Air Traffic Control Tower Communications and Weather Station Package
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66888-NONST-2027-000000006
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 03509 Aircraft Communications Radio
- 06036 Electrical Accessories: Alternators, Ammeters, Distributors, Generators, Regulators, Starters, Etc.
- 07502 Alarm Systems, Visual And Audio (For Electrically And Mechanically Operated Doors)
- 20458 Modems, External, Data Communications
- 20620 Communication Boards: Fax, Modem (Internal), Network Cards, Etc.
- 20621 Communication Control Units: Concentrators, Multiplexers, Couplers, Etc.
- 20623 Communication Processors And Protocol Converters: Front-End Processor, Network Interface Module, Protocol Interchange, Switching Controls, Etc.
- 20659 Modems, External Data Communications
- 20827 Communications: Networking, Linking, Etc. (Includes Clustering Software)
- 20928 Communications: Networking, Linking, Etc.
Show all 39
- 28029 Communications/Telecommunications Cable And Wire
- 28509 Cabinets, Electrical Service Entrance
- 28515 Coatings, Protective, Electrical
- 28517 Conduit And Fittings, Fiber And Asbestos-Cement
- 28525 Current Collection Equipment And Accessories, Electrical
- 28569 Misc. Electrical Equipment And Supplies (Not Otherwise Classified)
- 28595 Wiring Devices: Adapters, Caps, Connectors, Extension Cords, Fluorescent And Hp Starters, Outlets, Plates And Covers, Plugs, Receptacles, Safety Cord Lock, Switches, Terminals, Etc. (Incl. Recycled Electrical Products, Supplies)
- 45025 Cords, Power, Electrical
- 72531 Monitoring, Surveillance And Intrusion Detection Systems, Telecommunications Network (Effective 3-1-07 This Class-Item Inactivated For New Use, Refer To 838-83)
- 72647 Frequency Data Communication Equipment, Radio (Including Identification Equipment)
- 83823 Batteries, Communication (Radio, Telephone, Etc)
- 83828 Cable, Copper (Cat. 5E 6 Etc) Including Interconnecting Components And Accessories (See Class 280 For Other Communications Cable)
- 83833 Communications: Networking, Linking, Fiber Modems, Power Over Ethernet, Wireless
- 83834 Communication Security Systems
- 83835 Communication Systems, Integrated (Includes Telephone, Clock, Intercom, Etc.)
- 83846 Emergency Simultaneous Communication Systems (Voice, E-Mail, Text)
- 83885 Telecommunication Parts And Accessories (Not Otherwise Classified)
- 83896 Wire And Cable, Telecommunication (Not Otherwise Specified)
- 90526 Air Traffic Control Services
- 90684 Telecommunications Systems (Telephone, Radio, Etc.) - Architectural
- 91082 Wiring And Other Electrical Maintenance And Repair Services
- 91316 Construction, Communication Equipment (Includes Antenna Towers)
- 91341 Construction, Power Line (Includes Installation, Maintenance, And Repair)
- 91429 Communication Systems, Including Infrastructure
- 91438 Electrical
- 91579 Telecommunication Services (Not Otherwise Classified)
- 91597 Wiring Services, Data/Voice
- 96218 Cable Construction, Installation And Maintenance (Fiber Optic, Communication, Computer, Etc.)
- 96735 Communications Equipment Manufacturing Services
- Point of contact
-
- Laura Schechtel laura.schechtel@mbakerintl.com (678) 966-6638
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Peachtree City Airport Authority is requesting bids on supply, installation, testing, and commissioning of an Air Traffic Control Tower communications and weather system for Atlanta Regional Airport–Falcon Field in Fayette County, Georgia, with bids due September 17, 2026 at 2:00 p.m. The central qualification filter is demonstrated prior experience installing, configuring, and integrating equivalent equipment at a minimum of three locations within the last five years in compliance with FAA Advisory Circular 90-93A and the FAA Contract Tower Minimum Equipment List; bidders must submit copies of FCC radiotelephone licenses for radio certification. The Airport retains the right to refuse unqualified contractors regardless of bid price.
The scope includes Voice Communications Control System handsets, four VHF transmitters and receivers, one ATIS transmitter, antennas with polyphasers, voice recorders, GPS-synchronized clocks, weather equipment (Non-FAA AWOS I Secondary), tower 911 hotline crash phones, uninterruptible power supplies, controller chairs, flight strip bays, cabling, and wiring, plus a new Airfield Lighting Control Panel and Secondary Weather Wind Sensor tower. All equipment must comply with the Federal Contract Tower FAA Minimum Equipment List. The contractor must provide all labor, tools, materials, and equipment; perform installation, wiring, connecting, adjusting, testing, commissioning, and training; and warrant all items.
The contract duration is ninety consecutive calendar days from the Notice-to-Proceed, commencing within ten calendar days of that notice and beginning after main ATCT construction completion. Liquidated damages are assessed at $1,000 per day for failure to meet the 90-day deadline. The project is funded under the Airport and Airway Safety and Capacity Act of 1987 and is subject to Davis-Bacon prevailing wages, equal employment opportunity requirements, Buy American preferences, and debarment certifications. A non-mandatory but recommended virtual pre-bid conference is scheduled for August 26, 2026 at 2:30 p.m. Questions are due September 7, 2026 at 5:00 p.m. Bid security is 5% of the total bid amount; 100% Performance and 100% Payment Bonds are required upon award. The Office of Engineer is Michael Baker International, with Laura Schechtel as the primary contact (Laura.Schechtel@mbakerintl.com, 678-966-6638).
Opportunity text
This project consists of supplying, installation, test and commission of the new Atlanta Regional Airport Falcon Field Airport ¿ Air Traffic Control Tower (ATCT) Communications and Weather Equipment. Deliver a fully operational communications and weather system that is in compliance with the Federal Contract Tower FAA Minimum Equipment List. Contractor shall provide all labor, tools, materials and equipment and perform all work required for the installation, wiring, connecting, adjusting, testing, commissioning and training and warranting of all items. A new Airfield Lighting Control Panel and Secondary Weather Wind Sensor tower is included in this scope. The Contractor¿s installers shall provide evidence of prior experience on at least three (3) locations within the last five (5) years where as they have demonstrated the ability to install, configure and integrate all equipment needed to meet FAA minimum equipment standards as laid out in FAA Advisory Circular 90-93A and the FAA Contract Tower Minimum Equipment List. Contractor shall provide copies of FCC radiotelephone license for radio certification. Airport has the right, for any reason, to refuse unqualified Contractors regardless of bid price.
Files
| File | Type | Posted |
|---|---|---|
| C1_Notice _ FINAL.pdf | ||
| 00_FFC Tower Comms IFB _ 20260818.pdf | ||
| FFC_210574_ PreBid Communications Weather St.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity