Chalk Hill Trail Phase 1– TAPP Project 90155
Closed State & local contract opportunity
- Solicitation number
- 2026-006-7091
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15538 Field Offices And Sheds, Construction Type
- 90610 Buildings - Architectural Design
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 90923 Building Construction, Residential (Apartments, Etc.)
- 90954 Home Construction, Single Family
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91240 Demolition Services
- 914 Construction Services, Trades, New Construction
- 95826 Construction Management Services
- UNSPSC codes
- 95120000 Permanent buildings and structures
- 72141511 Digging services
- 81101513 Building construction management
- 30191701 Construction shed
- 30191702 Construction trailer
- 72111100 Multiple unit dwelling construction services
- 72111101 New apartment building construction service
- 72111102 New cooperative construction service
- 72111111 General residential construction contractor service
- 95122101 Residential home
Show all 29
- 72111008 Single family new town home or garden home construction service
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
- 72110000 Residential building construction services
- 72111103 New condominium construction service
- 95122102 Flat or apartment
- 95122105 Retirement home
- 72111006 Single family home new construction service
- 30191700 Construction sheds and trailers
- 95122100 Accommodation buildings and structures
- 95122104 Daycare center
- 95122103 Childrens home
- 72111000 Single family dwelling construction services
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- Point of contact
-
- Marina Valley marina.valley@dallascounty.org (214) 653-7618
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
Dallas County and the City of Dallas are seeking bids for the Chalk Hill Trail Phase 1 Construction Project, a federally-funded transportation improvement initiative under the Trail and Preserve Program (TAPP Project 90155). The project involves constructing approximately 0.88 miles of trail from Ginger Avenue to the intersection of Cockrell Hill Road and Illinois Avenue within a former Burlington Northern Santa Fe Railway right-of-way. Key deliverables include installation of a 12-foot-wide concrete hike and bike trail with 3-foot shoulders, three drainage culverts, four small storm sewers, earthwork (approximately 3,956 cubic yards), railing, signage, and pavement markings. The bid (number 2026-006-7091) is due on January 15, 2026, at 2:00 p.m. CST, with two pre-bid conferences scheduled for December 11 and December 18, 2025, at 2:00 p.m. via Microsoft Teams. Contractors must complete all improvements within 277 working days and attend a pre-construction conference before commencing work. A 5% bid guaranty is required, and bidders must submit pricing through multiple schedules covering paving, removals, pavement markings, signs, drainage, traffic items, utilities, stormwater pollution prevention, and environmental disposal.
The project has specific requirements for potential contractors, including mandatory registration in the SAM.gov database and compliance with federal regulations such as Davis-Bacon wage requirements, Buy America provisions, and Title VI nondiscrimination requirements. Contractors must also comply with TPDES stormwater permits and various state and local special provisions. Electronic submission through BidNet Direct is preferred, with hard copy submissions also accepted at the Dallas County Purchasing Department. The contract includes performance bonds, payment bonds, and maintenance/warranty bonds, each equal to 100% of the contract amount. Liquidated damages will be assessed on a sliding scale from $65 to $2,500 per day depending on contract value, with 5% retainage held on all payments. While no specific set-aside designations are mentioned, the project appears to be open to qualified contractors who can meet the extensive federal and local compliance requirements. The estimated base bid for environmental disposal items alone is approximately $100,000, suggesting a potentially significant overall project value.
Files
| File | Type | Posted |
|---|---|---|
| Bid Book 2026-006-7091 Chalk Hill Trail Phase 1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity