Construction Manager at Risk for the Construction of Two Water Wastewater Plants and Upgrades to Existing Facilities
Open State & local contract opportunity Posted
- Solicitation number
- RFP 201-27
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 95121642 Sewage pumping station
- 81101513 Building construction management
- 80172104 Issues management and mitigation advisory service
- 80171700 Reputation and brand management services
- 81103100 Technology research and development service
- 80101606 Project monitoring and evaluation
- 81141900 Manufacturing technology research and development services
- 80171701 Reputation management service
- 95121643 Sewage outfall
- 80101607 Project impact assessment
Opportunity details come from amarillo.bonfirehub.com. Updated .
About this opportunity
The City of Amarillo, Texas is soliciting proposals under RFP 201-27 for a Construction Manager at Risk to build two water and wastewater plants and upgrade existing facilities. A mandatory pre-proposal conference is set for January 27, 2027, 10:00 a.m. to 4:00 p.m. at City Hall, 623 S. Johnson Street, and proposals are due February 11, 2027 at 3:00 p.m. through Euna Procurement. Local preference under Texas Local Government Code Section 271.9051 does not apply, because it excludes construction projects exceeding $100,000. No set-aside is stated; the City states that minority and women business enterprises receive equal opportunities.
The project includes a 10 MGD plant adjacent to the Hollywood Road Treatment Plant and a 14 MGD plant adjacent to the River Road Treatment Plant, along with upgrades to existing facilities. The CMAR must maintain uninterrupted operation of existing facilities and collaborate with the City and design engineer Kimley Horn Engineering through design and construction. Scope includes pre-construction and construction services, a Guaranteed Maximum Price that converts to a stipulated sum at the 90-percent construction documents milestone, an open-book cost model, and operator training, startup, commissioning, and performance testing at no additional cost. Key personnel, including the project manager, superintendent, lead estimator, lead scheduler, quality control manager, and startup and commissioning manager, may not be replaced without the owner's prior written approval. Bidders must provide performance, payment, and maintenance bondability, with performance and payment bonds at 100 percent of contract price from sureties rated "A" or better by A.M. Best. Required coverage includes commercial general liability of $2,000,000 per occurrence, professional liability of $2,000,000, builder's risk at 100 percent replacement cost with a deductible not exceeding $50,000, and pollution liability of $2,000,000 per occurrence. A 5 percent proposal bond is required, and a proposed subcontractor list is due with the proposal, with the final list due seven business days after close.
No contract value is stated. The term runs from Notice to Proceed through final completion, with substantial completion no later than December 2031 and a one-year maintenance bond period following final acceptance. Liquidated damages are $3,000 per day. Work is subject to Texas Government Code Chapter 2258 prevailing wage requirements, with a $60 penalty per worker per day for violations, and a federal Davis-Bacon determination effective May 18, 2026 covers Potter and Randall counties.
Evaluation totals 100 points: General Experience (30), pre-construction services fee (10), construction services fee (10), general conditions cost and extent (10), and Understanding of Project (40). Questions must be submitted at least ten calendar days before the closing date. City Council will consider proposals in February 2027. The Notice to Bidders identifies the solicitation as RFP 201-27, while the Scope of Work file references RFP 202-27 MRH.
Opportunity text
The City of Amarillo is soliciting proposals for Construction Manager at Risk for the Construction of Two Water Wastewater Plants and Upgrades to Existing Facilities per the attached Scope of Work.