Phase 1 - beck sewer trunk line rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
525003142
State
Utah
Responses due

Opportunity facts

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Salt Lake City Corporation is procuring a comprehensive sewer infrastructure rehabilitation project through a competitive bid process for the Phase 1 Beck Sewer Trunk Line Rehabilitation. The project involves rehabilitating approximately 6,982 feet of 48-inch and 64-inch sewer trunk line using Cured-In-Place Pipe (CIPP) lining, replacing 1,637 feet of 64-inch sewer trunk line with a new 66-inch Fiber Reinforced Polymer (FRP) line, and rehabilitating existing manholes. Contractors must submit electronic bids through the Utah Public Procurement Place (U3P) EUNA platform by November 21, 2025, at 2:00 p.m., with a mandatory pre-bid meeting scheduled for November 3, 2025, at 1:00 PM at the West Campus Salt Lake City Public Utilities building. Bidders are required to have significant experience in large diameter CIPP installation, possess a Utah contractor license, and demonstrate a minimum of $10.0 million in bonding capacity. Evaluation criteria include personnel qualifications, previous project experience, financial condition, and references, with specific requirements for project superintendents and managers who have supervised similar large-scale sewer rehabilitation projects.

There are no specific set-aside designations or restrictions on bidding organizations mentioned in the documentation. The project does not indicate preferences for disadvantaged enterprises or specific vendor categories. The engineer's estimated project cost is $11,029,665.00, representing a significant municipal infrastructure investment. The geotechnical report indicates complex site conditions, including variable soil deposits and groundwater challenges between 5 and 25 feet deep, which may impact construction approaches. Bid security is set at five percent of the total bid amount, and unsuccessful bidders' bid security will be shredded 45 business days after contract award. The project is located in the Salt Lake Valley, running between 800 North near 300 West and 1800 North and Beck Street, with anticipated work involving extensive dewatering, bypass pumping, and lateral connection rehabilitation. The Salt Lake City Department of Public Utilities reserves the right to qualify contractors and modify the project scope and schedule.

Opportunity text

Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by CIPP lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch FRP, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work. Engineer's Estimate: $11,029,665.00

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity