County Road 220 Phase 2 – Milling and Resurfacing
Open State & local contract opportunity Posted
- Solicitation number
- 25/26-119
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 30102225 Cork plate
- 30191801 Structural formwork
- 30191802 Structural formwork accessory
- 30191800 Temporary construction and maintenance support equipment and materials
- 30191616 Construction safety net
- 30191617 Construction safety shelf
- 30191805 Structural deck plate
- 30191804 Temporary roadway lining plate
- 30191803 Structural spacer
- Point of contact
-
- Jerry Horton jerry.horton@claycountygov.com (904) 946-0155
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Clay County Board of County Commissioners is requesting bids for County Road 220 Phase 2 – Milling and Resurfacing, with bids due November 30, 2026. The project consists of milling approximately 1.75 inches of existing asphalt pavement and resurfacing with 2 inches of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with current Florida Department of Transportation Standards and Specifications.
The scope includes maintenance of traffic, quality control, milling and resurfacing of designated turnouts, pavement markings, daily cleanup, and associated work necessary for project completion. All work will be performed during nighttime hours between 7:00 p.m. and 5:30 a.m., with access maintained throughout construction. The project map extends from train tracks near Sleepy Hollow to the west of Lakeshore on County Road 220.
A performance and payment bond under Florida Statutes Section 255.05 is required. A two-year warranty period from the date of completion and acceptance applies; the contractor must remedy defects arising from improper materials or workmanship at its sole expense and respond to warranty calls within 24 hours of notification.
All bidder inquiries must be submitted through the Question and Answer tab of the RFB. Bidders are prohibited from contacting any member of the Board, County employees, the County Manager, County Attorney, Commission Auditor, Evaluation Committee members, or County agents regarding the RFB through any means—oral, telephonic, electronic, or written—during the Request for Bid Period, which commences from publication and ends upon the Bid Decision becoming final, including the 72-hour bid protest period and any protest resolution. Exceptions permit inquiries submitted to the Purchasing Department as specifically provided in the Instructions to Bidders.
Contractors must submit an EFT Authorization Form, W-9, and Certificate of Final Payment as part of the bidding package. No contract value, contract term, or incumbent contractor is identified in available materials.
Opportunity text
Clay County Board of County Commissioners is requesting bids from qualified Contractors for CR 220 Phase 2 - Milling and Resurfacing. The project consists of a mill-and-fill operation along County Road 220, including milling approximately one and three-quarter inches (1.75") of existing asphalt pavement and resurfacing with two inches (2") of Asphaltic Concrete SP-12.5, Traffic Level C, in accordance with current Florida Department of Transportation (FDOT) Standards and Specifications.
The project also includes maintenance of traffic, quality control, milling and resurfacing of designated turnouts, pavement markings, daily cleanup, and associated work necessary for a complete project. Work on CR 220 will be performed during nighttime hours between 7:00 p.m. and 5:30 a.m., with access maintained throughout construction.
Bidders shall submit all inquiries regarding this RFB in the "Question and Answer" tab of the RFB. See "Inquiries/Questions" in the "Instructions to Bidders" below for more information.
Bidders are prohibited from contacting, by any means, whether orally, telephonically, electronically or in writing, any member of the Board, any County employee, including the County Manager, the County Attorney or the Commission Auditor, any member of the designated Evaluation Committee or any agent of the County regarding the Request for Bids in any respect during the Request for Bid Period. The Request for Bid Period during which no contact may occur commences from the date of publication of the notice of a Request for Bids and ends upon a Bid Decision becoming final, i.e. after the notice of bid protest period of 72 hours has expired. However, in the event of a notice of protest, the no contact rule continues in place during the Protest Period and does not end until a resolution of the protest has occurred and become final. The following exceptions exist to the no-contact rule:
- Inquiries may be submitted to the Purchasing Department if specifically provided in the Request for Bids;
- Pre-bid conferences provided for in the Request for Bids; and
- Formal presentations by Bidders to the designated Evaluation Committee or to the Board or any committee thereof specifically contemplated in the Request for Bids.
The Board reserves the right and power to reject any and all Bids without cause and to waive technical and non-technical or non-material defects in the Request for Bids or submittal of any Bid, and in its discretion to re-advertise the Request for Bids. The Board reserves the right to award Request for Bids which would be in the Best Interest of the County. Interested vendors are advised that the Clay County Board of County Commissioners has a local preference policy and Buy American policy. The complete policy for both can be viewed at: https://www.claycountygov.com/government/purchasing/vendor-information.
FOLLOWING THE BID OPENING AND TABULATION, A "NOTICE OF INTENT TO AWARD BID" OR A "NOTICE OF REJECTION OF ALL BIDS" WILL BE POSTED ON THE INTERNET AT:https://procurement.opengov.com/portal/claycounty?status=all.
THIS WEBPAGE CAN ALSO BE ACCESSED FROM THE HOMEPAGE OF THE COUNTY'S WEBSITE AT: https://www.claycountygov.com/government/purchasing/formal-bid-solicitations
PROSPECTIVE BIDDERS ARE NOTIFIED THAT THE FAILURE TO INCLUDE A PROPER BID BOND OR OTHER SECURITY APPROVED UNDER THE COUNTY'S PURCHASING POLICY, IF REQUIRED FOR THIS REQUEST, WILL RESULT IN REJECTION OF THE BID AND SHALL, AS WELL AS THE FAILURE TO FILE A WRITTEN NOTICE OF PROTEST AND TO FILE A WRITTEN PETITION INITIATING A FORMAL PROTEST PROCEEDING WITHIN THE TIMES AND IN THE MANNER PRESCRIBED IN CHAPTER 8, SECTION I OF THE COUNTY'S PURCHASING POLICY SHALL, CONSTITUTE A WAIVER OF THE RIGHT TO PROTEST THE BID REQUEST, ANY ADDENDUM THERETO, OR THE BID DECISION, AS APPLICABLE, AND TO INITIATE A FORMAL PROTEST PROCEEDING UNDER THE PURCHASING POLICY. THE COUNTY'S PURCHASING POLICY CAN BE VIEWED AT THE COUNTY'S WEBSITE BY FOLLOWING THE APPROPRIATE LINKS FROM THE HOMEPAGE ADDRESS SET FORTH ABOVE.
IF A PROSPECTIVE BIDDER IS IN DOUBT WHETHER THIS REQUEST REQUIRES A BID BOND, SUCH PROSPECTIVE BIDDER IS SOLELY RESPONSIBLE FOR MAKING APPROPRIATE INQUIRY.
THE BOARD RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS WITHOUT CAUSE AND TO WAIVE TECHNICAL AND NON- TECHNICAL OR NON-MATERIAL DEFECTS IN THE REQUEST OR SUBMITTAL OF ANY BIDS.
A PERSON OR AFFILIATE WHO HAS BEEN PLACED ON THE CONVICTED VENDOR LIST FOLLOWING A CONVICTION FOR A PUBLIC ENTITY CRIME MAY NOT SUBMIT A BID ON A CONTRACT TO PROVIDE ANY GOODS OR SERVICES TO A PUBLIC ENTITY, MAY NOT SUBMIT A BID ON A CONTRACT WITH A PUBLIC ENTITY FOR THE CONSTRUCTION OR REPAIR OF A PUBLIC BUILDING OR PUBLIC WORK, MAY NOT SUBMIT BIDS ON LEASES OF REAL PROPERTY TO A PUBLIC ENTITY, MAY NOT BE AWARDED OR PERFORM WORK AS A CONTRACTOR, SUPPLIER, SUBCONTRACTOR, OR CONSULTANT UNDER A CONTRACT WITH ANY PUBLIC ENTITY, AND MAY NOT TRANSACT BUSINESS WITH ANY PUBLIC ENTITY IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO FOR A PERIOD OF 36 MONTHS FROM THE DATE OF BEING PLACED ON THE CONVICTED VENDOR LIST.
Files
| File | Type | Posted |
|---|---|---|
| County_Road_220_Phase_2_–_Milling_and_Resurfacing.pdf | ||
| updated_Map_CR220_.pdf | ||
| Certificate_of_final_payment.pdf | ||
| Certificate_of_partial_payment.pdf | ||
| Performance_&_Paymt_Bond.doc | DOC document | |
| Chapter_8_Section_I.pdf | ||
| EFT_FORM.pdf | ||
| W-9_(2024).pdf | ||
| Owner_Direct_Purchase_Program.pdf | ||
| Warranty_Letter_.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity