatment, clean-out installation, erosion control, traffic control, and pavement or landscape restoration. Work will be assigned through individual work orders containing unique assignments with specific projects developed from the City's Sewer System Evaluation Survey Program, and contractors must acknowledge receipt and commence work within 14 days. The contract is structured as a unit price contract with estimated quantities that are not guaranteed minimums, and the contractor must provide all necessary labor, equipment, materials, supplies, and utilities coordination while bearing responsibility for utility investigation, legal property access, and protection of existing utilities and structures. The posting date was May 8, 2026, with a due date of May 29, 2026.
No specific set-aside designations, disadvantaged enterprise restrictions, incumbent vendor information, or budget ranges are detailed in the available procurement documents. The contract encompasses multiple work locations throughout Atlanta and potentially extends to inter-jurisdictional sewer sections outside the city boundary, requiring contractors to coordinate with third-party utilities and maintain protection of existing infrastructure. Defective materials or improper installation must be corrected at the contractor's expense within three working days of notification, or the City reserves the right to charge correction costs to the primary contractor on the following monthly payment request. No specific award values, funding amounts, or contract award dates are provided in the scope of work documentation. Prospective vendors should monitor for the pre-solicitation conference notice and the subsequent Invitation for Bid to obtain detailed pricing terms, evaluation criteria, and additional contract specifications necessary for bid preparation.
Opportunity text
The City of Atlanta, on behalf of the Department of Watershed Management, will shortly undergo a Multi-Step Sealed Bid process comprised of a prequalification phase as the initial step, followed by an Invitation for Bid (IFB), towards the procurement intended to support the continued rehabilitation, renewal, and repair of DWM's sanitary sewer collection system through work-order assignments for sewer mains, manholes, service laterals, and related site restoration. Interested vendors during the prequalification phase should be prepared to demonstrate the proper staffing levels, equipment, materials, and field experience needed to perform multiple sewer repair assignments across various City locations. The City's expectation is that the selected vendor ensures timely mobilization, proper coordination, and completion of each assigned work order in accordance with approved schedules, The Department of Watershed's direction, and the contract documents. Vendors capable of performing bypass pumping, sewer cleaning, CCTV/sonar inspection, point repairs, open-cut replacement, CIPP, pipe bursting, jack and bore, manhole rehabilitation, traffic control, utility coordination, and pavement or landscape restoration are encouraged to prepare for this upcoming solicitation process. A Pre-Solicitation Conference will be noticed and then held to provide more details and address questions.
Files
| File | Type | Posted |
|---|---|---|
| New DWM Annual Sanitary Sewer Scope of Work_ .pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity