Powder River Correctional Facility Roof Replacement

Closed State & local contract opportunity Posted

Solicitation number
S-29100-00014105
State
Oregon
Responses due

Opportunity facts

Jurisdictions
NIGP code
UNSPSC codes
Show all 34
Points of contact

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Corrections is seeking bids for a comprehensive roof replacement project at the Powder River Correctional Facility located in Baker City, Oregon. This Invitation to Bid (ITB) requires a complete roof system replacement across multiple buildings within the correctional facility complex, involving the removal of existing metal panels, potential wood deck replacement, and installation of a new standing seam metal roofing system. A mandatory pre-bid conference is scheduled for August 7, 2025, at 9:00 AM PST, with strict security requirements for attendees, and bids are due on September 4, 2025, at 2:00 PM PST. The project has a substantial completion timeline of 335 days and a final completion timeline of 365 days from the Notice to Proceed (NTP). Bidders must provide bid security of 10% of the total bid amount and attend the mandatory pre-bid conference to be considered. The contract will be awarded to the lowest responsive and responsible bidder, with the state reserving the right to reject all bids. Evaluation criteria include compliance with prevailing wage rates, Construction Contractors Board registration, and adherence to institutional security protocols.

The procurement does not specifically indicate set-aside designations for disadvantaged enterprises. Bidders must be registered with the Construction Contractors Board and comply with labor and non-discrimination laws. The project budget is estimated between $4,400,000 to $4,600,000, with liquidated damages set at $566 per calendar day for delays beyond substantial and final completion dates. The roofing system specifications require a 40-year, no-dollar-limit warranty, with installers providing an additional 2-year warranty covering installation and water-tightness. Technical requirements include specific materials such as 24GA galvanized steel panels with a fluoropolymer-75% resin finish, precise panel clip installations, and compliance with wind load and thermal expansion tolerances. The project will involve multiple buildings within the correctional facility, including buildings 2, 3, 4, 5, and maintenance areas, with comprehensive roof system replacements including metal panels, fall protection devices, skylights, gutters, downspouts, and wall panel replacements.

Files

File Type Posted
14105 Drawings.pdf PDF
7043 NOIA.pdf PDF
14105 ITB TCs.pdf PDF
14105 ADDENDA 1.pdf PDF
14106 Addenda 1.pdf PDF
14105 Specs.pdf PDF
14105 Plan Holder List.pdf PDF
14105 Bid Tab.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity