MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)
Open State & local contract opportunity Posted
- Solicitation number
- 27-002
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 760 Road And Highway Equipment: Earth Handling, Grading, Moving, Packing, Etc.
- 071 Automobiles, School Buses, Suvs, And Vans, Including Diesel, Gasoline, Electric, Hybrid, And All Other Fuel Types
- 031 Air Conditioning, Heating, And Ventilating Equipment, Parts And Accessories
- 578 Miscellaneous Products (Not Otherwise Classified)
- 91360 Construction, Water System/Plants, Main And Service Line
- UNSPSC codes
- 72121505 Waste water and sewage treatment plant construction service
- 40000000 Distribution and Conditioning Systems and Equipment and Components
- 95000000 Land and Buildings and Structures and Thoroughfares
- 22000000 Building and Construction Machinery and Accessories
- 25000000 Vehicles and their Accessories and Components
- Point of contact
-
- Latasha Minor minorl@charlescountymd.gov (301) 645-0659
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The Board of Commissioners for Charles County, Maryland is requesting design-build proposals for construction of a new 40-foot diameter standpipe with associated surge-management infrastructure at the Mattawoman Wastewater Treatment Plant, with proposals due October 1, 2026 at 11:00 a.m. A Minority and Women-Owned Business Enterprise (MWBE) subcontractor participation goal of 33.96% applies. Prevailing wage rates apply to this County-financed project exceeding $500,000.
The scope encompasses hydraulic modeling, design and fabrication of a 40-foot diameter welded steel standpipe with radiographic level 3 welds, construction of three concrete valve vaults (influent, effluent, bypass), installation of 42-inch minimum diameter ductile iron influent and effluent pipes, temporary bypass systems capable of passing 60 million gallons per day at 150 psi, electrical and controls integration, sump pumps, drainage systems, pavement demolition and restoration, and comprehensive operations and maintenance manuals and operator training. The design-builder must obtain all permitting (Charles County Development Services, Building, Grading, Demolition; Maryland Department of the Environment Water and Sewerage Construction; Federal Aviation Administration obstruction evaluation) and maintain continuous effluent pump station flow during construction. Materials include ductile iron pipe for 4-inch and larger applications, Schedule 80 PVC for buried piping under 4 inches, and Type 316 stainless steel for above-grade exterior piping. Design deliverables include 60%, 90%, and 100% design packages; the contractor must submit a detailed Critical Path Method schedule within 75 days of Notice to Proceed and conduct 14-day consecutive startup testing using actual process fluids before system delivery.
The contract term is 690 consecutive calendar days from Notice to Proceed (design not to exceed 270 days; construction not to exceed 420 days). The site is located at 5310 Hawthorne Road, La Plata, Maryland 20646. Performance and Payment Bonds equal to 100% of contract price are required. Evaluation weights: design-build team qualifications 5 points, construction experience 5 points, key personnel experience 10 points, technical approach 20 points, construction schedule 5 points, safety risk management 5 points, price 50 points. The lead design firm must have a minimum 15 years' experience with three completed design projects exceeding $2 million each at municipal wastewater treatment plants rated 5 mgd or greater, including at least one design-build project; the lead construction firm requires 10 years' experience with three similar projects exceeding $2 million each, including at least one design-build project. The Design-Build Project Manager must have 15 years' experience; discipline leads must hold current Maryland Professional Engineer or Architect licenses with 10 years' experience. A non-mandatory pre-proposal meeting is scheduled July 30, 2026 at 11:00 a.m. via teleconference (registration due July 29). A non-mandatory site visit is scheduled August 13, 2026 at 9:00 a.m. Questions are due August 20, 2026 at 12:00 p.m.
Opportunity text
The Board of Commissioners for Charles County is hereby requesting proposals from qualified firms to design and construct a new standpipe with separate influent and effluent pipes for force main surge management at the Mattawoman Wastewater Treatment Plant located in Charles County, MD.
The primary purpose of the Project is for the Design and Construction of a new standpipe with separate influent and effluent pipes that join with the existing force main. This Project will construct a new 40-ft. diameter standpipe with spiral staircase, platform, piped overflow, overflow swale, influent, effluent and bypass vaults, new ductile iron pipe, fittings, valves, and miscellaneous improvements such as sump pumps and drainage, electrical and instrumentation and pavement and yard restoration. The Design-Build Teams will be required to provide complete turn-key services for the Project including design, permitting, furnishing and installing and equipment, testing and start up, contract close out to provide a complete and fully functioning system.
Files
Show all 17
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity