AH-000-200-001 Design and Construction of a Fire Alarm and Mass Notification System at the Maryland School for the Deaf Columbia Campus

Closed State & local contract opportunity Posted

Solicitation number
BPM036887
State
Maryland
Responses due

Opportunity facts

Jurisdictions

Opportunity details come from emma.maryland.gov. Updated .

About this opportunity

The State of Maryland Department of General Services is issuing a Multi-Step Invitation to Bid (MS-IFB) for Design-Build Construction Services to procure a new campus-wide Fire Alarm and Mass Notification System (FA/MNS) for the Maryland School for the Deaf's Columbia Campus in Ellicott City, Maryland. The project involves the design, partial demolition, and new construction of the integrated FA/MNS system across three campus buildings. Key deliverables include the removal of existing wiring, conduit, and fire alarm components, the reconfiguration and installation of new mass notification system components with an emphasis on visual, textual, and audible notification, upgrades to the existing fire alarm system, owner training, and pre-testing prior to review by the Office of the Maryland State Fire Marshal. The project must comply with all applicable state codes and regulations, as well as National Fire Protection Association (NFPA) requirements. The bid is due on June 6, 2023, and the project has a duration of 486 calendar days for substantial completion and 530 days overall.

The procurement has a 25% Minority Business Enterprise (MBE) participation goal and a 5% Veteran-Owned Small Business Enterprise (VSBE) goal. Waivers may be requested but are not typically granted. No incumbent information or budget range was provided in the documentation. The contract will be awarded to the lowest responsive and responsible bidder.

Opportunity text

This is a Multi-Step Invitation to Bid (MS-IFB) for Design-Build Construction Services for a new campus-wide Fire Alarm and Mass Notification System (FA/MNS) for the Maryland School for the Deaf, at 8169 Old Montgomery Road, Ellicott City, Maryland 21043. The project involves the design, partial demolition and new construction of a FA/MNS in three campus buildings as follows: the demolition and removal from the site of existing wiring, conduit, devices and any other fire alarm and related components not retained in the new design; the reconfiguration and installation of new components of a mass notification system with emphasis on visual and textural information as well as audible notification; existing fire alarm system upgrades to create an integrated FA/MNS; Owner training and proficiency in operation of the FA/MNS; and ongoing pre-testing of the system operation prior to requesting review by the Office of the Maryland State Fire Marshal (FM). Compliance with State codes and regulations, as well as National Fire Protection Association (NFPA) regulations, is required.

Files

File Type Posted
046 - AH-890-110-001 Repl Fire Alarm Baker & Steiner Bldgs Drawings.pdf PDF
046 - AH-892-071-003 Replace Fire Alarm System Construction Drawings.pdf PDF
Addendum #9 - 5-17-2023.pdf PDF
Attachment K - Performance Bond.pdf PDF
Attachment S - Payment of Employee Health Care Expenses Certification.pdf PDF
Baker-Site Plan.pdf PDF
Columbia Campus Map.pdf PDF
Denton 1st Floor South.pdf PDF
Denton 2nd Floor South.pdf PDF
Denton Site Plan-Non-current.pdf PDF
Fire Alarm Testing Report.pdf PDF
Fire Sprinkler Tests.pdf PDF
AH-000-200-001- MS-IFB-Final 4-5-2023.pdf PDF
Addendum #1 - 4-19-2023.pdf PDF
Addendum #3 - 4-25-2023.pdf PDF
Addendum #6 - 5-11-2023.pdf PDF
Addendum #7 - 5-12-2023.pdf PDF
Addendum #8 - 5-16-2023.pdf PDF
Attachment Q - Risk Analysis.pdf PDF
Attachment T - Prevailing Wage Rates Updated '23.pdf PDF
MSD Columbia FA Appendix K- SCM Rev. 3.21_mp3.pdf PDF
Steiner-Baker Site Plan.pdf PDF
Addendum #11 - 6-1-2023.pdf PDF
Addendum #5 - 5-10-2023.pdf PDF
Attachment J - Bid Bond.pdf PDF
Attachment M - Modified DGS Procedure Manual for Professional Services.pdf PDF
Attachment N - General Conditions for Construction Contracts January 18, 2023.pdf PDF
Attachment P - MSD Program Manual.pdf PDF
Denton 1st Floor North.pdf PDF
Steiner A-Floor Plan.pdf PDF
Template - Monthly Usage Report - NEW.xlsx XLSX spreadsheet
Addendum #2 - 4-24-2023.pdf PDF
Addendum #4 - 4-27-2023.pdf PDF
Attachment D - MBE Procedure Manual 2.5.21.pdf PDF
Attachment L - Payment Bond.pdf PDF
Attachment O - DGS Instructions to Bidders for Construction Projects July 1, 2022.pdf PDF
Attachment R - Corporate Diversity Addendum (Version 8.12.2022).pdf PDF
Baker East-Floor Plan.pdf PDF
Baker West-Floor Plan.pdf PDF
Denton 2nd Floor North.pdf PDF
Steiner B-Floor Plan.pdf PDF
Addendum #10 - 5-23-2023.pdf PDF
Show all 42

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors