Highland Drive & 14600 South Intersection Improvements

Closed State & local contract opportunity Posted

Solicitation number
CIP 26-08
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Draper City Engineering Division is requesting bids on Highland Drive & 14600 South Intersection Improvements, including roadway widening, curb and gutter installation, asphalt paving, and drainage work on Minuteman Drive and the Minuteman Drive/14600 South/Highland Drive intersection, with bids due June 12, 2026 at 2:00 p.m. through the Utah Public Procurement Place (U3P).

The scope encompasses 29 bid items: removal of existing roadway improvements, clearing and grubbing, asphalt and concrete removal, excavation, installation of six storm drain catch basins with associated piping, reinforced concrete pipe installation, concrete sidewalk and ADA ramp construction, approximately 1,025 linear feet of asphalt removal and replacement, approximately 555 to 470 linear feet of curb and gutter, approximately 9,960 square feet of new asphalt placement, fire hydrant relocation with concrete pad, approximately 105,500 square feet of micro-surface treatment, pavement striping, storm water pollution prevention, and traffic control systems including a UDOT encroachment permit for I-15 interchange impacts. All work must conform to Draper City standard specifications, MUTCD standards, and applicable UDOT and APWA standards. The contractor is responsible for utility coordination through Blue Stakes notification, construction staking (with one initial staking provided by the City at its expense), and all labor, materials, tools, equipment, permits, fees, and insurance.

Work must commence no later than July 13, 2026 and reach substantial completion by September 26, 2026, a maximum of 75 calendar days. Liquidated damages are $2,000 per day for late completion. The contractor must maintain an 18-month warranty and maintenance guarantee period following project acceptance. A 5% bid bond payable to Draper City is required. Award will be based on the lowest responsible bidder, considering bid compliance, contractor experience, prior City performance history, change order management, schedule adherence, materials quality, and any claims or legal issues. Construction work is restricted to 7:00 a.m. to 10:00 p.m., Monday through Saturday. Questions are due by 5:00 p.m. on June 11, 2026 through U3P.

Opportunity text

The scope of this project will be to provide all the labor, materials, tools and equipment necessary to remove roadway improvements and widen roadway complete with curb and gutter, asphalt and drainage improvements on Minuteman Drive and resurface the intersection of Minuteman and 14600 S/Highland Drive as described in the project plans and specifications. Bid documents and specifications will be posted to the Utah Public Procurement Place (U3P), PURCHASING.UTAH.GOV on or before Wednesday, May 27, 2026 at 10:00 AM. A 5% Bid Bond will be required. The Engineering Division will receive electronic responses on PURCHASING.UTAH.GOV until 2:00 PM on Friday June 12th, 2026. Responses received after this time will not be accepted. Responses will be opened by Draper City staff and will be promptly posted to the Utah Public Procurement Place (U3P) website within 24 hours of the above-stated time and date, with only the names of the firms submitting responses and their total bid amounts being presented. Preliminary bid results will be located within the Q & A section of the said project on U3P. Questions concerning the scope of work, response submittal, or process should be directed to us electronically through U3P before 5:00 PM on Thursday June 11th, 2026.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity