Drainage & Estuary Monitoring

Closed State & local contract opportunity Posted

Solicitation number
25-SW-05
State
Florida
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 26
Points of contact

Updated .

About this opportunity

The City of Holly Hill, Florida is requesting bids for provision and installation of water monitoring devices at four base-bid locations along the LPGA Canal, with one add-alternate location, under IFB #25-SW-05, with sealed bids due October 21, 2026 at 3:00 p.m. A non-mandatory pre-bid meeting is scheduled for October 1, 2026 at 2:00 p.m. in City Hall Commission Chambers.

The scope requires installation of Campbell Scientific water-level monitoring systems at five locations along LPGA Boulevard, Center Avenue, Alta Drive, Daytona Avenue, and Riverside Drive. Equipment includes the ASPEN10 edge device, RANGEVUE-15 radar water level sensor, 10-foot sensor cable, mounting brackets, and 12-month IoT subscription. Monitoring devices must be mounted at specified elevations (ranging from 6.0 to 8.0 feet) above anticipated flood levels on the south side of existing bridge structures unless otherwise directed by the engineer. The contractor must comply with Florida Department of Transportation Standard Plans and Specifications, the City of Holly Hill's Land Development Code, St. Johns River Water Management District requirements, and EPA NPDES obligations. Deliverables include erosion control measures, stormwater pollution prevention plans, utility coordination, as-built surveys by a Florida-registered professional land surveyor, traffic maintenance to FDOT standards, shop drawings, material certifications, sensor configuration, water-level calibration, and system testing prior to final acceptance.

Contract completion is required within 120 calendar days of Notice to Proceed. The contractor must provide Workers' Compensation (statutory limits), Commercial General Liability ($2 million general aggregate), Business Automobile Liability ($1 million), and Installation Floater insurance equal to 100 percent of installed replacement cost. Liquidated damages are $500 per calendar day for delays beyond the completion date. A one-year warranty on workmanship is required following final acceptance. Monthly progress payments are due by the 15th of each month with five percent retainage. No bid security or performance bonds are required. Award will be made to the lowest responsive and responsible bidder based on qualifications, experience, references, and past performance. Written questions are due October 14, 2026 at 5:00 p.m. to Mary Mearsheimer, Procurement Agent.

Opportunity text

SCOPE OF WORK: This project consists of the provision and installation of water monitoring devices at four (4) Base Bid locations along the LPGA Canal in Holly Hill, with one (1) additional location included as an Add Alternate. The detailed Scope of Work is contained in the Engineer's Technical Specifications and Engineering Plans, which are provided as separate solicitation documents through VendorLink and are incorporated into and made part of the Contract Documents.

Files

File Type Posted
Drainage__Estuary_IFB_25SW05.pdf PDF
Specifications_25SW05.pdf PDF
25185Holly_Hill_Canal_Monitoring_.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity