751/21078. GAG; Ludington SP - Big Sable Point Lighthouse
Awarded State & local contract opportunity Posted
- Solicitation number
- RFQ 171 220000000334 3
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 95121600 Transport buildings and structures
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121008 Warehouse construction and remodeling service
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
Show all 19
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
- 72121004 Paper or pulp mill construction and remodeling service
- 72121501 Chemical plant construction service
- 95122402 Cold storage installation
Updated .
About this opportunity
The State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division, in coordination with the Michigan Department of Natural Resources, is procuring shoreline protection and erosion control services for the Big Sable Point Lighthouse located at Ludington State Park. The primary scope of work involves replacing approximately 400 linear feet of steel sheet pile cap on an existing sheet pile wall at specified locations, with construction access restricted to a 1.9-mile sandy gravel road through sensitive dune areas requiring construction mats and restoration of staging areas. Original scope elements including placement of approximately 300 tons of 3-to-6-ton armor stone on the lakeward side and installation of 270 cubic yards of MDOT heavy rip-rap over geotextile fabric on the landward side have been deleted from the current contract pursuant to Addendum No. 1, which cited changed site conditions and lower Lake Michigan water levels. Qualified contractors must demonstrate experience with similar shoreline protection projects, provide a project superintendent and references, submit experience modification ratings upon request, and comply with all state and federal environmental regulations including Soil Erosion and Sedimentation Control (SESC) requirements, EGLE and USACE permits, and prevailing wage standards. The mandatory pre-bid conference and site tour occurred on May 18, 2022, at 10:00 a.m.; questions were due by June 1, 2022, at 2:00 p.m. EST; electronic bids through the SIGMA VSS portal were due June 8, 2022, at 2:00 p.m. EST; and contract award was anticipated by July 19, 2022, with construction scheduled from October 15, 2022, to December 15, 2022 (100 calendar days from notice to proceed).
The contract includes a 10-percent preference applied to qualified disabled veteran (QDV) bidders meeting specified criteria, and award will be made to the lowest responsive, responsible bidder. Michigan-based business certification is required for bids exceeding $100,000. A five-percent bid guarantee is mandatory, and performance and payment bonds are required for all bids exceeding $50,000. Provisional and contingency allowances have been deleted from the contract documents and should not be included in bid submissions. Liquidated damages of $500 per calendar day apply for delays beyond the December 15, 2022, completion date. No incumbent vendors or current contractors are identified in the procurement documents. The contract requires compliance with prevailing wage requirements per the Mason County Prevailing Wage Rate Schedule (Issue Date April 20, 2022) and is funded by state sources through the Michigan Department of Natural Resources; specific award values or budget ranges are not disclosed in the available documentation, though the project is bid as a lump-sum contract covering mobilization, bonds, insurance, permits, labor, materials, and general conditions costs for the sheet pile cap replacement work.
Opportunity text
751/21078.GAG; Ludington SP - Big Sable Point Lighthouse
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity