Gas burner equipment
Closed State & local contract opportunity Posted
- Solicitation number
- FY26-ITB-043
- State
- New Mexico
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC code
- Point of contact
-
- Kathy Sanchez kssanchez@santafenm.gov (505) 927-5405
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Santa Fe County, New Mexico is seeking a contractor to purchase and install a new waste gas burner for an anaerobic digester, replacing the existing waste gas burner system. The procurement opportunity requires a comprehensive solution involving equipment procurement and full installation of a digester gas control system with specific technical specifications. The project demands a contractor capable of sourcing equipment exclusively from Varec or Groth manufacturers, with a precise technical configuration including a 6-inch inlet gas burner capable of handling 30,000 standard cubic feet per hour, featuring a ring-type pilot with flame curtain, electric pilot igniter, optical flame sensor, and automatic flame restriking controls. The technical specification (Attachment A, Section 46 73 35) details extensive requirements for components including manually operated drip traps, foam separators, accumulators, flame arresters, pressure relief assemblies, and various monitoring equipment. The solicitation was posted on December 26, 2025, with proposals due by January 20, 2026, indicating a relatively short procurement timeline of approximately 25 days for interested contractors to prepare and submit comprehensive technical and installation proposals.
While no specific set-aside designations are explicitly mentioned in the provided documentation, the project will require strict adherence to prevailing wage rates as outlined in the Wage_Rates.pdf document. Contractors must comply with New Mexico's wage standards for all laborers and mechanics involved in the construction and installation activities. The technical complexity and specific manufacturer requirements may limit the pool of potential bidders to those with specialized expertise in anaerobic digester gas handling systems and demonstrated experience with Varec or Groth equipment. Though no specific budget range is provided, the comprehensive technical specifications and specialized equipment suggest a potentially significant capital investment. Contractors will need to demonstrate technical competence, provide detailed shop drawings, submit comprehensive installation plans, and be prepared to conduct on-site training for City personnel regarding equipment operation and maintenance. The project appears to be a critical infrastructure upgrade for waste gas management, indicating potential long-term operational importance for the Santa Fe County facility.
Opportunity text
The contractor shall purchase all equipment and install a Waste Gas Burner for the Anaerobic Digester, to replace the existing waste gas burner for the waste gas produced by the anaerobic sludge digestor. Specifications for the waste gas burner equipment and installation is attached as Attachment A: Specification Section 46 73 35 - Digester Gas Equipment.
Files
| File | Type | Posted |
|---|---|---|
| GAS_BURNER_EQUIPMENT.pdf | ||
| GAS_BURNER_EQUIPMENT.pdf | ||
| Gas_Burner_Spec.pdf | ||
| Gas_Burner_Spec.pdf | ||
| Wage_Rates.pdf | ||
| Wage_Rates.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity