12-02. SOW and Proposal Requriements.pdf
PDF 354 KB Posted
- Solicitation number
- RFP 201-27
- Issued by
- Upton County, Amarillo City, Texas
About this file
This Scope of Work and Proposal Requirements document is issued by the City of Amarillo for a Construction Manager-at-Risk (CMAR) contract to oversee the construction of two new wastewater treatment plants and approved upgrades and maintenance of existing facilities (RFP 202-27 MRH). The project encompasses the construction of a 10 Million Gallons per Day (MGD) plant adjacent to the existing Hollywood Road Treatment Plant and a 14 MGD plant adjacent to the existing River Road Treatment Plant in Amarillo, Texas. The City intends for the selected CMAR firm to collaborate with the municipal government and the design engineer, Kimley Horn Engineering, throughout the design and construction phases to optimize plant design, processing methods, and cost control while maintaining uninterrupted operations of existing facilities. The bid opening is scheduled for February 11th at 3:00 PM. The project is currently planned for substantial completion no later than December 2031, with separate completion dates for each facility specified in the special conditions. The contract requires the CMAR to assume full responsibility for all services, whether self-performed or subcontracted, and to serve as the single point of contact for all contractual matters and payment obligations.
The CMAR firm must submit a comprehensive proposal addressing twelve evaluation criteria, including pre-construction services, construction phase services, estimating and cost control, planning and scheduling, quality control and commissioning, safety programs, warranty support, and best practices implementation. Pricing shall include proposed fees for pre-construction services, construction phase services, general conditions, and an initial Guaranteed Maximum Price (GMP) that converts to a stipulated sum upon completion of construction documents at the 90-percent milestone. The City requires evidence of bondability with performance, payment, and maintenance bonds, as well as extensive insurance coverage including commercial general liability of $2,000,000 per occurrence, professional liability of $2,000,000, builder's risk insurance at 100 percent replacement cost with a maximum $50,000 deductible, and pollution liability insurance of $2,000,000 per occurrence. Liquidated damages are assessed at $3,000 per day for failure to meet the project schedule. Key personnel, including the project manager, superintendent, lead estimator, lead scheduler, quality control manager, and startup and commissioning manager, may not be replaced without the owner's prior written approval. The CMAR must maintain an open-book cost model with full access to estimating details and subcontractor pricing for owner audit purposes, and the firm must provide operator training, startup, commissioning, and performance testing at no additional cost.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL FOR:
CONSTRUCTION MANAGER-AT-RISK
FOR THE CONSTRUCTION OF TWO NEW WASTEWATER TREATMENT PLANTS:
1. A ten (10) Million Gallons/Day (MGD) Plant next to the Existing Hollywood Treatment Plant
2. A fourteen (14) Million Gallons/Day (MGD) Plant next to the Existing River Road Treatment Plant
AND:
Approved Upgrades and Maintenance of Existing Plants
RFP 202-27 MRH
The City of Amarillo
Donny Hooper - Assistant CITY MANAGER
Jerry Danforth –Managing Director of Capital Projects
Bid Opening:
February 11th at 3P.M.
Contents Section 1 – Introduction
1.1 Description / Project Intent:
1.2 Type of Contract:
1.3 CMAR Responsibilities
1.4 Partnership Narrative:
1.5 Project Scope Description and Duration:
1.6 Background & Special Concerns:
"OƯeror" means oƯeror responding to this RFP
1.7 Objectives:
Section 2 – General Information & Requirements
2.1 No Reimbursement for Costs:
2.2 Personnel Requirements:
2.3 Coordination Requirements:
2.4 Conceptual Design:
2.5 Project Locations:
2.6 Submittal Checklist:
2.7 Plans & Specifications Access:
2.8 Bidder’s Knowledge of Conditions:
2.9 Specific Performance:
2.10 Liens:
2.11 Utilities:
2.12 AƯidavit & Consent of Surety:
2.13 Project Sign:
2.14 SDS Sheets:
Section 3 – Proposal Requirements & Evaluation Criteria:
3.1 Criterion One – Pre-construction Services:
3.2 Criterion Two – Construction Phase Services:
3.3 Criterion Three – Estimating & Cost Control:
3.4 Criterion Four – Planning & Scheduling:
3.5 Criterion Five – Quality Control & Commissioning:
Describe how you will control the quality of construction performed by your subcontractors on this Project
3.6 Criterion Six – CMAR Understanding of Role:
3.7 Criterion Seven – Safety Program:
3.8 Criterion Eight – Warranty & Service Support:
3.9 Criterion Nine – Initial GMP and Delivery Proposal
3.10 Criterion Ten – Bondability:
3.11 Criterion Eleven – Letter of Transmittal:
3.12 Criterion Twelve – Best Practices:
Section 4 – General & Supplementary General Conditions
06. General and Supplementary General Conditions
Section 5 – Specifications
5.1 General:
5.2 Scope of Work:
5.3 Delivery Requirements:
5.4 Miscellaneous Provisions:
5.5 Liquidated Damages:
5.6 Additional Services
Section 6 – Additional Insurance Requirements
6.1 Insurance Overview:
6.2 Schedule of Coverages
6.3 CMAR Firm’s Equipment:
6.4 Evidence of Insurance:
6.5 Subcontractor’s Insurance:
6.6 Release and Waiver:
6.7 Deductibles
Section 7 – Attachments
Section 8 – Exhibits
Section 9 – Project Scope & Site Plans
9.1 Partnership Narrative
9.2 MOPO Requirements
9.3 Site Plans
Section 1 – Introduction
1.1 Description / Project Intent:
It is the intention of this project to include the following scopes of work, to include the construction of a new ten (10) Million Gallons/Day (MGD) Treatment Plant at the current Hollywood Site and the construction of a new fourteen (14) Million Gallons/Day (MGD) Plant at the current River Road Site for the City of Amarillo. The Construction Manager at Risk (CMAR) awarded this contract would work with the City’s Owner Designated Representative (ODR) as well as the engineering firm, Kimley Horn Engineering, to control pricing through collaboration with the parties involved. It will be the goal of all parties involved to reach all construction timelines and stay within the approved Guaranteed Maximum Price (GMP). Additional work required on Upgrades and Maintenances, as related to currently existing treatment plants, will use the State guidelines and procurement processes with pricing separate from the new construction GMP.
In order to provide value added engineering and greater eƯiciency, it is the intent of the City of Amarillo that the selected CMAR Firm be involved in the design process in conjunction with the Project Engineers in finalizing design documents.
1.2 Type of Contract:
The City of Amarillo will use its own Construction Manager at Risk contract in contracting for construction manager at risk services for this Project. After a CMAR firm is selected for the award of a contract, the successful OƯeror will be required to enter into a contract with the City of Amarillo.
1.3 CMAR Responsibilities
The selected Construction Manager at Risk firm will be required to assume responsibility for all services required for the Project, whether or not the selected Construction Manager at Risk firm performs the services or the services are performed by a subcontractor to the Construction Manager at Risk firm. Further, the City of Amarillo will consider the Construction Manager at Risk firm to be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.
1.4 Partnership Narrative:
It is the intent of the City that the selected CMAR for these Projects works with the City of Amarillo and its selected Engineer, Kimley Horn, to develop and select the best available plant design for the future needs of Amarillo. The primary concerns are long term operations, capacity, connections to current infrastructure, State Compliance, timelines for construction, and costs. It is understood that the City intends to build both plants and maintain uninterrupted, permit-compliant operation of the existing plants throughout construction and during the transition to the new facilities. The City views the partnership between the three parties, City, Kimley Horn, and CMAR, as paramount to the future success of these projects and future operations. While Plant sizing has been determined, the processing methods have not. It will be the responsibility of the three parties to work together to address all the concerns listed above as well as helping to finalize the processing design and the GMP. OƯerors shall submit a Maintenance of Plant Operations (MOPO) plan addressing, at a minimum: the permitted and operational treatment capacity that must be preserved at each facility at all times; the sequencing of tie-ins to the existing headworks and eƯluent outfall at each site; the maximum duration of any proposed shutdown of an influent or eƯluent connection; temporary bypass pumping and temporary treatment provisions, including redundancy and failure response; notification periods required by the Owner in advance of any shutdown; and any seasonal or wet-weather restrictions on shutdown activities. The CMAR's obligation for upgrades and maintenance of the existing plants extends through Final Completion of the new facilities and the associated warranty periods; it does not constitute an ongoing operations or maintenance obligation thereafter.
1.5 Project Scope Description and Duration:
The Scope of Work will be finalized during the Pre-Construction Phase, based on the conceptual design documents prepared by the Engineer for three candidate treatment technologies (Conventional, Membrane Bioreactor, and Oxidation Ditch). OƯerors shall price Pre-Construction Phase services, the Construction Phase Fee, and General Conditions on the understanding that the treatment technology has not yet been selected and shall state all assumptions on which their proposed fees are based.
It is currently planned that the project will be substantially complete no later than December 2031. OƯerors shall submit a milestone schedule demonstrating achievement of this date and shall identify any assumptions or constraints that would prevent it.
Separate Substantial Completion dates apply to the Hollywood Road II and River Road II facilities as set forth in the Special Conditions.
1.6 Background & Special Concerns:
BACKGROUND AND SPECIAL CONCERNS: The City of Amarillo is seeking a Construction Manager at Risk using the one-step process authorized by Section 271.118 of the Texas Local Government Code. Under this process, the Owner issues a Request for Proposals (“RFP”) inviting potential general contractors to submit a proposal which includes information on past performance, safety record, proposed personnel and methodology as well as proposed fees and prices for fulfilling the General Conditions detailed in this Request for Proposals for performing the described work.
As specifically used in this RFP, the terms below have the meanings set forth below:
"Contractor" means a sole proprietorship, partnership, corporation, or other legal entity that assumes the risk for the Construction of the 2 New Treatment Plants at the contracted price.
"Construction Manager at Risk Contract" means a single contract with a Construction Manager at Risk firm for the Construction of the 2 new Treatment Plants for the City of Amarillo, Texas.
"Construction Manager at Risk" ("CMAR") means a sole proprietorship, partnership, corporation, or other legal entity that assumes the risk for construction, rehabilitation, alteration, or repair of a facility at the contracted price as a general contractor and provides consultation to the governmental entity regarding construction during and after the design of the facility.
"OƯeror" means oƯeror responding to this RFP.
1.7 Objectives:
The City of Amarillo is currently working with Kimley Horn Engineering as the design firm for the construction of two plants; the first plant being a ten (10) MGD plant next to the existing Plant at Hollywood Road, and the second plant to be a fourteen (14) MGD plant next to the existing River Road Plant. The CMAR selected at the end of this process will be required to work closely with the City of Amarillo’s Capital Projects and Development Engineering (CP&DE) Department and City of Amarillo Building Code oƯicials, as well as the Texas Commission on Environmental Quality (TCEQ) to support the Owner and Engineer in securing and maintaining all required permits. The Owner and Engineer are responsible for the TCEQ wastewater discharge permit and Basis of Design Report; the CMAR is responsible for all construction-phase permits, including stormwater Construction General Permit / Stormwater Pollution Prevention Plan (CGP/SWPPP), dewatering discharge authorization, air permitting for temporary equipment, and spoil handling. The CMAR will also be required to coordinate all City of Amarillo (COA) inspection activities, Project Engineers, and Federal and State requirements to ensure the safety of all personnel.
OƯerors shall respond to all elements of the Project Scope description below and any addenda issued prior to the submission deadline.
Section 2 – General Information & Requirements
2.1 No Reimbursement for Costs:
OƯeror acknowledges and accepts that any costs incurred from the OƯeror's participation in this RFP shall be at the sole risk and responsibility of the OƯeror.
2.2 Personnel Requirements:
OƯerors shall provide employment of suƯiciently qualified personnel to fully accomplish the services in accordance with the Project schedule.
2.3 Coordination Requirements:
OƯerors will be required to work with: (a) City of Amarillo’s staƯ and oƯicials to gather information and analyze needs; (b) utility and regulatory entities to determine the feasibility of the Project; and (3) may be required to actively participate in a limited number of public meetings.
2.4 Conceptual Design:
The City of Amarillo has signed a contract with Kimley Horn Engineering for the drafting of construction documents for the Project. These documents include:
17. HR 10 MGD Site Plan for CMAR
18. RR 14 MGD Site Plan for CMAR
2.5 Project Locations:
1st New Plant
Hollywood Road Wastewater Treatment Plant
3700 E LOOP 335 SOUTH, AMARILLO TX
SECT 117 A B & M BLK 0002, S/PART OF SECT, 236.2300 ACRES
2nd New Plant
River Road Wastewater Treatment Plant
12600 RECLAIMATION PN RD, TX 79108
SECT 14 B S & F BLK 0001, IRREG TR - BEING RIVER ROAD WASTE WA
2.6 Submittal Checklist:
OƯerors are instructed to complete, sign and return the required documents outlined in Euna Bonfire as a part of their proposal submittal. Failure to return these documents may subject your Proposal to disqualification.
2.7 Plans & Specifications Access:
A copy of the RFP Project Manual with supporting documents will be provided to OƯerors by downloading a copy of the RFP and its contents at the City of Amarillo Bonfire site, https://amarillo.bonfirehub.com/.
2.8 Bidder’s Knowledge of Conditions:
Prior to submission of any proposals, each bidder shall have made a thorough inspection of each site of the work, and to have read and made a thorough examination of the plans, standard specifications, and project specifications. Each bidder shall become informed as to the nature of the work, labor conditions, and other matters that may aƯect the cost and time of completion of the work. The failure or omission of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his bid.
2.9 Specific Performance:
This contract will require specific performance on all criteria as stated in your proposal. All specifications as written unless specifically taken exception to by you, and that exception accepted by the City of Amarillo will be strictly adhered to. Any unauthorized substitution or substandard products or construction will not be tolerated.
2.10 Liens:
It is distinctly understood that by virtue of this contract, no mechanic, contractor, material man, artisan or laborer, whether skilled or unskilled, shall ever in any manner have claim or acquire any lien upon the building or buildings, or any of the improvements of whatever nature or kinds so erected or to be erected by virtue of this contract, nor upon any of the land on which said building or any of the improvements are so erected, built or situated, except as set forth in the McGregor Act as amended by the Act of the 56th Legislature, 1959.
2.11 Utilities:
The contractor will be solely responsible for all utilities furnished to the worksite that are required for construction purposes.
2.12 AƯidavit & Consent of Surety:
Before final payment is made, the contractor shall provide the owner with the following:
An aƯidavit that all payrolls, bills of materials and equipment, and other indebtedness connected with the work, have been paid or otherwise satisfied.
Consent of Surety to final payment is required.
2.13 Project Sign:
The only sign to be erected on the site shall be the project sign designed and approved by the ODR.
2.14 SDS Sheets:
The contractor is responsible for providing and distributing SDS sheets.
Section 3 – Proposal Requirements & Evaluation Criteria:
The City of Amarillo requires comprehensive responses to every section within this RFP. To facilitate the review of the responses, Respondents shall follow the described response format. The intent of the response format requirements is to expedite review and evaluation. It is not the intent to constrain Respondents with regard to content, but to assure that the specific requirements set forth in this RFP are addressed in a uniform manner amenable to review and evaluation. A response that does not provide all the information requested below may be deemed non-responsive. Your response must concisely contain suƯicient information to assure the City of Amarillo of its accuracy and any additional information necessary to summarize the overall benefit of the response to the City of Amarillo. Proposals must include the following information in the order listed:
3.1 Criterion One – Pre-construction Services:
Describe your Construction Management and Execution plan for providing Pre-construction Phase Services required for this Project.
Confirm in graphic form the proposed Project assignments, lines of authority and communication for each member and the estimated percentage of time these individuals will be involved in this Project for Pre-Construction Services.
Provide a detailed list of all Pre-construction Services you will provide to the City of Amarillo and the Architect/Engineer (A/E) on this Project. Provide the proposed fee for Pre-Construction Services.
Describe what you perceive are the critical pre-construction issues for this Project.
Describe your procedures, objectives, and personnel responsible for reviewing design and construction documents and for providing feedback regarding cost, schedule and constructability to the A/E and the City of Amarillo on this Project.
Describe your Bid/Proposal Package Strategy for completion of the Construction Documents and for procuring Cost of the Work from subcontractors, vendors, suppliers, etc.
Describe your plans to interface with the A/E and its consultants to enhance the design and planning process on this Project.
Describe your Constructability Program for this Project and how it would be implemented.
Provide examples of records, reports, monitoring systems, and information management systems you would use on this Project during Pre-Construction Services.
Describe your process for attracting qualified and experienced mechanical, electrical, and other subcontractors to submit proposals for this project.
3.2 Criterion Two – Construction Phase Services:
Describe your Construction Management and Execution plan for providing Construction Phase Services required for this Project.
Confirm in graphic form the proposed Project assignments, lines of authority and communication for each member and the estimated percent of time these individuals will be involved in this Project for Construction Services.
Provide a detailed list of all Construction Services you would provide to the City of Amarillo and the Architect/Engineer (A/E) on this Project. Provide the proposed fee for Construction Services.
Describe what you perceive are the critical Construction issues for this Project.
Identify each scope of work you intend to self-perform, the estimated percentage of the Cost of the Work each represents, and the aggregate percentage you propose to self-perform. For each such scope, describe the competitive process by which the Owner may verify that your self-performed price represents best value, including the minimum number of competing subcontractor proposals you will solicit and the documentation you will provide for Owner review and written approval. Self-performance of any scope requires the Owner's prior written approval.
Describe your experience constructing liquid-retaining structural concrete in accordance with ACI 350, including basin leakage testing results on first fill for your three most recent comparable projects, and your approach to deep excavation, shoring, and construction dewatering in the subsurface conditions anticipated at these sites.
Describe your ability and desire to self-perform work on this Project, and the method for determining yourself as the "best value" through a competitive proposal process.
Provide examples of records, reports, monitoring systems, and information management systems you would use on this Project during Construction Services.
Identify the long-lead equipment and materials you consider critical to the Project schedule, including mechanical screening, grit removal, aeration, membrane bioreactor, tertiary filtration, UV disinfection, solids thickening, and solids dewatering equipment, as well as motor control centers, switchgear, and standby generation. Describe how you will coordinate with the Engineer's equipment prequalification matrix, your recommended early procurement strategy, and how you propose allocating escalation risk on equipment ordered in advance of the GMP.
3.3 Criterion Three – Estimating & Cost Control:
Identify the proposed cost control team for Pre-Construction and Construction Services, their duties, of residence, estimating system, and Guaranteed Maximum Price ("GMP") cost control system for this Project.
Describe your project estimating system for developing the GMP Proposal and how you will monitor and track these costs on the Schedule of Values during the procurement and payment process.
Describe how the cost control team would ensure the executed GMP Proposal would be within the City of Amarillo’s budget on this Project.
If the City of Amarillo requests a GMP prior to 100 per cent completion of the Construction Documents, describe your process for ensuring that the scope, cost, and schedule assumptions will arrive at a "complete" GMP Proposal for this Project.
Describe the contingencies you will propose in the GMP, and how these contingencies will be managed through the completion of Construction Phase Services.
Describe your plans for establishing, tracking, reporting and payment of the GMP and possible future changes on this Project.
Describe your philosophy regarding Payment and Performance bonds required by the City of Amarillo on this project, and the bonds your firm requires of subcontractors. Identify a maximum of three (3) of your previous projects with GMP contracts and the amount of savings returned to the project Owner. Describe the open-book cost model you will maintain during Pre-Construction Services, the format and frequency of cost reporting to the Owner and Engineer, and the access the Owner will have to your estimating detail, subcontractor pricing, and supporting documentation for audit purposes.
3.4 Criterion Four – Planning & Scheduling:
Provide examples of the following which you plan on using during the construction manager at risk process to implement this Project, or otherwise, respond to the question.
At what point(s) in the Project schedule (design and construction) will you secure services of major subcontractors? Provide a milestone listing.
Which, if any, of the major subcontractors (at least 10% of the construction cost) will you have on board prior to completion of the Design Development drawings?
How will you help define the scope of work with the City of Amarillo? Describe your approach to maximize design solution within cost target.
Identify the specific resources (i.e. personnel, hardware, software, etc.) to be used on this Project. Provide resumes, indicating the scheduling experience of all personnel responsible for establishing and updating project schedules, and their City of residence. Describe the open-book cost model you will maintain during Pre- Construction Services, the format and frequency of cost reporting to the Owner and Engineer, and the access the Owner will have to your estimating detail, subcontractor pricing, and supporting documentation for audit purposes.
Provide a Primavera CPM Milestone schedule for this Project using the Project Planning Schedule and identify specific critical process, phases, milestones, approvals, and procurements anticipated. Clearly identify the 10 percent Total Project Float required during the construction phase.
As the Project Scheduler, describe your philosophy regarding establishment and use of Total Project Float on this Project to achieve the City of Amarillo required Substantial Completion date.
Describe your plan for meeting or improving the City of Amarillo’s proposed schedule for design and/or construction. If you propose to improve the schedule, describe the impact on quality of services, materials, or workmanship that may occur.
3.5 Criterion Five – Quality Control & Commissioning:
Identify the quality control and commissioning team, their duties, City of residence, and their objectives for this Project.
Describe how your quality control team will measure and document the quality of construction and commissioning performed by all trade, mechanical, electrical, and instrumentation subcontractors, and how nonconforming work will be identified, tracked, and corrected.
Describe your startup and commissioning program for a wastewater treatment facility, addressing at a minimum: factory acceptance testing of major process equipment; pre-functional and functional testing; integrated systems testing across the SCADA and instrumentation platform; process seeding and biological startup;
performance testing demonstrating compliance with applicable TPDES eƯluent limits prior to Owner acceptance; the duration of on-site support by your staƯ and by equipment manufacturers following acceptance; delivery of O&M manuals and spare parts; and operator training hours included in your proposal at no additional cost.
Describe your implementation of a quality control process for this Project during the Design Development stage though completion of Construction Documents stage.
Describe how your quality control team will measure the quality of construction performed by trade contractors on this Project, and how non-conforming work will be addressed.
Describe how your quality control team will measure the quality of construction performed by mechanical and electrical subcontractors on this Project, and how non-conforming work will be addressed.
OƯeror's proposed quality control process for the entire Project duration.
Describe your quality control objectives for this Project and what your firm quality control program will be for each phase of this Project.
Identify the quality control team for this Project and their duties.
Describe how you will control the quality of construction performed by your subcontractors on this Project
3.6 Criterion Six – CMAR Understanding of Role:
Describe your fiduciary responsibility to the City of Amarillo (as a public agency) for tracking all construction costs and contingencies on this Project.
Describe your philosophy for maximizing Project scope for the City of Amarillo during Preconstruction Services, minimizing risk to yourself, and identifying when savings can be returned to the City of Amarillo during construction.
Describe the insurability of the CMAR Firm and any and all contractors and subcontractors as required in Article 4.2 of the General and Supplementary Conditions (See Pp. 35-40) and Section 7.2 Insurance Provided by CMAR Firm (See Pp. 81-84) of this RFP.
Describe your methods for advertising, receiving proposals, awarding contracts, and paying trade contractors on this Project, including review by City of Amarillo.
3.7 Criterion Seven – Safety Program:
Describe your job site safety program for this Project and specific safety policies with which employees must be in compliance.
Identify the Project safety team, their qualifications, duties and City of residence.
Identify any deaths that have occurred on a project site controlled by your firm, or any subcontractor(s) (at any contractual level), that had a death on your project site.
If any, describe how you have revised your safety program. Provide your firm's Experience Modification Rate (EMR) for each of the last five (5) years, together with a letter from your insurance carrier verifying those rates. Provide your Total Recordable Incident Rate (TRIR) and Days Away, Restricted, or Transferred (DART) rate for the same period, supported by OSHA Form 300A summaries. Identify all OSHA citations, including classification and disposition, issued to your firm within the last five (5) years. Describe your confined space entry, trenching and excavation, and hazardous atmosphere programs as they apply to work at an operating wastewater treatment facility.
OƯeror's utilization of Project scheduling throughout the design and construction phases, in construction management, Describe your ability to provide a scheduling system.
Identify all key process steps, phases, milestones, approvals, and project meetings you commonly anticipate. Provide a milestone schedule showing, as a minimum, completion dates for the list of specification sections, list of drawings, SD Issue, DD Issue, the GMP, 50% CD Issue, 95% CD Issue, dates of securing a contracts with major subcontractors, etc. Describe your execution plan for meeting or shortening the City of Amarillo’s schedule; during design; and during construction.
Describe any phased construction you anticipate or recommend.
3.8 Criterion Eight – Warranty & Service Support:
Describe your warranty service support philosophy and warranty service implementation plan for this Project.
Describe how you would measure the quality of service provided to the City of Amarillo for this Project.
Provide reference letters from the owners of three (3) previous projects that describe your response to, and performance on, warranty services after substantial completion projects completed and similar in size on completed water or wastewater treatment facility projects of comparable size, complexity, and delivery method. At least two (2) references shall be for facilities of 10 MGD capacity or greater delivered under a CMAR or GMP contract.
OƯeror's Proposals relating to the long-term durability and life-cycle costs of the Project.
3.9 Criterion Nine – Initial GMP and Delivery Proposal
3.10 Criterion Ten – Bondability:
Attach a letter of intent from a surety company indicating the OƯeror's bendability for this Project. The surety shall acknowledge that the OƯeror is able to provide a performance bond and a payment bond in the amount of max bonding capacity [$______] and shall state the OƯeror's total bonding capacity and current uncommitted bonding capacity as of the proposal date, the Project budget in accordance with Texas Local Government Code Section 271.118(l). The OƯeror awarded the contract must provide a payment bond, performance bond and a maintenance bond to the City of Amarillo Purchasing Agent within ten (10) days following every proposed GMP within this project.
3.11 Criterion Eleven – Letter of Transmittal:
Included with each copy of a Proposal shall be a transmittal letter, which must include the following:
Executive Summary
An Executive Summary, not exceeding ten (10) pages. The Executive Summary shall be written in a non-technical style and shall contain suƯicient information for reviewers with both technical and non-technical backgrounds to become familiar with the OƯeror's qualifications and its ability to satisfy the requirements of the Project.
Confidential Contents Index
A page executed by the OƯeror that sets forth the specific items (and the section and page numbers within the Proposal at which such items are located) that the OƯeror deems confidential, trade secret or proprietary information protected by the Texas Public
Information Act. Blanket designations that do not identify the specific information shall not be acceptable and may be cause for the City of Amarillo to treat the entire Proposal as public information. Notwithstanding the foregoing, the list required under this subsection is intended to provide input to the City of Amarillo as to the confidential nature of an OƯeror's Proposal but in no event shall such list be binding on the City of Amarillo’s determination regarding any issue relating to confidentiality or a request under the Act.
Statement of Understanding
A brief statement of understanding of the Project and the services the Construction Manager at Risk firm will be required to perform as well as a positive commitment to perform the services within the Project schedule.
Contact Person
Name of the contact person or representative for the Construction Manager at Risk firm, title, address and telephone number. State whether the contact person is authorized to contractually bind the CMAR firm for this Project. If the contact person is not authorized to contractually bind the Firm for this Project, state the name and title of the individual with contracting authority for the Construction Manager at Risk firm.
Litigation Summary
A litigation summary that briefly describes any claims or lawsuits that have been filed against the Construction Manager at Risk firm for misfeasance or nonfeasance or anything else, of professional services. Identify the claim or suit by adverse party, case number, jurisdiction where filed and current status. This statement must be submitted in the Proposal envelope.
Legal Qualifications
The following information regarding legal issues aƯecting the OƯeror and its team members shall be submitted:
Legal Issues
Identify and explain any significant anticipated legal issues which the OƯeror must resolve in order to carry out the Project and its obligations under a contract.
Legal Liabilities
Provide a list and a brief description of all instances during the last five years involving projects in which the OƯeror or any team member (or any other organization that is under common ownership with the OƯeror or any team member) was: (i) determined, pursuant to a final determination in a court of law, arbitration proceeding or other dispute resolution proceeding, to be liable for a material breach of contract; or (ii) terminated for cause. For each instance, identify an owner's representative with a current phone and fax number (and e-mail address if available).
Legal Proceedings
Provide a list and a brief description (including the resolution) of each arbitration, litigation, dispute review board and other dispute resolution proceeding occurring during the last five years involving OƯeror or any team member (or any other organization that is under common ownership with the OƯeror or any team member), and involving an amount in excess of ONE MILLION DOLLARS ($1,000,000.00) related to performance in projects with a contract value in excess of
TEN MILLION DOLLARS ($10,000,000.00).
Include a similar list of all projects included in the response to Section below, of which the dispute occurred during the past five years or involved the same organization that is on the OƯeror's team. For each instance, identify an owner's representative with a current phone and fax number (and e-mail address if available).
OƯeror's Information
Provide information about the OƯeror's Construction Manager at Risk firm and the personnel to be assigned to this Project. Include:
Name and Address
The name and business address of the Construction Manager at Risk firm and the principal who will be responsible for the Project.
Resumes
Separate resumes for the following key personnel and management staƯ who will be committed to the Project:
Project manager.
Deputy project manager.
General superintendent and the resident superintendent proposed for each facility.
Lead estimator and lead scheduler.
Quality control manager.
Startup and commissioning manager.
Site safety manager.
Lead individual from each team member.
Any other key members of the OƯeror's management team; and Any other individuals that the OƯeror wishes to identify at this time.
Each resume shall identify the individual's role, years of experience, and specific water or wastewater treatment projects on which the individual served in a comparable capacity.
The proposed Project Manager and each Superintendent shall each serve in that role on at least one (1) completed wastewater treatment facility project of 10 MGD or greater. The OƯeror shall state the percentage of time each individual will be committed to this Project.
Key personnel identified in the Proposal may not be replaced without the Owner's prior written approval, and any proposed replacement shall have equal or greater qualifications.
Three references each for the project manager and the deputy project manager.
References shall be previous owners or clients with whom the project manager and the deputy project manager have worked within the past five years and shall include the name, position, company or agency, and current addresses and telephone and email addresses.
Recent Projects
List, and briefly describe, the Construction Manager at Risk projects recently completed or currently in progress by the OƯeror, which are of similar scope, size and complexity to the Project. similar scope, size, and complexity to the Project. At a minimum, identify three (3) water or wastewater treatment facility projects of 10 MGD capacity or greater, delivered under a CMAR, GMP, or progressive design-build contract, and completed within the last seven (7) years. For each, state the initial GMP, the final Contract Sum, the original and actual Substantial Completion dates, the reasons for any variance, and whether the facility remained in operation during construction.
References
With respect to each project identified pursuant to section above, include the project name and contract number, owner's name, address, contact name and current e-mail address, telephone and fax numbers, dates of work performed (if applicable), project description, description of work and percentage actually performed by OƯeror, and project outcome or current status.
SMWBE
A statement of the extent to which the OƯeror's Construction Manager at Risk Firm qualifies as a small, woman and/or minority-owned business.
OƯices
A statement indicating the locations of the OƯeror's oƯices in the State of Texas.
Availability
An assessment of the present and projected workload of the OƯeror's oƯice where the work on this Project will be accomplished, including number of projects currently being managed by that oƯice, the size of those projects, and the availability of on-site technical staƯ in that oƯice (describe on-site staƯ by title/position).
Statement of Work
OƯerors should provide information and an assessment of the following:
Pre-Construction Services: The CMAR will work with staƯ members of the design firm Kimley Horn Engineering, and City of Amarillo CP&DE StaƯ, prior to construction, to ensure the feasibility and constructability of the design and that the proposed construction budget for the Project is realistic considering the complexity of the work to be performed. The CMAR will provide value engineering, the selection of building systems and materials, cost estimating, scheduling during this phase of the Project. Upon completion of this phase the CMAR will provide a proposed Guaranteed Maximum Price for the construction of the Project that is within the agreed Construction Budget.
Construction Services: the CMAR will, as General Contractor, perform all construction work of the Project. OƯeror will identify and outline the scope of services the OƯeror anticipates will be required to be performed on this Project. Describe the OƯeror's approach to performing the specific services required by this Project. OƯeror will identify the level of participation which OƯeror will expect from City of Amarillo’s StaƯ and/or OƯicials on the Project.
Method
The OƯeror is to describe its substantive approach to providing the services required for this Project. Include any, and all, specialized services that appear to be needed to successfully accomplish this Project. Identify the advantages and constraints inherent in the method proposed.
Management Structure
Describe the OƯeror's management structure, including its teaming arrangements and how the OƯeror would institutionally operate, particularly in light of the complexity and phasing of the Project.
Management Plan
Provide general information on the organization and management processes of the OƯeror's staƯ to be involved in the Project, as well as an outline of the structure of the Project team members.
The management plan should include a narrative and an organizational chart of the Project team. Answer the questions: Who will have overall responsibility? What will the lines of authority be? How much of each of the key personnel's time will be committed to the Project?
Describe your management plan for performing the work required of this Project and include your program for managing designers, subcontractors, and material providers.
Describe your CMAR firm's start-up and commissioning (closeout procedures) procedures.
3.12 Criterion Twelve – Best Practices:
Describe your CMAR firm's procedures for implementing the industry's "Best Practices" as defined by the Construction Industry institute and similar organizations.
Establishing Project objectives.
Project scope definitions, such as the Project Definitions Rating index (PDRI);
Partnering.
Change (order) management system.
Total quality management for each phase, including close-out -and commissioning.
Any others not listed.
Describe how you quantitatively and qualitatively measure the success of a project.
Section 4 – General & Supplementary General Conditions
06. General and Supplementary General Conditions
Section 5 – Specifications
5.1 General:
City of Amarillo requests Proposals from qualified and experienced CMAR firms to meet the following minimum specifications stated in this Section.
5.2 Scope of Work:
Included in the scope of work requirements are the following phases:
Provide Value Analysis Presentation Begin CD's 60% Review 90% Review
GMP
Start of Construction Tie-In and Plant Shut Down windows Startup, Commissioning, and Performance Testing Complete Construction Owners Beneficial and Occupancy
Cost confirmation must be provided at the conclusion of design milestone identified in section 5.3 with a stipulated sum amount ("Contract Sum") to occur at 90% Construction Documents. The cost methodology and format will be agreed by City of Amarillo and CMAR firm's team prior to submission of the Contract Sum. All references in this RFP, including the General Conditions, Supplementary Conditions and Exhibits, to "guaranteed maximum price," "Guaranteed Maximum Price" or "GMP" shall refer to the initial Guaranteed Maximum Price prior to completion of established Documents prior to that milestone.
Following completion of the construction documents, the initial guaranteed maximum price shall be converted to a stipulated sum amount and thereafter be referred to as the "Contract Sum. The CMAR may propose one or more Early Work Packages in advance of the total GMP. Each Early Work Package will require a GMP for that scope.
5.3 Delivery Requirements:
OƯerors are instructed to provide a milestone schedule for the Project as follows:
Provide Value Analysis Presentation Begin CD's 60% Review 90% Review GMP City of Amarillo’s Approval Conversion to Contract Sum Start of Construction Tie-in and Plant Shutdown Windows Startup, Commissioning, and Process Performance Testing Complete Construction Owner Beneficial Occupancy and Operator Training
Failure of the CMAR Firm to notify City of Amarillo suƯiciently in advance of inability to complete within the delivery schedule, shall grant City of Amarillo the option of canceling the order, purchasing from the best available source, and charging the CMAR Firm the diƯerence between the Contract Sum and actual purchase price, if any, plus cost of handling. Notwithstanding the foregoing, City of Amarillo shall have no obligation to accept late performance or to waive timely performance by CMAR Firm.
5.4 Miscellaneous Provisions:
Personnel
CMAR firm shall maintain a staƯ of properly trained and experienced personnel to ensure satisfactory performance under the construction manager at risk contract.
CMAR firm shall assign to City of Amarillo a designated representative, who will be responsible for the coordination and administration of City of Amarillo’s requirements, Key personnel identified in the Proposal, including the Project Manager, each Superintendent, the lead estimator, the lead scheduler, the quality control manager, and the startup and commissioning manager, may not be reassigned or replaced without the Owner's prior written approval. Any proposed replacement shall have equal or greater qualifications.
Project Execution
Following execution of the construction manager at risk contract by the parties, the CMAR Firm hereunder, that Firm's engineers or architects shall work with the Project Architects to identify elements of value-added engineering and design in the completion of the design, submitting all design elements for review and determination of scope compliance by City of Amarillo’s engineer or architect before or concurrently with commencement of construction.
An engineer shall have responsibility for compliance with the engineering design requirements and all other applicable requirements of Chapter 1001, Occupations Code. An architect shall have responsibility for compliance with the requirements of Chapter 1051, Occupations Code
5.5 Liquidated Damages:
THREE THOUSAND DOLLARS ($3,000.00) per day beyond the Project scheduled set out in the construction manager at risk contract executed by the parties.
5.6 Additional Services
The following additional services will be provided by the CMAR firm's team:
Design Criteria Confirmation Utility Requirements Site-specific Salvage and Selective Demolition Storm Water Pollution Prevention Plan Design Construction Dewatering Plan and
Discharge Authorization Maintenance of Plant Operations, Bypass Pumping, and Temporary Treatment Startup, Commissioning, and Operator Training
Section 6 – Additional Insurance Requirements
6.1 Insurance Overview:
CMAR firm shall, at its sole expense, maintain in eƯect at all times during the full term of its Work under the Contract Documents (including, without limitation, any post acceptance warranty work of CMAR firm or any subcontractor) and as otherwise required under the Contract Documents, insurance coverage with limits not less than those set forth in the below. Insurance coverage shall be procured from insurers licensed to do business in the State of Texas, with a minimum acceptable A.M. Best Rating of A-VIII, acceptable to City of Amarillo and under forms of policies satisfactory to City of Amarillo. None of the requirements contained in this Section 1.1 as to types, limits or City of Amarillo’s approval of insurance coverage to be maintained by CMAR firm is intended to, and shall not in any manner limit, qualify or quantify the liabilities and obligations assumed by CMAR firm under the Contract Documents or otherwise provided by law. In the event of any failure by CMAR firm to comply with the provisions of this Attachment to Section 6, City of Amarillo may, without in any way compromising or waiving any right or remedy at law or in equity, on notice to CMAR firm, purchase such insurance, at CMAR firm's expense (which may be deducted from any payment due by City of Amarillo to CMAR firm under the Contract Documents), provided that City of Amarillo shall have no obligation to obtain and maintain such insurance amounts and coverages. The coverages and limits stated in this Section 7 control over any conflicting coverage or limit stated in Article 4.2 of the General and Supplementary General Conditions.
6.2 Schedule of Coverages
Coverage: Minimum Amounts and Limits
Worker's Compensation: Statutory Limits
Employer's Liability: $1,000,000
7.1 The coverage set forth in this SCHEDULE OF CMAR FIRM'S INSURANCE COVERAGES shall include all operations of the CMAR firm and all subcontractors. This coverage shall include a waiver of subrogation in favor of City of Amarillo.
Professional Liability Coverage
Professional Liability Errors and Omissions insurance of TWO MILLION DOLLARS ($2,000,000.00) each claim and TWO MILLION DOLLARS ($2,000,000.00) aggregate. The policy shall have an Extended Reporting Period (or tail coverage) extending for a minimum of three (3) years following immediately upon the eƯective date of the policy expiration.
CLAIMS MADE POLICIES With respect to any of the insurance policies provided by CMAR Firm pursuant to the Contract Documents which are "claims made" policies, in the event at any time any such policies are canceled or not renewed, CMAR firm shall provide to City of Amarillo a substitute insurance policy(ies) with terms and conditions and in amounts which comply with the terms of the Contract Documents and which provides for retroactive coverage to the date of cancellation or non-renewal to fill any gaps in coverage which may exist due to the cancellation or non-renewal of the prior "claims made" policies.
With respect to all "claims made" policies which are renewed, CMAR firm shall provide coverage retroactive to the date of commencement of the Work in said renewed policy. All substitute or renewed "claims made" policies shall be maintained in full force and eƯect for the longer of (a) three (3) years from the date of Final Completion of the Work; or (b) as otherwise required by the Contract Documents. A certificate evidencing continuation of such policies shall be submitted with the final Application for Payment. Nothing herein shall aƯect the continuing eƯect of the indemnity clauses in the Contract Documents.
Commercial General Liability
Bodily Injury/Property Damage: $2,000,000 each occurrence, or equivalent
(Occurrence Basis) subject to a $5,000,000 aggregate applicable to the Project
This policy shall be on a form acceptable to City of Amarillo, endorsed to include City of Amarillo as additional insured, state that this insurance is primary insurance as regards any other insurance carried by the City of Amarillo, and shall include the following coverages:
Premises/Operations;
Independent CMAR firms;
Completed Operations for a period of two years following the acceptance of CMAR firm's Work;
Broad Form Contractual Liability specifically in support of, but not limited to, the
Indemnity sections of the contract;
Broad Form Property Damage;
Personal Injury Liability with employee and contractual exclusions removed; and Delete Exclusions relative to Collapse, Explosion, Underground Property Damage
Hazards, and Hostile Fire.
The coverage required in this Subparagraph shall cover CMAR firm and any applicable subcontractor.
Comprehensive Automobile Liability
Combined Single Limit of $1,000,000 per occurrence
This policy shall be on a form acceptable to City of Amarillo, written to cover all owned, hired and non-owned automobiles. The policy shall be endorsed to include City of Amarillo as additional insured, and state that this insurance is primary insurance as regards any other insurance carried by the City of Amarillo.
Umbrella Excess Liability Insurance
Bodily Injury/Property Damage $5,000,000 per occurrence
(Occurrence Basis) $5,000,000 aggregate
This policy shall be on a form acceptable to City of Amarillo, written on an umbrella/excess basis above coverages as described in 7.2.2 above and 7.2.5 below, endorsed to include City of Amarillo as an additional insured (City of Amarillo shall be named as Additional Insured on the policies required in 1.2.2 and 1.2.5), and state that this insurance is primary insurance as regards any other insurance carried by City of Amarillo. In addition, the policy shall be endorsed to provide defense coverage obligations. The coverage required in this Section 1.2.3 shall cover CMAR Firm and subcontractors.
BUILDER'S RISK INSURANCE. CMAR firm shall carry, at its sole expense, completed value form…