Hemisfair Boulevard Phase 3 and Marbach Road Area Streets/Area Drainage (Loop 410 to Horal Street)
Closed State & local contract opportunity Posted
- Solicitation number
- PW082823JEC
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 91232 Construction, Street Lighting
- 91273 Paver Block Installation
- 91345 Construction, Sewer And Storm Drain
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 96882 Traffic Signal Installation
- UNSPSC codes
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72141123 Manhole construction service
- 46161535 Pedestrian walkway street boundary marker
- 46161538 Vehicle height restriction bars
- 72141105 Sidewalk construction and repair service
- 72152705 Sidewalk or ramp construction service
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Public Works Department of the City of San Antonio is issuing a Request for Qualifications (RFQ) for a Construction Manager at Risk (CMAR) to provide pre-construction and construction phase services for two 2022 Bond projects. The first project is the Hemisfair Boulevard Phase 3, located in District, and the second project is the Marbach Road Area Streets/Area Drainage, located in Districts 4 and 6. The scope of work involves roadway, utility, and drainage improvements. The RFQ seeks experienced CMAR firms with the necessary qualifications to execute these projects. The submission deadline is October 13, 2023, with a shortlist notification and RFP issuance expected on November 24, 2023. The CMAR contract award and notice to proceed is anticipated in March 2024.
The City of San Antonio is subject to the Small Business Economic Development Advocacy (SBEDA) program, and the selected CMAR firm will be required to meet or exceed SBEDA goals. The RFQ does not include pricing terms, as this is a qualifications-based selection process. The RFQ also contains provisions related to prohibited campaign contributions, conflicts of interest, and other legal requirements. The total budget or award value for these projects is not specified in the provided information.
Opportunity text
The Public Works Department is issuing a Request for Qualifications (RFQ) for Construction Manager at Risk (CMAR) to provide Pre-Construction and Construction Phase Services for 2022 Bond projects for the Hemisfair Boulevard Phase 3 project located in District and Marbach Road Area Streets/Area Drainage project located in Districts 4 and 6.
Files
| File | Type | Posted |
|---|---|---|
| ESBD_File_335080_FINAL - CMAR Public Works Horizontal.08282023.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity