This document is the last page of a proposal submission form for the City of Amarillo, Texas, related to a Construction Manager at Risk solicitation for the construction of two water wastewater plants and upgrades to existing facilities (RFP 201-27). The bidder certifies that it has visited each site and examined all contract documents. The proposal structure allows for either individual unit-priced items or a lump-sum all-inclusive summation item, with the City responsible for checking bid extensions and correcting mathematical errors. Upon bid acceptance, the successful bidder must execute the formal contract and deliver performance, maintenance, and payment bonds along with a certificate of insurance within ten calendar days. Work must commence within ten calendar days of receiving a notice to proceed and must be completed within thirty days using a crew appropriately sized for the project scope.
Bid security of not less than five percent of the total bid amount must be attached and will be forfeited if the contractor fails to execute the contract, bonds, and insurance documentation within the specified timeframe. The form includes signature blocks for authorized representatives and a section acknowledging receipt of up to five addenda. Contact information fields are provided for the bidder's business address, telephone, facsimile, and email. No specific pricing, set-asides, or funding sources are detailed on this final proposal page.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAST PAGE OF PROPOSAL
CITY OF AMARILLO, TEXAS
The undersigned hereby declares that he has visited each site and has carefully examined the Contract Documents relating to the Work covered by the bid.
Work order proposal form(s) is/are made up of individual items of materials supplied or services performed for a completed project(s). A unit price is an amount stated in the bid as a price per unit of measurement for such items. The summation of total amount bid for each item is the total cost of the project and the contract amount per project combination instructions. The City will check bid extensions and summation. Mathematical errors will be corrected by the City.
A summation proposal which may consist of more than one proposal is not made up of individual items but will consist of one all inclusive item as a lump sum for the completed project.
The summation item and the project total will be the same.
Upon notice of the acceptance of this bid, the undersigned will execute the formal Contract and will deliver the Performance Bond, Maintenance Bond and Payment Bond, and Certificate of Insurance within ten (10) calendar days. The bid security attached, without endorsement, in the sum of not less than five percent (5%) of the total bid is to be forfeited to the City of Amarillo, Texas in the event the contract and Bonds and Certification of Insurance are not executed within the time above set forth.
The undersigned agrees to begin work within ten (10) calendar days of receipt of a notice to proceed with a crew comparable to the size of the project(s) and will proceed continuously until the final completion of the project within thirty (30) days.
Bid # RFP 201-27 Construction Manager at Risk for the Construction of Two Water Wastewater Plants and Upgrades to Existing Facilities Respectfully submitted, SEAL (If Bidder is a Corporation) Name of Business
By _________________________________ Authorized Representative- Signed Date
Authorized Representative-Typed or printed The undersigned hereby acknowledges the receipt of the following addenda. _____________________________________
Addenda #1 Issued __________ (Date) _____________________________________ Addenda #2 Issued __________ (Date) Business Address – complete Addenda #3 Issued __________ (Date) Addenda #4 Issued __________ (Date) Addenda #5 Issued __________ (Date) _____________________________________ Telephone Number