4-Final Bid Set Specifications 24OCT2025.pdf
PDF 29 MB Posted
- Attached to
- PHASE 1 - BECK SEWER TRUNK LINE REHABILITATION
- Solicitation number
- 525003142
- Issued by
- Utah
About this file
The provided file is a bid set specification document for the Phase 1 Beck Sewer Trunk Line Rehabilitation project located in Utah. The project involves comprehensive sewer infrastructure improvements, specifically the rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line through CIPP (Cured-In-Place Pipe) lining, replacement of 1,637 feet of 64-inch sewer trunk line with a new 66-inch FRP (Fiber Reinforced Polymer) line, and rehabilitation of existing manholes. The project also includes associated dewatering, bypass pumping, and lateral connection work.
The engineer's estimated project cost is $11,029,665.00, indicating a significant municipal infrastructure investment. While specific funding sources are not detailed in the provided document, the scale and nature of the project suggest this is likely a municipal or regional infrastructure improvement initiative funded through public works budgets, potentially supplemented by state or federal infrastructure grants. The comprehensive scope of work indicates a strategic approach to modernizing and improving critical wastewater infrastructure, with a focus on long-term durability and system performance through advanced rehabilitation techniques.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .