14106 Addenda 1.pdf

PDF 725 KB Posted

Attached to
Powder River Correctional Facility Roof Replacement
Solicitation number
S-29100-00014105
Issued by
Baker County, Barlow City, Oregon

About this file

This is Addendum 1 to an Invitation to Bid issued by the Oregon Department of Corrections Purchasing Section for project S-29100-00014106, a TRCI Warehouse Cooler/Freezer Upgrade. The addendum modifies the original bid specifications through six revisions and clarifications regarding project scope and construction requirements. Key modifications include a revision requiring the contractor to demolish the existing pad and construct a new pad extending a minimum of 36 inches on all sides of compressor racks, with exact positioning to be coordinated with ODOC staff. The addendum clarifies that the contractor will demo the existing fence and replace it with new fencing surrounding the new pad according to attached specifications. Additional clarifications confirm that the owner will provide temporary cooling equipment during the equipment replacement phase, provide contact information for Omni Team equipment and Schulz Associates, permit temporary removal and replacement of food racking to access evaporator coils, and include attached details for concrete slab and chain link fence construction specifications.

The addendum represents a material change to the original ITB and requires bidder signature and return by the bid closing date, with failure to comply potentially resulting in bid rejection. The liquidated damages amount has been revised to $2,066.00. Detailed fencing specifications require eight-foot-tall chain link fabric with two-inch woven diamond mesh of number 9 gauge steel wire, hot-dipped zinc-coated steel components meeting ASTM A120 and A123 standards, concrete post foundations with minimum 3,000 PSI compressive strength, proper spacing of wire ties and stretcher bars at 15-inch intervals, and fabric stretched taut with bottom extending to within two inches of finished grade. The concrete slab specifications and additional technical requirements are provided in attached detail drawings.

View the file

Other files

File Type Posted
14105 Specs.pdf PDF
7043 NOIA.pdf PDF
14105 ITB TCs.pdf PDF
14105 Plan Holder List.pdf PDF
14105 Drawings.pdf PDF
14105 Bid Tab.pdf PDF
14105 ADDENDA 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon

Department of Corrections Purchasing Section

3723 Fairview Industrial Dr SE Salem, OR 97302

(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov

8/20/25

ADDENDUM 1

For S-29100-00014106

TRCI Warehouse Cooler/Freezer Upgrade

Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.

This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.

This addendum shall be added to and become part of the original Invitation to Bid.

1. Revision: Contractor to demo existing pad and construct new pad that extends a min. of 36” on all sides of compressor racks. Coordinate exact position with ODOC staff.

2. Clarifications: What gauge should the new fence be that we’ll be installing in lieu of the one being removed?

Answer: Contactor to demo existing fence and replace with new surrounding the new pad. Specifications attached.

3. Clarification: Do we need to provide temporary cooling during the equipment replacement phase?

Answer: Owner will provide temporary cooling equipment during the replacement phase.

4. Clarifications: Contact information for Omni Team equipment:

Answer: www.omniteaminc.com

Jeffrey Schulz | Schulz Associates PO Box 3256 | Kirkland WA 98083 M: 206.947.2165 | O: 425.828.4557 www.SchulzAssociates.com

5. Revision: Liquidated damages amount deleted entirety and replaced with $2,066.00.

6. Clarification: Will the food racking remain in place, or would it be possible to temporarily remove the existing racking to replace the evaporator coils?

Answer: It can be temporarily removed and replaced by the contractor.

7 Clarification: I believe this was talked about at the first meeting, but is there any more details about the construction of the new concrete pad or the chain link fence? Looking for things like thickness, rebar requirements, and height and materials of the fence.

Answer: Attached is a detail for the concrete slab.

Oregon

Department of Corrections Purchasing Section

3723 Fairview Industrial Dr SE Salem, OR 97302

(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov

This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.

Company Name: __________________________________________________________

Authorized Signature: ______________________________________________________

Date:_______________________________________

FENCING

1. THE MOST CURRENT EDITION OF THE "PRODUCT MANUAL" AS PUBLISHED BY THE CHAIN LINK FENCE

MANUFACTURERS' INSTITUTE

APPLIES TO THIS WORK.

2. MATERIALS SHALL BE NEW AND PRODUCTS OF RECOGNIZED MANUFACTURERS. MATERIALS SHALL

CARRY A LABEL IDENTIFYING THE

MANUFACTURER AND CLASS OF ZINC COATING ON THE FABRIC AND CONCERTINA WIRE.

3. ALL COMPONENTS SHALL BE HOT_DIPPED ZINC COATED STEEL IN ACCORDANCE WITH ASTM A120

AND A123 AS APPLICABLE.

4. FENCE FABRIC SHALL BE TWO INCH WOVEN DIAMOND MESH, OF STANDARD COMMERCIAL GRADE

STEEL WIRE. WIRE SIZE SHALL BE

NO. 9 GAUGE. THE TOP AND BOTTOM SELVAGES OF THE FABRIC SHALL HAVE A TWISTED AND BARBED

FINISH. THE WIRE SHALL BE

BARBED BY CUTTING THE WIRE AT AN ANGLE, PRODUCING SHARP POINTS. THE TOTAL HEIGHT OF THE

FABRIC SHALL BE EIGHT FEET, PLUS OR MINUS ONE INCH.

5. CONTACTOR CAN UTILIZE THE EXSITING GATES.

6. TERMINAL AND GATE POSTS SHALL BE STANDARD COMMERCIAL GRADE STEEL PIPE.

7. GATE POSTS SHALL BE FITTED WITH AN OUTRIGGER FOR BARB WIRE.

8. TENSION WIRE SHALL BE NO. 7 GAUGE, HOT_DIP GALVANIZED, STANDARD COMMERCIAL GRADE

STEEL.

9. HORIZONTAL STEEL PIPE BRACES FOR, CORNERS, AND TERMINAL POSTS SHALL BE STANDARD

COMMERCIAL GRADE STEEL

PIPE 1.66 INCH OD WEIGHING 1.806 POUNDS PER LINEAL FOOT.

10. DIAGONAL TRUSS BRACING FOR, CORNER, AND TERMINAL POSTS SHALL BE STEEL RODS 3/8 INCH

DIAMETER WITH

TURNBUCKLES.

11. FENCE FABRIC SHALL BE FASTENED TO THE LINE POSTS WITH MINIMUM 9 GAUGE WIRE TIES AND TO

TENSION WIRES WITH MINIMUM

11 GAUGE WIRE TIES. WIRE TIES MAY BE EITHER ALUMINUM OR GALVANIZED STEEL WIRE.

12. MISCELLANEOUS FITTINGS USED IN THE CONSTRUCTION OF THE FENCE SHALL BE MALLEABLE IRON, CAST IRON, OR PRESSED STEEL

AND SHALL BE HOT_DIP GALVANIZED.

13. ALL POSTS SHALL BE SET IN CONCRETE, PLUMB AND TRUE TO LINE.

14. ALL CONCRETE USED FOR THE FENCE CONSTRUCTION SHALL DEVELOP A MINIMUM COMPRESSIVE

STRENGTH OF 3,000 PSI IN 28

DAYS. ALL POSTS SHALL BE FIRMLY SUPPORTED TO PREVENT MOVEMENT OR DEFLECTION UNTIL THE

CONCRETE HAS THOROUGHLY

SET (24 HOURS MINIMUM).

15. THE FENCE SHALL BE INSTALLED TRUE TO LINE AND GRADE, AROUND THE NEWPAD IN ACCORDANCE

WITH

THESE NOTES AND THE CHAIN LINK MANUFACTURERS' INSTITUTE REQUIREMENTS.

16. STRETCHER BARS SHALL BE THREADED THROUGH END LOOPS OF EACH SECTION OF FABRIC WITH

STRETCHER BAR BANDS SPACED

NOT MORE THAN 15 INCHES ON CENTER.

17. THE FABRIC SHALL BE FASTENED TO THE LINE POSTS WITH TIES SPACED NOT MORE THAN 15 INCHES

ON CENTER. THE TOP MOST

TIES SHALL BE AS NEAR THE TOP OF THE FABRIC AS POSSIBLE. THE LOWEST TIE SHALL BE AS NEAR THE

BOTTOM OF THE FABRIC AS

POSSIBLE.

THE FABRIC SHALL BE TIED TO THE TOP RAIL AND BOTTOM TENSION WIRE WITH TIES SPACED NOT MORE

THAN 24 INCHES ON

CENTER.

19. THE FABRIC WIRE SHALL BE STRETCHED TAUT. THE BOTTOM OF THE FABRIC SHALL EXTEND TO

WITHIN 2 INCHES OF THE FINISHED

GRADE.

14106 Addenda 1
TRCI Fence spec
Concrete Details