ESB - LaGrande Maintenance Facility Deicer Tank Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- S-73000-00014505
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Dave Dethloff william.d.dethloff@odot.oregon.gov (503) 569-8793
- Jessica Spann odot.oregonbuys@odot.oregon.gov
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Oregon Department of Transportation (ODOT) is seeking competitive quotes for the ESB - LaGrande Maintenance Facility Deicer Tank Replacement project located in Union County, Oregon. The procurement involves a comprehensive infrastructure replacement effort at the La Grande Maintenance Station, specifically focusing on removing and disposing of three existing 10,000-gallon poly deicer tanks, associated pump house, pumps, and miscellaneous plumbing and electrical materials. The project requires complete site preparation, including trenching, general excavation, conduit installation, gravel foundation preparation, and construction of a reinforced concrete pad. Deliverables include the delivery and placement of three new 15,500-gallon deicer tanks with specific technical requirements such as rotationally molded polyethylene construction and UV inhibitors. A mandatory pre-quote conference is scheduled for Tuesday, August 12th at 1:00 PM at the project site, with substantial completion required by October 16, 2025, and final completion by October 20, 2025. Quotes must be submitted through the OregonBuys system, with evaluation based on lowest responsive bid meeting all qualifications.
This procurement is exclusively restricted to contractors certified as Emerging Small Businesses (ESB) by Oregon's Certification Office for Business Inclusion and Diversity (COBID) under the state's ESB Assistance Program. Selected contractors must perform at least 51 percent of the labor using their own workforce and comply with all ESB program requirements. The contract is exempt from standard competitive bidding for public improvement contracts with estimated values of $250,000 or less. Contractors must be licensed with the Oregon Construction Contractors Board (CCB) and comply with prevailing wage requirements under the Bureau of Labor and Industries (BOLI) for Union County Region 13. The selected contractor will be required to provide performance and payment bonds each equal to 100% of the contract value, along with comprehensive insurance coverage including $1,000,000 per occurrence commercial general liability and $1,000,000 combined single limit commercial automobile liability. While specific budget details are not explicitly stated, the project involves significant infrastructure replacement and is subject to standard public works contracting protocols.
Opportunity text
Project includes removing and disposing of 3-10,000 gallon existing poly deicer tanks, pump house, pumps, and miscellaneous plumbing and electrical materials occupying the new construction area. Project includes trenching, general excavation, conduit install, disposal, preparation of a gravel foundation, construction of a reinforced concrete pad, and delivery and placement of 3 new 15,500 gallon deicer tanks.
Files
| File | Type | Posted |
|---|---|---|
| ESB_RFCQ_279C.docx | DOCX document | |
| 00014505 Prebid Meeting Agenda.doc | DOC document | |
| Exhibit 2 Plans~23.pdf | ||
| 00014505 Intent To Award.xlsx | XLSX spreadsheet | |
| ESB_RFCQ_Attachments_279C~1.docx | DOCX document | |
| 00014505 Preliminary Results.xlsx | XLSX spreadsheet | |
| NOIBinder.pdf | ||
| Exhibit 1 Technical Specifications~14.pdf | ||
| 00014505 MandatoryPreBidSignInSheet.docx | DOCX document | |
| Exhibit 2 Plans REVISED~1.pdf | ||
| 00014505A1 Addendum1~1.docx | DOCX document |
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity