Lake Hazel Middle School Phase 4 Tenant Improvement
Closed State & local contract opportunity Posted
- Solicitation number
- PW-F-26-34901-2029
- State
- Idaho
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 570 Metal: Bars, Plates, Rods, Sheets, Strips, Structural Shapes, Tubing, And Fabricated Items
- 57083 Structural Shapes, Other Than Steel: Angles, Channels, I-Beams, Etc.
- 540 Lumber, Siding, And Related Products
- 150 Builder's Supplies
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 90977 Special Construction: Observatory, Security, Special Rooms, Etc.
- 91457 Metal Work, Decorative
- 90927 Building Construction, Educational
- UNSPSC codes
- 30000000 Structures and Building and Construction and Manufacturing Components and Supplies
- 30100000 Structural components and basic shapes
- 30170000 Doors and windows and glass
- 72120000 Nonresidential building construction services
- 72121406 School building construction service
- 72150000 Specialized trade construction and maintenance services
- 30160000 Interior finishing materials
- 72152900 Structural steel erection services
Opportunity details come from westada.bonfirehub.com. Updated .
About this opportunity
The West Ada School District is soliciting competitive bids for the Lake Hazel Middle School Phase 4 Tenant Improvement project located in Boise, Idaho. This multi-phased renovation project encompasses comprehensive improvements to approximately 22,039 square feet of the existing middle school facility, including renovations to science classrooms, library, MDF room, general education classrooms, a new teacher work room, and hallway modifications. The project requires multiple specialized bid packages covering areas such as asbestos abatement, selective demolition, steel fabrication, interior architectural woodwork, roofing, doors and hardware, aluminum entrances, glazing, metal framing, drywall, plumbing, and mechanical systems. Bidders must be licensed in the State of Idaho and comply with public works contractor regulations. The pre-bid conference is scheduled for November 18, 2025, at 4:00 PM MDT at the school site, with electronic bid submissions due through the Bonfire web portal by December 15, 2025, at 2:00 PM MDT. The district will evaluate bids based on the lowest responsive and responsible bidder, with a 5% bid bond required for bids over $50,000.
The procurement opportunity appears open to all qualified contractors with valid Idaho state licensing, with no specific set-aside designations for disadvantaged enterprises explicitly noted in the documentation. Contractors must provide comprehensive insurance coverage, including general liability, workers' compensation, and automobile liability, with West Ada School District and Kreizenbeck Constructors named as additional insureds. Background checks will be mandatory, and all construction personnel will require job-specific ID badges. The project includes provisions for a two-year warranty period from the date of substantial completion, with potential extended warranties specified in individual bid packages. Several bid packages incorporate allowances ranging from $3,500 to $30,000, to be used at the Construction Manager's discretion. While specific total project budget is not explicitly stated, the comprehensive nature of the renovation, involving upgrades to HVAC, electrical, technology infrastructure, and fire protection systems, suggests a significant capital investment by the West Ada School District.
Opportunity text
The West Ada School District (the "District" or "WASD") is the largest school district in the state of Idaho with 40,000 students and 57 school sites (34 elementary, 11 middle schools, 11 high schools and 1 K-12 school). The District covers 382 square miles and is contained within 8 municipalities ((2) Counties: Ada County, Canyon County and (6) Cities: Boise, Meridian, Star, Eagle, Nampa & Kuna). WASD is seeking proposals from qualified organizations ("Organizations," "Respondents," "Bidders," "Proposers" or "Contractors") to bid on multiple bid packets for a multi-phased TI project at Lake Hazel Middle School in Boise, Idaho.
Files
Show all 18
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity